ATTACH_7___Question_and_Answer_Compiled- Amendment 02.pdf
PDF 185 KB Posted
- Solicitation number
- FA252126B0003
About this file
This is a Questions and Answers document for the DEMO IDIQ (Demolition Indefinite-Delivery Indefinite-Quantity) contract solicitation issued by Space Launch Delta 45, Patrick Space Force Base and Cape Canaveral Space Force Station, Florida. The solicitation number is FA252126B0003, with a deadline of September 2, 2026, and pertains to the seed project DBEH 11-1638 for demolishing a Heavy Equipment Shop (Building B49800).
The Q&A addresses 18 control items clarifying submission requirements, site conditions, and contract terms. Key clarifications include: Attachment 4 (Bid Schedule Summary) is not required for submission; Amendment 02 will provide a revised Attachment 17 (Seed Project IDIQ Price List); the SF 1442 solicitation document is available in editable conformed copy format; the existing concrete slab-on-grade and foundations will remain in place as active hardstand with no paving permitted; electrical service has been removed from the building; dumpster and material staging are permitted on the concrete slab and adjacent parking areas subject to site plan approval; the pre-bid site visit is not mandatory and no additional site visits are available; no Professional Engineer-stamped drawings are required; working hours are 7:30 AM to 4:00 PM excluding weekends and federal holidays; the Contracting Officer may extend the contract term up to 5 years and 6 months total; bonding is based on individual task orders, which may exceed $1 million; and the Government does not possess a recent comprehensive hazardous materials survey but records indicate no friable asbestos. Offerors must price pre-demolition sampling and testing line items and base superstructure demolition proposals on zero hazardous materials, with confirmed abatement quantities to be added via contract modification.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project:
Control
Number Reference Document and Section Questions Government Answer
1 ATTACH 03 - DEMO IDIQ Pricing Sheet
The revised Demo IDIQ Pricing Sheet contains the seed project name and project information on the individual pricing tabs. Kindly confirm whether this information is intentional or whether those fields should be blank for the Demo IDIQ Pricing Sheet.
To not create confusion, the Government has removed refrences of Seed project from Attachment
3.
2 ATTACH 4 - Bid Schedule Summary
Amendment 0001 includes a revised Attachment 4 - Bid Schedule Summary. Section
L identifies the documents required for submission of the electronic bid package.
Please confirm whether the revised Attachment 4 is required to be completed and submitted with the offer. If so, kindly clarify where it should be included within the required bid package attachments.
Attachment 4- Bid schedule summary- is not required to be completed and submitted by the offeror.
3 ATTACH 17 - Seed Project IDIQ Price List
Amendment 0001 includes a revised Attachment 03 - Demo IDIQ Pricing Sheet, however a revised Seed Project Price List was not included. Kindly confirm whether offerors should continue to use Attachment 17 - Seed Project IDIQ Price List without modification or whether a revised Seed Project Price List will be issued. Amendment 02 will have a revised Attachment 17
4 SF 1442
The solicitation document(s) (SF 1442) for the Demolition Indefinite-Delivery
Indefinite-Quantity (IDIQ), Space Launch Delta 45, Patrick Space Force Base and
Cape Canaveral Space Force Station, Florida — Seed Project: DBEH 11-1638, Demolish Heavy Equipment Shop, B49800 — Solicitation No. FA252126B0003 is password protected.
We have included an editable conformed copy of the Sol. SF 1442 with amendment.
Attachment 15
Is the existing building set on a concrete slab? If so, what are the slab depths and footing sizes?
Yes. As detailed in SOW Sections 1.0, 3.0, 3.2, and 5.4, the existing concrete slab-on-grade, foundations, and grade beams will remain in place to serve as the active hardstand. No asphalt or concrete paving, resurfacing, or overlays are required or permitted.
Attachment 16
Is there any existing prints on the existing structure detailing the slab thickness / footing sizes?
See amendment 01 documents for all available/applicable documents. As detailed in SOW
Sections 1.0, 3.0, 3.2, and 5.4, the existing concrete slab-on-grade, foundations, and grade beams will remain in place to serve as the active hardstand. No asphalt or concrete paving, resurfacing, or overlays are required or permitted.
Attachment 15
It states we need to take electrical back to the transformer. Where is the exisitng transformer located?
After further investigation, electrical service has been removed from the building. Assume there is no electrical service to the building for bidding purposes.
Attachment 15 What area can we use for dumpster/material staging?
Staging of roll-off dumpsters, heavy demolition equipment, and salvaged metal is permitted on the existing concrete building slab and immediately adjacent designated asphalt/concrete parking lot/apron within the project limit of disturbance.
Contractors must maintain clear emergency access lanes and general traffic circulation at all times and not interfer with the operations related to adjacent facilities. Prior to mobilization, submit a site layout and staging plan via AF Form 3000 to 45 CES Planning for review and approval.
Solicitation Document Will the agency release the prebid conference sign in sheet?
Pre-bid site visit Sign in sheet was provided with
Amendment 01 Documents
10 Solicitation Document Was the pre-bid site visit mandatory for bidding? Pre-bid site visit is not mandatory for bidding
Solicitation Document Would the agency be open to any additional site visits for the seed project?
Due to mission acquisition deadlines, an additioanl site visit for the seed project will not be available.
DEMO IDIQ - 09/02/2026
Question and Answer
DEMO IDIQ
Soliciation Document /Price sheet
Am I correct in assuming that the total price for attachment 3 pricing schedule is to be entered on the Attachment 4 bid schedule summary? Which pricing schedule information should be entered into the table on page 5 with the estimated quanities of 20?
Attachment 4- Bid schedule summary- is not required to be completed and submitted by the offeror. See
SF1442, section L-5:Submission of bids.
Attachment 15 Have any hazzardous material surveys already been completed on the structure?
The Government does not possess a recent full predemolition hazardous materials survey; however, the 2016 Facility Condition Assessment records that friable asbestos is not present in the building. Offerors shall price the required pre-demolition sampling and testing line items in Attachment
3 (CLINs 02 82 1345 4501–4508) and base the superstructure demolition proposal on zero hazardous materials. Following award, the Contractor will perform comprehensive testing
(ACM, LBP, PCBs); confirmed abatement quantities will be added via contract modification utilizing the unit rates in Attachment 3.
Soliciation Documents Is there any engineered prints needed in our scope?
No Professional Engineer (PE) stamped structural engineering or civil drawings are required for this seed project. Because the scope is limited to the superstructure removal of a single-story corrugated metal Quonset structure with the slab/foundation remaining intact, the project involves no ground/soil disturbance (<1 acre), eliminating the need for an engineered Stormwater Management Plan
(SWMP/SWPPP). Offerors are only required to submit standard contractor administrative and safety submittals per the SOW, including: (1) Demolition
Sequencing & Utility Safing Plan, (2) Standard
Crane/Rigging Lift Plan (if utilizing hoists/cranes for structural steel arch removal), and (3) Environmental
Protection / Storm Drain Inlet Protection measures
(BMPs) to prevent dust and debris from entering adjacent storm grates.
Past Demo Term Contract
Can you advise if any singular project in the last term demo term contract exceeded
$1 Million?
It is possible that an individual task order for this
Demo IDIQ can be greater than 1 million. See section
B: Task order minimum/maximum amount.
See clause 52.216-19 for futher information on Order limitiations.
Soliciation Documents Are there any specific hours of operation that must be abided by?
Working hours will normally range between the hours of 7:30 AM and 4:00 PM (0730-1600) excluding
Saturdays, Sundays and Federal Holidays.
See Attachment 1- Demo IDIQ SOW, Section 1.3.3
Soliciation Documents
When the contract comes up for renewal each year, is it the contractors option to renew, the project owners option to renew, or both? Our surety is not comfortable issuing a 5 year bond.
In regards to renewing options, the Contracting
Officer may extend the term of the contract (exercise the option), not to exceed 5 years and 6 months in total duration.
Soliciation Documents
If awarded the project, does the payment and performance bond need to be issed on the maximum penalty, or can it be issued on each purhcase order? Our bonding capacity at this time is $1 Million per project.
Bonding is based on the individual task order;
however, It is possible that an individual task order for this Demo IDIQ may be greater than 1 million.
See section B: Task order minimum/maximum amount. (SF1442) See clause 52.216-19 for further information on Order limitations.(SF 1442) See
Clause 52.228-1 Bid guarantee
File details come from the government source that posted it. Updated .