JFP_CODI_Site_Visit_Q&A_2_Mar_18.pdf

PDF 35 KB Posted

Attached to
Joint Forces Paving (JFP) for Colorado DoD Installations (CODI) Federal contract opportunity
Solicitation number
FA2550-18-R-1004
Issued by
Department of the Air Force Space Command

About this file

This document outlines a federal contract opportunity for joint forces paving services across Colorado Department of Defense installations. The solicitation seeks multiple award indefinite-delivery, indefinite-quantity firm-fixed-price contracts for paving, sidewalk, and site work with a maximum combined ceiling value of $200 million over a seven-year period from September 2018 to September 2025. The 50th Contracting Squadron intends to award up to six Multiple Award Task Order Contracts by September 2018. Questions regarding this solicitation are due in writing to the contracting points of contact by March 13, 2018. Offerors must be registered in the System for Award Management prior to award.

The accompanying file provides questions and answers related to sample paving projects at Fort Carson and Peterson Air Force Base, addressing issues such as contaminated base course, material recycling requirements, storm drain protection, tree replacement specifications, and abatement of stormwater lines.

Site Visit Questions and Answers. Answers to all sample project site visit questions received by the 27 February 2018 deadline.

View the file

Other files for this federal contract opportunity

Other files attached to Joint Forces Paving (JFP) for Colorado DoD Installations (CODI), newest first.
File Type Posted
JFP_CODI_Industry_Update_13_Nov_18.docx DOCX document
JFP_CODI_Notice_to_Industry_MFR_7_Sep_18.pdf PDF
JFP_CODI_Notice_to_Industry_MFR_13_Aug_18.pdf PDF
JFP_CODI_Notice_to_Industry_MFR_20_July_2018.pdf PDF
JFP_CODI_2_May_18_Questions.pdf PDF
JFP_CODI_Notice_to_Industry_MFR_13_Apr_18.pdf PDF
RFP_Amended_SF_1442_13_Apr_18.pdf PDF
SF_30_13_Apr_18.pdf PDF
Notice_to_Industry_12_Apr_18.pdf PDF
Protest_to_GAO_B-416179_22_Mar_18.pdf PDF
JFP_CODI_Notice_to_Industry_MFR_23_Mar_18.pdf PDF
JFP_CODI_RFQ_Follow_on__QA__21_Mar_18.pdf PDF
JFP_CODI_RFQ_QA_16_Mar_18_Responses.pdf PDF
13_Contract_Management.pdf PDF
4_Safety_Security_Health_and_Environmental_Requirements_01510.pdf PDF
5_Airfields_and_Hangars_01540.pdf PDF
7_CODI_PP_Questionnaire.pdf PDF
FA2550-18-R-1004_JFP_CODI_RFP.pdf PDF
6_Task_Order_Close_Out_01700.pdf PDF
1_General_Requirements_01000.pdf PDF
9_PAFB_Sample_Project_DRAWING.dwg DWG drawing
2_Organizational_Guidance_01030.pdf PDF
10_PAFB_Sample_Project_SUBMITTAL_SCHEDULE.xlsx XLSX spreadsheet
11_PAFB_Sample_Project_SOW.pdf PDF
8_Ft_Carson_Sample_Project.pdf PDF
12_Acronyms.pdf PDF
14_TASK_ORDER_PROCEDURES.pdf PDF
3_Contractor_Quality_Control_01440.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MASTER OF SPACE

2 March 2018

Questions and Answers

Questions – Ft Carson Sample Project Answer – Ft Carson Sample Project

1. Should bidders assume there is any contaminated base course?

No.

2. Can any material be recycled on post? No, haul all materials off post. 10% shall be recycled.

3. What should be done with storm drain inlets? Protect and install thickened edge expansion joint around inlet.

4. Section 2.1.1.2 – Should the removed existing base material be replaced with C-Dot Class 5 base course? Is there a percentage of base material that should assumed to be removed and replaced in the proposal?

Assume only regrading (no import of base course) will be required for gravel adjacent to integral curbs.

5. Section 2.2.16.1 - Which project personnel will be required to submit driver’s license and registration information at the time proposal submission?

None.

6. Section 2.2.16.3 - How much time per employee should be assumed for Antiterrorism (AT) Level 1 Training and the annual OPSEC training?

3 (three) hours.

7. Section 2.2.16.4 - How much time per employee should be assumed for iWATCH Training?

1 (one) hour.

8. Section 2.2.16.5 - Will access cards be valid for the entire duration of the contract?

No, access cards will be granted for awarded task orders for the duration of the task order.

Question – Peterson AFB Sample Project Answer – Peterson AFB Sample Project

1. Should bidders assume the waterline will not be disturbed by stormwater line placement?

Yes.

2. Can smaller trees be used to replace mature trees, and if so what size?

Yes. 3" caliper.

3. Does the stormwater line have to be fully abated and removed?

Yes.

DEPARTMENT OF THE AIR FORCE

50TH SPACE WING (AFSPC)

DEPARTMENT OF THE AIR FORCE
50TH SPACE WING (AFSPC)