Attachment_11_-_Inst_to_Annual_Sortie_Arcft_Adj_Vol1_Amd_5.pdf

PDF 117 KB Posted

Attached to
F-16 Aircraft Maintenance for Taiwan
Solicitation number
FA3002-16-R-0005
Issued by

About this file

Attachment 11 - Inst to Annual Sortie Arcft Adj Vol1 Amd 5

View the file

Other files

File Type Posted
Taiwan_F-16_Mx_-_Industry_Question_Spreadsheet_Round_5.xlsx XLSX spreadsheet
FA3002-16-R-0005-06.pdf PDF
Taiwan_F-16_Mx_-_Industry_Question_Spreadsheet_Round_4.xlsx XLSX spreadsheet
Luke_Appendix_3A_Amd_5.pdf PDF
01_01_Luke_Expectations_Section_Amd_5.pdf PDF
00_00_Luke_AFB_TOC_Amd_5.pdf PDF
03_02_Luke_Service_Summary_Amd_5.pdf PDF
03_01_Luke_Aircraft_MaintenanceTaiwan_FMS_Supply_Warehouses_Amd_5.pdf PDF
Attachment_12_-_Seniority_List.docx DOCX document
02_01_Luke_Applicable_to_All_Services_Amd_5.pdf PDF
Attachment_7_-_Small_Business_Subcontracting_Checklist_Amd_5.docx DOCX document
FA3002-16-R-0005-05.pdf PDF
Industry_Question_Spreadsheet_Round_3.xlsx XLSX spreadsheet
Taiwan_F-16_Mx_-_Industry_Question_Spreadsheet_Round_2.xlsx XLSX spreadsheet
FA3002-16-R-0005-04.pdf PDF
02_01_Luke_All_Services_V7_Amd_3.doc DOC document
03_03_Luke_General_Information_V3_Amd_03.doc DOC document
FA3002-16-R-0005-03.pdf PDF
Luke_Appendix_3A_v3_Amd_03.doc DOC document
Industry_Question_Spreadsheet_Round_1.xlsx XLSX spreadsheet
FA3002-16-R-0005-02.doc DOC document
ppi_tool.accdb —
FA3002-16-R-0005-01.pdf PDF
Luke_Appendix_D_v1.docx DOCX document
Attachment_8_-_Question-Comment_Form.doc DOC document
01_01_Luke_Expectations_Section_v3.doc DOC document
05-2023 _Revision_20_dated_7-14-15_(2).pdf PDF
Attachment_7_-_Subcontracting_Plan_Worksheet.xls XLS spreadsheet
CBA-2015-7478.pdf PDF
Luke_Appendix_E_v2.xlsx XLSX spreadsheet
03_02_Luke_Service_Summary_V6.docx DOCX document
Luke_Appendix_3B_v1.doc DOC document
Attachment_3_-_Staffing_Matrix.xlsx XLSX spreadsheet
00_00_Luke_AFB_TOC_V5.docx DOCX document
02_03_Luke_Government_Furnished_Property_and_Services_v1.docx DOCX document
02_01_Luke_V6.doc DOC document
Attachment_11_-_Inst_to_Annual_Sortie_Arcft_Adj.docx DOCX document
Attachment_1_-_Past_Performance_Information_(PPI)_for_Offerors.docx DOCX document
Luke_Appendix_A_v1.docx DOCX document
03_01_Luke_AC_MX_V7.docx DOCX document
21_FS__254_22_Sept.pdf PDF
Attachment_2_-_Subcontractor_Consent_Letter.docx DOCX document
Attachment_4_-_Sample_Client_Authorization_Letter.docx DOCX document
FA3002-16-R-0005.doc DOC document
Luke_Appendix_F_v2.doc DOC document
Luke_Performance_Incentive_Calculator_Attachment_6_(protected).xlsx XLSX spreadsheet
Luke_Appendix_3A_v2.doc DOC document
05-2023 _CBA_Revision_20_dated_7-14-15.txt.pdf PDF
Luke_Appendix_H_V1.docx DOCX document
Final_Luke_Performance_Incentive_Plan_Attachment_5-PIP_12_May_15_(2).docx DOCX document
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA3002-16-R-0005

Attachment 11, Instructions to Annual Sortie and Aircraft Inventory Adjustments

Amendment 05

ATTACHMENT 11

Instructions to Annual Sortie and Aircraft Inventory Adjustments

B-1. SORTIE ADJUSTMENTS

a. The number of sorties listed in of TABLE B-1 ORDERING PERIOD (OP) ANNUAL SORTIE PROJECTION/ADJUSTMENT TABLE, Column 1, OP SORTIE PROJECTIONS (Non-Binding for estimates only) represent the Government's best estimate (non-binding) of the number of sorties required to be flown during each OP. However, subject to the limitations of the scope and level of workload identified in the Performance Work Statement (PWS) and Appendices, it shall be understood, the 21P st P Fighter Squadron

(21 FS) Luke AFB, AZ Taiwan F-16 aircraft may be replaced by other Taiwan F-16 aircraft. The Taiwan replacement aircraft may be retrofitted or modified to a different configuration. Neither Taiwan nor the service provider (SP) shall be entitled to equitable adjustment simply by virtue of Taiwan aircraft replacements completed within the scope of Sortie Adjustments section B-1.

b. RESERVED

c. The SP shall be responsible for supporting all flying training requirements for each OP in TABLE B-1 Column 2, OP AFSAT APPROVED SORTIES (Government Unilateral Decision), for the 21 FS.

d. During each OP, TABLE B-1 Column 2, OP AFSAT APPROVED SORTIES (Government Unilateral Decision) and Column 4, AFSAT SORTIE ADJUSTMENT PARAMETERS (+/-7%) will be provided to the SP NLT 60 days prior to the next OP. CO initial notification may be sent by e-mail until TABLE B-1. Columns 2 and 4 are updated by the CO.

e. At the end of each OP, TABLE B-1 Column 2, OP AFSAT APPROVED SORTIES (Government Unilateral Decision) and Column 3, ACTUAL ANNUAL OP 21 FS COMPLETED SORTIES will be reconciled against Column 4, AFSAT SORTIE ADJUSTMENT PARAMETERS (+/-7%) to determine if the adjustment parameters were exceeded. If TABLE B-1 Column 4, AFSAT SORTIE ADJUSTMENT PARAMETERS (+/-7%) is exceeded, the number of sorties exceeded will be identified in Column 5, ACTUAL ADJUSTED SORTIES (Outside the Adjustment Parameters). If the parameter in TABLE B-1 Column 5, ACTUAL ADJUSTED SORTIES (Outside the Adjustment Parameters) is exceeded proceed to paragraph f below.

f. An adjustment to the contract by task order to TABLE B-1 Column 6, OP SORTIE ADJUSTMENT CLIN X005 and Column 7, CONTRACT TASK ORDER NUMBER using the Government accepted SP Sortie Adjustment CLIN X005 Rate in contract Section B to calculate the adjustment price. The cost will be reconciled by the CO and sent to the SP for review/concurrence. SP non-concurrences with adjustments will be addressed to the CO for resolution.

g. The proposal for the SP Sortie Adjustment CLIN X005 Rate in contract Section B shall include projected annual labor rate increases for all affected workers and will follow the Service Contract Labor Standards as amended. The CO accepted Sortie Adjustment CLIN X005 Rate in contract Section B for each OP will not be subject to annual adjustments under the provisions of FAR 52.222-43.

h. EXAMPLE OF SORTIE RECONCILIATION: AFSAT approved sorties for OP 1 of 5 is 2340 sorties.

The 21 FS completed 2505 sorties during OP 1 of 5. The TABLE B-1 Column 4, AFSAT SORTIE ADJUSTMENT PARAMETERS (+/-7%) for OP 1 are (+164/-164). The 21 FS exceeded OP 1 of 5 under TABLE B-1 Column 5, OP ADJUSTED SORTIES (Outside the Adjustment Parameters) by +1 sortie.

THE SORTIE ADJUSTMENT FORMULA: The number of completed sorties listed in TABLE B-1 Column 5, OP ADJUSTED SORTIES (Outside the Adjustment Parameters) for OP 1 of 5 (+1 sortie) times the Sortie Adjustment CLIN 0005 rate in contract Section B (Example Only $1,232). +1 sortie times (x) $1,232 = $1,232 payable to the SP by Taiwan. If the sortie adjustment number is a negative number (example only -1 sortie) the example costs would be payable by the SP to Taiwan. UThis program is an OP annual sortie program.

TABLE B-1. OP/OY ANNUAL SORTIE MANAGEMENT/ADJUSTMENT TABLE (See PWS TABLE 3A-1):

OP

SORTIE

PROJECTIONS

(Non-Binding for estimates Only)

OP AFSAT

APPROVED

SORTIES

(Government

Unilateral Decision)

BINDING

ACTUAL

ANNUAL

OP

21 FS

COMPLETED

SORTIES

AFSAT SORTIE

ADJUSTMENT

PARAMETERS

(+/-7%)

OP ADJUSTED

SORTIES

(Outside the Adjustment Parameters)

OP SORTIE

ADJUSTMENT

CLIN X005

COST

CONTRACT

TASK ORDER OR

MODIFICATION

NUMBER

OP 1 of 5

2430 2430 (+164/-164)

OP 2 of 5

OP 3 of 5

OP 4 of 5

OP 5 of 5

OY 1

OY 2

B-2. AIRCRAFT OFF-STATION RECOVERY

The SP shall only recover aircraft assigned to the 21 FS anywhere in North America. Costs for recovery of 21 FS aircraft shall be included in the CLIN X001, F-16 Aircraft Maintenance (Contract Basic Service Price). However, travel costs for recovery of aircraft will be included in CLIN X003, Travel.

B-3. PRICE ADJUSTMENT FOR CHANGE IN TOTAL ACTIVE INVENTORY (TAI) AIRCRAFT, WITHOUT A

CORRESPONDING INCREASE OR DECREASE IN NUMBER OF SORTIES

a. The number of total active inventory (TAI) aircraft assigned to the 21 FS is listed below in TABLE B-3 Column 2, 21 FS TAI PROJECTIONS (Non-Binding) represents the Government's best estimate (non-binding) of the number of TAI aircraft assigned to the 21 FS as shown for each OP in TABLE B-3.

However, subject to the limitations of the scope and level of workload as described in the Performance Work Statement (PWS) and Appendices, it shall be understood, 21 FS aircraft may be replaced by Taiwan F-16 aircraft and these aircraft may be retrofitted or modified to a different configuration. Taiwan F-16 aircraft replacements are considered within the scope of Section B-3 and neither Government nor the SP shall be entitled to equitable adjustment.

b. RESERVED

c. The SP shall be responsible for providing aircraft maintenance support for the TAI listed for each OP in TABLE B-3 Column 3, 21 FS ASSIGNED TAI (Binding).

d. During each OP, the TAI and parameter amounts in TABLE B-3 Column 3, 21 FS ASSIGNED TAI (Binding) and Column 4, TAI PARAMETER (-/+ 7.5%) will be provided to the SP NLT 60 days prior to the proceeding OP. CO initial notification may be sent by e-mail until Table B-3 is updated by the CO.

e. If the number of 21 FS TAI aircraft (14 TAI) increase/decrease by more than 7.5%, with a corresponding cumulative increase/decrease in the number of projected sorties (annual sortie plan divided by 14) and the aircraft are assigned to the 21 FS fleet for more than 60 calendar days, then the price shall be adjusted using CLIN X006, TAI Monthly Adjustment Rate, in accordance with FAR 52.243-1 Alt I, Change Clause in section I of this contract. Neither Taiwan nor the Government will reassign possessed 21 FS TAI aircraft just to avoid exceeding the 60 calendar days assigned to the 21 FS in an effort to circumvent the intent of SectionB-3 then re-possess the aircraft in the 21 FS without invoking Section B-3. The TAI price proposed by the SP and accepted by the CO for TAI MONTHLY ADJUSTMENT RATE, CLIN X006, represents the SP’s total price per each aircraft increases/decreases over Table B-3 Column 3, 21 FS ASSIGNED TAI (Binding) for each OP. If additional Taiwan F-16 aircraft are assigned/reassigned to/from the 21 FS for more than 60 calendar days, proceed to paragraph f below.

f. TAI adjustments due to increases/decreases in the number of aircraft assigned (if Table B-3 Column 4, TAI PARAMETER (-/+ 7.5%) is exceeded for over 60 calendar days) represent workload changes. Workload consists of variations in preflight, thru-flight, and basic post-flight inspections;

ground handling; servicing; washes; calendar inspections; Time Compliance Technical order (TCTO) and one-time inspection requirements; aircraft repairs and transfer/acceptance inspections etc. A TAI adjustment to the contract will be a Task Order to Table B-3 Column 6, OP TAI MONTHLY ADJUSTMENT CLIN X006 COST and Column 7, CONTRACT TASK ORDER NUMBER using the Government accepted SP TAI Monthly Adjustment Rate, CLIN X006 in contract Section B to calculate the adjustment price. The CO will provide the task order and change TABLE B-3 Column 3, 21 FS ASSIGNED TAI (Binding) to the updated number. Table B-3 Column 6, OP TAI MONTHLY ADJUSTMENT CLIN X006 COST amount will be reconciled between the CO and the SP.

g. Section B, SP TAI Monthly Adjustment Rates, accepted by the CO, will include the projected annual labor rate increases for all affected workers and will follow the Service Contract Labor Standards as amended. SP TAI Monthly Adjustment Rates for each OP will not be subject to annual adjustments under the provisions of FAR 52.222-43.

h. EXAMPLE OF TAI RECONCILIATION: AFSAT approved TAI for OP 1 of 5 is 14 aircraft. The 21 FS received an additional one (1) aircraft from Taiwan (15 TAI) for the final 3 months of OP 1 of 5. The TAI adjustment parameter for OP 1 of 5 is (+1/-1) aircraft for more than 60 calendar days. The 21 FS exceeded OP 1 of 5, Column 4, TAI PARAMETER (-/+ 7.5%) by +1 sortie for over 60 calendar days.

The formula: the number of TAI aircraft outside the parameter of Table B-3 Column 4, TAI PARAMETER (-/+7.5%) for more than 60 calendar days (+1 aircraft for 3 months). The 3 months (possession months) will be multiplied by the contract Section B CLIN X005 TAI Monthly Adjustment Rate (example only:

$1,232) for the corresponding OP.

The calculation: +3 months x $1,232 = $3,696 is payable to the SP by Government. If the sortie number is a negative number (Example Only: -1 sortie for the same period of 3 months) the same cost would be payable by the SP to the Government. UThe TAI adjustment is a monthly adjustment beginning with the date an aircraft is assigned to the 21 FS.

TABLE B-3. TOTAL AIRCRAFT INVENTORY ADJUSTMENT TABLE (See PWS Table 3A-3):

ORDERING

PERIODS

21 FS

TAI

PROJECTIONS

(Non-Binding)

21 FS

ASSIGNED

(Binding)

PARAMETER

(-/+ 7.5%)

ADJUSTED

TAI

(Outside the

Adjustment Parameters)

OP

TAI MONTHLY

ADJUSTMENT

CLIN X006

COST

CONTRACT

TASK

ORDER

NUMBER

OP 1 of 5 13 13 1 OP 2 of 5 13 1 OP 3 of 5 13 1 OP 4 of 5 13 1 OP 5 of 5 14 1

OY 1 14 1

OY 2 14 1

B-4. TAIWAN F-16 AIRCRAFT TRANSFER AND ACCEPTANCE COST DETERMINATION

(Refer to PWS paragraphs 3.1.11, Aircraft Acceptance and Transfer Inspection Program.)

a. Monthly Cost. When the number of assigned Taiwan 21 FS F-16s exceeds the TAI (See table B-

3) Ufor at least 30 calendar days but less than 60 calendar daysU and is the result of an F-16 transfer or acceptance, the monthly cost per aircraft exceeding TAI paid to the SP for the transfer or acceptance will be calculated as follows:

Monthly CLIN X008 Firm Fixed Price for the first two pricing years and CLIN X016 for the remaining years, divided by TAI, equals transfer or acceptance monthly cost times number of aircraft exceeding TAI

Example: $500,000/14 = $35,714.29 (monthly cost per aircraft exceeding TAI) Number of aircraft exceeding 14 TAI = 2 $35,714.29 x 2 = $71,428.57 (total monthly cost of aircraft exceeding TAI)

b. Daily Cost. UAfter exceeding TAI for 30 calendar days but less than 60 calendar daysU, the daily cost per aircraft exceeding TAI paid to the SP as a result of an F-16 transfer or acceptance will be calculated as follows:

Monthly transfer or acceptance cost per aircraft exceeding TAI (see paragraph B-4a.) divided by the number of days in the affected month (up to 29 days) equals the daily transfer or acceptance cost rate times number of aircraft exceeding TAI.

Example: $500,000/14 = $35,714.29 (monthly cost per aircraft exceeding TAI) 18 February = 18 calendar days

$35,714.29/18 = $1984.13 (daily cost per aircraft exceeding TAI) Number of aircraft exceeding 14 TAI = 2 $1984.17 x 2 = $3968.25 (total daily cost of aircraft exceeding TAI)

c. After 60 calendar the TAI Adjustment Section B-3 takes precedence over Section B-4.

B-5. SP VEHICLES

The SP is responsible for providing vehicles for this contract as stated in the PWS. The cost for vehicles proposed to support each contract ordering period shall include G&A and profit. This cost shall be included in Section B, CLIN X001, F-16 Aircraft Maintenance.

File details come from the government source that posted it. Updated .