Attachment 6 - Performance Incentive Calculations
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PI Calculator Example
| Luke Aircraft Maintenance Support Services Performance Incentive | ||||||||||||||
| Metric - Pass/Fail rate reduction set at 5% and 1% as shown | ||||||||||||||
| CLIN PRICING | Monthly FFP | Annual FFP | ||||||||||||
| CLIN | Description | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
| X001 | F-16 Aircraft Maintenance | $ 250,000.00 | $ 250,000.00 | $500,000.00 | ||||||||||
| Example - Amounts are notional for illustration ONLY |
| Metric | Pass Threshold | Rate Reduction | Monthly Performance (Jan - Jun) | ||||||||||||||||||
| Jan | Pass/Fail | PIR | Feb | Pass/Fail | PIR | Mar | Pass/Fail | PIR | Apr | Pass/Fail | PIR | May | Pass/Fail | PIR | Jun | Pass/Fail | PIR | Check Column | |||
| Monthly Aircraft Availability (AA) | 10 | 5% | 10 | Pass | $ - 0 | 10 | Pass | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Monthly Maintenance Loss Rate | 3.0% | 1% | 1.0% | Pass | $ - 0 | 3.5% | Fail | $ 2,500 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 2,500 | ||||||||
| Monthly Repeat | 2.5% | 1% | 2.0% | Pass | $ - 0 | 5.1% | Fail | $ 2,500 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 2,500 | ||||||||
| Monthly Recur | 2.5% | 1% | 2.0% | Pass | $ - 0 | 5.1% | Fail | $ 2,500 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 2,500 | ||||||||
| Monthly Maintenance Scheduling Effectiveness | 95.0% | 1% | 94.5% | Fail | $ 2,500 | 98.0% | Pass | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 2,500 | ||||||||
| $ 2,500 | $ 7,500 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 10,000 | |||||||||||||||
| Monthly Performance (Jul - Dec) | |||||||||||||||||||||
| Metric | Total Fails/Ordering Period | Total PIR | Jul | Pass/Fail | PIR | Aug | Pass/Fail | PIR | Sep | Pass/Fail | PIR | Oct | Pass/Fail | PIR | Nov | Pass/Fail | PIR | Dec | Pass/Fail | PIR | |
| Monthly Aircraft Availability (AA) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Cancel | 1 | $ 2,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 1 | $ 2,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 1 | $ 2,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 1 | $ 2,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Total PIR Cost = | $ 10,000.00 | ||||||||||||||||||||
| Total Annual PIR % = | 2.00% |
| Instructions: |
| 1) Insert monthly FFP for X001 above |
| 2) Insert performance achieved for each month under "Monthly Performance" columns. |
| 3) Apply Performance Incentive Reduction (PIR) to contractor invoices for the associated CLIN. |
| 4) Utilize the tabs below for each ordering period. The ACO will save and retain all period calculations. |
FA3002-16-R-0005
Attachment 6
Ordering Period 1
| Luke Aircraft Maintenance Support Services Performance Incentive | ||||||||||||||
| Metric - Pass/Fail rate reduction set at 5% and 1% as shown | ||||||||||||||
| CLIN PRICING | Monthly FFP | Annual FFP | ||||||||||||
| CLIN | Description | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
| X001 | F-16 Aircraft Maintenance | $0.00 |
| Metric | Pass Threshold | Rate Reduction | Monthly Performance (Jan - Jun) | ||||||||||||||||||
| Jan | Pass/Fail | PIR | Feb | Pass/Fail | PIR | Mar | Pass/Fail | PIR | Apr | Pass/Fail | PIR | May | Pass/Fail | PIR | Jun | Pass/Fail | PIR | Check Column | |||
| Monthly Aircraft Availability (AA) | 10 | 5% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Loss Rate | 3.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 95.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Monthly Performance (Jul - Dec) | |||||||||||||||||||||
| Metric | Total Fails/Ordering Period | Total PIR | Jul | Pass/Fail | PIR | Aug | Pass/Fail | PIR | Sep | Pass/Fail | PIR | Oct | Pass/Fail | PIR | Nov | Pass/Fail | PIR | Dec | Pass/Fail | PIR | |
| Monthly Aircraft Availability (AA) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Cancel | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Total PIR Cost = | $ - 0 | ||||||||||||||||||||
| Total Annual PIR % = | ERROR:#DIV/0! |
| Instructions: |
| 1) Insert monthly FFP for X001 above |
| 2) Insert performance achieved for each month under "Monthly Performance" columns. |
| 3) Apply Performance Incentive Reduction (PIR) to contractor invoices for the associated CLIN. |
| 4) Utilize the tabs below for each ordering period. The ACO will save and retain all period calculations. |
Ordering Period 2
| Luke Aircraft Maintenance Support Services Performance Incentive | ||||||||||||||
| Metric - Pass/Fail rate reduction set at 5% and 1% as shown | ||||||||||||||
| CLIN PRICING | Monthly FFP | Annual FFP | ||||||||||||
| CLIN | Description | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
| X001 | F-16 Aircraft Maintenance | $0.00 |
| Metric | Pass Threshold | Rate Reduction | Monthly Performance (Jan - Jun) | ||||||||||||||||||
| Jan | Pass/Fail | PIR | Feb | Pass/Fail | PIR | Mar | Pass/Fail | PIR | Apr | Pass/Fail | PIR | May | Pass/Fail | PIR | Jun | Pass/Fail | PIR | Check Column | |||
| Monthly Aircraft Availability (AA) | 10 | 5% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Loss Rate | 3.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 95.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Monthly Performance (Jul - Dec) | |||||||||||||||||||||
| Metric | Total Fails/Ordering Period | Total PIR | Jul | Pass/Fail | PIR | Aug | Pass/Fail | PIR | Sep | Pass/Fail | PIR | Oct | Pass/Fail | PIR | Nov | Pass/Fail | PIR | Dec | Pass/Fail | PIR | |
| Monthly Aircraft Availability (AA) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Cancel | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Total PIR Cost = | $ - 0 | ||||||||||||||||||||
| Total Annual PIR % = | ERROR:#DIV/0! |
| Instructions: |
| 1) Insert monthly FFP for X001 above |
| 2) Insert performance achieved for each month under "Monthly Performance" columns. |
| 3) Apply Performance Incentive Reduction (PIR) to contractor invoices for the associated CLIN. |
| 4) Utilize the tabs below for each ordering period. The ACO will save and retain all period calculations. |
Ordering Period 3
| Luke Aircraft Maintenance Support Services Performance Incentive | ||||||||||||||
| Metric - Pass/Fail rate reduction set at 5% and 1% as shown | ||||||||||||||
| CLIN PRICING | Monthly FFP | Annual FFP | ||||||||||||
| CLIN | Description | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
| X001 | F-16 Aircraft Maintenance | $0.00 |
| Metric | Pass Threshold | Rate Reduction | Monthly Performance (Jan - Jun) | ||||||||||||||||||
| Jan | Pass/Fail | PIR | Feb | Pass/Fail | PIR | Mar | Pass/Fail | PIR | Apr | Pass/Fail | PIR | May | Pass/Fail | PIR | Jun | Pass/Fail | PIR | Check Column | |||
| Monthly Aircraft Availability (AA) | 10 | 5% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Loss Rate | 3.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 95.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Monthly Performance (Jul - Dec) | |||||||||||||||||||||
| Metric | Total Fails/Ordering Period | Total PIR | Jul | Pass/Fail | PIR | Aug | Pass/Fail | PIR | Sep | Pass/Fail | PIR | Oct | Pass/Fail | PIR | Nov | Pass/Fail | PIR | Dec | Pass/Fail | PIR | |
| Monthly Aircraft Availability (AA) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Cancel | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Total PIR Cost = | $ - 0 | ||||||||||||||||||||
| Total Annual PIR % = | ERROR:#DIV/0! |
| Instructions: |
| 1) Insert monthly FFP for X001 above |
| 2) Insert performance achieved for each month under "Monthly Performance" columns. |
| 3) Apply Performance Incentive Reduction (PIR) to contractor invoices for the associated CLIN. |
| 4) Utilize the tabs below for each ordering period. The ACO will save and retain all period calculations. |
Ordering Period 4
| Luke Aircraft Maintenance Support Services Performance Incentive | ||||||||||||||
| Metric - Pass/Fail rate reduction set at 5% and 1% as shown | ||||||||||||||
| CLIN PRICING | Monthly FFP | Annual FFP | ||||||||||||
| CLIN | Description | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
| X001 | F-16 Aircraft Maintenance | $0.00 |
| Metric | Pass Threshold | Rate Reduction | Monthly Performance (Jan - Jun) | ||||||||||||||||||
| Jan | Pass/Fail | PIR | Feb | Pass/Fail | PIR | Mar | Pass/Fail | PIR | Apr | Pass/Fail | PIR | May | Pass/Fail | PIR | Jun | Pass/Fail | PIR | Check Column | |||
| Monthly Aircraft Availability (AA) | 10 | 5% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Loss Rate | 3.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 95.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Monthly Performance (Jul - Dec) | |||||||||||||||||||||
| Metric | Total Fails/Ordering Period | Total PIR | Jul | Pass/Fail | PIR | Aug | Pass/Fail | PIR | Sep | Pass/Fail | PIR | Oct | Pass/Fail | PIR | Nov | Pass/Fail | PIR | Dec | Pass/Fail | PIR | |
| Monthly Aircraft Availability (AA) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Cancel | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Total PIR Cost = | $ - 0 | ||||||||||||||||||||
| Total Annual PIR % = | ERROR:#DIV/0! |
| Instructions: |
| 1) Insert monthly FFP for X001 above |
| 2) Insert performance achieved for each month under "Monthly Performance" columns. |
| 3) Apply Performance Incentive Reduction (PIR) to contractor invoices for the associated CLIN. |
| 4) Utilize the tabs below for each ordering period. The ACO will save and retain all period calculations. |
Ordering Period 5
| Luke Aircraft Maintenance Support Services Performance Incentive | ||||||||||||||
| Metric - Pass/Fail rate reduction set at 5% and 1% as shown | ||||||||||||||
| CLIN PRICING | Monthly FFP | Annual FFP | ||||||||||||
| CLIN | Description | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
| X001 | F-16 Aircraft Maintenance | $0.00 |
| Metric | Pass Threshold | Rate Reduction | Monthly Performance (Jan - Jun) | ||||||||||||||||||
| Jan | Pass/Fail | PIR | Feb | Pass/Fail | PIR | Mar | Pass/Fail | PIR | Apr | Pass/Fail | PIR | May | Pass/Fail | PIR | Jun | Pass/Fail | PIR | Check Column | |||
| Monthly Aircraft Availability (AA) | 10 | 5% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Loss Rate | 3.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 95.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Monthly Performance (Jul - Dec) | |||||||||||||||||||||
| Metric | Total Fails/Ordering Period | Total PIR | Jul | Pass/Fail | PIR | Aug | Pass/Fail | PIR | Sep | Pass/Fail | PIR | Oct | Pass/Fail | PIR | Nov | Pass/Fail | PIR | Dec | Pass/Fail | PIR | |
| Monthly Aircraft Availability (AA) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Cancel | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Total PIR Cost = | $ - 0 | ||||||||||||||||||||
| Total Annual PIR % = | ERROR:#DIV/0! |
| Instructions: |
| 1) Insert monthly FFP for X001 above |
| 2) Insert performance achieved for each month under "Monthly Performance" columns. |
| 3) Apply Performance Incentive Reduction (PIR) to contractor invoices for the associated CLIN. |
| 4) Utilize the tabs below for each ordering period. The ACO will save and retain all period calculations. |
Option Period 1
| Luke Aircraft Maintenance Support Services Performance Incentive | ||||||||||||||
| Metric - Pass/Fail rate reduction set at 5% and 1% as shown | ||||||||||||||
| CLIN PRICING | Monthly FFP | Annual FFP | ||||||||||||
| CLIN | Description | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
| X001 | F-16 Aircraft Maintenance | $0.00 |
| Metric | Pass Threshold | Rate Reduction | Monthly Performance (Jan - Jun) | ||||||||||||||||||
| Jan | Pass/Fail | PIR | Feb | Pass/Fail | PIR | Mar | Pass/Fail | PIR | Apr | Pass/Fail | PIR | May | Pass/Fail | PIR | Jun | Pass/Fail | PIR | Check Column | |||
| Monthly Aircraft Availability (AA) | 10 | 5% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Loss Rate | 3.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 95.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Monthly Performance (Jul - Dec) | |||||||||||||||||||||
| Metric | Total Fails/Ordering Period | Total PIR | Jul | Pass/Fail | PIR | Aug | Pass/Fail | PIR | Sep | Pass/Fail | PIR | Oct | Pass/Fail | PIR | Nov | Pass/Fail | PIR | Dec | Pass/Fail | PIR | |
| Monthly Aircraft Availability (AA) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Cancel | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Total PIR Cost = | $ - 0 | ||||||||||||||||||||
| Total Annual PIR % = | ERROR:#DIV/0! |
| Instructions: |
| 1) Insert monthly FFP for X001 above |
| 2) Insert performance achieved for each month under "Monthly Performance" columns. |
| 3) Apply Performance Incentive Reduction (PIR) to contractor invoices for the associated CLIN. |
| 4) Utilize the tabs below for each ordering period. The ACO will save and retain all period calculations. |
Option Period 2
| Luke Aircraft Maintenance Support Services Performance Incentive | ||||||||||||||
| Metric - Pass/Fail rate reduction set at 5% and 1% as shown | ||||||||||||||
| CLIN PRICING | Monthly FFP | Annual FFP | ||||||||||||
| CLIN | Description | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
| X001 | F-16 Aircraft Maintenance | $0.00 |
| Metric | Pass Threshold | Rate Reduction | Monthly Performance (Jan - Jun) | ||||||||||||||||||
| Jan | Pass/Fail | PIR | Feb | Pass/Fail | PIR | Mar | Pass/Fail | PIR | Apr | Pass/Fail | PIR | May | Pass/Fail | PIR | Jun | Pass/Fail | PIR | Check Column | |||
| Monthly Aircraft Availability (AA) | 10 | 5% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Loss Rate | 3.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 2.5% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 95.0% | 1% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Monthly Performance (Jul - Dec) | |||||||||||||||||||||
| Metric | Total Fails/Ordering Period | Total PIR | Jul | Pass/Fail | PIR | Aug | Pass/Fail | PIR | Sep | Pass/Fail | PIR | Oct | Pass/Fail | PIR | Nov | Pass/Fail | PIR | Dec | Pass/Fail | PIR | |
| Monthly Aircraft Availability (AA) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Maintenance Cancel | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Repeat | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Monthly Recur | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| Monthly Maintenance Scheduling Effectiveness | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||
| Total PIR Cost = | $ - 0 | ||||||||||||||||||||
| Total Annual PIR % = | ERROR:#DIV/0! |
| Instructions: |
| 1) Insert monthly FFP for X001 above |
| 2) Insert performance achieved for each month under "Monthly Performance" columns. |
| 3) Apply Performance Incentive Reduction (PIR) to contractor invoices for the associated CLIN. |
| 4) Utilize the tabs below for each ordering period. The ACO will save and retain all period calculations. |
File details come from the government source that posted it. Updated .