Proposal Bldg 2160.xls

XLS spreadsheet 67 KB Posted

Attached to
Roofing Maintenance, Repair and Installation IDIQ Federal contract opportunity
Solicitation number
FA3020-12-R-0008
Issued by
Department of the Air Force Air Education and Training Command

About this file

Price Proposal Building 2160

View the file

Other files for this federal contract opportunity

Other files attached to Roofing Maintenance, Repair and Installation IDIQ, newest first.
File Type Posted
Amendment 5.pdf PDF
PrepProposal conference.pdf PDF
amendment 3.doc DOC document
amendment 1.doc DOC document
amendment 2.doc DOC document
01-G-001-PROJECT LOCATION PLAN.pdf PDF
03-A-102-EXISTING- FILL AND NEW BLDG 4477 ROOF PLAN ELEVATION VIEW AND SECTION.pdf PDF
02-A-101-EXISTING- FILL AND NEW BLDG 2160 ROOF PLAN ELEVATION VIEW AND DETAIL.pdf PDF
07 21 16 Blanket Insulation-1111(Nov).pdf PDF
01 33 00 Project Submittals-1111(Nov).pdf PDF
Proposal Bldg 4477.xls XLS spreadsheet
FA3020-12-R-0008 Solicitation.pdf PDF
Past Performance Questionnaire.pdf PDF
01 11 02 10 Summary of Work-1204(Apr).pdf PDF
01 11 02 30 Contractor Quality Control-1111(Nov).pdf PDF
Schedule B Total.doc DOC document
03-A-102.dwf DWF file
02 82 14 00 15 Asbestos Hazard Control Activities-Roofing-1206(Jun).pdf PDF
07 60 00 Flashing and Sheet Metal-1111(Nov).pdf PDF
07 61 14 Steel Standing Seam Roofing-1111(Nov).pdf PDF
WD TX268.doc DOC document
Site Visit Map.doc DOC document
06 10 00 Rough Carpentry-1111(Nov).pdf PDF
01 33 00A Attachment A-Submittals-1206(Jun).pdf PDF
WD TX6.doc DOC document
Asbestos Bldg 4477 Roof Summary.pdf PDF
Schedule B-First Option-1206.xls XLS spreadsheet
00 00 00 TOC-1206(Jun).pdf PDF
02-A-101.dwf DWF file
01 11 02 10B Attachment B-Forms-1206(Jun).pdf PDF
01 11 02 20 Measurement And Payment-1204(Apr).pdf PDF
07 92 00 Joint Sealants-1111(Nov).pdf PDF
Asbestos Bldg 2160 Roof Summary.pdf PDF
01 78 00 10 Project Closeout-1206(Jun).pdf PDF
07 42 13 Metal Wall Panel-1111(Nov).pdf PDF
07 22 00 Roof and Deck Insulation-1111(Nov).pdf PDF
07 95 00 Maintenance and Repair-1204(Apr).pdf PDF
01-G-001.dwf DWF file
OK14.doc DOC document
Disclosure of Lobbying Activities.pdf PDF
01 62 35 Recycled Recovered Materials-1111(Nov).pdf PDF
Base Pass Forms.doc DOC document
07 51 13 Built Up Asphalt Roofing-1111(Nov).pdf PDF
01 35 26 Governmental Safety Requirements-1111(Nov).pdf PDF
00 00 00 Cover Stamped 1111(Nov).pdf PDF
Schedule of Material Submittals.xls XLS spreadsheet
07 61 14A Attachment A-SSM Details-1111(Nov).pdf PDF
Schedule B-Basic Year-1206.xls XLS spreadsheet
07 31 13 Asphalt Shingle-1111(Nov).pdf PDF
01 11 02 10A Attachment A-Performance Tables-1201(Jan).pdf PDF
Show all 50

Roofing Maintenance, Repair and Installation IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ROOFING MAINTENANCE, REPAIR, AND INSTALALTION
Basic Contract Period
SEED PROJECT COST PROPOSAL
VNVP 111080B: Replace BUR-Bldgs 2160 & 4477

(PROPOSAL SPECIFICALLY FOR BLDG 2160)

Contract Line Item Number (CLIN)DESCRIPTIONUNIT OF MEASUREESTIMATED QUANTITYTo compile, click arrow and un-select "0"
A1000The following CLIN's are common to the DEMOLITION PHASE1
A1001Remove & Dispose Aggregate Surfaced Asphalt BUR Membrane:SQ0.000
A1002Remove & Dispose Aggregate Surfaced Asphalt BUR Membrane, With Asbestos Containing Material (ACM):SQ0.000
A1003Remove & Dispose Shingled Roof System:SQ0.000
A1004Spud & Remove Aggregate Surfacing, Major:SQ0.000
A1005Spud & Remove Aggregate Surfacing, Minor:SF0.000
A1006Remove & Dispose Bituminous Base Flashing with Asbestos Containing Material (ACM):LF0.000
A1007Remove & Dispose Insulation:ISQ0.000
A1008aRemove & Dispose Decking (Wood):SF0.000
A1008bRemove & Dispose Decking (Metal):SF0.000
A1009Remove & Dispose Metal Flashing:LF0.000
A1010Remove & Dispose Miscellaneous Metal:SF0.000
A1011Remove & Dispose Miscellaneous Metal:LB0.000
A1012Remove & Dispose Metal Gutter:LF0.000
A1013Remove & Dispose Metal Downspouts:LF0.000
A1014Remove and Dispose Metal Conductor Head:EA0.000
A1015Remove and Dispose Scupper:EA0.000
A1016Remove & Dispose Ridge Vent:LF0.000
A1017aRemove & Dispose Roof Walk Pads (Concrete):EA0.000
A1018aRemove, Save, & Reinstall Roof Walk Pads (Concrete)EA0.000
A1019Remove and Dispose Roof Hatch-Complete:EA0.000
A1020Remove & Dispose Gravity/Power Vent:EA0.000
A1021Demolish Power/Vent Circuit (to include < =3/4 inch Conduit, Conductor, Boxes, Clamps)LF0.000
A1022Remove & Dispose Wood Blocking/Nailer:LF0.000
A1023Remove & Dispose Pipe Support:EA0.000
A1024Remove & Dispose Equipment Curb:EA0.000
A1025aRemove & Dispose Expansion Joint (Metal):LF0.000
A1025bRemove & Dispose Expansion Joint (Elastomeric):LF0.000
A1026Remove & Dispose Continuous Cleat:LF0.000
A1027Remove & Dispose Pitch Pan:EA0.000
A1028Remove & Dispose Guy Wire Package:EA0.000
A1029Remove & Dispose Sealant Material:LF0.000
A1031Remove & Dispose Flexible Vent Flashing:EA0.000
A1032Roof Coring In Preparation for Re-roofing:EA0.000
A1033Move & Re-Align Satellite Dish:EA0.000
A1034aDisconnect & Reconnect HVAC Condensing Unit (< 5 ton):EA0.000
A1034bDisconnect & Reconnect HVAC Condensing Unit (=> 5 ton & < 10 ton):EA0.000
A1034cDisconnect & Reconnect HVAC Condensing Unit (=> 10 ton & < 15 ton):EA0.000
A1035Disconnect & Reconnect HVAC Package Unit (<16 Ton):EA0.000
A1037Asbestos Report (Report generated as a result of roofing sample taken and tested for Asbestos Containing Material [ACM]):EA0.000
A1038Sampling/Testing of Roofing Material (Minimum of six tests/samples):EA0.000
A1039Notification required by State of Texas for Removal of Roofing Material Containing Asbestos: (Not to exceed $1,000.00/Task Order)SF0.000
A1040Air Monitoring During Asbestos Removal:DAY0
A2000The following CLIN's are common to the NEW CONSTRUCTION PHASE1
A2001Dimensional or Miscellaneous Lumber/Wood Decking:BF0.000
A2002Plywood Decking:ISF0.000
A2003Metal Decking:SF0.000
A2004aRemove, Save, and Re-Install Splash Block (Concrete):EA0.000
A2004bRemove, Save, and Re-Install Splash Block (Aluminum):EA0.000
A2005aSplash Blocks (Concrete):EA0.000
A2005bSplash Blocks (Aluminum):EA0.000
A2007aApply Paint (Enamel):SF0.000
A2007bApply Paint (High Temperature Enamel):SF0.000
A2008Remove, Save, and Re-Install Roof Hatch-Complete:EA0.000
A2009Roof Hatch-Complete:EA0.000
A2010Remove, Save, & Re-Install Gravity/Power Vent:EA0.000
A2011Disconnect & Reconnect Electrical Service < 200 amp:EA0.000
A2013Extend Power/Vent Circuit (includes up to 1/2 inch EMT Conduit, Conductor, Boxes, Clamps):LF0.000
A2014aInsulation Board (perlite):ISQ0.000
A2014bInsulation Board (mineral fiber):ISQ0.000
A2014cInsulation Board (thermal, polyurethane, or polyisocyanurate):ISQ0.000
A2015aFaced Insulation (Blanket):SF0.000
A2015bFaced Insulation (Batt):SF0.000
A2016½" Recover Board:SQ0.000
A2017Tapered Edge Strip:LF0.000
A2018aPerlite Cricket (1/4"/Foot Slope):SQ0.000
A2018bPerlite Cricket (1/2"/Foot Slope):SQ0.000
A2019aTapered Perlite Insulation (1/16 inch/Foot Slope):SQ0.000
A2019bTapered Perlite Insulation (1/8 inch/Foot Slope):SQ0.000
A2019cTapered Perlite Insulation (1/4 inch/Foot Slope):SQ0.000
A2019dTapered Perlite Insulation (1/2 inch/Foot Slope):SQ0.000
A2020Cant Strip:LF0.000
A2021Wood Blocking/Nailer:BF0.000
A2022aUnderlayment (Built Up Roof):SQ0.000
A2022bUnderlayment (Shingle Roof):SQ0.000
A2023aComposition Shingles (3-Tab):SQ0.000
A2023bComposition Shingles (Shadow Tone):SQ0.000
A2024aAsphalt Built-Up Roofing Membrane & Aggregate (3-Ply):SQ0.000
A2024bAsphalt Built-Up Roofing Membrane & Aggregate (4-Ply):SQ0.000
A2025aFlood Coat & Aggregate Application (Small Area):SF0.000
A2025bFlood Coat & Aggregate Application (Large Area):SQ0.000
A2026Glass Fiber Cap SheetSQ0.000
A2027Eaves Flashing (Ice Dam-Shingle Roof)SF0.000
A2028Edge Envelope:LF0.000
A2029Provide & Install 3-Ply Strip-In:LF0.000
A2030Base Flashing Sheet:LF0.000
A2031aProvide & Install Walkway (Asphalt Plank):SF0.000
A2032aPlumbing Vent Flashing (<2”):EA0.000
A2032bPlumbing Vent Flashing (=>2” & <3”):EA0.000
A2032cPlumbing Vent Flashing (=>3” & <4”):EA0.000
A2032dPlumbing Vent Flashing (=>4” & <6”):EA0.000
A2032ePlumbing Vent Flashing (=>6”):EA0.000
A2033aFlexible Vent Pipe Flashing (<2”)EA0.000
A2033bFlexible Vent Pipe Flashing (=>2” & <3”):EA0.000
A2033cFlexible Vent Pipe Flashing (=>3” & <4”)EA0.000
A2033dFlexible Vent Pipe Flashing (=>4” & <6”)EA0.000
A2033eFlexible Vent Pipe Flashing (>6”)EA0.000
A2034Roof Drains:EA0.000
A2035Provide and Install Roof Drain Strainer:EA0.000
A2036Provide and Install Roof Drain Clamping Ring:EA0.000
A2037Remove, Save, & Reinstall Metal Edge/Fascia:LF0.000
A2038aEdge/Fascia (mill finished aluminum):SF0.000
A2038bEdge/Fascia (pre-finished aluminum):SF0.000
A2038cEdge/Fascia (galvanized steel):SF0.000
A2038dEdge/Fascia (Kynar finished galvanized steel):SF0.000
A2039Remove, Save, & Reinstall Metal Counter Flashing:LF0.000
A2040aMetal Counter Flashing (mill finished aluminum):SF0.000
A2040bMetal Counter Flashing (pre-finished aluminum):SF0.000
A2040cMetal Counter Flashing (galvanized steel):SF0.000
A2040dMetal Counter Flashing (Kynar finished galvanized steel):SF0.000
A2041Remove, Save, & Reinstall Draw Bar:LF0.000
A2042aDraw Bar (mill finished aluminum):LF0.000
A2042bDraw Bar (galvanized steel):LF0.000
A2043Remove, Save, & Reinstall Reglet/Receiver:LF0.000
A2044aReglet/Receiver (mill finished aluminum):LF0.000
A2044bReglet/Receiver (pre-finished aluminum):LF0.000
A2044cReglet/Receiver (galvanized steel):LF0.000
A2044dReglet/Receiver (Kynar finished galvanized steel):LF0.000
A2045Remove, Save, & Reinstall Metal Coping:LF0.000
A2046aMetal Coping (mill finished aluminum):SF0.000
A2046bMetal Coping (pre-finished aluminum):SF0.000
A2046cMetal Coping (galvanized steel):SF0.000
A2046dMetal Coping (Kynar finished galvanized steel):SF0.000
A2047aMetal Drip Edge-Shingles (Eave)LF0.000
A2047bMetal Drip Edge-Shingles (Rake)LF0.000
A2048aRemove, Save, & Reinstall Expansion Joint (metal):LF0.000
A2048bRemove, Save, & Reinstall Expansion Joint (elastomeric):LF0.000
A2050aElastomeric Expansion Joint (4 inch Width):LF0.000
A2050bElastomeric Expansion Joint (6 inch Width):LF0.000
A2050cElastomeric Expansion Joint (8 inch Width):LF0.000
A2051Remove, Save, & Reinstall Miscellaneous Metal:LB0.000
A2052Remove, Save, & Reinstall Miscellaneous Metal:LF0.000
A2053aMiscellaneous Metal Flashing (mill finished aluminum):SF0.000
A2053bMiscellaneous Metal Flashing (pre-finished aluminum):SF0.000
A2053cMiscellaneous Metal Flashing (galvanized steel):SF0.000
A2053dMiscellaneous Metal Flashing (uncoated steel):SF0.000
A2054aMiscellaneous Metal (mill finished aluminum):LB0.000
A2054bMiscellaneous Metal (galvanized steel):LB0.000
A2054cMiscellaneous Metal (uncoated steel):LB0.000
A2055Remove, Save, & Reinstall Gutter:LF0.000
A2056aGutter (mill finished aluminum):LF0.000
A2056bGutter (pre-finished aluminum):LF0.000
A2056cGutter (galvanized steel):LF0.000
A2056dGutter (Kynar finished galvanized steel):LF0.000
A2056eGutter (Paint Finished):LF0.000
A2057Remove, Save, & Reinstall Downspout:LF0.000
A2058aDownspouts (mill finished aluminum):LF0.000
A2058bDownspouts (pre-finished aluminum):LF0.000
A2058cDownspouts (galvanized steel):LF0.000
A2058dDownspouts (Kynar finished galvanized steel):LF0.000
A2058eDownspouts (Paint Finished):LF0.000
A2059Remove, Save, and Reinstall Conductor Heads::EA0.000
A2060aConductor Heads (mill finished aluminum):EA0.000
A2060bConductor Heads (pre-finished aluminum):EA0.000
A2060cConductor Heads (galvanized steel):EA0.000
A2060dConductor Heads (Kynar finished galvanized steel):EA0.000
A2061Remove, Save, and Reinstall Scupper::EA0.000
A2062aScupper (Through Wall):EA0.000
A2062bScupper (Over Flow):EA0.000
A2062cScupper (Raised Edge):EA0.000
A2063Remove, Save, & Reinstall Continuous Cleat:LF0.000
A2064aContinuous Cleat (Mil Finished Aluminum):LF0.000
A2064bContinuous Cleat (Galvanized Steel):LF0.000
A2065Remove, Save, and Reinstall Pitch Pan:EA0.000
A2066Pitch Pan:EA0.000
A2067Remove, Save, & Reinstall Ridge Vents:LF0.000
A2068aRidge Ventilator (BUR):LF0.000
A2068cRidge Ventilator (Shingle):LF0.000
A2069Remove, Save, & Reinstall Metal Wall Panel:SF0.000
A2070aPre-Manufactured Pipe Support (By Miro Model 1.5):EA0.000
A2070bPre-Manufactured Pipe Support (Miro Model 3-R-2 or 3-R-4)EA0.000
A2070cPre-Manufactured Pipe Support (Miro Model 5-R, 5-RAH-7, OR 5-RAH-12)EA0.000
A2072Remove, Save, & Re-Install Guy Wire Package:EA0.000
A2073Guy Wire Package:EA0.000
A2075One Way Vent:EA0.000
A2076Prepare Surface & Seal Joint, Receiver, Reglet or Coping Stone Joint:LF0.000
A2077Warranty Sign:EA0.000
A2078aStructural Standing Seam Metal Roofing (trapezoidal profile-paint finish):SF0.000
A2078bStructural Standing Seam Metal Roofing (vertical leg profile-paint finish):SF0.000
A2079Sub-Purlins:LF0.000
A2080Hat Channel:LF0.000
A2081Rake Fascia:LF0.000
A2082Eave Fascia:LF0.000
A2083Wall to Roof Flashing:LF0.000
A2084Valley Flashing:LF0.000
A2085Hip FlashingLF0.000
A2086Ridge FlashingLF0.000
A2087Custom FlashingSF0.000
A2088aSoffit Panel (Perforated)SF0.000
A2088bSoffit Panel (Non-Perforated)SF0.000
A2089aWall Panel (Concealed Fastener-Paint Finish):SF0.000
A2090aRooftop Equipment Curb: (<4 SF)EA0.000
A2090bRooftop Equipment Curb: (=>4 SF & <9 SF)EA0.000
A2090cRooftop Equipment Curb: (=>9 SF & <16 SF)EA0.000
A2090dRooftop Equipment Curb: (=>16 SF & <25 SF)EA0.000
A2091aGable Vents (<4 SF):EA0.000
A2091bGable Vents (=>4 SF & <9 SF):EA0.000
A2091cGable Vents (=>9 SF & <16 SF)EA0.000
A2091dGable Vents (=>16 SF & <25 SF):EA0.000
A2091eGable Vents (=>25 SF & < 36 SF)EA0.000
A2092aRidge Ventilator (continuous operable) :LF0.000
A2092bRidge Ventilator (fixed low profile) :LF0.000
A2093aExtend Plumping Vents (<2”)LF0.000
A2093bExtend Plumping Vents (=>2” & <3”)LF0.000
A2093cExtend Plumping Vents (=>3” & <4”)LF0.000
A2093dExtend Plumping Vents (=>4” & <6”)LF0.000
A2093eExtend Plumping Vents (>6”)LF0.000
A2094aExtend Hot Flue Stacks: (<4”):LF0.000
A2094bExtend Hot Flue Stacks: (=>4” & <6”):LF0.000
A2094cExtend Hot Flue Stacks: (=>6” & <8”):LF0.000
A2094dExtend Hot Flue Stacks (=>8” & <10”):LF0.000
A2094eExtend Hot Flue Stacks (=>10” & <12”):LF0.000
A2094fExtend Hot Flue Stacks (=>12” & <14”):LF0.000
A2094gExtend Hot Flue Stacks: (=>14” & <16”):LF0.000
A2094hExtend Hot Flue Stacks: (=>16” & <18”):LF0.000
A2094iExtend Hot Flue Stacks: (>18”):LF0.000
A2095Extend Ductwork:LB0.000
A2096Steel Structural Framing System:SF0.000
A3000The following CLIN's are common to the REPAIR PHASE1
A3001Clear Clogged Roof Drain:EA0.000
A3002Clear Underground Drainage System at Downspout:EA0.000
A3003Clean Gutter/Downspout Filled With Leaves, Dirt, Or Other Debris:LF0.000
A3004Repair Open Laps in Metal Counter Flashing:LF0.000
A3005Repair Open Laps in Metal Coping:LF0.000
A3006aRepair Laps/Seams in Expansion Joints (Metal):LF0.000
A3006bRepair Laps/Seams in Expansion Joints (Elastomeric):LF0.000
A3007Repair Interior Gutters with Minor Deterioration:LF0.000
A3008Repair Bituminous Coating, Exposed (Asphalt Bitumen):SF0.000
A3009Repair Bituminous Coating, Weathered Severely Over Entire Area (Asphalt Bitumen):SQ0.000
A3010Repair Exposed Felts (Asphalt Bitumen):SF0.000
A3011aRepair Exposed & Partially Disintegrated Felts (Asphalt Bitumen-Small Area):SF0.000
A3011bRepair Exposed & Partially Disintegrated Felts (Asphalt Bitumen-Large Area):SQ0.000
A3012aRepair Blisters, Buckles, or Ridges (Asphalt Bitumen-Small Area):SF0.000
A3012bRepair Blisters, Buckles, or Ridges (Asphalt Bitumen-Large Area):SQ0.000
A3013Repair Roof Membrane Splits (Asphalt Bitumen):LF0.000
A3014Repair Bituminous Base Flashing (Asphalt Bitumen):LF0.000
A3015Repair Metal Counter Flashing Separated from Vertical Surface:LF0.000
A3016Repair Holes, Splits, or Deterioration in Strip-in Flashing (Asphalt Bitumen):LF0.000
A3017Repair Damaged Composition ShingleEA0.000
A3018Repair Exposed Felts (Composition Shingle):SF0.000
A3019Repair Hip or Ridge Flashing Separated from Roof.LF0.000
A3020Repair Open Laps in Hip or Ridge Flashing:EA0.000
A3021Replace Damaged or Missing Hip or Ridge Flashing.LF0.000
A3022Repair Rake or Eave Flashing Separated from Roof.LF0.000
A3023Repair Open Laps in Rake or Eave Flashing.EA0.000
A3024Replace Damaged or Missing Rake or Eave Flashing.LF0.000
A3025Repair Valley Flashing Separated from Roof.LF0.000
A3026Repair Open Laps in Valley Flashing.EA0.000
A3027Replace Damaged or Missing Valley Flashing.LF0.000
A3028Manually Re-Seal Open Seam in Standing Seam RoofLF0.000
A3029Install Expansion Joint to Replace Open Sean in Standing Seam Metal RoofLF0.000
A3030Repair Open Laps in Roof Panels of Standing Seam Metal RoofLF0.000
A3031Repair Rips, Tears, or Penetrations in Roof Panel:SF0.000
A3032Remove and Replace exposed gasketed fasteners (Lot contains 500 fasteners)LOT0.000
A3033Repair Wall-to-Roof Flashing in Metal RoofsLF0.000
A3034Repair Curb Flashing in Metal RoofsLF0.000
A3035aReplace Upper Closure Strip for Metal Roofs (used at metal flashing-to-roof panel loctions)LF0.000
A3035bReplace Lower Closure Strip for Metal Roofs (used at roof panel to other metal flashing loctions)LF0
A4000The following CLIN's are common to the MISCELLANEOUS PHASE1
A4001Set-Up/Tear Down (One per building per Task Order)EA0.000
A4002aRemove and Re-Install Lighting Protection/Arresting System (BUR):EA0.000
A4002bRemove and Re-Install Lighting Protection/Arresting System (SSM):EA0.000
Company Officer Signature and Date1

&CPage &P of &N Pages

File details come from the government source that posted it. Updated .