ATTACH 23 - Building Assessment Summary 49800.xlsx
XLSX spreadsheet 382 KB Posted
- Solicitation number
- FA252126B0003
About this file
This is a Building Assessment Summary report for Facility 49800 (Heavy Equipment Shop) located at what appears to be a military installation. The facility, built in 1959 and covering 5,526 square feet, was assessed in May 2016 and currently serves as a vacant vehicle maintenance shop. The building is in very poor condition with a red condition rating (66) for the overall structure, a risk assessment score of 105, and a mission dependency index of 61. Critical system deficiencies include red-rated exterior (72) and roofing (51) components, along with amber-rated interior finishes (74), plumbing (10 rated red), HVAC, and electrical systems (71). The facility has been decommissioned with utilities shut down, no friable asbestos present, and no installed fixed ladders or water systems. A real property inventory was completed in 2016 with the next required cycle scheduled for 2019.
The assessment recommends no corrective action as the facility is programmed for demolition under Work Order DBEH111638, scheduled for 2018. This building assessment directly correlates to the Demolition IDIQ contract opportunity (FA252126B0003) issued by the Department of the Air Force Space Command for Space Launch Delta 45 at Patrick Space Force Base and Cape Canaveral Space Force Station, Florida. The seed project for this IDIQ contract is DBEH 11-1638 Demo Heavy Equip Shop B49800, with a minimum guarantee of $2,500 upon award. The total contract value ceiling is $4,999,999.99 across a one-year base period and four one-year option periods. The acquisition is set aside for Economically Disadvantaged Women-Owned Small Businesses (EDWOSB), with Site Preparation Contractors (NAICS 238910) as the applicable industry classification and a $19 million size standard.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Building Assessment Report | |||||
| Work Order Number: | 20463470 | Date of Assessment: | May | 2016 | |
| Facility Number | 49800 | Mission Dependency | 61 | ||
| Facility Name | HEAVY EQUIPMENT SHOP | Risk Assessment Score | 105 |
| General Information | Sq Ft: | 5526 | Current Use: | VEH MAINT SHOP | |
| Built: | 1959 | Historic? | Yes | Organization: | VACANT |
Condition Information
| Building | 66 | Red | Condition Comments: |
| Systems | Facility is in very poor | ||
| Exterior | 72 | Amber | condition. Utilities have |
| Roofing | 51 | Red | been decommissioned. |
| Interior | 74 | Amber | |
| Finishes | 80 | Amber | |
| Plumbing | 10 | Red | |
| HVAC | NA | ||
| Fire | NA | ||
| Electrical | 71 | Amber |
Risk Assessment
| Consequence of Failure Relative Scoring MDI x .6 |
| Probability of Failure (POF) Condition Index |
| The shaded areas of the adjacent chart show |
| probabilities of obtaining funding for SRM projects |
| associated with this facility. The upper right shade |
| shows the best chance for funding as probability |
| and consequence of failure measure mission |
| dependency and condition. |
| The blue diamond represents the position of risk |
| assessment associated with the building relative |
| to funding probabilities. |
Ancillary Inspections and Data
| Fixed Ladder Status: | Asbestos Status: |
| Not applicable. No installed ladders. | Friable asbestos is not present in the building. |
| Cross-Connection Status: |
| Not applicable; no water systems installed. |
| Real Property Inventory Status: |
| The last real property inventory was accomplished in 2016. The required three-year cycle of historic facilities, places |
| the next inventory for 2019. However, the field assessment inventory does reconcile with the accountable assets |
| recorded in ACES RP. Book-to-Floor/Floor-to-Book validated. |
| Corrective Actions - Proposed Work Orders/Projects |
| DBEH111638 demolishes the building in 2018. There are no active DSW or planned work orders. |
Recommendation: None, facility is programmed for demolition.
Chart
| POF - Condition Index (B10-1) previous sheet | 66 | ||
| 100 | 68 | ||
| COF- Consequence of Failure (I3) 60% of MDI | |||
| 61 | 36.6 | ||
| Risk Assessment Score: | 105 |
SRM Funding Risk Probability of Failure 68 36.6 Probability of Failure Consequence of Failure
Data Entry
| FROM SPREADSHEET OF WONS | |
| Work Order Number | 20463470 |
| Facility Number | 49800 |
| FROM BUILDER REPORT | |
| Date of Assessment | April |
| Facility Name | Heavy Equipment Shop |
| FROM ACES RP | |
| Year Built | 1959 |
| Square Footage | 5526 |
| Current Use | VEH MAINT SHOP |
| Historic | Yes |
| MDI | 61 |
| Customer | VACANT |
image1.png image2.png image3.png image4.png