Luke_Appendix_C_v2.docx

DOCX document 35 KB Posted

Attached to
F-16 Aircraft Maintenance for Taiwan
Solicitation number
FA3002-16-R-0005
Issued by

About this file

Attachment 1 (Cont'd) - PWS Appendix C

View the file

Other files

File Type Posted
Taiwan_F-16_Mx_-_Industry_Question_Spreadsheet_Round_5.xlsx XLSX spreadsheet
FA3002-16-R-0005-06.pdf PDF
Taiwan_F-16_Mx_-_Industry_Question_Spreadsheet_Round_4.xlsx XLSX spreadsheet
Attachment_11_-_Inst_to_Annual_Sortie_Arcft_Adj_Vol1_Amd_5.pdf PDF
Luke_Appendix_3A_Amd_5.pdf PDF
01_01_Luke_Expectations_Section_Amd_5.pdf PDF
00_00_Luke_AFB_TOC_Amd_5.pdf PDF
03_02_Luke_Service_Summary_Amd_5.pdf PDF
03_01_Luke_Aircraft_MaintenanceTaiwan_FMS_Supply_Warehouses_Amd_5.pdf PDF
Attachment_12_-_Seniority_List.docx DOCX document
02_01_Luke_Applicable_to_All_Services_Amd_5.pdf PDF
Attachment_7_-_Small_Business_Subcontracting_Checklist_Amd_5.docx DOCX document
FA3002-16-R-0005-05.pdf PDF
Industry_Question_Spreadsheet_Round_3.xlsx XLSX spreadsheet
Taiwan_F-16_Mx_-_Industry_Question_Spreadsheet_Round_2.xlsx XLSX spreadsheet
FA3002-16-R-0005-04.pdf PDF
02_01_Luke_All_Services_V7_Amd_3.doc DOC document
03_03_Luke_General_Information_V3_Amd_03.doc DOC document
FA3002-16-R-0005-03.pdf PDF
Luke_Appendix_3A_v3_Amd_03.doc DOC document
Industry_Question_Spreadsheet_Round_1.xlsx XLSX spreadsheet
FA3002-16-R-0005-02.doc DOC document
ppi_tool.accdb —
FA3002-16-R-0005-01.pdf PDF
Luke_Appendix_D_v1.docx DOCX document
Attachment_8_-_Question-Comment_Form.doc DOC document
01_01_Luke_Expectations_Section_v3.doc DOC document
05-2023 _Revision_20_dated_7-14-15_(2).pdf PDF
Attachment_7_-_Subcontracting_Plan_Worksheet.xls XLS spreadsheet
CBA-2015-7478.pdf PDF
Luke_Appendix_E_v2.xlsx XLSX spreadsheet
03_02_Luke_Service_Summary_V6.docx DOCX document
Luke_Appendix_3B_v1.doc DOC document
Attachment_3_-_Staffing_Matrix.xlsx XLSX spreadsheet
00_00_Luke_AFB_TOC_V5.docx DOCX document
02_03_Luke_Government_Furnished_Property_and_Services_v1.docx DOCX document
02_01_Luke_V6.doc DOC document
Attachment_11_-_Inst_to_Annual_Sortie_Arcft_Adj.docx DOCX document
Attachment_1_-_Past_Performance_Information_(PPI)_for_Offerors.docx DOCX document
Luke_Appendix_A_v1.docx DOCX document
03_01_Luke_AC_MX_V7.docx DOCX document
21_FS__254_22_Sept.pdf PDF
Attachment_2_-_Subcontractor_Consent_Letter.docx DOCX document
Attachment_4_-_Sample_Client_Authorization_Letter.docx DOCX document
FA3002-16-R-0005.doc DOC document
Luke_Appendix_F_v2.doc DOC document
Luke_Performance_Incentive_Calculator_Attachment_6_(protected).xlsx XLSX spreadsheet
Luke_Appendix_3A_v2.doc DOC document
05-2023 _CBA_Revision_20_dated_7-14-15.txt.pdf PDF
Luke_Appendix_H_V1.docx DOCX document
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA3002-16-R-0005

30 November 2015

Appendix C - Required Reports

TABLE 2C-1. Required Reports

TYPE
TO
FREQ
REQ’D BY
FOD Investigation Report
56 AMXS/CC

56 AMXS/MXAQ

HQ AETC/A4MSP

HQ AETC/A4PM

HQ AETC/A4MAT

As required per a reportable FOD incident AFI 91-223, Chapter 6

All Non-Afterburner Operational Engine Stalls
56 AMXS/CC

56 AMXS/MXAQ

56 FW/SG

HQ AETC/A4MSP

HQ AETC/A4PM

HQ AETC/A4MAT

HQ AETC/SG

As required per All Non-Afterburner Operational Engine Stalls happening
AFMAN 91-223, Para 1.3.2.2.2.
Dropped Object Report
56 AMXS/MXAQ

HQ AETC/A4MAT

HQ AETC/A4PM

HQ AETC/A4MAT

Within 3 hours during normal duty hours or the beginning of the next day if after hours

Provide a monthly report of all dropped objects that occurred during the previous month NLT the 5th day of each month AFI 21-101, AETC SUP Para 2.4.58. and 11.9.3.3.3.

Aircraft Maintenance and Utilization Plan
56 AMXS/CC

56 AMXS/MXAQ

HQ AETC/A4MAT

Weekly Forward all required information to SP PS&D no later than two duty days before the weekly scheduling meeting AETCI 21-104, Chapter 13

Final Monthly Logistics Indicator Report (MLIR) (AETC-A4M(M)7501)
56 AMXS/CC

56 AMXS/MXAQ

HQ AETC/A4MMA

HQ AETC/A4PM

CO

NLT 1600 CST the tenth (10) calendar day following the month being reported
AETCI 21-105 Para 5.2
Key Personnel List
56 AMXS/CC

56 AMXS/MXAQ

HQ AETC/A4PM

CO

NLT Pre-performance conference and when data changes
PWS Section 3-1 Para 3.1.5.3. and 3.1.5.4.
Current List of Employees
56 AMXS/CC

56 AMXS/MXAQ

HQ AETC/A4PM

CO

Within the first seven (7) workdays of each month and as requested by the CO
PWS Section 3-1 Para 3.1.5.5.
Mishap and Incident Occurrences
56 AMXS/CC

56 AMXS/MXAQ

HQ AETC/A4PM

CO

Inform the MAJCOM, within 24 hours, of any significant weapons or armament related issues such as dropped/hung munitions, equipment and aircraft release reliability or deficiency problems, and weapons safety or mishap issues

As required per a mishap and incident occurrences happening IAW AFI 21-101, Para 2.7.16.

AETC SUP, AFI 91-204, Chapter 1

Deficiency Report
56 AMXS/CC

56 AMXS/MXAQ

HQ AETC/A4MAC

OO-ALC/YPXX

As required per a DR event happening
AFI 21-101, Para 11.8.6.3.3. & TO 00-35D-54, all
AFTO IMT 22
56 AMXS/CC

56 AMXS/MXAQ

HQ AETC/A4MAC

OO-ALC/YPXX

As required to recommend a TO change
TO 00-5-19, Chapter 7

Reports sent to: F16 TCG Website (https://www.tcghome.net/taiwan)

Time Change Forecast
56 AMXS/CC

56 AMXS/MXAQ

21 FS/RA

NLT 31 Jan each calendar year

Quarterly NLT the 10th working day after the previous month in Jan, Apr, July, and Oct PWS Section 3-1 Para 3.1.25.5.

QC Monthly Summary
56 AMXS/CC

56 AMXS/MXAQ

HQ AETC/A4PM

HQ AETC/A4MMP

NLT the 10th working day after the previous month
PWS Section 3-1 Para 3.1.31.6.
Locker Numbers, Location and The List of Flammable Contents
HAZMAT Pharmacy

56 AMXS/MXAQ

NLT 10 Working after Contract Start Date and Update when Flammable Contents Changes PWS Section 3-1 Para 3.1.40.3.

TO Changes Requiring Hazardous Materials
HAZMAT Pharmacy

56 AMXS/MXAQ

Upon Receipt of TO changes requiring Hazardous Materials
PWS Section 3-1 Para 3.1.40.2.
Training Currency/Proficiency Reports
56 AMXS/MXAQ

HQ AETC/A4PM

HQ AETC/A4MMR

NLT the 5th workday after the previous month
PWS Para 3.1.5.1.
Appendix 3B Annual Workload Estimate Update Reporting
56 AMXS/MXAQ

HQ AETC/A4PM

Yearly NLT one (1) month after each contract period of performance is completed
PWS Para 3.1.6.1.6.

C-1

File details come from the government source that posted it. Updated .