This document is a facility assessment file containing asbestos data archives, facility condition reports, and real property inventory information for Building 49800 (Heavy Equipment Shop) at Cape Canaveral Air Force Station (CCAFS).

Building 49800 is a 5,526 square foot structure constructed in 1959 with a concrete foundation, corrugated metal walls and roof, and six roll-up bay doors, partitioned into three high-bays. The facility was used by SpecPro Environmental Services for storing heavy equipment, vehicles, tools, and chemicals for forestry services and invasive plant control. The Asbestos Data Archive indicates that Room 2 contains friable asbestos-containing materials (ACM) in wall tile covering (144 SF) and fibrous board panels (144 SF), along with non-friable floor mastic (72 SF). Rooms 3, 4, and 5 contain only non-friable ACM in silver paint wall coverings and black expansion joints. Sample testing from 1992 and 2005 across all rooms returned "NAD" (No Asbestos Detected) results with 0% asbestos content. The May 2016 Facility Condition Assessment rated the building in very poor condition with a Building Condition Index of 66 (Red), noting that utilities have been decommissioned and the facility is vacant. Deficiencies identified include roof leaks at various locations, one inoperable roll-up door shifted from its guide, and a compressed air system hose reel leak. Project DBEH111638 scheduled the building for demolition in FY2018, with no active Deferred Scheduled Work orders recommended. The facility is listed as historic and requires real property inventory updates every three years, with the last inventory completed in 2016.

View the file

Other files

File Type Posted
FA252126B0003 Abstract.pdf PDF
ATTACH 03 - DEMO IDIQ Pricing Sheet-02 September 2026.xlsx XLSX spreadsheet
Solicitation Amendment - FA252126B00030002- Conformed Copy.pdf PDF
ATTACH 17 - SEED PROJECT - Pricing Sheet- 02 September 2026.xlsx XLSX spreadsheet
Solicitation Amendment FA252126B00030002 SF 30.pdf PDF
ATTACH_7___Question_and_Answer_Compiled- Amendment 02.pdf PDF
Solicitation Amendment 1 - FA252126B00030001- SF30.pdf PDF
Conformed Solicitation Amendment 1_ FA252126B0003 0001 SF 1442.pdf PDF
ATTACH_7___Question_and_Answer_Compiled.pdf PDF
Solicitation FA252126B0003 0001 SF 1442.pdf PDF
ATTACH 15 - SEED PROJECT -SOW DBEH111638_Demolish Heavy Equipment Shop B49800_21AUG2026.pdf PDF
ATTACH 23 - Building Assessment Summary 49800.xlsx XLSX spreadsheet
ATTACH 24 - Demo IDIQ Site Visit- 17 August 2026.pdf PDF
ATTACH 4 - Bid Schedule Summary- Amendment 01.pdf PDF
ATTACH 03 - DEMO IDIQ Pricing Sheet.xlsx XLSX spreadsheet
ATTACH 12 - SCA WD- Brevard- 13 May 2026.pdf PDF
ATTACH 2 -DEMO IDIQ Specifications.pdf PDF
ATTACH 19 - EDWOSB-SelfPerformanceCertificationWrksht.pdf PDF
ATTACH 4 - Bid Schedule Summary.pdf PDF
ATTACH 6 -DEMO IDIQ Haz Waste Generation Form.pdf PDF
ATTACH 7 - Question and Answer Template.xlsx XLSX spreadsheet
ATTACH 3 - DEMO IDIQ Pricing Sheet.xlsx XLSX spreadsheet
Solicitation - FA252126B0003.pdf PDF
ATTACH 15 - SEED PROJECT -SOW DBEH 11-1638 Demolish Heavy Equipment Shop B49800.pdf PDF
ATTACH 20 - PIEE Solicitation- PIEE Vendor Registration.pdf PDF
ATTACH 11 - DBA WD- Residential_Brevard-18 May 2026.pdf PDF
ATTACH 9 - DBA WD- Heavy_Brevard-18 May 2026.pdf PDF
ATTACH 14 - Badge Request 45 SFS Form V14.pdf PDF
ATTACH 1 -DEMO IDIQ Statement of Work_15JUL2026.pdf PDF
ATTACH 16 - SEED PROJECT - Plans_DBEH111638.pdf PDF
ATTACH 13 - Rules of Engagement for Site Visit- Seed Project.pdf PDF
ATTACH 18 - SEED PROJECT - SHPO Response 49800 Demo_260624_184357.pdf PDF
ATTACH 21 - PIEE Solicitation- Posting Offer Guide.pdf PDF
ATTACH 8 - DBA WD- Building_Brevard-18 May 2026.pdf PDF
ATTACH 10 - DBA WD- Highway_Brevard-18 May 2026.pdf PDF
ATTACH 5 -DEMO IDIQ GPP Certification.pdf PDF
ATTACH 17 - SEED PROJECT - Pricing Sheet.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Installatio DBEH

AMIS Asbestos Data Archive

Building Number 49800 HEAVY EQUIPMENT SHOP

DescriptionGroup Name

ACM

Code

FriableACM Presen

Room Number / Name 2

Quantity Units

N YWT Wall Covering (Tile) 12" LARGE AND

MEDIUM HOLES

144 SF

N YWP Wall Covering (Panel)

BROWN FIBROUS

BOARD

144 SF

N NFM Floor Covering (Mastic)

WHITE CARPET

ADHESIVE

72 SF

DescriptionGroup Name

ACM

Code

FriableACM Presen

Room Number / Name 3

Quantity Units

N NWA Wall Covering (Alumicote)

SILVER PAINT 1296 SF

N NFE Floor Covering (Expansion joint)

BLACK 200 LF

DescriptionGroup Name

ACM

Code

FriableACM Presen

Room Number / Name 4

Quantity Units

N NWA Wall Covering (Alumicote)

SILVER PAINT 1350 SF

N NFE Floor Covering (Expansion joint)

BLACK 240 LF

DescriptionGroup Name

ACM

Code

FriableACM Presen

Room Number / Name 5

Quantity Units

N NWA Wall Covering (Alumicote)

SILVER PAINT 2460 SF

N NFE Floor Covering (Expansion joint)

BLACK 220 LF

Not Valid For Design Or Decision Making

AMIS Asbestos Sample Results Archive

Building Number 49800

CommentsGroup Name

ACM

Code

ACM

2 Type

ACM

Percen

Room Number / Name ROOM 2

ACM

Type

ACM 2

Percen

Sample Number

Sample Date

0FM01 Floor Covering (Mastic)

NAD 0CHS2918 4/7/2005

0FM01 Floor Covering (Mastic)

NAD 0CHS2919 4/7/2005

0FM01 Floor Covering (Mastic)

NAD 0CHS2920 4/7/2005

0WP01 Wall Covering (Panel)

NAD 0BOC2439 6/30/1992

0WP01 Wall Covering (Panel)

NAD 0BOC2440 6/30/1992

0WP01 Wall Covering (Panel)

NAD 0BOC2441 6/30/1992

0WT01 Wall Covering (Tile) NAD 0BOC2445 6/30/1992

0WT01 Wall Covering (Tile) NAD 0BOC2446 6/30/1992

0WT01 Wall Covering (Tile) NAD 0BOC2447 6/30/1992

CommentsGroup Name

ACM

Code

ACM

2 Type

ACM

Percen

Room Number / Name ROOM 3

ACM

Type

ACM 2

Percen

Sample Number

Sample Date

0FE01 Floor Covering (Expansion joint)

NAD 0BOC2433 6/30/1992

0WA01 Wall Covering (Alumicote)

NAD 0BOC2430 6/30/1992

CommentsGroup Name

ACM

Code

ACM

2 Type

ACM

Percen

Room Number / Name ROOM 4

ACM

Type

ACM 2

Percen

Sample Number

Sample Date

0FE01 Floor Covering (Expansion joint)

NAD 0BOC2434 6/30/1992

AMIS Asbestos Sample Results Archive

Building Number 49800

CommentsGroup Name

ACM

Code

ACM

2 Type

ACM

Percen

Room Number / Name ROOM 4

ACM

Type

ACM 2

Percen

Sample Number

Sample Date

0WA01 Wall Covering (Alumicote)

NAD 0BOC2431 6/30/1992

CommentsGroup Name

ACM

Code

ACM

2 Type

ACM

Percen

Room Number / Name ROOM 5

ACM

Type

ACM 2

Percen

Sample Number

Sample Date

0FE01 Floor Covering (Expansion joint)

NAD 0BOC2435 6/30/1992

0WA01 Wall Covering (Alumicote)

NAD 0BOC2432 6/30/1992

49800 Facility Condition Assessment

CCAFS IOMS 2009

Facility No: 49800 Fiscal Year: 2009

Facility Name: Heavy Equipment Shop Inspection Date: 4/13/09

Location: CCAFS Industrial Area Facility Owner: USAF

InDyne Maintained Systems/Codes:

Mission Essential Equipment: None Remaining Systems: AC, SR, WP, HT, and AI

OMEU Extract Date:

10/24/07

Inspector(s): Shad Wilson

A. Facility Description/Mission:

Constructed in 1959, Facility 49800 (Heavy Equipment Shop) is a 5,526 square foot (SF) building with a concrete foundation, corrugated metal walls and roof, two metal personnel doors, and six roll-up bay doors. The facility is partitioned with metal walls into three high-bays. The facility is used by SpecPro Environmental Services to store heavy equipment, vehicles, tools, and chemicals used to conduct forestry services and invasive plant control at Cape Canaveral Air Force Station (CCAFS). See Figure 1.

Figure 1. 49800 General View

B. Facility Manager Interview:

Kenneth Burkett, Facility Manager, SpecPro Environmental Services – The facility has problems with rainwater intrusion, but currently meets its assigned mission.

C. Facility/Systems Condition Assessment:

AC: The Electrical Power system meets current mission/function requirements.

o General System Description: The low voltage electrical power system consists of standard low voltage power distribution equipment such as panelboards, disconnect switches, emergency lighting, circuit breakers, conduit, wiring, indoor/outdoor lighting, and receptacles.

o Deficiencies Noted: None o Recommendations: None

SR: The Structural system meets current mission/function requirements.

o General System Description: The structure consists of a poured concrete foundation, corrugated metal walls, a corrugated metal roof, metal personnel doors, and six high-bay roll-up doors. The exterior corrugated metal walls and roof are coated with an elastomeric sealant. The roll-up door is secure and does not need to be operational for the current facility mission.

o Deficiencies Noted: One roll-up door has shifted off its vertical guide and is not operational. The roof leaks rainwater at various locations during heavy rainstorms.

o Recommendations: Generate a Direct Scheduled Work (DSW) project to indentify the roof/wall leaks and perform necessary repairs.

WP: The Potable Water system meets current mission/function requirements.

o General System Description: The potable water system consists of potable lateral piping, two eyewash stations, and exterior water spigots.

o Deficiencies Noted: None o Recommendations: None

AI: The Compressed Air system meets current mission/function requirements.

o General System Description: The compressed air system consists of piping, hose reels, a compressor motor, and compressed air tank.

o Deficiencies noted: A hose reel assembly in the west high-bay leaks air.

o Recommendations: Repair hose reel assembly leak.

HT: The Hoist system meets current mission/function requirements.

o General System Description: The hoist system consists of a one and a half ton electric chain hoist located in the center high-bay.

o Deficiencies Noted: None o Recommendations: None

D. Compliance Issues: None

E. Fixed Ladder Inspection Results: No fixed ladders.

F. Other Observations: Two Potable Water (WP) systems are listed in the OMEU.

G. Summary Tables:

Work Order Action Summary

System Action Work Type

SR

A hose reel assembly in the west high-bay leaks air.

Repair hose reel assembly leak.

DSW

SR

Generate a Direct Scheduled Work (DSW) project to identify the roof/wall leaks and perform necessary repairs.

DSW

Administrative Action Summary

System Action Work Type

WP Delete duplicate WP system in the OMEU. OMEU

Work Order Number: 20463470 Date of Assessment: May 2016

Facility Number Mission Dependency 61

Facility Name Risk Assessment

Score

General Information Sq Ft: 5526 Current Use: VEH MAINT SHOP

Built: 1959 Historic? Yes Organization: VACANT

Condition Information

Building 66 Red Condition Comments:

Systems Facility is in very poor

Exterior 72 Amber condition. Utilities have

Roofing 51 Red been decommissioned.

Interior 74 Amber

Finishes 80 Amber

Plumbing 10 Red

HVAC NA

Fire NA

Electrical 71 Amber

Risk Assessment

Consequence of Failure Relative Scoring MDI x .6

Probability of Failure (POF) Condition Index

The shaded areas of the adjacent chart show probabilities of obtaining funding for SRM projects associated with this facility. The upper right shade shows the best chance for funding as probability and consequence of failure measure mission dependency and condition.

The blue diamond represents the position of risk assessment associated with the building relative to funding probabilities.

Ancillary Inspections and Data

Fixed Ladder Status: Asbestos Status:

Not applicable. No installed ladders. Friable asbestos is not present in the building.

Cross-Connection Status:

Not applicable; no water systems installed.

Real Property Inventory Status:

The last real property inventory was accomplished in 2016. The required three-year cycle of historic facilities, places the next inventory for 2019. However, the field assessment inventory does reconcile with the accountable assets recorded in ACES RP. Book-to-Floor/Floor-to-Book validated.

Corrective Actions - Proposed Work Orders/Projects DBEH111638 demolishes the building in 2018. There are no active DSW or planned work orders.

Recommendation: None, facility is programmed for demolition.

Building Assessment Report

49800

HEAVY EQUIPMENT

SHOP

FACILITY ASSESSMENT REPORT

BUILDING 49800

HEAVY EQUIPMENT SHOP

2 MAY 2016

FACILITY ASSESSMENT CONTENTS

ASSESSMENT DETAIL REPORT

Contents include a Builder report detailing assessment results. Report shows data to the section level.

Summary data shows Building Condition Index (BCI), System Condition Index (SCI), Component Condition Index (CCI) and Section Condition Index (CSCI). For sections with protective coating assessment, included is a rating for Section Paint Condition Index (CCI). Inspection dates are included.

WORK ORDERS AND PROJECTS

Contents include a Builder report detailing recommended work orders and long term projects. Work Orders and Project data input indirectly from Maximo and ACES PM.

FIXED LADDER REPORT

Inventory and assessment of fixed ladders associated with the building.

CROSS-CONNECTION REPORT

Inspection of water system components required for prevention of backflow contamination.

ASBESTOS INSPECTION

Inventory of recorded asbestos materials in the building.

REAL PROPERTY INVENTORY

Depicts last real property inventory report with a reconciliation of “floor-to-book and book-to-floor” of accountable records. If an inventory was due during the period of condition assessment, the new task was completed with the report shown.

ASSESSMENT DETAIL REPORT

PROJECT INFORMATION

DBEH111638 Demolish Heavy Equipment Shop, FY18

FIXED LADDER REPORT

Not applicable.

CROSS-CONNECTION REPORT

Not applicable.

ASBESTOS INSPECTION

The facility does not contain friable asbestos containing material.

REAL PROPERTY INVENTORY

49800 CHSAsbestosReport
49800 CHSAsbestosSamplingReport
Appendix 49800 FCA_CCAFS IOMS 2009
Appendix building assessment summary 49800
Appendix FACILITY ASSESSMENT REPORT 49800

File details come from the government source that posted it. Updated .