This is a Recovered Materials Determination Form used for federal procurement compliance related to environmentally preferable purchasing requirements under FAR 11.002(c).

The form applies to the "Demolition IDIQ CCSFS/PSFB & Annexes" procurement and consists of three components: Part 1 (Design/Procurement), Part 2 (Construction), and a Waiver Form. Part 1 requires the specifying authority to identify whether EPA-designated items apply to the procurement by selecting from comprehensive product categories including construction products (insulation, carpet, concrete, roofing materials, etc.), landscaping products (compost, mulch, plastic lumber), park and recreation products, non-paper office products, paper and paper products, vehicular products (oils, retread tires), transportation products (cones, barricades, delineators), and miscellaneous products (pallets, signage, sorbents). Upon completion of Part 1, the specifying agent must certify either that no EPA-designated items are included, that EPA recycled content requirements have been specified for all designated items, or that exemptions apply with documented justifications. The form is not required for construction purchases under $2,000 or other purchases under $3,000. Part 2, completed upon delivery of goods and services, requires contractor/supplying agent certification that EPA recycled content requirements have been met, with the same exemption options available using justifications for non-availability (competitive sourcing, reasonable timeframe), unreasonable pricing (life-cycle cost analysis), or failure to meet performance standards per NIST guidelines. The Waiver Form provides a template for documenting individual exemptions with required signatures from the design/specifying agent, requiring organization's technical representative, and contracting officer, along with detailed rationale including vendor information and cost analysis per 42 USC 6962(c)(1).

View the file

Other files

File Type Posted
FA252126B0003 Abstract.pdf PDF
ATTACH 03 - DEMO IDIQ Pricing Sheet-02 September 2026.xlsx XLSX spreadsheet
Solicitation Amendment - FA252126B00030002- Conformed Copy.pdf PDF
ATTACH 17 - SEED PROJECT - Pricing Sheet- 02 September 2026.xlsx XLSX spreadsheet
Solicitation Amendment FA252126B00030002 SF 30.pdf PDF
ATTACH_7___Question_and_Answer_Compiled- Amendment 02.pdf PDF
Solicitation Amendment 1 - FA252126B00030001- SF30.pdf PDF
Conformed Solicitation Amendment 1_ FA252126B0003 0001 SF 1442.pdf PDF
ATTACH_7___Question_and_Answer_Compiled.pdf PDF
Solicitation FA252126B0003 0001 SF 1442.pdf PDF
ATTACH 15 - SEED PROJECT -SOW DBEH111638_Demolish Heavy Equipment Shop B49800_21AUG2026.pdf PDF
ATTACH 23 - Building Assessment Summary 49800.xlsx XLSX spreadsheet
ATTACH 24 - Demo IDIQ Site Visit- 17 August 2026.pdf PDF
ATTACH 4 - Bid Schedule Summary- Amendment 01.pdf PDF
ATTACH 22 Facility Data.pdf PDF
ATTACH 03 - DEMO IDIQ Pricing Sheet.xlsx XLSX spreadsheet
ATTACH 12 - SCA WD- Brevard- 13 May 2026.pdf PDF
ATTACH 2 -DEMO IDIQ Specifications.pdf PDF
ATTACH 19 - EDWOSB-SelfPerformanceCertificationWrksht.pdf PDF
ATTACH 4 - Bid Schedule Summary.pdf PDF
ATTACH 6 -DEMO IDIQ Haz Waste Generation Form.pdf PDF
ATTACH 7 - Question and Answer Template.xlsx XLSX spreadsheet
ATTACH 3 - DEMO IDIQ Pricing Sheet.xlsx XLSX spreadsheet
Solicitation - FA252126B0003.pdf PDF
ATTACH 15 - SEED PROJECT -SOW DBEH 11-1638 Demolish Heavy Equipment Shop B49800.pdf PDF
ATTACH 20 - PIEE Solicitation- PIEE Vendor Registration.pdf PDF
ATTACH 11 - DBA WD- Residential_Brevard-18 May 2026.pdf PDF
ATTACH 9 - DBA WD- Heavy_Brevard-18 May 2026.pdf PDF
ATTACH 14 - Badge Request 45 SFS Form V14.pdf PDF
ATTACH 1 -DEMO IDIQ Statement of Work_15JUL2026.pdf PDF
ATTACH 16 - SEED PROJECT - Plans_DBEH111638.pdf PDF
ATTACH 13 - Rules of Engagement for Site Visit- Seed Project.pdf PDF
ATTACH 18 - SEED PROJECT - SHPO Response 49800 Demo_260624_184357.pdf PDF
ATTACH 21 - PIEE Solicitation- Posting Offer Guide.pdf PDF
ATTACH 8 - DBA WD- Building_Brevard-18 May 2026.pdf PDF
ATTACH 10 - DBA WD- Highway_Brevard-18 May 2026.pdf PDF
ATTACH 17 - SEED PROJECT - Pricing Sheet.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-1

UNCLASSIFIED

RECOVERED MATERIALS DETERMINATION FORM

(Part 1) Design/Procurement

INSTRUCTIONS

This form is to be completed by the requiring activity when EPA-designated items are applicable to the requirement. For questions on whether the product counts as “EPA-designated” or what the required recycled content is, refer to product descriptions on EPA’s website at www.epa.gov/cpg/products.htm.

This form is not required for construction item purchases less than $2,000, or for other purchases less than $3,000. The completed form becomes part of the contracting office contract file.

PROCUREMENT TITLE: Demolition IDIQ CCSFS/PSFB & Annexes

PROCUREMENT REQUEST NO.

PART 1: RECOVERED MATERIALS DETERMINATION

Part 1 shall be completed by the specifying authority when requesting a procurement action.

EPA-DESIGNATED ITEMS

(Place a check mark next to each product that applies to this procurement)

Construction Products:

Building insulation Polyester carpet Carpet Cushion Cement & concrete containing:

Coal fly ash Ground granulated blast furnace slag

Cenospheres or Silica fume

Floor tiles (rubber & plastic) Flowable fill Latex paint Laminated paperboard Modular threshold ramps Nonpressure pipe Patio blocks Railroad grade crossings/surfaces Roofing materials Shower & restroom dividers/partitions

Structural fiberboard

Landscaping Products:

Compost from yard trimmings or food waste

Garden and soaker hoses Hydraulic mulch Lawn and garden edging Plastic lumber landscaping timbers and posts

Park & Recreation Products:

Park and recreational furniture Playground equipment Playground surfaces Running tracks Plastic fencing (snow or erosion control, safety barriers)

Non-paper Office Products:

Binders (paper, solid plastic or plastic covered)

Plastic clipboards Plastic file folders Plastic clip portfolios Plastic presentation folders Office furniture Office recycling containers Office waste receptacles Plastic desktop accessories Plastic envelopes Plastic trash bags Printer ribbons Toner cartridges

Paper & Paper Products:

Commercial/industrial sanitary tissue products

Miscellaneous papers Newsprint Paperboard and packaging Printing and writing papers Tray liners

Vehicular Products:

Engine coolants Rebuilt vehicular parts Re-refined lubricating oils Retread tires

Transportation Products Channelizers Delineators Flexible delineators Parking stops Traffic barricades Traffic cones

Miscellaneous Products:

Awards and plaques Bike racks Blasting grit Industrial drums Mats Pallets Signage Sorbents Strapping

GREEN PROCUREMENT FORMS

RECOVERED MATERIALS DETERMINATION FORM

(PART 1) Design/Procurement (Cont’d)

PROCUREMENT TITLE: Demolition IDIQ CCSFS/PSFB & Annexes

PROCUREMENT REQUEST NO.

FAR 11.002(c) requires the establishment of statements of work and specification requirements for the procurement of products containing recovered materials and environmentally preferable and energy-efficient products and services.

If no EPA designated items were checked on page 1, than check box A:

A.

I hereby certify that no EPA designated guideline items are included in this procurement action

If any EPA designated items are checked on page 1, than mark box B or C:

B.

I hereby certify that the EPA recycled content requirements have been specified for all of the designated guideline items in this procurement action

OR

C.

I hereby certify that the EPA recycled content requirements have been specified for all but the following designated guideline items for which compliance with EPA standards is not attainable

If Box C is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.

The exemption being claimed for this purchase is:

1. The product is not available competitively (from two or more sources) within a reasonable time frame;

2. The product is only available at an unreasonable price (based on a life-cycle cost analysis);

3. The product does not meet appropriate performance standards (in accordance with

National Institute of Standards and Technology (NIST) guidelines.)

Designated Item Justification #

1.

2.

3.

Design/Specifying Agent Signature Date

Requiring Organization’s Technical Representative Signature

Date

2 June 2025

RECOVERED MATERIALS DETERMINATION FORM

(PART 2) Construction

PROCUREMENT TITLE: Demolition IDIQ CCSFS/PSFB & Annexes

PROCUREMENT REQUEST NO.

Part 2 of this certification is to be completed upon receipt of the purchase goods and services. If EPA designated items were specified in this procurement action, the contractor/supplying agent shall complete Part 2 of this certification upon delivery of the products or services. Attach supporting documentation identifying percentage of recovered material content used in each designated item. NOTE: A designated item is specified if no exemptions were prepared and identified in Part 1.C of this form during the development of this procurement action.

Check the appropriate box:

A.

EPA recycled content requirements have been met for all designated items specified in this procurement action.

OR

B.

EPA recycled content requirements have been met for all but the following EPA designated guideline item(s) for which compliance with EPA standards was not attainable.

If Box B is checked, list each designated item and the corresponding justification number from the list below for each exemption claimed. Attach the supporting documentation for each waiver item listed.

The exemption being claimed for this purchase is:

1. The product is not available competitively (from two or more sources) within a reasonable time frame;

2. The product is only available at an unreasonable price (based on a life-cycle cost analysis);

3. The product does not meet appropriate performance standards (in accordance with

National Institute of Standards and Technology (NIST) guidelines.)

Designated Item Justification #

1.

2.

3.

Contractor/Supplying Agent Signature Date

Requiring Organization’s Technical Representative Signature

Date

MATERIALS DETERMINATION FORM

Waiver Form

PROCUREMENT TITLE: Demolition IDIQ CCSFS/PSFB & Annexes

PROCUREMENT REQUEST NO.

The technical authority shall prepare a separate justification for each designated item purchased that does not meet EPA standards as part of this procurement action:

The following item does not comply with EPA standards for recycled/recovered materials:

The exemption being claimed for this purchase is:

The product is not available competitively (from two or more sources) within a reasonable time frame;

The product does not meet appropriate performance standards (in accordance with National Institute of Standards and Technology (NIST) guidelines);

The product is only available at an unreasonable price (based on a price analysis that considers life-cycle cost). The recycled-content product costs $ per and the non-recycled-content product costs $ per

This written justification is made in accordance with 42USC 6962(c)(1):

Design/Specifying Agent’s Signature Date

Requiring Organization’s Technical Representative Signature Date

Contracting Officer’s Signature Date

Rationale for exemption: (Please provide the rationale upon which this justification was based.

Include vendor names, points of contact, life-cycle cost analysis and any other documentation that supports this decision.)

2025-06-02T12:10:18-0400
GRAFF.ROBERT.M.1627255396
2025-06-02T12:10:38-0400
GRAFF.ROBERT.M.1627255396
2025-06-02T12:11:13-0400
GRAFF.ROBERT.M.1627255396

File details come from the government source that posted it. Updated .