This document contains questions and answers regarding a solicitation for Joint Forces Paving contracts for Colorado Department of Defense installations. The solicitation will result in multiple award indefinite-delivery, indefinite-quantity firm-fixed-price contracts with a maximum value of $200 million to be awarded to up to six offerors. The period of performance is from September 2018 to September 2025, including an initial five-year ordering period and a two-year option period. Questions were due by March 13, 2018 and proposals are due by April 2, 2018 at 11:00 AM Mountain Time. Eligible offerors must be registered in the System for Award Management and provide proof of a bona fide office in the Colorado region. The contracts will be used to issue task orders for asphalt and concrete construction services.
Government responses to industry questions.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MASTER OF SPACE
14 March 18
FA2550-18-R-1004
Questions and Answers
Question Referenced in Section
Referenced on Page Number / Paragraph
Answer
1. If a project is currently available in the Contractor Performance Assessment Reporting System (CPARS), would the Government allow the contractor to attach the CPARS evaluation and submit directly to the Contracting Office before the official closing date and time?
RFP, PPQ 3.7.14, page
Yes. CPARS may be provided directly to the Government in advance of the closing date and time. However, submitting CPARS does not negate the requirement for submitting PPQs.
See RFP Section 00100, Part 1, paras.
3.7.14.2 and 4.4.2.
2. The solicitation requires at least four (4) and depending on interpretation, up to six (6) Past Performance citations in Volume IV. The information required on these contracts will exceed ½ of one page. Will the Government consider allowing 15 pages for this volume?
RFP, Past Performance Volume
4.0, page 11 Yes. The Government will amend the page limit to allow for 18 pages.
3. Relative to #3., we have completed relevant projects under an IDIQ contract that were assigned the NAICS of the IDIQ contract, 236220. If the work on the individual projects are in accordance with 237310 criteria, will the Government allow us to show relevancy and eliminate that restriction?
RFP, Past Performance Volume
4.4.2, Page
Yes. All work performed must fall within NAICS 237310 criteria.
4. In accordance with FAR 15.305 (a)(2)(iii), will the Government take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition?
RFP, Past Performance
4.4.2, Page
No. See RFP Section 00100, Part 1, para. 4.4. The past performance considered will be limited to that of the Offeror. The Government seeks demonstration of the Offeror’s ability to perform.
5. Will the Government permit the use of sister company experience and past performance if a meaningful relationship is documented in a commitment letter? If so, will this letter(s) be excluded form page count?
RFP, Past Performance
4.4.2, Page
No. See RFP Section 00100, Part 1, para. 4.5.5.1. The only relationship where another firm’s past performance will be recognized is a Joint Venture.
6. Please confirm that title page, binder cover will be also excluded from page count.
RFP, Page limitations
3.7.4, Page
A title page on the outer covering of the binder will not be included in the total page count. If pages are located within the binder they will be included in the page count.
7. Please confirm that up to six (6) contract RFP, Past 3.7.14.2, Yes. See RFP Section 00100, Part 1, DEPARTMENT OF THE AIR FORCE
50TH SPACE WING (AFSPC)
references are allowed. Performance page 10, and 4.4.2 paras. 3.7.14.2 and 4.4.2. Offerors shall submit no less than four (4), but may submit up to six (6), recent contracts. The Government will amend the solicitation to include the word “additional” in para. 4.4.2.a.
8. Relative to #2., would the Government please confirm that a Concrete Flatwork project, performed as Prime Contractor, equal to $750K or above would be considered Very Relevant even though not specifically performed on an Airfield/Roadway?
RFP, Past Performance Volume
4.4.2, Page
A Concrete Flatwork project not performed as Airfield/Roadway construction, which is performed as a Prime Contractor, equal to $250K but less than $1.5M would be considered Relevant. See RFP Section 00100, Part 2, para. 4.4.1 for the Very Relevant rating description.
9. Would the Government please define what you mean by “other construction or repair”?
RFP, Past Performance Relevancy Rating
4.4.1 (b), “Other construction or repair” would be any description within the NAICS that is not asphalt or concrete.
10. Would the Government please extend the page limit for the technical volume to 30 pages?
RFP,
Proposal Format
4.0, Page 11 Yes. The Government will amend the solicitation extend the technical volume page limit to 30.
11. Would the Government please clarify what the phrase “labor surplus area designation” means?
RFP,
Volume V
4.5.6.2, “Labor surplus area” means the following: a geographical area identified by the Department of Labor in accordance with 20 CFR Part 654, subpart A, as an area of concentrated unemployment or underemployment or an area of labor surplus. See FAR 2.101.
12. Relative to #1. and #2., if a project consists of both Asphalt Flatwork and Concrete Flatwork but there is a higher quantity of asphalt, can it still be used for past performance for #2?
RFP, Past Performance Volume
4.4.2, Page
No. The preponderance of the effort must correspond to the descriptions in RFP Section 00100, Part 1, para. 4.4.2 Factor 3. Contracts cannot be used more than once.
13. SF1442 states 1 Original 1 Copy, but section
4.0 states 4 hard copies.
Can you please clarify?
SF1442,
RFP
Page 1, and
4.0 Page 11
The Government will amend the SF1442, block 13.A. to reflect the requirement in Section 00100, Part 1, para. 4.0 to four (4) hard copies and 1 E-copy.
14. Section 4.4 Volume IV-Past performance states Factor 3 Past Performance
2 Asphalt flatwork contracts 1 Concrete Flatwork Contracts 1 Contract of the contractors choosing that falls within NAICS code 237310
a. the Offeror may include information on up to two recent contracts that fall within the NAICS code 237310 that you consider most relevant in demonstrating your ability to perform the proposed effort.
RFP Past Performance
4.4.2.3(a)
All contracts submitted must fall within NAICS 237310 criteria. See RFP Section 00100, Part 1, para. 4.4.2.
Also, the offeror may include additional information on up to two more recent contracts that fall within the NAICS criteria. Offerors shall submit no fewer than four and no more than six (6) recent contracts. The Government will amend the solicitation to add, “that fall(s) within
Is it 1 or 2 projects that fall within the 237310 NAICS Code that is need for this requirement?
NAICS 237310 criteria to #s 1. And 2.
15. The job was posted to FBO on Mar. 01, 2018, however, the attached information stated the “site visit” was scheduled for Feb. 20, 2018 at 02:001
PM MST.
Will this site visit be re-schedule due to being posted on FBO after the scheduled date noted?
RFP,
General Information
3.7.12, Page
No. It was administratively determined that it was necessary to hold a site visit prior to the release of the solicitation.
A notice to industry indicating the dates for the site visit was posted to FBO on 9 Feb 18, which was an attachment to the pre-solicitation notice. The site visit was held on 20 Feb 18.
No further investigation of the sample project sites will be facilitated. The questions posed by those that attended the site visit, and the answers in response, have been added to the solicitation.
16. (2) Additional PPQ’s that are needed.
-What are the requirements for these 2 requested jobs?
-Are these determined on relevancy or amounts?
-Are these considered the same as the Past Performance Relevancy Rating chart?
RFP,
General Information
3.7.14.2, See RFP Section 00100, Part 1, para.
3.7.14.2. The offeror is given the
opportunity to submit an additional two (2) PPQs; however, the submissions are not mandatory. (The two (2) additional PPQs would be in line with the additional two (2) recent contracts submitted from para. 4.4.2).
All requirements are listed in Section 00100, Part 1, paras. 3.7.14.2 and
4.4.2. See RFP Section 00100, Part 2, para. 4.4.1 for the Evaluation Process.
17. Is this 2 pages per job which would include 8 pages or total of 2 pages for the relevant experience of 4 projects?
RFP 4.4.2 Tab B The RFP will be revised. See answer to question #2.
18. Given that performance and payment bonds and alternative payment protections are required at the task order level in accordance with FAR 28.102, what is the single and aggregate bonding capacity required to perform on this contract?
Where in the proposal should a bonding capability letter be included?
RFP Attachment
See Attachment 14 – Task Order Procedures, Paragraph 8. A contractor must be able to meet the bonding requirements for each individual task order it is awarded. The aggregate bonding capacity will depend on the number of task orders awarded and the combined dollar value of those task orders.
A bonding capability letter, while not required, may be included in Volume V, 4.5.5 Tab E – Other Representations of Offerors.
19. Can CPARS be utilized in lieu of the PPQ Questionnaire (Attachment 7)? Given that points
RFP 3.7.14, Page
No. See Section 00100, Part 2, para.
4.4.1 for the evaluation process.
of contacts may have left their position or have retired it may difficult to track down those individuals.
Submitting CPARS does not negate the requirement for submitting PPQs.
See RFP Section 00100, Part 1, paras.
3.7.14.2 and 4.4.2.
20. Is the CO and the COR (as stated in the solicitation) the only individuals allowed to completed the PPQ?
RFP 4.4.2, Page
No. The PPQ may be filled out by a cognizant official who is intimately familiar with the contract. See Section 00100, Part 1, para. 3.7.14 for information that must be included in the PPQ. The Government will amend the solicitation, Section 00100, Part 1, para. 4.4.2.b. to include “or other cognizant official intimately familiar with/responsible for each submitted contract.”
21. Would you allow other individuals from the government that are familiar with the project to complete these forms other than a CO or COR?
RFP 4.4.2, Page
Yes. The PPQ may be filled out by a cognizant official who is intimately familiar with the contract. The Government will amend the solicitation, Section 00100, Part 1, para. 4.4.2.b. to include “or other cognizant official intimately familiar with/responsible for each submitted contract.”
See Section 00100, Part 1, para. 3.7.14 for information that must be included in the PPQ.
22. Is it required to submit the information of the contractor’s personnel that will be hand carrying the proposal if they do not have base access ID badge? It has been our experience in the past that the individual’s information needs to be approved by base security prior to the day of needing base access and has been required to be more than 24 hours to process the pass request. Please advise.
RFP 3.7.11, Page 10, and 3.1, Yes. The Government will amend the solicitation to extend the proposal due time, in the SF1442, block 13.A., to 11:00 AM Mountain Time. See RFP Section 00100, Part 1, para. 3.7.11 for substantial revision. No access to the base should be necessary.
The Government will substantially amend the solicitation to clarify the receipt of proposal instructions in Section 00100, Part 1, para. 3.7.11.
23. The proposal due date states April 2nd at 8AM and recommends arriving 2 hours earlier.
Can the proposal due date time be pushed out to accommodate gaining access to the base since the visitor center opens at 7AM?
RFP 3.7.11, Page 10, and 3.1, Yes. The proposal due time will be extended, in the SF1442, block 13.A., to 11:00 AM Mountain Time. No access to the base should be necessary.
The Government will substantially revise the RFP Section 00100, Part 1, para. 3.7.11 to clarify language for receipt of proposals.
24. Please confirm if the page count is only 2-pages total for Tab B Relevant Contracts or if we are allowed 2-pages per relevant contract.
RFP 4.4.2 Tab B Reference the answer to Question 2.
above. The total page limit for relevant contracts is 18 pages.
25. Please clarify the number of hard copies and E-copies due to the Government.
SF1442 Box 13 Reference the answer to Question 13 above.
26. Will either of these sample projects be awarded from this solicitation? If so, will there be an additional site visit, since during the previous site visit the sample project sites were covered in snow.
Attachments 8 and 11
Ft Carson and PAFB Sample Projects
No. These are sample projects specifically submitted for the purpose of proposal evaluation.
27. Can motor pool traffic use Afton Street for access during construction?
Attachment
Ft Carson Sample Project
No.
28. Will a storm water management plan be required for this project?
Attachment
Ft Carson Sample Project
No, but contractor shall implement best management practices (BMPs) to minimize and eliminate non-storm water and contaminated or sediment-laden storm water discharges to local drainages or storm drains.
29. What is the approximate depth below grade of the storm pipe that is to be removed?
Attachment
PAFB
Sample Project
Inverts of ends of storm water line align with inverts of manholes specified on pdf page 16 of '11_PAFB_Sample_Project_SOW.pdf'
30. Would the Government like offerors to provide proof of a Bona Fide office in the Colorado region, and if so, would you like it included in Volume V – Contract Documents?
SF1442 Block 10 Yes. See RFP block 10.E. and Section 00100, Part 1, para. 2.6. The Offeror shall provide proof of a Bona Fide office located in SBA Region 8, which may be included in Volume V, 4.5.5 Tab E. The Government will amend the solicitation to mandate proof of a Bona Fide office in RFP block 10.E.
and Section 00100, Part 1, para. 2.6.
| DEPARTMENT OF THE AIR FORCE |
| 50TH SPACE WING (AFSPC) |
File details come from the government source that posted it. Updated .