Tab_4_-_CAMP_VANCE_AFB_Prospectus_Amendment_0004.pdf
PDF 346 KB Posted
- Attached to
- Vance AFB Base Operations Support Federal contract opportunity
- Solicitation number
- FA3002-13-R-0011
About this file
Tab 4 - CAMP VANCE AFB Prospectus Amendment 0004
View the file
Other files for this federal contract opportunity
Show all 50
Vance AFB Base Operations Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11-Dec-14
PA
Colonel, USAF
Christopher T. Daniels
Installation Risks
Installation Opportunities
Pri
$2,711,400 $401,500
$200,300
SIR
$917,707 $411,600
$7,774,200 $1,554,300
$196,700
Project Number
Project Score
Title
XTLF151022
$292,500 $98,000
Construct Fire Station Bays
XTLF151025C
XTLF141022
XTLF131016R
XTLF131016C
XTLF091011
XTLF121014
XTLF151030
Repair Pavements - Brown Parkway R&M 98.4
142.6
XTLF041026
106.8
140.8
XTLF131035
Repair Apron Lighting Construct Flight Line Shelter Power
Construct SE Quadrant Drainage - Phase I
VANCE AFB
Repair Taxilane at Taxiway E (Pri 1) could force the only Taxiway south on the apron to close, and reroute traffic around the closure. This would cause Vance to close to all transient traffic larger than a T-1A.
Repair Apron Lighting (Pri 4) will provide a brighter safer work environment during night flying weeks. The current lighting is well maintained and functions properly but is very uneven across the apron. Construct Flight Line Shelter Power (Pri 5) is a companion project for this project.
Construct NDI Addition F130 (Pri 2) will provide a proper training room that will also function as a break room. The addition will be away from the X-ray area. Currently anyone in their storage/training/break room has to wear radiation badges since the room has a old door into the X-ray area.
Construct Airfield Lighting (Pri 9) will address two airfield waivers and will eliminate one.
Pri Project Number
Title Program
PA
R&M
146.8
Program
R&M R&M
Sustainment R&M
This Installation Risk Profile illustrates the risk distribution of infrastructure requirements included in the Commander's FY15/16 Integrated Priority List.
The risk narrative below explains how top priority projects impact the installation's mission, and focuses on critical projects that may not have scored well in the risk based model. Additionally, information is provided regarding opportunities to invest in projects that could substantially decrease operations and maintenance costs in the near and long term.
Repair Taxilane at Taxiway E Construct NDI Addition F130 Repair Electrical Distribution Base Wide
Submission Date:
R&M R&M
Commander
Repair Alt CP-CAT F246
R&M
Construct Airfield Lighting
R&M
Low Risk
0 10 20 30 40 50 60 70 80 90 100
C o n se q u en ce o f Fa il u re
Probability of Failure
Risk Matrix
7 89
0 10 20 30 40 50 60 70 80 90 100
Moderate Risk Significant RiskHigh Risk
FY16/17
Self-Assessment of Cost of Ownership Inventories & Programming
0%
| Environmental | Quality |
| Environmental | Restoration |
Hazardous Waste
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0%
0%
Goals: 20 worst systems by 15 May 14; 100% inventory by FY18
Life Cycle Requirements
100% FY17‐21 Reqmts 0%
20 Worst 0%
0%
0% 0%
0%
0%
0% 0%
Note: Funding profile chart above includes requirements programmed within the following programs:
Dorm O&M,EQ,Facility Operations (incl. Real Property), MFH Construction, MFH O&M, MILCON 321,331, P-341, R&M, and Sustainment
100% Inventory
0%
0%
| Facilities | ‐ | Mechanical/HVAC | |
| Facilities | ‐ | Structures/Finishes | |
| Facilities | ‐ | Interior | Utilities |
Service Contracts (Big 3)
0% 0%
Pavements
Utilities ‐ Electrical
0% 0% 0%
The table above is not populated because maintaining the AMPs is not part of the current Base Operating Support (BOS) contract. The initial Vance AFB AMPs were completed during a one-time event in 2009 and have not been updated since that time. All legacy system (ACES-PM) data is accurate and up to date as required by the BOS contract.
| Transactions/Leased | Space |
| Land | Management |
0%
Goal: 100% of FY17-21 requirements by 15 May 14
Activity
Non-Life Cycle Requirements
VANCE AFB
Funding Profile
| Utilities | ‐ | Wastewater/Stormwater | |
| Utilities | ‐ | Potable/Non‐Potable | Water |
| Utilities | ‐ | Mechanical | Distribution |
Airfield Pavements
$0
$20
$40
$60
$80
$100
$120
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
M ill io n s
Facilities Natural Infrastructure Real Property Airfield & Transportation Networks Utilities
File details come from the government source that posted it. Updated .