This is a notice of award for six multiple award indefinite-delivery, indefinite-quantity contracts for joint forces paving services at Colorado Department of Defense installations. The contracts have a combined ceiling value of $200 million over a potential seven-year period from September 2018 to September 2025, including a base ordering period of five years and a single two-year option. The contracts will be awarded by the 50th Contracting Squadron and are for firm-fixed-price task orders to provide paving services such as repair of hardstands, roadways, and parking areas. Questions regarding this solicitation were due by March 13, 2018, and proposals must follow submission instructions and clauses in the Standard Form 1442 provided. Registration in the System for Award Management is required for award.
Attachment 8 - Ft Carson Sample Project
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DPW18-999
REPAIR HARDSTAND POSTWIDE
FORT CARSON, CO
DIRECTORATE OF PUBLIC WORKS
30 NOV 2017
30 November 2017 1 DPW18-999
STATEMENT OF WORK
DPW18-999
REPAIR HARDSTAND POSTWIDE
1.0 BACKGROUND
1.1. THE LEGACY MOTORPOOLS ON FORT CARSON STILL RESIDE ON THE
ORIGINAL CONCRETE HARDSTAND. MUCH OF THIS HARDSTAND IS NOW
EXPERIENCING SEVERE SPALLING, JOINT FAILURE, AND GENERAL
STRUCTURAL FAILURE AS IT EXCEEDS ITS USEFUL LIFE.
2.0 GENERAL
2.1. SCOPE
2.1.1. THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, AND
MATERIALS TO ACCOMPLISH THE FOLLOWING IAW THE
ACCOMPANYING PLANS AND SPECIFICATIONS.
2.1.1.1. CONDUCT HARDSTAND REPLACEMENT ON ALL HATCHED
AREAS. DIMENSIONS ARE APPROXIMATE AND SHALL BE TAKEN TO
NEAREST EXISTING JOINT. INTEGRAL CURBS SHALL BE REPLACED IN
KIND. EXISTING PAVEMENT MARKINGS SHALL BE REPLACED IN KIND.
DOWELED CONTRACTION JOINTS OR CONSTRUCTION JOINTS SHALL BE
USED ON ALL INTERIOR JOINTS. THICKENED EDGE JOINTS SHALL BE
USED ON ALL JOINTS ABUTTING GRAVEL. THICKENED EDGE
EXPANSION JOINTS SHALL BE USED ON ALL JOINTS ABUTTING
EXISTING HARDSTAND AND OTHER STRUCTURES (I.E. BUILDINGS,
LIGHT POLES, MANHOLES). NEW HARDSTAND SECTION SHALL BE 10"
THICK WITH A CDOT CLASS 5 BASE COURSE THICKNESS OF 12".
EXISTING HARDSTAND IS 10" THICK.
2.1.1.2. REMOVE SUBGRADE, REMOVE GRAVEL, AND REINSTALL
GRAVEL AS NECESSARY 5' FROM ALL INTEGRAL CURBS BEING
30 November 2017 2 DPW18-999
REPLACED SO IT FALLS 1/2 INCH BELOW THE EDGE OF CURB TO
PREVENT OVERFLOW INTO THE HARDSTAND.
2.1.1.3. CONDUCT PARTIAL DEPTH PATCHING (ALLOWANCE) OF 50 SY.
ALL ALLOWANCE WORK SHALL BE DECIDED ON SITE WITH A
GOVERNMENT REPRESENTATIVE. PATCHING SHALL BE DONE USING A
GOVERNMENT APPROVED POLYMERIC CONCRETE PATCH MATERIAL
DESIGNED FOR THAT PURPOSE. PRODUCT SHALL BE ON CDOT
APPROVED PRODUCTS LIST.
2.2. CONSTRAINTS
2.2.1. PHASING: WORK SHALL BE PHASED TO ALLOW FOR CONTINUOUS
ACCESS TO COMPOUND. CONTRACTOR SHALL DEVELOP PHASING
PLANS AND COORDINATE DIRECTLY WITH FACILITY MANAGERS OF
AFFECTED FACILITIES. CONTRACTOR SHALL OBTAIN ALL REQUIRED
SIGNATURES, INCLUDING FACILITY MANAGERS, ON THE OUTAGE
REQUEST FORM FOR ALL AFFECTED FACILITIES FOR EACH WORK AREA.
THIS WILL ENTAIL PHYSICALLY GOING TO EACH FACILITY TO OBTAIN
SIGNATURES AND SUBMITTING THE OUTAGE FORM TO THE FT. CARSON
DIG PERMITS OFFICE. WORK PERIODS MAY BE ADJUSTED WITH
FACILITY MANAGER APPROVALS AND SIGNATURES.
2.2.2. FIELD PERFORMANCE DAYS: THE MAXIMUM FIELD PERFORMANCE
DAYS SHALL NOT EXCEED 180 DAYS.
2.2.3. HOURS: MONDAY - FRIDAY, 0600 - 1700
2.2.4. EXISTING CONDITIONS: CONTRACTOR SHALL FIELD VERIFY
CONDITIONS PRIOR TO START OF WORK TO CONFIRM PLANS MATCH
EXISTING CONDITIONS.
2.2.5. UTILITY OUTAGE/CONNECTION REQUESTS: THE CONTRACTOR
SHALL DEVELOP AND SUBMIT A FORT CARSON UTILITY
OUTAGE/CONNECTION REQUEST, FC FORM 420-E, FOR ANY CLOSURES
OR UTILITY OUTAGES. THE FORM SHALL BE SUBMITTED IN
ACCORDANCE WITH FORT CARSON REGULATION 420-19. OUTAGES
SHALL BE COORDINATED BY THE CONTRACTOR AND CONTRACTOR
SHALL OBTAIN ALL REQUIRED SIGNATURES ON THE OUTAGE REQUEST.
FORMS SHALL BE TURNED IN TO THE DIG PERMIT COORDINATOR AT
BLDG 1225, 1649 EVANS ST, FORT CARSON, CO, 719-526-5345.
30 November 2017 3 DPW18-999
2.2.6. WORK DURING UTILITY OUTAGES: THE CONTRACTOR SHALL HAVE
CONTINGENCY PLANS FOR CONTINUING WORK DURING UTILITY
OUTAGES CAUSED BY THE CONTRACTOR OR OUTSIDE FORCES. THE
PLAN MUST ALSO INCLUDE PROCEDURES FOR PROMPTLY REPAIRING
UTILITY BREAKS MADE BY THE CONTRACTOR.
2.2.7. TRAFFIC CONTROL: THE CONTRACTOR IS RESPONSIBLE FOR
ESTABLISHING A TRAFFIC CONTROL PLAN IN ACCORDANCE WITH THE
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND
APPROVED BY DPW. TRAFFIC CONTROL IS THE SOLE RESPONSIBILITY
OF THE CONTRACTOR. TRAFFIC CONTROL MEASURES AND PHASING
SHALL ALLOW FOR CONTINUOUS ACCESS TO THE MOTORPOOL (AT
LEAST 1 14’ LANE).
2.2.8. DIG PERMIT REQUEST: EXISTING UTILITIES SHOWN ON DRAWINGS
ARE COMPILED FROM THE BEST AVAILABLE INFORMATION. HOWEVER,
THE SITE PLAN MAY NOT BE INCLUSIVE OF ALL UTILITIES AND THE
DEPICTED LOCATIONS MAY NOT BE ACCURATE. THE CONTRACTOR
SHALL OBTAIN AND PROCESS A FORT CARSON FACILITIES ENGINEER
DIG PERMIT REQUEST, FC FORM 86-E, FOR EACH REQUIREMENT THAT
REQUIRES A DIG PERMIT IN ACCORDANCE WITH FORT CARSON
REGULATION 420-20. CONTRACTOR SHALL OBTAIN ALL REQUIRED
SIGNATURES ON THE OUTAGE REQUEST. THE CONTRACTOR SHALL
VERIFY THE EXACT LOCATION OF ALL INDICATED UTILITY LINES AND
STRUCTURES ON THE DIG PERMIT AND TAKE NECESSARY
PRECAUTIONS TO PROTECT THEM. SHOULD THE CONTRACTOR
DAMAGE ANY SUCH UTILITY LINE OR STRUCTURE, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR THE PROMPT REPAIR OF THAT DAMAGE,
AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL CONTACT
THE CONTRACTING OFFICER AND GOVERNMENT INSPECTOR TO
REPORT ANY DAMAGE AND IDENTIFY THE CONTRACTOR'S REPAIR.
FORMS SHALL BE TURNED IN TO THE DIG PERMIT COORDINATOR AT
BLDG 1225, 1649 EVANS ST, FORT CARSON, CO, 719-526-5345.
2.2.9. WORKING WITH OTHER AGENCIES/CONTRACTORS: OTHER
CONSTRUCTION AGENCIES/CONTRACTORS MAY WORKING IN THE
VICINITY OF THE PROJECT. THE CONTRACTOR SHALL CONDUCT WORK
SO AS TO NOT INTERFERE WITH OR HINDER THE PROGRESS OF THE
COMPLETION OF WORK BEING PERFORMED BY OTHER AGENCIES/
CONTRACTORS.
30 November 2017 4 DPW18-999
2.2.10. CONSTRUCTION DEBRIS: UNLESS OTHERWISE NOTED, ALL
CONSTRUCTION DEBRIS, SPOILS, AND REMOVALS SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OFF
POST.
2.2.11. RESTORATION TO ORIGINAL CONDITIONS: THE CONTRACTOR SHALL
LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE
LIMITS OF DISTURBANCE. ANY DISTURBANCE BEYOND THESE LIMITS
SHALL BE RESTORED TO ORIGINAL CONDITION BY THE CONTRACTOR
AT THE CONTRACTOR'S EXPENSE.
2.2.12. RESTROOMS: CONTRACTOR SHALL PROVIDE PORTABLE
RESTROOMS FOR ALL PERSONNEL. GOVERNMENT FACILITY
RESTROOMS ARE OFF LIMITS.
2.2.13. SAFETY: CONTRACTOR PERFORMING WORK MUST COMPLY WITH
EM 385-1-1, AR 385-10, OSHA 29 CFR 1910/1926, EPA & NFPA STANDARDS,
ALL REHABILITATION/ENVIRONMENTAL LAWS AND REGULATIONS.
2.2.14. FIRE HYDRANTS: THE CONTRACTOR SHALL COORDINATE WITH THE
GOVERNMENT INSPECTOR PRIOR TO MAKING ANY CONNECTIONS. A
BACKFLOW PREVENTER IS REQUIRED TO BE INSTALLED BY
CONTRACTOR WHENEVER A HYDRANT IS USED TO SUPPLY WATER FOR
CONSTRUCTION SITE USE.
2.2.15. HOT WORK PERMIT: THE CONTRACTOR SHALL OBTAIN HOT WORK
PERMITS PRIOR TO CONDUCTING ANY TYPE OF HOT WORK OR WORK
THAT MAY EMIT SPARKS SUCH AS CUTTING METAL, WELDING, ETC.
PERMITS ARE REQUIRED BEFORE WORK MAY BE COMMENCED. IT IS
THE CONTRACTOR'S DUTY TO TIMELY OBTAIN SUCH PERMITS.
2.2.16. ANTITERRORISM-FORCE PROTECTION REQUIREMENTS:
2.2.16.1. GENERAL. CONTRACTOR PERSONNEL PERFORMING WORK
UNDER THIS CONTRACT MUST BE ABLE TO DOCUMENT APPROPRIATE
VEHICLE REGISTRATION AND INSURANCE, AS WELL AS DRIVER
IDENTIFICATION AT TIME OF THE PROPOSAL SUBMISSION, AND MUST
MAINTAIN THE LEVEL OF SECURITY REQUIRED FOR THE LIFE OF THE
CONTRACT. THE CONTRACTOR SHALL MAINTAIN VEHICLE
REGISTRATION, INSURANCE, AND DRIVER CERTIFICATIONS FOR THE
DURATION OF THE CONTRACT.
30 November 2017 5 DPW18-999
2.2.16.2. ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND
PROCEDURES. THIS STANDARD LANGUAGE IS FOR CONTRACTOR
EMPLOYEES WITH AN AREA OF PERFORMANCE WITHIN ARMY
CONTROLLED INSTALLATION, FACILITY, OR AREA. CONTRACTOR AND
ALL ASSOCIATED SUB-CONTRACTORS EMPLOYEES SHALL PROVIDE
ALL INFORMATION REQUIRED FOR BACKGROUND CHECKS TO MEET
INSTALLATION ACCESS REQUIREMENTS TO BE ACCOMPLISHED BY
INSTALLATION PROVOST MARSHAL OFFICE, DIRECTOR OF
EMERGENCY SERVICES OR SECURITY OFFICE. CONTRACTOR
WORKFORCE MUST COMPLY WITH ALL PERSONAL IDENTITY
VERIFICATION REQUIREMENTS (FAR CLAUSE 52.204-9, PERSONAL
IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL) AS DIRECTED
BY DOD, HQDA AND/OR LOCAL POLICY. IN ADDITION TO THE
CHANGES OTHERWISE AUTHORIZED BY THE CHANGES CLAUSE OF
THIS CONTRACT, SHOULD THE FORCE PROTECTION CONDITION
(FPCON) AT ANY INDIVIDUAL FACILITY OR INSTALLATION CHANGE,
THE GOVERNMENT MAY REQUIRE CHANGES IN CONTRACTOR
SECURITY MATTERS OR PROCESSES.
2.2.16.3. AT LEVEL I TRAINING. THE CONTRACTOR EMPLOYEES, TO
INCLUDE SUBCONTRACTOR EMPLOYEES, REQUIRING ACCESS ARMY
INSTALLATIONS, FACILITIES AND CONTROLLED ACCESS AREAS SHALL
COMPLETE AT LEVEL I AWARENESS TRAINING WITHIN 60 CALENDAR
DAYS AFTER CONTRACT START DATE OR EFFECTIVE DATE OF
INCORPORATION OF THIS REQUIREMENT INTO THE CONTRACT,
WHICHEVER IS APPLICABLE. THE CONTRACTOR SHALL SUBMIT
CERTIFICATES OF COMPLETION FOR EACH AFFECTED CONTRACTOR
EMPLOYEE AND SUBCONTRACTOR EMPLOYEE, TO THE COR OR TO THE
CONTRACTING OFFICER, IF A COR IS NOT ASSIGNED, WITHIN 30
CALENDAR DAYS AFTER COMPLETION OF TRAINING BY ALL
EMPLOYEES AND SUBCONTRACTOR PERSONNEL. AT LEVEL I
AWARENESS TRAINING IS AVAILABLE AT THE FOLLOWING WEBSITE:
HTTP://JKO.JTEN.MIL . PER AR 530-1, OPERATIONS SECURITY, NEW
CONTRACTOR EMPLOYEES MUST COMPLETE LEVEL I OPSEC TRAINING
WITHIN 30 CALENDAR DAYS OF THEIR REPORTING FOR DUTY. ALL
CONTRACTOR EMPLOYEES MUST COMPLETE ANNUAL OPSEC
AWARENESS TRAINING.
2.2.16.4. IWATCH TRAINING. THE CONTRACTOR AND ALL ASSOCIATED
SUB-CONTRACTORS SHALL BRIEF ALL EMPLOYEES ON THE LOCAL
IWATCH PROGRAM (TRAINING STANDARDS PROVIDED BY THE
30 November 2017 6 DPW18-999
REQUIRING ACTIVITY ATO). THIS LOCAL DEVELOPED TRAINING WILL
BE USED TO INFORM EMPLOYEES OF THE TYPES OF BEHAVIOR TO
WATCH FOR AND INSTRUCT EMPLOYEES TO REPORT SUSPICIOUS
ACTIVITY TO THE COR. THIS TRAINING SHALL BE COMPLETED WITHIN
60 CALENDAR DAYS OF CONTRACT AWARD AND WITHIN 60 CALENDAR
DAYS OF NEW EMPLOYEES COMMENCING PERFORMANCE WITH THE
RESULTS REPORTED TO THE COR NLT 90 CALENDAR DAYS AFTER
CONTRACT AWARD.
2.2.16.5. ACCESS CARDS. FOR CONTRACTORS THAT DO NOT REQUIRE
CAC, BUT REQUIRE ACCESS TO A DOD FACILITY OR INSTALLATION.
CONTRACTOR AND ALL ASSOCIATED SUB-CONTRACTORS EMPLOYEES
SHALL COMPLY WITH ADJUDICATION STANDARDS AND PROCEDURES
USING THE NATIONAL CRIME INFORMATION CENTER INTERSTATE
IDENTIFICATION INDEX (NCIC-III) THIS IS DONE BY COMPLETING A
REQUEST FOR A FORT CARSON INSTALLATION ACCESS CONTROL
CARD (FC FORM FC FORM 2036-E) AND TERRORIST SCREENING
DATABASE (TSDB) (ARMY DIRECTIVE 2014-05/AR 190-13), APPLICABLE
INSTALLATION, FACILITY AND AREA COMMANDER
INSTALLATION/FACILITY ACCESS AND LOCAL SECURITY POLICIES
AND PROCEDURES (PROVIDED BY GOVERNMENT REPRESENTATIVE),
OR, AT OCONUS LOCATIONS, IN ACCORDANCE WITH STATUS OF
FORCES AGREEMENTS AND OTHER THEATER REGULATIONS. THE
PROCESS FOR OBTAINING AN ACCESS PASS IS AS FOLLOWS: THE COR
WILL PRE‐-FILL OUT FC FORM 2036‐-E REQUEST FOR FORT CARSON
INSTALLATION ACCESS CONTROL CARD, WITH ALL RELEVANT
CONTRACT INFORMATION AND PROVIDE TO THE CONTRACTOR
PROJECT MANAGER OR DESIGNATED POC. THE CONTRACTOR WILL
PROVIDE THE COMPLETED FORM IN PDF FORMAT ELECTRONICALLY
BY EMAIL TO THE COR FOR APPROVAL AND DIGITAL SIGNATURE. (THE
SPONSOR CAN BE A CONTRACTOR EMPLOYEE). THE COR WILL VERIFY
NEED FOR FORT CARSON ACCESS, DIGITALLY SIGN AND EMAIL BACK
TO THE CONTRACTOR EMPLOYEE. CONTRACTORS WILL GO DIRECTLY
TO GATE 1 VISITOR CENTER WITH THEIR SIGNED FC FORM 2036‐-E AND
CREDENTIALS FOR A ONE‐-STOP NCIC III CHECK AND ACCESS CARD
WITH PHOTO ISSUE.
2.2.16.6. 1 DAY PASSES: COMMERCIAL VEHICLES AND VENDORS’ WILL
USE GATE 3 WHERE THE NCIC CHECK WILL BE DONE “IN‐-LANE”AND A
DAY PASS WILL BE ISSUED. FOR VISITOR ACCESS, USE GATE 1 VISITOR
CENTER WHERE THE NCIC CHECK WILL BE DONE AND A DAY PASS
30 November 2017 7 DPW18-999
ISSUED. THIS ALSO APPLIES TO ALL THOSE WHO HAVE A VALID ID,
BUT HAVE TEMPORARILY MISPLACED IT.
3.0 PROJECT REQUIREMENTS
3.1. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS,
EQUIPMENT, AND MATERIALS NECESSARY TO COMPLETE THE PROJECT
IAW THE ACCOMPANYING PLANS, SPECIFICATIONS, AND THE
FOLLOWING CDOT SECTIONS.
3.2. CDOT SECTION 106– CONTROL OF MATERIAL
3.2.1. CONDUCT MATERIAL/COMPACTION/QUALITY CONTROL TESTING IN
ACCORDANCE WITH TABLE 106-3 FOR CONCRETE. COSTS OF ALL TESTS
SHALL BE PAID BY THE CONTRACTOR.
3.3. CDOT SECTION 202– REMOVAL OF STRUCTURES AND OBSTRUCTIONS
3.3.1. REMOVE EXISTING HARDSTAND.
3.4. CDOT SECTION 203– EXCAVATION AND EMBANKMENT
3.4.1. REMOVE EXISTING BASE COURSE AND SUBGRADE TO THE
SPECIFIED DEPTH.
3.5. SECTION 250– ENVIRONMENTAL, HEALTH, AND SAFETY MANAGEMENT
3.5.1. REGULATIONS AND REQUIREMENTS: THIS PROJECT IS SUBJECT TO
ALL ENVIRONMENTAL REGULATIONS AND REQUIREMENTS AS
ENUMERATED BY THE FORT CARSON DPW ENVIRONMENTAL DIVISION.
THESE REQUIREMENTS ARE LISTED IN THE MITIGATION
MEASURES/REQUIREMENTS TABLE. THESE REQUIREMENTS SHALL BE
CONSIDERED TO BE PART OF THIS STATEMENT OF WORK, AND
COMPLIANCE WITH THESE REQUIREMENTS IS THE RESPONSIBILITY OF
THE CONTRACTOR.
3.5.2. DISTURBANCE UNDER (1) ACRE: INSTALL ALL SEDIMENT AND
EROSION CONTROL MEASURES UTILIZING BEST MANAGEMENT
PRACTICES (BMP's) AS DIRECTED IN THE STORMWATER MANAGEMENT
PLAN AND CDOT SPECIFICATIONS PRIOR TO COMMENCING WORK. HAY
BALES ARE NOT CONSIDERED BMP's. THE CONTRACTOR SHALL
PROTECT EXISTING STORM DRAINS, WATERWAYS, ETC., IN
ACCORDANCE WITH THE FORT CARSON MS-4 PERMIT, MINIMIZE OFF
30 November 2017 8 DPW18-999
SITE RUNOFF AND SEDIMENT TRANSPORT, AND ENSURE THERE ARE NO
NON-STORMWATER DISCHARGES FROM THE SITE.
3.5.3. THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO
THOSE AREAS WITHIN THE LIMITS OF DISTURBANCE AND/OR TOES OF
SLOPES AS SHOWN ON THE PLANS. ANY DISTURBANCE BEYOND THESE
LIMITS SHALL BE RESTORED TO ORIGINAL CONDITION BY THE
CONTRACTOR AT THE CONTRACTOR'S EXPENSE. CONSTRUCTION
ACTIVITIES, IN ADDITION TO NORMAL CONSTRUCTION PROCEDURES,
SHALL INCLUDE THE PARKING OF VEHICLES OR EQUIPMENT, DISPOSAL
OF LITTER, AND ANY OTHER ACTION WHICH ALTER EXISTING
CONDITIONS. ANY STAGING AREAS MUST BE APPROVED BY THE
CONTRACTING OFFICER.
3.5.4. THE CONTRACTOR SHALL PROVIDE ON SITE DUST CONTROL.
3.5.5. WASTE MANAGEMENT: GOVERNMENT POLICY IS TO APPLY SOUND
ENVIRONMENTAL PRINCIPLES IN THE DESIGN, CONSTRUCTION AND
USE OF FACILITIES. AS PART OF THE IMPLEMENTATION OF THAT
POLICY: (1) PRACTICE EFFICIENT WASTE MANAGEMENT WHEN SIZING,
CUTTING, AND INSTALLING PRODUCTS AND MATERIALS AND (2) USE
ALL REASONABLE MEANS TO DIVERT CONSTRUCTION AND
DEMOLITION WASTE FROM LANDFILLS AND INCINERATORS AND TO
FACILITATE THEIR RECYCLING OR REUSE. A MINIMUM OF 10 PERCENT
BY WEIGHT OF TOTAL PROJECT SOLID WASTE SHALL BE DIVERTED
FROM THE LANDFILL.
3.5.6. CONTRACTOR MAY ENCOUNTER MATERIALS THAT ARE
CONTAMINATED WITH PETROLEUM PRODUCTS. IF THE CONTRACTOR
DETECTS CONTAMINATION, CEASE WORK AND CONTACT DPW FOR
TESTING. CDOT SECTION 304– AGGREGATE BASE COURSE
3.6. CDOT SECTION 304– AGGREGATE BASE COURSE
3.6.1. INSTALL AGGREGATE BASE COURSE TO ACHIEVE SPECIFIED
THICKNESS. COMPACT TO 95% MODIFIED PROCTOR AND +/-3%
OPTIMUM MOISTURE CONTENT, WITH A MAXIMUM COMPACTED LIFT
DEPTH OF 3". DEEPER LIFTS MAY BE PERMITTED IF DESIRED
COMPACTION CAN BE DEMONSTRATED FOR THE FULL DEPTH OF THE
LIFT.
3.7. CDOT SECTION 306– RECONDITIONING
30 November 2017 9 DPW18-999
3.7.1. EXPOSE AND RECONDITION EXISTING BASE COURSE OR SUB-
GRADE. SCARIFY TO A DEPTH OF 6 INCHES, SHAPE AND COMPACT TO
95% MODIFIED PROCTOR AND +/- 3% OPTIMUM MOISTURE CONTENT.
3.8. CDOT SECTION 412- PORTLAND CEMENT CONCRETE PAVEMENT
3.8.1. ALL FORMWORK AND SHORING DESIGN SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
3.8.2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF
WORK.
3.8.3. COLD WEATHER PLACEMENT SHALL BE DONE IN ACCORDANCE
WITH THIS SECTION.
3.8.4. CONCRETE HARDSTAND REPLACEMENT
3.8.4.1. THE MAXIMUM DOWEL BAR SPACING SHALL BE 12" ON
CENTER.
3.8.4.2. ALL DOWEL BARS SHALL BE EPOXY COATED, INCLUDING
ENDS. IF DOWEL BARS ARE CUT THE ENDS MUST BE COATED WITH
EPOXY AS WELL. ALL DOWEL BARS SHALL BE SMOOTH DOWEL BARS.
ONE HALF (1/2) OF THE LENGTH OF THE DOWELS SHALL BE OILED.
3.8.4.3. DOWEL BARS PARALLEL TO A PLANNED JOINT SHALL NOT BE
PLACED CLOSER THAN 0.6 TIMES THE DOWEL BAR LENGTH FROM THE
PLANNED JOINT.
3.8.4.4. DOWELS MAY EITHER BE PLACED BEFORE CASTING, DRILLED
OR INSTALLED WITH THE FORMWORK. IF THE DOWELS ARE DRILLED,
AN INJECTION GROUT SHALL BE INJECTED INTO THE BACK OF THE
HOLE. THE DOWEL BAR SHALL THEN BE INSERTED AND TWISTED
SIMULTANIOUSLY FOR AT LEAST ONE FULL TWIST OF 360 DEGREES.
BUTTERING OF THE DOWEL BARS IS NOT PERMITTED. A PLASTIC DISK
SHALL BE INSTALLED WITH EACH DOWEL BAR TO PREVENT THE
GROUT FROM RUNNING OUT OF THE HOLE. IF DOWELS BASKETS ARE
USED, DOWEL BASKETS SHALL BE ANCHORED TO BASE COURSE TO
ENSURE PROPER ALIGNMENT/ELEVATION. IF DOWELS ARE INSTALLED
IN THE FORMWORK, MEASURES SHALL BE PUT IN PLACE TO ENSURE
PROPER DOWEL ALIGNMENT.
30 November 2017 10 DPW18-999
3.8.4.5. ALL JOINTS SHALL BE SAWED, CLEANED AND SEALED WITH A
POLYURETHANE JOINT SEALANT. JOINT CLEANING, SIZE AND
PREPARATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS.
3.8.4.6. FOR ALL JOINTS INSTALL A BACKER ROD (ENSURE IT IS
COMPATIBLE WITH THE PROPOSED SEALANT) TO PREVENT THREE
SIDED ADHESION. USE BOND BREAKER TAPE IN JOINTS THAT WILL
NOT ALLOW FOR PROPER BACKER ROD INSTALLATION. INSTALL
BACKER ROD IN ACCORDANCE WITH THE MANUFACTURERS
INSTRUCTIONS.
3.8.4.7. EXPANSION JOINTS TO BE USED AT ALL EXISTING OR
PROPOSED STRUCTURES AND FEATURES PROJECTING THROUGH, INTO,
OR AGAINST THE PAVEMENT.
3.8.4.8. POLYURETHANE JOINT SEALANT SHALL BE WEATHER AND
PETROLEUM PRODUCT RESISTANT.
3.8.4.9. ALL DEBRIS SHALL BE HAULED OFF POST.
3.8.4.10. BEST PRACTICES AND EQUIPMENT SHALL BE EMPLOYED TO
PREVENT MATERIAL SEGREGATION.
3.8.4.11. THE CONTRACTOR SHALL ADJUST ALL MANHOLES, VALVE
BOXES, CATHODIC PROTECTION TEST STATION BOXES, ETC. FLUSH
WITH FINISHED GRADE.
3.8.4.12. WHERE POSSIBLE, CONCRETE JOINT SPACING SHALL MATCH
EXISTING DIMENSIONS.
3.8.5. PARTIAL DEPTH CONCRETE PATCHING
3.8.5.1. PATCHING SHALL BE DONE USING A GOVERNMENT
APPROVED POLYMERIC CONCRETE PATCH MATERIAL DESIGNED FOR
THAT PURPOSE. PRODUCT SHALL BE ON CDOT APPROVED PRODUCTS
LIST. PATCHING SHALL BE DONE IN ACCORDANCE WITH
MANUFACTURER'S WRITTEN INSTRUCTIONS AND UFC 3-270-03
'CONCRETE CRACK AND PARTIAL DEPTH SPALL REPAIR'.
3.8.5.2. REMOVE ALL UNSOUND CONCRETE TO AN APPROXIMATE
DEPTH OF 3". IF CHIPPING IS USED, A BOUNDARY SHALL BE CUT
AROUND AREA TO BE PATCHED USING A CONCRETE OR HAND SAW
30 November 2017 11 DPW18-999
PRIOR TO CHIPPING. REMOVE ANY UNSOUND CONCRETE. MINIMUM
PATCH SIZE SHALL BE 4' X 4'.
3.8.5.3. CLEAN THE REPAIR SURFACES USING WATER BLASTING OR
SAND BLASTING TO REMOVE ANY LOOSE CONCRETE, RUST, OIL, OR
OTHER CONTAMINANTS THAT WOULD INTERFERE WITH A PROPER
BOND. REMOVE DEBRIS FROM AREA TO PREVENT FROM REENTERING
PATCH.
3.8.5.4. IF REQUIRED FOR THE REPAIR MATERIAL, APPLY BONDING
AGENT TO THE SPALL REPAIR SURFACE.
3.8.5.5. EXISTING JOINT LOCATIONS AND WIDTHS SHALL BE
MAINTAINED. MATERIAL SHALL NOT BE ALLOWED TO FILL GAPS
BELOW PATCH IN EXISTING JOINTS. WHERE THE SPALLED AREA
ABUTS A JOINT, AN INSERT OR OTHER BOND BREAKING MEDIUM
SHALL BE USED TO PREVENT BONDING AT THE JOINT FACE.
3.8.5.6. APPLY AND CURE PATCH MATERIAL IN ACCORDANCE WITH
MANUFACTURER'S WRITTEN INSTRUCTIONS.
3.8.5.7. ALL JOINTS SHALL BE SAWED, CLEANED AND SEALED WITH A
POLYURETHANE JOINT SEALANT. JOINT CLEANING, SIZE AND
PREPARATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS.
3.8.5.8. FOR ALL JOINTS INSTALL A BACKER ROD (ENSURE IT IS
COMPATIBLE WITH THE PROPOSED SEALANT) TO PREVENT THREE
SIDED ADHESION. USE BOND BREAKER TAPE IN JOINTS THAT WILL
NOT ALLOW FOR PROPER BACKER ROD INSTALLATION. INSTALL
BACKER ROD IN ACCORDANCE WITH THE MANUFACTURERS
INSTRUCTIONS.
3.8.5.9. POLYURETHANE JOINT SEALANT SHALL BE BE WEATHER AND
PETROLEUM PRODUCT RESISTANT.
3.9. CDOT SECTION 601- STRUCTURAL CONCRETE
3.9.1. PCC COARSE AND FINE AGGREGATE TESTS USED FOR MATERIAL
APPROVAL SHALL BE DATED WITHIN THE PAST 180 DAYS AND INCLUDE
THE FOLLOWING MINIMUM TESTS/REQUIREMENTS. MATERIAL SHALL
MEET CDOT 2017 SPECIFICATIONS UNLESS OTHERWISE NOTED.
30 November 2017 12 DPW18-999
3.9.1.1. AASHTO STANDARD SPECIFICATION FOR FINE AGGREGATE
FOR PORTLAND CEMENT CONCRETE (AASHTO M 6)
3.9.1.2. ALL AGGREGATE TESTS LISTED IN CDOT 2017 SPECIFICATIONS
SECTION 601.05
3.9.2. PCC MIX DESIGN TESTS USED FOR MATERIAL APPROVAL SHALL BE
DATED WITHIN THE PAST 180 DAYS AND INCLUDE THE FOLLOWING
MINIMUM TESTS/REQUIREMENTS. MATERIAL SHALL MEET CDOT 2017
SPECIFICATIONS UNLESS OTHERWISE NOTED.
3.9.2.1. CDOT CLASS P REQUIREMENTS
3.9.2.2. MINIMUM 20% CLASS F FLY ASH SUBSITUTION BY WEIGHT
3.9.2.3. TYPE II CEMENT
3.9.2.4. ALL TRIAL MIX DATA TESTS LISTED IN CDOT 2017
SPECIFICATIONS SECTION 601.05
3.9.3. PATCHING SHALL BE DONE USING A GOVERNMENT APPROVED
POLYMERIC CONCRETE PATCH MATERIAL DESIGNED FOR THAT
PURPOSE. PRODUCT SHALL BE ON CDOT APPROVED PRODUCTS LIST.
3.10. CDOT SECTION 630– CONSTRUCTION ZONE TRAFFIC CONTROL
3.10.1. THE CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A TRAFFIC
CONTROL PLAN IN ACCORDANCE WITH MUTCD AND APPROVED BY
DPW. TRAFFIC CONTROL IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
3.11. CDOT SECTION 708– PAINTS
3.11.1. ALL PAVEMENT MARKINGS SHALL COMPLY WITH THIS SECTION.
4.0 GOVERNMENT FURNISHED DOCUMENTS
4.1. 60% SITE PLAN
5.0 APPLICABLE DOCUMENTS
5.1. ALL REQUIRED SUBMITTALS WILL BE LISTED ON AF FORM 66 AND
SUBMITTED USING AF FORM 3000, ANY MISSING SUBMITTALS REQUIRED
BY THE SPECIFICATIONS SHALL BE SUBMITTED TO USING AF FORM 3000.
30 November 2017 13 DPW18-999
ALL SUBMITTALS SHALL MEET THE REQUIREMENTS LISTED IN THE
SPECIFICATIONS UNDER EACH SECTION.
6.0 APPLICABLE CODES, PERMITS AND SPECIFICATIONS:
6.1. WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE MOST
CURRENT APPLICABLE FEDERAL, STATE, LOCAL, AND FORT CARSON
LAWS, CODES, REGULATIONS AND STANDARDS AT TIME OF AWARD.
THE CONTRACTOR IS RESPONSIBLE TO RESEARCH ALL APPLICABLE
LAWS, CODES REGULATIONS AND STANDARDS TO MEET CONTRACT
REQUIREMENTS AND PROVIDE A SAFE AND USEABLE FINISHED
PRODUCT. IF THERE IS A CONFLICT BETWEEN THE LAWS, CODES,
REGULATIONS AND STANDARDS AND THE INFORMATION PROVIDED BY
THE GOVERNMENT, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY
THE CONTRACTING OFFICER FOR DIRECTION. APPLICABLE CODES AND
STANDARDS INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING:
6.1.1. CDOT M&S STANDARDS (2017)
6.1.2. COLORADO DEPARTMENT OF TRANSPORTATION (CDOT)
STANDARDS SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTIONS. (2017)
6.1.3. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (2009)
7.0 POINTS OF CONTACT
PROJECT ENGINEER: WARREN L. WADE, 719.526.9211 OR 727.741.1947
CONSTRUCTION REPRESENTATIVE: WILL BE PROVIDED AT PROJECT KICKOFF
MEETING
8.0 ATTACHMENTS
8.1.1. DRAWINGS/SPECIFICATIONS
8.1.2. SUBMITTAL REGISTER
8.1.3. NEPA MITIGATION MEASURES/REQUIREMENTS
8.1.4. FORT CARSON DOCUMENTS AND FORMS
8.1.4.1. FC FORM 86-E DIG PERMIT REQUEST
30 November 2017 14 DPW18-999
8.1.4.2. HYDRANT APPLICATION
8.1.4.3. FC FORM 2036-E REQUEST FOR A FORT CARSON
INSTALLATION ACCESS CONTROL CARD
END OF DOCUMENT
30 November 2017 DPW18-999
DRAWINGS/SPECIFICATIONS
SUBMITTAL REGISTER
SUBMITTAL REGISTER CONTRACT NO.
(ER 415-1-10)
TITLE AND LOCATION CONTRACTOR SPECIFICATION SECTION
DPW18-99 Repair Hardstand Postwide
CLASSI-
TYPE OF SUBMITTAL FICATION CONTRACTOR CONTRACTOR GOVERNMENT
SCHEDULED DATES ACTION ACTION
I C N E I S S R N G
TRANS- SPECIFICATION T S T T F O
MITTAL ITEM PARAGRAPH DESCRIPTION OF D R C A I O V A R
NO. NO. NUMBER ITEM SUBMITTED R U H T R F S R R E P E APPROVAL MATERIAL SUBMIT
A C E E E I A E M R P V SUBMIT NEEDED NEEDED CODE DATE TO CODE DATE REMARKS
W T D M P C M C A N R I BY BY GOVERN-
D I I U E O A P O T O M O E MENT
A N O L N R T L R I N E V W T G N E T T E E D O L N E E A S S S S S S S S N Y T D R
a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x.
Construction Schedule showing Key Milestones and Inspection Points, As Often As Required to Maintain Accuracy x x Bid
2 Quality Control and Safety Plans x x Bid
3 Phasing Plan x x Bid
4 Concrete Mix Design x x NTL 2 Weeks after NTP
5 Proposed Reinforcing Steel x x NTL 2 Weeks after NTP
6 Proposed Landscape Rock x x NTL 2 Weeks after NTP
7 Proposed Base Course x x NTL 2 Weeks after NTP
DPW Approved Outage Requests, Signed by Required Signators x x
NLT 1 week Prior to Outage
9 All Quality Control Test Reports x x
NLT 1 week after Testing Conducted
10 DD1354 x x NLT 2 weeks after CCD
11 As-Builts x x NLT 2 weeks after CCD
ENG TIO
g
_______ (Proponent: CEMP-CE)
NEPA MITIGATION
MEASURES/REQUIREMENTS
MITIGATION MEASURES / REQUIREMENTS TABLE
Proponent Name:
Warren L. Wade Project Number:
DPW18-999
POC Phone:
(719) 526-9211
NEPA Number:
2017-417df
Title:
Repair Hardstand at Bldg 8200
Description:
Repair hardstand at bldg 8200.
AIR
Lana Altepeter 719-526-6601
WASTEWATER/DRINKING WATER
Harold Noonan 719-526-1730
Dan Follett 719-526-2022
STORMWATER
Suzy Rohrs 719-526-1697
Although this is a larger area, it falls into the category of full depth replacements such as roads. As long as appropriate BMPs are used to control contaminated run off, the project does not require a stormwater permit. Concrete sawcut and washout are not allowable discharges to stormwater or the ground. If the stormwater inlets will be replaced as a part of this project, they need to be marked either with a permanent metal placard or a precast manhole cover similar to this:
The following standard comment applies:
The project is located within the permit area of Fort Carson's Municipal Separate Storm Sewer System (MS4) Permit.
The MS4 permit requires that Fort Carson implement best management practices (BMPs) to minimize and eliminate non-stormwater and contaminated or sediment laden stormwater discharges to local drainages or storm drains.
Examples of prohibited discharges include but are not limited to concrete washout water and water from concrete saw cuts; water contaminated with sediment, detergents, or petroleum products; and super-chlorinated water from line flushing. The contractor/construction entity must implement BMPs that prevent these types of discharges from leaving the project area for the duration of the project, regardless of the project size.
ASBESTOS/LEAD/TOXICS
David Martin 719-526-1725
No concerns.
IRP
Updated 11/30/2017 diane.frost1 Highlight
Eric Dunker 719-526-8004 Julia Simmons 719-526-1682
It is possible that POL may be encountered under the existing hardstand during construction. If this occurs, the DPW- Environmental Division must me contacted immediately. There shall be no soil sampling whatsoever, unless authorized and directed by DPW-Environmental. Contact the IRP program with questions at 719-526-8001.
AST/UST/SPILL
Terry Eberle 719-526-9411
No concerns.
RCRA
Cheryl Frischkorn 719-526-1686
Contact the RCRA Program Manager for questions regarding any potential waste characterization, waste accumulation, storage and disposal. 526-1686
INVASIVE PLANTS/PEST MANAGEMENT
Dawn Rodriguez 719-526-1329
Utilize native plants for any vegetative restoration work.
CULTURAL RESOURCES
Pam Miller 719-526-4484
Jennifer Kolise 719-503-6136 (PCMS) Betty Whiting 719-526-3796
This activity is exempted from further Section 106 consultation under the Built Environment Programmatic Agreement. Inadvertent Discovery of Archaeological, Cultural, or Paleontological Materials Standard Operating Procedure applies. (BE 1.A2)
FORESTRY/ARBORIST
Dan Gray 719-526-1692 (Main Post)
Jason Zayatz 719-526-1667 (Down Range)
Any trees within the proposed project area should be retained and incorporated into the landscape to the extent possible. If this is not feasible, the project proponent must contact DPW- Forestry at 526-1667/1692 for guidance PRIOR to any tree pruning or removal to ensure Army Reg. 200-1 and other laws/ guidelines are adhered to.
WATERSHEDS/WETLANDS/404
James Kulbeth 719-526-1685
WILDLIFE
Stephanie Smith-Froese 719-526-8006
Bryan Kluever 719-524-5393 Richard Riddle 719-503-6529 (PCMS)
To minimize Migratory Bird Treaty Act (MBTA) conflicts, removal of small trees and shrubs, mowing or removal of cattails, disturbance/destruction of riparian areas, and/or grading of prairie grass should occur from 1 November to 15 April. Otherwise, prior coordination with DPW-Wildlife is necessary to survey the project area within 2 weeks of starting construction. The primary nesting season for most birds protected by the MBTA occurs between 15 April -15 Sept, annually. If active MBTA nests are found, a 50ft buffer around each nest would be needed or a US Fish & Wildlife Service (USFWS) permit authorizing removal. If active nest(s) are discovered during project work activities, contact DPW-Wildlife immediately to avoid MBTA violation(s). If the scope or location changes, the proponent needs to coordinate with DPW Wildlife prior to beginning any work. The DPW Wildlife Biologist will conduct all surveys for wildlife.
OTHER
diane.frost1 Highlight
NEPA POCs Deb Benford 719-526-4666 Jack Haflett 719-526-6206 Diane Frost 719-526-0896
The Fort Carson NEPA Office must be notified of any change to the scope, location, or size of the project.
Project proponent is responsible to ensure coordination, monitoring, and mitigation requirements listed in this document are implemented.
Further Coordination May Be Required:
Finalized Date:
Click here to sign this section
Signed by FROST.DIANE.J.1147158200 View details on Monday, August 22, 2016 8:15 AM (Mountain Daylight Time)
9/30/2017
** Subject to requirements listed in the Mitigation Measures/Requirements Table. If project is not initiated within 180 days, and/or there is a change in scope of work or location this document becomes null and void. Contact the NEPA Coordinator for re-submittal. Expiration Date:
Any environmental information needed to meet permit requirements (i.e. historic properties, T&E Species, Air Quality.
etc) can be obtained from the Fort Carson Program POCs listed above.
CAUTION: IF THIS FORM IS PROVIDED AS AN ATTACHMENT TO, OR OTHERWISE AS A PART OF, A CONTRACT, THE FOLLOWING APPLIES:
The above information represents assessments from the Fort Carson DPW Environmental Division concerning environmental requirements relating to this project. These assessments are provided for the Contractor’s information only. The Government does not warrant that these assessments are accurate or comprehensive. The Contractor remains responsible to determine and comply with all applicable federal, state, local, and military environmental laws and regulations.
Fort Carson has implemented an Environmental Management System (EMS) as the primary management approach for addressing environmental impacts of its processes, activities, and services. Fort Carson uses the ISO 14001:2004 as the standard for its EMS. All personnel performing work for on behalf of Fort Carson must be aware of and understand Fort Carson's Environmental Policy. For information regarding EMS requirements contact the Fort Carson EMS office at 719- 526-1697.
7/1/2018
Updated 11/30/2017
Inadvertent Discovery of Archaeological, Cultural, or Paleontological Materials
In the event that a cultural resource, item of cultural material, or vertebrate paleontological resource is encountered during an undertaking, it is Fort Carson’s policy to make reasonable efforts to avoid, minimize, or mitigate adverse effects to those resources until the CRM can make a recommended determination of eligibility for inclusion in the NRHP and/or of the significance of the material. This process applies to newly discovered sites, as well as for a discovery on or near previously recorded properties where additional cultural materials or features may have been exposed. Note: A vertebrate paleontological resource is defined as fossil remnants from aquatic vertebrates (fish) to mammals, including birds.
Inadvertent Discovery of Archaeological Materials: Upon discovery, the following actions will be taken:
1. The project proponent, coordinator, or contractor will notify the Cultural Resources Manager (CRM) immediately, and all project work will cease within 30 meters of the site or discovery until otherwise notified by the CRM.
2. The CRM will inspect the site where archaeological materials have been discovered.
3. Documentation of the disturbance will be made, including notes and photographs.
4. The CRM will investigate to determine if the discovery constitutes a site with the potential to be eligible for inclusion in the National Register of Historic Properties (NRHP). If so, the CRM will initiate the Section 106 consultation process using 36 CFR 800.4 through 800.6, as applicable.
Willful Destruction of Archaeological Materials: The willful destruction, unauthorized excavation, removal, damage, or defacement of archeological materials is a violation of the Archaeological Resources Protection Act of 1979 (ARPA, as amended) and may result in a felony prosecution. The Integrated Natural Resource Management Plan (INRMP) provides for implementation of provisions under these laws. It is Fort Carson’s intent to prosecute anyone who vandalizes archeological sites or removes from federal property cultural materials or Native American remains or cultural items. See Section 4.c. Conservation Law Enforcement of the INRMP for details and enforcement procedures.
Native American Human Remains: In the event the find is or is suspected to be Native American human remains or funerary objects that are or may have been associated with human remains, the CRM will follow the stipulations and guidelines outlined in the Fort Carson NAGPRA policy, found within the Comprehensive Agreement between Fort Carson and 11 federally-recognized Native American Tribes.
Project Monitoring: Monitoring by Cultural Resources Management Program (CRMP) personnel may occur for activities or projects that are planned in areas that are known or suspected to have a greater likelihood for subsurface archaeological materials. The CRM will determine the appropriate level of monitoring and coordinate a schedule with the project proponent.
FORT CARSON DOCUMENTS AND FORMS
FC FORM 86-E, JAN 2015 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 2
FACILITIES ENGINEERING DIG PERMIT REQUEST
(DPW is the proponent; the approving authority is FC Reg 420-20)
INVOLVING EXCAVATION, UTILITY, OR OTHER DISTURBANCES PER ATTACHED SKETCH.
DIG PERMIT NUMBER:
1. CLEARANCE IS REQUESTED TO PROCEED WITH WORK AT:
RECEIVED DATE: PROJECT NO: CONTRACTOR:
2. TYPE OF FACILITY WORK INVOLVED - EXPLAN THE EXACT LOCATION AND PROPOSED WORK:
3. INSTRUCTIONS: This work clearance request is used for any work (contract or in-house) that may disrupt vehicular, rail, or air traffic flow, utility services, protection provided by fire and intrusion alarm systems or routine activities of the installation. This form is used to coordinate the required work with key installation activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance must be reprocessed. If you have any questions, please call the Dig Permit Coordinator at 526-3089 or the Utility Locator at 524-0892.
4. SIGNATURE OF REQUESTING OFFICIAL: 5. PHONE:
7. DATE DIG PERMIT TERMINATED:6. DATE DIG PERMIT REQUIRED:
ORGANIZATION
10. COMMUNICATIONS (HELP DESK) 526-5232
TICKET NUMBER REVIEWER'S NAME & DATE
8. UNCC 1-800-922-1987
9. CITY OF FOUNTAIN WATER 382-5604
11. ENVIRONMENTAL COMPLIANCE 526-1682
12. BARRACK PHONE (SPRINT) 579-1000
13. GOVERNMENT UTILITIES REMARKS AND INITIALS
a. ELECTRICAL DISTRIBUTION
REVIEWER'S NAME & DATE
b. GAS DISTRIBUTION
c. CATHODIC PROTECTION
d. WATER DISTRIBUTION
e. IRRIGATION SYSTEMS
f. SEWER LINES
g. STORM DRAIN SYSTEM
h. STEAM DISTRIBUTION
i. CHILLED WATER
j. COMPUTER/TRAFFIC
k. OTHER
14. ROAD CLOSURE; IF NEEDED, PLEASE COMPLETE FC FORM 420-E (FORT CARSON UTILITY OUTAGE/CONNECTION REQUEST)
a. MILITARY POLICE
b. MEDDAC AMBULANCE 526-7112
c. FIRE PREVENTION 526-0651
15. RANGE CONTROL 526-5597
16. DPW TRAFFIC CONTROL 526-9267
17. POST AGRONOMIST 526-1666/1696
FC FORM 86-E, JAN 2015 (Back) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 2
CONTRACT PRIOR TO:
1. ANY PROJECT THAT REQUIRES THE PLANTING OR DIGGING UP OF TREES AND BUSHES.
2. ANY PROJECT BEING DONE DOWNRANGE.
3. ANY PROJECT REQUIRING GROUND DISTURBANCE OR GREATER THAN ONE (1) ACRE.
18. REMARKS: THIS SECTION MUST DESCRIBE SPECIFIC PRECAUTIONARY MEASURES TO BE TAKEN BEFORE AND DURING WORK.
SPECIFIC COMMENTS CONCERNING THE APPROVED METHOD OF EXCAVATION, HAND, OR POWERED EQUIPMENT SHOULD BE
INCLUDED. NOTE: BORING: ALL UTILITIES MUST BE EXPOSED BEFORE CROSSING.
19. TROOP CONSTRUCTION:
IMPORTANT - READ BEFORE SIGNING
The undersigned understands that the Fort Carson Base Operations and Maintenance contract locators will attempt to locate the underground utility lines by using electronic detectors, maps, and other available information, but that all such methods may be inaccurate. Therefore, it is expressly understood and agreed between the undersigned and Fort Carson that NO GUARANTEES OR WARRANTIES, EXPRESSED OR IMPLIED, ARE MADE BY FORT CARSON as to the accuracy of any information furnish. Depth of bury, when provided, is never guaranteed. Twenty four inches either side of the stake, paint marks, or flag is considered a correct horizontal location for government owned utilities. When utilities cannot be electronically located, their approximate location will be drawn on the attached Underground Utility Location Map (Form.4.34.003). All identified utilities must be exposed before crossing or paralleling within three feet of the existing utility to determine bury depth. It is the responsibility of the undersigned and/or excavating company to pot hole or hand dig these identified utilities. All damages to any utilities by any person must be reported immediately so an investigation can be made to determine the cause of damage and arrangements made for necessary repairs. WHEN THE GOVERNMENT INVESTIGATOR DETERMINES THAT THE EXCAVATING COMPANY WAS AT FAULT AND DISREGARDED THE ABOVE MENTIONED INSTRUCTIONS, THE DIG PERMIT WILL BE TERMINATED. Locates are good for 30 days, unless extended by the government, and all utilities will be marked once, then it is the contractors responsibility to maintain the marks.
(SIGNATURE)
(DATE)
(PRINT NAME)
APPROVED
(DATE)
(PRINT NAME)
(SIGNATURE)
Hydrant Use Application
Organization: ____________________________________________________
Mailing Address: ___________________________________________________________________
Office Phone: _____________________________ Cell Phone: _____________________________
Hydrant Number: ______________Location:________________________________________
Hydrant Meter #: _________________ Beginning Meter Reading (gallons): _____________
Scheduled Start Date: ____________________ Scheduled Finish Date: ______________________
____ Backflow Preventer Will Be Used ____ Shutoff Valve Will Be Used
Proposed Use of Hydrant Water: _______________________________________________________
Note!! Use only fire hydrant wrenches on the caps or operating nut. No pipe wrenches. Open hydrant valve all to way to establish flow and prevent possible valve damage. Turn hydrant valve completely off at the end of each work day to allow the hydrant to drain and prevent freezing. Contractor WILL be charged for any hydrant valve damage they cause. Call 719-491- 2982 or email vincent.e.guthrie2.civ@mail.mil with your meter reading by the 15TH of each month.
Call the Fort Carson Dig Permit Office at (719) 302-0157 to obtain a work clearance/dig permit if any digging or excavation will be done. Fort Carson requires that a backflow preventer and shutoff valve be used at the connection point to the fire hydrant. Hydrants may be used for essential purposes only. Essential uses include, but are not limited to, dust mitigation, compaction, and construction site water use. Do not allow water to pool or flow onto the pavement or into gutters/storm sewers. Repair any system breaks and leaks immediately. Submit application to:
Fort Carson Directorate of Public Works Building 1219, Room 209
Phone: Vince Guthrie 719-526-2927 or 719-491-2982 M-F 0730 – 1600 hours
Name Signature Date
For Office Use Only
Permit Issued: No (see attached explanation) _____ Yes _____
Based on the information provided, a permit is issued authorizing the use of the requested hydrant. Call 719-491-2982 with the final meter reading from the hydrant. Keep a copy of this permit near the hydrant location, in your water truck(s), and/or in your construction trailer.
This permit will expire _______________ day of __________________, 201____.
DPW approval by _____________________________________________________
FC FORM 2036-E, DEC 2014
REQUEST FOR A FORT CARSON INSTALLATION ACCESS CONTROL CARD (Required for all Pass Requests greater than 24 hours) (DES is the proponent; the approving authority is DTM 09-012, December 8, 2009)
APPLICANT INFORMATION
NAME (Last, First, Middle): GRADE/RANK/STATUS: CTR
DATE OF BIRTH:SSN: GENDER (circle one): MALE / FEMALE
DRIVER'S LICENSE#: ORGANIZATION/UNIT:
ORGANIZATION/UNIT PHONE#: RELATIONSHIP TO SPONSOR:
E-MAIL ADDRESS:
REQUESTED CARD
NON-DOD CONTRACTOR FOREIGN NATIONAL FORT CARSON GOOD NEIGHBOR VENDOR FAMILY CARE PROVIDER
REQUESTED DATE(s) AND TIME(s) OF VISIT:
CONTRACT PERIOD (FROM/TO DATES) (CONTRACTOR/VENDOR USE AS APPLICABLE):
JUSTIFICATION FOR CARD:
SPONSOR INFORMATION
NAME (Last, First, Middle): GRADE/RANK/STATUS:
ORGANIZATION/UNIT: ORGANIZATION/UNIT PHONE#:
E-MAIL ADDRESS:
BDE/BN CDR/XO/DIRECTOR/DEPUTY DIRECTOR/COR CERTIFICATION
I certify that the applicant meets the justification requirements as indicated in Paragraph 2 above for access privileges. Furthermore I certify that the applicant requires an access control card to perform assigned duties or conduct official business on Fort Carson.
Privacy Act Statement
Authority: 10 U.S.C. 3013, Secretary of the Army; Army Regulation 190-13, The Army Physical Security Program and E.O. 9397 (SSN).
Purpose(s): To support Department of the Army physical security and access control programs; Information Assurance program; to record personal data and vehicle information registered with the Department of the Army; to provide a record of security/access badges issued; to restrict entry to installations and activities; to ensure positive identification of personnel authorized access to restricted areas; to maintain accountability for issuance and disposition of security/access badges and for producing installation management reports.
Routine uses: In addition to those disclosures generally permitted under 5 U.S.C. 552a(b) of the Privacy Act, these records or information contained therein may specifically be disclosed outside the DoD as a routine use pursuant to 5 U.S.C. 552a(b)(3) as follows: The DoD 'Blanket Routine Uses' also apply to this system of records.
Disclosure: Disclosure of SSN and other personal information is voluntary; however, failure provide the requested information can result in denial of access to the military installation.
PRINT CERTIFYING OFFICIAL'S NAME
RANK/PHONE NUMBER CERTIFYING OFFICIAL'S SIGNATURE
INSTALLATION ACCESS CONTROL OFFICE USE ONLY
ISSUING OFFICIAL:
APPROVED / DISAPPROVED
(circle one)
PRINT ISSUING OFFICIAL'S NAME ISSUING OFFICIAL'S SIGNATURE
DATE
| 20171206 Repair Hardstand 8200 SOW |
| 20171206 Repair Hardstand 8200 Attachments |
| 21071206 DPW18-999_Drawings G-001 |
| DPW18-999_Drawings G-101 |
| DPW18-999_Drawings G-102 |
| DPW18-999_Drawings G-103 |
| DPW18-999_Drawings G-104 |
| DPW18-999_Drawings C-101 |
| 20171206 DPW18-999_Drawings C-501 |
| DPW18-999 Submittal Register |
| DPW18-999 NEPA |
| FC Form 86-E Dig Permit Request Flattened |
| DPW18-999 Hydrant Application |
| FC Form 2036-E Flattened |
File details come from the government source that posted it. Updated .