About this file

This solicitation is for multiple award indefinite-delivery, indefinite-quantity firm-fixed-price contracts to provide joint forces paving services for Colorado Department of Defense installations. The 50th Contracting Squadron intends to award a maximum of six contracts with a combined ceiling value of $200 million and a period of performance from September 2018 to September 2025, including a base ordering period and one two-year option period. Contractors must be registered in the System for Award Management prior to award. Questions are due in writing by March 13, 2018, and proposals must be delivered by the time and date specified in the solicitation. The contractor shall provide signed copies of required forms and acknowledge any amendments. Debarred or suspended contractors are ineligible.

Attachment 4 - Safety, Security, Health and Environmental Requirements 01510

View the file

Other files for this federal contract opportunity

Other files attached to Joint Forces Paving (JFP) for Colorado DoD Installations (CODI), newest first.
File Type Posted
JFP_CODI_Industry_Update_13_Nov_18.docx DOCX document
JFP_CODI_Notice_to_Industry_MFR_7_Sep_18.pdf PDF
JFP_CODI_Notice_to_Industry_MFR_13_Aug_18.pdf PDF
JFP_CODI_Notice_to_Industry_MFR_20_July_2018.pdf PDF
JFP_CODI_2_May_18_Questions.pdf PDF
JFP_CODI_Notice_to_Industry_MFR_13_Apr_18.pdf PDF
RFP_Amended_SF_1442_13_Apr_18.pdf PDF
SF_30_13_Apr_18.pdf PDF
Notice_to_Industry_12_Apr_18.pdf PDF
Protest_to_GAO_B-416179_22_Mar_18.pdf PDF
JFP_CODI_Notice_to_Industry_MFR_23_Mar_18.pdf PDF
JFP_CODI_RFQ_Follow_on__QA__21_Mar_18.pdf PDF
JFP_CODI_RFQ_QA_16_Mar_18_Responses.pdf PDF
JFP_CODI_Site_Visit_Q&A_2_Mar_18.pdf PDF
12_Acronyms.pdf PDF
14_TASK_ORDER_PROCEDURES.pdf PDF
3_Contractor_Quality_Control_01440.pdf PDF
11_PAFB_Sample_Project_SOW.pdf PDF
8_Ft_Carson_Sample_Project.pdf PDF
5_Airfields_and_Hangars_01540.pdf PDF
7_CODI_PP_Questionnaire.pdf PDF
FA2550-18-R-1004_JFP_CODI_RFP.pdf PDF
6_Task_Order_Close_Out_01700.pdf PDF
1_General_Requirements_01000.pdf PDF
9_PAFB_Sample_Project_DRAWING.dwg DWG drawing
2_Organizational_Guidance_01030.pdf PDF
10_PAFB_Sample_Project_SUBMITTAL_SCHEDULE.xlsx XLSX spreadsheet
13_Contract_Management.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Joint Forces Paving for

Colorado DoD Installations (CODI)

SECTION 01510

SAFETY, SECURITY, HEALTH AND ENVIRONMENTAL REQUIREMENTS

ATTACHMENT 4

1. GENERAL: The Contractor shall maintain safe and healthful conditions for all personnel performing, or coming into contact with the performance of, the work required by this contract. The contractor shall also comply with all environmental and energy conservation objectives.

2. EXECUTION

2.1. Safety Program

2.1.1. The Contractor shall organize, maintain, and implement a safety program. The Contractor's management organization shall include administrative, liaison, and technical functions to implement, direct, monitor, control, and allocate resources for these tasks and allied safety efforts with other tasks of the project. As part of a comprehensive safety program, the safety tasks herein shall be accomplished by the Contractor to assure that safety requirements are satisfied.

2.1.2. The Contractor’s safety plan shall document the approach used to satisfy safety requirements. The Contractor's files containing safety and safety related data shall be available for review by the government as deemed necessary by the cognizant Contracting Officer.

2.2. Specific Safety Requirements.

2.2.1. No welding shall be permitted before the Contractor has obtained approval from the base fire marshal/chief. If approval is granted, welding shall be accomplished in accordance with (IAW) applicable safety standards. A trained person shall be used as the Welders Fire Watch while welding or cutting is being performed.

2.2.2. A confined space permit must be submitted to the Fire Department in the method and manner specified in the task order.

2.2.3. Emergencies: In the case of an emergency, the cognizant Contracting

Officer, base fire chief, CE Operations Flight Chief, and Base Safety

Office personnel, or their representative(s), have the authority to order the Contractor to terminate work and clear the area of personnel and equipment. The Contractor shall comply with such an order with all possible speed.

Joint Forces Paving for

Colorado DoD Installations (CODI)

2.3. Mishap/Hazard Investigation

2.3.1. The Contractor shall report promptly by telephone to the c o g n i z a n t

Contracting Officer, all available information relating to each instance of a mishap involving government personnel or property. During weekends, holidays, or after normal Contracting Office duty hours, the Contractor shall notify the installation’s Security Forces.

2.3.2. The Contractor shall immediately secure, and impound any mishap scene, wreckage, and the mishap documentation until released by the investigation safety officer. Such release will be accomplished through the cognizant Contracting Officer.

2.3.3. The Contractor, and all related subcontractors within its control, shall support the Government, as it requires, in any mishap or hazard investigation. This support shall include, but not be limited to, technical assistance as well as access to undelivered internal contractor data.

2.4. Environmental and Energy Conservation Objectives. The contractors will be required to comply with all applicable federal, state, county, local, standards regarding environmental pollution, energy management, and hazardous material compliance. Hazardous material and waste storage will be accomplished in accordance with all applicable Occupational Safety and Health Act (OSHA), Federal, State and local laws and regulations. The known environmental considerations are lead-based paint, asbestos containing products, and the use of a storm water protection plan when applicable. Individual projects will receive appropriate National

Environmental Policy Act (NEPA) and cultural resources review.

2.4.1. The Occupational Safety and Health Act (OSHA). OSHA

requirements will be enforced by each installation’s safety office.

2.5. Security requirements vary by installation and by task order. The contractors will be required to comply with all installation security requirements. The issuing task order level installation will process security clearances for all contractor employees who will require a clearance in accordance with the specifications. The contractors will not be allowed access to information technology equipment on any installation.

2.5.1. Anti-Terrorism. Department of Defense Instruction (DoDI)

2000.16, DoD Anti-terrorism Standards, will be addressed in the

MATOCs and will be tailored to meet any requirements at the task order level for each installation.

END OF SECTION 01510