AFPSL Draft RFP Questions and Responses.docx

DOCX document 66 KB Posted

Attached to
AFPSL Recompete Federal contract opportunity
Solicitation number
FA2263-20-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This draft solicitation is for calibration services at the Air Force Primary Standards Laboratory. The solicitation seeks proposals for operation and maintenance of the laboratory including calibration services, quality programs, and supply chain management. Key details include calibration of equipment to Air Force technical orders, maintaining accreditation under ISO/IEC 17025 standards, and supporting proficiency testing programs. The period of performance is July 2020 through December 2020 for transition activities, with the first six-month base period for laboratory operations following transition. Pricing includes both firm-fixed-price and cost-reimbursable contract line items. The final solicitation and bidder's library are planned for release by January 2020.

View the file

Other files for this federal contract opportunity

Other files attached to AFPSL Recompete, newest first.
File Type Posted
Solicitation Amendment FA226320R00020004 SF 30.pdf PDF
AFPSL Recompete Section L Rev 3.docx DOCX document
Solicitation Amendment FA226320R00020003 SF 30.pdf PDF
FA226320R0002 AFPSL_Questions.docx DOCX document
AFPSL Recompete Section L Rev 2.docx DOCX document
Section L Attachment 2 PPI Tool Instructions Rev 1.docx DOCX document
AFPSL Draft RFP Questions and Responses2.docx DOCX document
Solicitation - FA226320R0002.pdf PDF
DOL CBA Rev2.pdf PDF
Attachment 7_ Accreditation Areas.xlsx XLSX spreadsheet
Data Requirements.pdf PDF
Section L Attachment 2 PPI Tool Instructions.docx DOCX document
Attachment 2a_Workload.xlsx XLSX spreadsheet
Attachment 5e_AFPSL Measurement Capabilities.docx DOCX document
AFPSL Recompete Section L.docx DOCX document
Attachment 2b_Turnaround Time Exceptions.xlsx XLSX spreadsheet
Section L Attachment 1 Solicitation_Cross_Reference_Matrix.docx DOCX document
Attachment 4_Data Requirements Cross Reference.docx DOCX document
Attachment 5b_GFE List.xlsx XLSX spreadsheet
DOL Wage Determination.pdf PDF
Attachment 5a_Facilities Lease Agreement.docx DOCX document
AFPSL Recompete Incentive Plan.docx DOCX document
AFPSL Recompete PWS.docx DOCX document
AFPSL Recompete Section M.docx DOCX document
Attachment 6_GFE Usage Fee.docx DOCX document
Attachment 3_Radioactive Material List.doc DOC document
AFPSL_Priority_Workload - Bidder's Library.xlsx XLSX spreadsheet
Note64 report - Bidder's Library.xlsx XLSX spreadsheet
33K-1-100-1 - Bidder's Library.pdf PDF
AFPSL_5_Year_Commercial_Calibration_Data - Bidder's Library.xlsx XLSX spreadsheet
TO 00-20-14_20190131 - Bidder's Library.pdf PDF
AFPSL_5_Year_History_Listing - Bidder's Library.xlsx XLSX spreadsheet
AFPSL_5_Year_Accredited_Cal Items Shipped - Bidder's Library.xlsx XLSX spreadsheet
21-2 - US AFPSL Calibration Procedure TOs - 8 March 2016 - Bidder's Library.pdf PDF
AFPSL Draft RFP Questions and Responses2.docx DOCX document
AFPSL Cal Software list - Bidder's Library.xlsx XLSX spreadsheet
Tech Exhibit 5a_Facilities Lease Agreement.docx DOCX document
Tech Exhibit 2b_Turnaround Time Exceptions.xlsx XLSX spreadsheet
Tech Exhibit 5e_AFPSL Measurement Capabilities.doc DOC document
Tech Exhibit 5b_GFE List.xlsx XLSX spreadsheet
Tech Exhibit 4_Data Requirements Cross Reference.docx DOCX document
Tech Exhibit 7_ Accreditation Areas.xlsx XLSX spreadsheet
Draft Solicitation - FA226320R0002.pdf PDF
Section L Attachment 2 PPI Tool Instructions.docx DOCX document
AFPSL Recompete Section M 20191217.docx DOCX document
AFPSL Recompete Incentive Plan.docx DOCX document
DOL CBA Rev2.pdf PDF
Tech Exhibit 3_Radioactive Material List.doc DOC document
Tech Exhibit 6_GFE Usage Fee.doc DOC document
Tech Exhibit 1_SDS.xlsx XLSX spreadsheet
Show all 50

AFPSL Recompete has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft RFP Questions – Submitted to CO

Air Force Primary Standards Lab (AFPSL)

#
Reference RFP Section
Page No.
Reference Text
Question
AFMETCAL Response
1
5.1.8.9
30
5.1.1.1 Cal Software Maintenance

The contractor shall maintain all calibration software used in the AFPSL and ensure calibration software complies with the accuracy requirements and test points of the applicable 33K series calibration technical orders. Calibration software consists of all machine language code, templates, data files, and formulas used to perform automated measurement, perform calculations, prepare calibration test result reports, and track historic performance of reference standards or TMDE and as directed by TO 00-20-14.

What calibrations software(s) are used in the laboratory? Are automated procedures utilized and if so, who wrote and maintains them? Does the laboratory use any Fluke METCAL procedures? What percentage of the calibrations are automated?
List of calibration software will be provided in bidder’s library. There is no data on automated calibrations.
2
General
After Contractor Support Date (CSD) will the government entertain contractor recommendations regarding additional automated calibration processes and other potential process and workflow analysis improvements from the contractor throughout the contract?
Yes.
3
5.1.9.4
32
The contractor shall be responsible for all scheduled and unscheduled on-site calibration and maintenance of TMDE identified on the government provided LABMET listing. The contractor shall coordinate all on-site calibration and maintenance with the customer and the government COR prior to departure for the job site. In the absence of a customer's request for priority service, the work shall be considered routine.
Please provide a list of onsite customers. Please include two years scheduling history reflecting the number of trips, trip lengths, and the number of personnel historically required for each trip.
Only two on-site calibrations have been scheduled in recent years. Both involved driving the HEL van to either Kirtland or Wright Patterson. Both have been on a 24 month schedule however, there is discussion recently changing both to yearly. Two AFPSL technicians normally go. Average trip time at Kirtland is 10-14 days and 5-7 days at Wright Patterson.
4
5.1.10.1.3
37
For GFE Technical Exhibit 5B, the contractor shall submit requests for additional or replacement government furnished equipment over $2,500 required in the performance of the contract. The contractor shall submit such requests through the COR for approval. The government will either provide the approved equipment or will authorize the contractor to locally procure using operating funds provided by the government for that purpose.

(CDRL A026, DI-ILSS-80415, Request for Requisition Approval)

It appears that the government pays for replacement equipment over $2500. Does the contractor pay for equipment under $2500? Is this cost covered under a cost reimbursement CLIN? If so, please provide 3 years cost data history for the under $2500 replacement equipment costs.
All repair cost are reimbursable. $2,500 limit is for prior government approval of the higher dollar repairs.
5
5.1.10.7
39
The contractor shall be responsible for inspection, hydrostatically testing, certifying, marking, and tagging all compressed gas cylinders as required by AFR 67-12 and TO 42B5-1-2. A three-part tag may be used in lieu of DD Form 1574.
Is the contractor responsible for Hydostatic testing of DOD and DLA vendor GAS cylinders? Or just permanently installed cylinders?
Contractor will not be required to complete hydrostatic testing. PWS 5.1.10.7 will be updated roughly as follows “The contractor shall obtain compressed gas cylinders as needed. A three-part tag may be used in lieu of DD Form 1574.”
6
5.1.12
45
The AFPSL has primary reference standards calibrated by NIST. These reference standards are critical to the accuracy and traceability of the AFPSL. The contractor shall ensure these standards are periodically calibrated by NIST on a schedule documented in TO 33K-1-100-2. Some AFPSL primary reference standards are calibrated by other nationally recognized laboratories, as approved by AFMETCAL, such as U.S. Naval Observatory. The contractor shall deliver one copy of each Certificate of Calibration to AFMETCAL COR when the standards are returned after calibration from NIST, N4C, and N4N, or other nationally recognized laboratories, as approved by AFMETCAL. (CDRL A017, DI- NDTI-80809B, Test/Inspection Report)
Who pays for the NIST calibrations? Is this a cost reimbursement CLIN item? What is the approximate cost averaged over the last three years for NIST calibrations?
Gov’t pays directly to NIST for calibrations. Contractor will schedule with NIST. Costs not provided since gov’t pays.
7
General

In order for the contractor to prepare a reasonable proposal for this contract, we need the following information:

a. List of items calibrated during the last two years by make and model number b.

c. List of on0site equipment calibrated including location

d. Number of trips and manhours spend on on-site calibrations e.

f. List of equipment sent to NIST g.

h. List of equipment sent to other outside vendors for calibration including vendor name and invoiced costs i.

j. List of commercial customers and total number of calibrations and k.

l. List of equipment receiving accredited calibrations.

m.

n. Please include the percentage of calibrations that are accredited in each area.

This will be provided in the Bidder’s Library.

8
PWS 5.1.8.8.4 AFMETCAL Proficiency testing program
30
The Contractor shall provide scheduling, testing, and transportation services to support the AFMETCAL Proficiency testing program. (CDRL A017, DI-NDTI-80809B, Test/Inspection Report)
Is the contractor required to pay for the transportation services? If so, will you provide the historical cost per year over the last 5 years? Three years Minimum!
Transportation to/from calibration/repair is paid by the government.

Contractor will be required to staff and supply a shipping department. See raw data estimating number of shipments.

9
Section L. 5.4 Recent and Relevant Contracts
10
…. Offerors shall complete a separate "FACTS Sheet" for each active or completed contract (with preferably at least one year of performance history) in the past five (5) years, that the offeror considers relevant in demonstrating its ability to perform the proposed effort. If the total number of such contracts exceeds four (4), the offeror shall address its four (4) most relevant contracts. Also include information on four (4) recent contracts performed by each of your teaming partners and significant subcontractors that you consider most relevant in demonstrating their ability to perform the proposed effort.
In the case of several companies forming a joint venture (JV) to pursue this opportunity, will the companies still be allowed to submit independent past performance as in the example below:

For a 3 company JV:

Lead Company- 4 past performances Company 2- 2 past performances Company 3-2 past performances Or will the joint Venture only be allowed to submit 4 total PPF. It seems to make sense to allow each company the same PPF submission opportunities as any team effort to better understand the overall JV capability.

Each company forming a JV shall submit past performance addressing each company’s four most relevant contracts over the past five years.

10
Solicitation - Supplies or Services and Prices/Cost
3
AFPSL Transition Activities in accordance with (IAW) the performance work statement (PWS). These activities will cover 1 July 2020 - 31 December 2020. Product Service Code: H266 Signal Code: A Program: S10 Firm Fixed Price
Item 1 ask for cost over a 6 months period for the Transition. Items 0002-0010 ask for cost to perform the work over the 6 months period. Is there a 6 months Transition period or is the new contractor responsible for the work starting 1 Jul 2020? Please clarify Contractor Support Date (CSD)
Transition is 3 months (1 July 2020 – 30 September 2020). Remaining 3 months contractor is responsible for full operation of the lab.

Request the Government provide a list of destinations, and number of shipments that are required for this contract. How many will be on GBLs? ON CBLs? Will ITAR be required for Overseas shipments? Will Overseas shipment be on CBLs or GBLs?

ITAR will not be required for overseas shipments.

The majority are paid for by the government directly and the others on a reimbursable basis.

The workload data shows shipments.

Does this contract employ a WD or CBA? If yes, when will this pay schedule data be posted?

Wage determination will be provided with final RFP and the Bidder’s Library

13
Reference page 7 Paragraph 2.1.15
7
All contractor provided equipment must be approved by the COR.
What Specific CFE equipment has been approved by the COR and is currently being used to calibrate equipment in the Laboratory?

Currently no CFE. All calibration equipment is GFE.

14
PWS 5.1.8.3 Exchange Standards
25
The Exchange Standards program is a pool of calibrated rotatable assets that are provided to the customer prior to when their current used asset becomes due for calibration to ensure continuity of service by the customer. The contractor shall maintain an inventory of calibrated exchange standards of sufficient quantity to support the program. The contractor shall conduct quarterly an inventory of all Exchange Standards
How many exchange standards are there and how many are shipped out each year?

Are the calibrations for the exchange standards included in the projected workload data exhibit 2a?

Will be included in the Bidder’s Library.

Calibrations for exchange standards are included in Exhibit 2A.

15
PWS 4.1.2
15
With the exception of the High Energy Laser Calibration Van (see below) and government furnished Forklift the contractor shall furnish all other vehicles required for, but not limited to, transportation of personnel, supplies, and equipment to and from all on-site locations when required to perform calibration and/or repair of TMDE designated as AFPSL responsibility in TO 33K-1-100-2, 33K-1-100 -1, or applicable CMS.

How many Contractor Furnished vehicles have been required historically and is the past 2 years vehicle use and cost data available for this contract?

There are currently no CF vehicles.

16
PWS 4.1.3 Electronic Mail Service
15
The contractor shall establish an electronic mail service for communications with AFMETCAL, AFPSL and TO customers. Electronic mail capability may be installed on GFE, provided the GFE is restored to the original configuration at the end of the contract. Contractor must comply with all government ADPE security requirements.

Will the contractor need to provide their own internet service or just email service?

PWS 4.1.3 will be updated roughly as follows “The contractor shall have all employees obtain AF NIPRNet access and email accounts for use on SDC GFE computers for communications with AFMETCAL, AFPSL, PMEL, and TO customers. Contractor must comply with all government ADPE security requirements.”

NIPRNet – non-classified Internet Protocol Router Network SDC – Standard Desktop Configuration

17
PWS 5.1.1.3
16

Does the cost report need to cover the fixed price CLINs as well as the COST CLINS?

PWS 5.1.1.3 will be updated roughly as follows “The contractor shall submit a Cost Performance Report for each CLIN that is cost reimbursable CLIN type for the metrology effort. Efforts that are a fixed type CLIN do not need to be included in this report. (CDRL A010, DI-FNCL-80331A, Funds and Man-hour Expenditure Report)

18
PWS 5.1.6 Laboratory Environmental Requirements
16
The contractor shall maintain the calibration and repair area to laboratory standards as outlined in TO 00-20-14.
Who maintains the environmental systems that control the laboratories? The 68-degree rooms are very complex control systems. The contractor must clearly monitor the rooms but is the contractor required to maintain the systems? If so please share the past three years cost data for system repairs. Is this a cost reimbursement CLIN item?

Boeing maintains the environmental systems.

All costs associated with maintenance is part of the lease, which is cost reimbursable.

Reference CLIN: Lease Costs, subsequent CLINs of same name

19
PWS 5.1.4 Facility Management

Who pays for the utilities? Is this a cost reimbursement CLIN item?

Included in lease cost.

Reference CLIN: Lease Costs, subsequent CLINs of same name

20
PWS 3.1.3 PMEL Automated Management System (PAMS) / Laboratory Metrology Scheduling System (LABMET)
14
The government will provide automatic data processing systems known as PAMS / LABMET. The contractor shall use LABMET automatic data processing programs and software to manage TMDE inventories, schedule calibration and repair, document Maintenance Data Collection (MDC) system information, and accomplish other maintenance related tasks associated with the performance of this contract. LABMET refers to any government provided scheduling system (LABMET or successor).

Is LABMET a custom software package developed for AFPSL or is it a commercial package? If custom can the Government provide a description of the software and a user manual. Is the source code available?

LABMET is a custom AFMETCAL-developed software.

Government will provide training for MIS. No manual available

21
PWS 3.1.3
14
The government will provide automatic data processing systems known as PAMS / LABMET. The contractor shall use LABMET automatic data processing programs and software to manage TMDE inventories, schedule calibration and repair, document Maintenance Data Collection (MDC) system information, and accomplish other maintenance related tasks associated with the performance of this contract. LABMET refers to any government provided scheduling system (LABMET or successor).

Who maintains the LABMET server? Does the Government provide the Oracle License and Oracle maintenance/subscription contract?

Government maintains the LABMET server. Government provides Oracle license, etc.

22
Section L 3.1 and 4.1

Is the Master Table of Contents, which could be numerous pages, excluded from the Executive Summary page count?

Para. 3.1.1 states in part “The tables of contents, tab indexes that contain no information other than section information, and tables of abbreviations, glossaries (as required), are excluded from the total page count.”

Para. 4.1.2 states “Include a master table of contents of the entire proposal”. See Para. 3.1.1.

23
Section L 5.1

The PPI Tool and its instructions were not provided with the draft RFP. Would the Government please provide the current tool as soon as possible? With the transition of FBO.gov to SAM.gov, we have been unable to find the latest version of the tool. We'd like to get started on our Past Performance submittal now, since it has been requested early.

PPI Instructions will be included in RFP as an Attachment to Section L.

24
Section L 5.4

The "FACTS Sheet" referenced was not provided with the draft RFP. Would the Government please provide this sheet as soon as possible, so that we can be responsive with our past performance submittal?

FACTS Sheet will not be required. PPI tool will be used to provide past performance information.

25
Section M
1 and 7
In the Evaluation Factors for Award, the Basis for Contract Award states “Tradeoffs will be made only between Past Performance and Price among those offerors who have been determined to be technically acceptable. Past Performance is significantly more important than Price.” Then in Performance Relevancy Assessment Table the definition for very relevant is “essentially the same scope and magnitude of effort and complexities this solicitation requires.”
These Section M criteria appear to significantly favor the incumbent as they are the only company in the past 19 years who have performed work that is “essentially the same” as the AFPSL requirements. Would the Government please consider changing the evaluation criteria to encourage competition? The way it is stated closes the door for anyone except the incumbent. We recommend changing the words “essentially the same” to “similar,” and changing the definition of Relevant from “similar” to “somewhat similar”.

In addition, we recommend that the government make Technical and Past Performance equal in importance, since the Government intends to evaluate Technical, not simply make it a pass/fail. Evaluation per Technical Ratings on page 3 of Section M.

Section M updated for clarity and will be available in RFP posting. Technical factor is significantly more important than Past Performance and Price. Past performance is more important than Price. Tradeoffs may be made between all three factors.

Table 2.3.2.2 is from Department of Defense standard source selection guidance.

Can the Government provide probable templates that will be used for costing for each of the pricing arrangements?

Contract pricing will be included in Section B. Pricing breakdowns may be included in contractor’s format.

Will certified pricing be required?

Certified Cost or Pricing will not be required. Data other than certified cost or pricing may be required.

Will forward pricing or budgets need to be provided to support G&A and overhead estimates for each option year?

Yes. Should be part of pricing proposal.

Is there a CBA or SCA WD associated with this work?

Wage determination will be provided with final RFP and the Bidder’s Library

Will the incentive fee amount for the development and distribution of calibration technical manuals services and special calibrations-acceptance testing be determined by the USG or proposed by the company?

Incentive fee structure will be provided by the Government in the incentive fee plan.

Does the USG assume that the costs for the development and distribution of calibration technical manuals services, special calibrations acceptance testing, FMS calibration services and external calibration and repair services will include labor hours? If so how will the labor hour rates be provided in the proposal submittal?

Yes, the offerors will determine labor hours. The wage determination will provide minimum labor rates and will be provided with final RFP and the Bidder’s Library.

What workload and services elements of pricing should be included in the fixed price with incentive fee?

Section B will be updated for final RFP release and will include workload distribution by CLIN.

Should Section L, 1.1 Para 2 reads “cost plus incentive fee” instead of “cost plus incentive firm”?

Section L 1.1 Paragraph 2 has been updated

The solicitation states “Tradeoffs will be made only between Past Performance and Price among those offerors who have been determined to be technically acceptable.” §M.1.1. However, the evaluation criterion for the Technical factor (§M.2.2) contains a spectrum of 5 adjectival ratings ranging from Unacceptable to Outstanding. Typically, these type of adjectival ratings are not used when a factor is only evaluated on an Acceptable versus Unacceptable basis and when the factor is not considered in the best value trade-off. Will the agency consider revising the Technical criteria to clarify that the Technical factor is not being evaluated only for technical acceptability and including the Technical factor in the best value trade-off?

Section M updated for clarity and will be available in RFP posting. Technical factor is significantly more important than Past Performance and Price. Past performance is more important than Price. Tradeoffs may be made between all three factors.

The solicitation states “Tradeoffs will be made only between Past Performance and Price among those offerors who have been determined to be technically acceptable” and also states “Past Performance is significantly more important than Price.” §M.1.1. Given that the incumbent contractor has been performing these services for many years, including only Past Performance in the trade-off and making it "significantly more important than Price" appears to unreasonably favor the incumbent contractor. While the government consider including the Technical factor in the trade-off and/or reducing the importance of Past Performance to make it equal with Price?

Section M updated for clarity and will be available in RFP posting. Technical factor is significantly more important than Past Performance and Price. Past performance is more important than Price. Tradeoffs may be made between all three factors.

Will the current uncertainty budgets and accreditation documentation transfer from the current contract to the new contract and company operating it?

Yes. The accreditation will not.

What CAD programs will be provided for the TO writing aspect of this contract?

Government will provide a CAD program that is to be determined for TO drawings.

Will current uncertainty budgets, accreditation documentation, and any quality data on accredited calibrations since last ISO17025 accreditation transfer from the current contract to the new contract?

Yes. The accreditation will not.

Can the government provide the LabMet user guide?

Government will provide training for MIS. No manual available

Does the government require any email service outside of .mil/NIPR domain?

Not required.

41
Tech Exhibit 2A

A. Will the government provide more specific workload data?

B. Does the Qty indicate the number of items calibrated?

C. Can the government provide # of outgoing and incoming shipments estimated per year?

D. Are shipping and shipping materials, office supplies and fuel for vehicles including forklift fuel a reimbursable cost E. Is there an aspect of the workload that prevents software/firmware from being loaded on an AF Computer?

F. Does the workload include non-government calibrations/hours?

G. Can the government identify the workload that is associated with non-government calibrations and the average cumulative year to date totals of reimbursements for use of GFE?

A.-B. Five years of raw data will be provided for analysis.

C. If it’s not GFE and locally calibrated, it is shipped out.

D. Incorporated into firm fixed price CLIN.

E. Software can be loaded on AF computers; however, must follow AF policy concerning hardware and software.

F. No.

G. Yes. Will be included in the Bidder’s Library.

42
AFPSL Recompete PWS 3.2.6
14
Please confirm a plug number for travel will be provided for this requirement.
Offerors will propose a budget for employee travel and other costs associated with specialized metrology training
43
AFPSL Recompete PWS
15

Please provide copies of previous maintenance costs/records in order to accurately estimate costs.

Maintenance labor for calibration equipment (excluding RADIAC) is funded in CLIN 2, Calibration Services, and subsequent CLINs of the same name.

Maintenance labor for RADIAC calibration equipment is funded in CLIN 3, RADIAC Calibration Services, and subsequent CLINs of the same name.

Maintenance parts and materials for all calibration equipment and GFV is funded in CLIN 10, Cost Reimbursable Workloads, and subsequent CLINs of the same name.

External repair services for calibration equipment and GFV repaired by a third-party is funded in CLIN 4, External Calibration and Repair Services, and subsequent CLINs of the same name.

RFP Section B descriptions will be updated in final RFP posting.

44
AFPSL Recompete PWS
32

In order to accurately estimate costs, please provide additional workload data to include locations and a list of equipment with calibration intervals for each location.

Only two on-site calibrations have been scheduled in recent years. Both involved driving the HEL van to either Kirtland or Wright Patterson. Both have been on a 24 month schedule however, there is discussion recently changing both to yearly. Two AFPSL technicians normally go. Average trip time at Kirtland is 10-14 days and 5-7 days at Wright Patterson.

45
AFPSL Recompete PWS
37

Are Offerors expected to price additional/replacement GFE in their proposal response? Is so, in order to accurately estimate costs, please provide a list of all additional and replacement equipment that has been ordered in the previous years?

No, offerors are not expected to price additional GFE.

46
AFPSL Recompete PWS
45

Please provide the annual costs of NIST calibrations or labor rate from NIST.

Contractor will schedule calibrations with NIST. NIST calibrations paid directly by government. PWS section 5.1.12 will be clarified

47
Tech Exhibit 2A
1

Please provide the annual costs of NOTE 64 calibrations or labor rate from NOTE 64.

Data will be included in Bidder’s Library

48
Tech Exhibit 2A
1

Please clarify the workload that NOTE 64 signifies.

Definitions of all Note Codes will be included in the Bidder’s Library.

49
Tech Exhibit 2A
1

Please confirm that NOTE 64 is AFB exchange standards and/or ILC measurement processes.

Definitions of all Note Codes will be included in the Bidder’s Library.

50
Tech Exhibit 5A
1

Please confirm a plug number will be provided for the facility lease in order to ensure equal competition.

Lease costs will be provided in the final RFP CLIN structure

51
Tech Exhibit 2A
1

Please clarify the workload that SPECIAL NIST/ARMY signifies

SPECIAL NIST/ARMY workload is work from NIST and the Army that is calibrated at the AFPSL. For example, lapping/measuring gage block platens.

52
Tech Exhibit 2A
1

Please clarify the workload that SPECIAL AFMETCAL signifies

SPECIAL AFMETCAL signifies the contractor hours to manage the N64 workload.

53
Tech Exhibit 2A
1

Please clarify the workload that SPECIAL ACCEPTANCE signifies

SPECIAL ACCEPTANCE signifies the contractor hours to conduct the acceptance testing of AFMETCAL procured equipment.

54
Tech Exhibit 2A
1

Please clarify the workload that SPECIAL PROJECT PLAN signifies

Support of AFMETCAL Special projects (Ref CLIN 0007) Example, special calibrations, AFMETCAL directed contractor travel and specialized training, training of new AFMETCAL engineers.

55
Tech Exhibit 2A
1

Please clarify the workload that SPECIAL FMS signifies

Foreign Military Sales Workload

56
Tech Exhibit 2A
1
Please explain difference between FMS and FMS items sent out.
FMS items are calibrated at the AFPSL

FMS items sent out are shipped out for calibration or repair from the AFPSL

57
AFPSL Recompete PWS 5.1.9.4.1
32
Please provide the KPI turn-around time.
PWS 5.1.9.4.1 will be deleted. Standard turn-around time will apply IAW PWS 5.1.9.4
58
AFPSL Recompete PWS 5.1.10.1.3
37

Request to increase the $2,500 limit to the DoD micro-purchase threshold of $5,000.

No, $2,500 limit is for prior government approval of higher dollar purchases.

59
Draft Solicitation
N/A
Can the government provide a copy of the current collective bargaining agreement that covers the workforce?
Wage determination will be provided with final RFP and the Bidder’s Library
60
Section L 3.1 – Table 3.1
Table requires a "Transition Plan (as described in paragraph 4.2.2 subfactor 4)". However, 4.2.4 disucsses the volume organization and does not mention the transition plan as an attachment or a subfactor.
Will the government clarify the volume organization and how/where the transition plan should be included?
Transition plan will be included in Section II – Attachments as part of the technical proposal.
61
Section L 3.1.2 Page Size and Format
Pages shall be double spaced.
Please confirm that the attachments (i.e., the Transition Plan, Draft Quality Plan, Draft Technical Manual Production Plan, and Draft Measurement Area Capabilities Document) included in Vol. II - Attachments must be double spaced. Also, please confirm that double spacing applies to the Subcontracting Plan attached to Vol. 5 - Contract Documentation.
Double spacing shall be required.
62
Section L 4.1 – Volume I – Executive Summary

4.1.2 – Table of Contents

Paragraph 4.1.2 Table of Contents states, "Include a master table of contents of the entire proposal."
Three (3) pages are allowed for Vol. I - Executive Summary. How extensive/detailed does the master table of contents need to be (i.e., heading, subheading, sub-subheading, etc.)?
Offeror will determine format and level of detail for the Executive Summary
63
Section L 8.0 – List of Attachments

Paragraph 8.0 states, "Section L attachments listed below are provided as separate files.

Attachment 1: Cross Reference Matrix Attachment 2: Past Performance Information Tool Instructions"

Were "Attachment 1: Cross Reference Matrix" and "Attachment 2: Past Performance Information Tool Instructions" included in the draft RFP? If so, where?
Section L attachments will be included in final RFP posting.
64
Section L 3.8 – Electronic Offers
Instructions require electronic offers to be submitted on CDs.
Given that many offerors' computers no longer have the capability to produce CDs, will the Government allow submissions on flash drives?
No, Flash drives are not permissible on Government PCs
65
SAM.gov Notes
The Contracting Officer Notes on SAM.gov indicate the lease costs will be a passthrough to the contractor.
Is the Government expecting those costs to pass-through on invoices at cost, or will contractor indirect burdens be applicable?
Lease costs will pass through and will be included in the final RFP. Indirect cost burdens will not be applicable.
66
Section B
Questions regarding “External Calibration & Repair Services” CLINs:
a. What PWS Sections are included within these CLINs?

b. FAR 15.404-4 states that it is in the Government’s interest to offer contractors opportunities for financial rewards sufficient to stimulate efficient contract performance, attract the best capabilities of qualified large and small business concerns to Government contracts, and maintain a viable industrial base, as well as utilize fee/profit as a motivator of efficient and effective contract performance. Will the Government consider fee on these activities?

a. External Calibration & Repair Services are included in CLINs of the same name.

b. Fixed price type CLINs will include profit/fee. Cost reimbursable CLINs will not include profit/fee.

67
Section B
Questions regarding “Calibration Services - FMS” CLINs:
FAR 15.404-4 states that it is in the Government’s interest to offer contractors opportunities for financial rewards sufficient to stimulate efficient contract performance, attract the best capabilities of qualified large and small business concerns to Government contracts, and maintain a viable industrial base, as well as utilize fee/profit as a motivator of efficient and effective contract performance. Will the Government consider fee on these activities?
a. Calibration Services-FMS are included in CLINs of the same name.

b. Fixed price type CLINs will include profit/fee. Cost reimbursable CLINs will not include profit/fee.

68
Section B
Questions regarding “Cost Reimbursable Workloads” CLINs:
FAR 15.404-4 states that it is in the Government’s interest to offer contractors opportunities for financial rewards sufficient to stimulate efficient contract performance, attract the best capabilities of qualified large and small business concerns to Government contracts, and maintain a viable industrial base, as well as utilize fee/profit as a motivator of efficient and effective contract performance. Will the Government consider fee on these activities?
a. Cost Reimbursable Workloads are included in CLINs of the same name.

b. Fixed price type CLINs will include profit/fee. Cost reimbursable CLINs will not include profit/fee.

69
Section B
Questions regarding “Special Calibration Services” CLINs:
Please provide the Incentive Fee Plan showing target cost calculations, overrun/underrun share ratios, flat spots, and all other criteria used to determine earned incentive fee
Incentive fee plan will be included in final RFP release.
70
Section B
Questions regarding “Calibration Technical Orders” CLINs:
Please provide the Incentive Fee Plan showing target cost calculations, overrun/underrun share ratios, flat spots, and all other criteria used to determine earned incentive fee.
Incentive fee plan will be included in final RFP release.

N/A

Will the USAF provide an advanced copy of the CBA for this requirement to assist industry in developing the required pricing models prior to final release?
Wage determination will be provided with the final RFP and Bidder’s Library
72
Section J
Section J references “Item 10: Tech Exhibit 5e _AFPSL Measurement Capabilities”, but this file does not appear to be included in the files on beta-SAM. Can this file be provided?
Tech Exhibit 5e will be included in final RFP release
73
Section K
The solicitation includes three versions of FAR 52.230-1. Can this be simplified to only include the one version of FAR 52.230-1 applicable to the solicitation?
Yes, CON-IT error
74
Section L

Section L references Attachments that are not included in Section J. Can these Attachment be provided?

a. Section L: A Pricing Matrix is referenced in Comments by Hall, Marcia on 6/20/2019. Beta-SAM and Section J do not include a Pricing Matrix file.

b. Section L: A Cross Reference Matrix is referenced in Section 8.0 of Section L. Beta-SAM and Section J do not include a Cross Reference Matrix file.

Section L Attachments will be included in final RFP release.

a. Pricing Matrix will not be used in this contract. Pricing will be included in Section B.

b. Cross Reference Matrix will be included in final RFP release.

75
AFPSL Recompete PWS 5.1.10
Can the Government provide a matrix to cross reference the PWS Section 5.1.10 Supply/Transportation/Logistics Support costs to the contract CLINs?
Supply/Transportation/ Logistics support costs should be billed starting in CLIN 0002: Calibration Services, AFPSL Operations, Recurring and continue in all similarly described CLINs throughout the entire contract.
76
Tech Exhibit 2A
Can the Government provide a matrix to cross reference the Workload Estimates to specific PWS tasks and to the Contract CLINs in Section B of the DRFP?
Updated Section B, to include workloads from Tech Exhibit 2A, will be included in final RFP release
77
PWS 1.5.5 AFPSL Contractor Sponsored Tours
As this is part of a firm fixed price CLIN, please provide workload data in order to cost this element of work.
AFPSL Contractor sponsors about 20 tours per year, each tour last about 2 hours
78
PWS 5 Specific Taskings

This section includes the language “The contractor shall provide maximum support to Air Force activities…” This seems to be nebulous and subjective. Given that the many of CLINS are firm fixed price, it does not seem reasonable for this language to be part of the PWS as the offeror would not be able to define the workload and estimate the cost. Please define this workload.

PWS has been updated and will be included in final RFP release.

79
PWS 5.1.8.1 Turn Around Time

Please provide workload data for “Mission Essential” and “Emergency” designations as described in the Note.

“Mission Essential” and “Emergency” workload data will be included in the Bidder’s Library

80
PWS 5.1.8.8.4 AFMETCAL Proficiency Testing Program
Please provide workload data for this support.
Workload data will be included in the Bidder’s Library
81
PWS 4.1.2 High Energy Laser (HEL) Calibration Van
Is this work in the FFP CLIN or is it in a Cost Reimbursable CLIN?
HEL Van work is associated with Firm Fixed Price CLIN 0002
82
Tech Exhibit 2a
Do the hours in Attachment 2a – Workload include time for other tasks performed by the technicians, such as: 1.3 ISO accreditation, 1.4 Quality Program Requirements, Quality Assurance, 1.5.4.3 Radiation Safety Officer, 3.2.5 Qualification Training Program, 4.1.2 High Energy Laser Cal-Van, 4.1.6 Training, 5.1.6.4 Particle Counts, 5.1.7 Quality Sampling, 5.1.2.2.3 COR Audits, 5.1.7.3.5.2 AFMETCAL On-Site Assessment, 5.1.8.3 Exchange Standards, 5.1.8.7.7 Preventive Maintenance Inspections, 5.1.8.19 Customer Assistance, 5.1.8.8.4 AFMETCAL Proficiency Program, 5.1.8.10.2 Customer Approval, 5.1.9.1 Acceptance Testing, 5.1.9.2 Inspection TMDE commercial cal, 5.1.9.4 Off-Site calibration?
The hours in 2a do not include 1.3, 1.4, 1.5.4.3, 3.2.5, 4.1.6, 5.1.6.4, 5.1.7, 5.1.2.2.3, 5.1.7.3.5.2, 5.1.8.7.7, 5.1.8.19, 5.1.8.10.2

Calibrations utilizing 4.1.2 High Energy Laser Cal-Van are included in 2a, maintenance and transporting the van are not included in 2a

83
RFP Section M 1.1

Considering the Technical Rating for the proposal is either acceptable or unacceptable, what is the purpose of the color rating and associated adjectival rating systems as it relates to the Technical Volume? This type of evaluation system is for a best value evaluation where the technical rating system has an impact on the award decision other than acceptable or unacceptable.

Please clarify the proposal evaluation process and resulting source selection process. We suggest aligning the proposal evaluation description and process to align with the source selection evaluation process.

Section M updated for clarity and will be available in RFP posting. Technical factor is significantly more important than Past Performance and Price. Past performance is more important than Price. Tradeoffs may be made between all three factors.

Section M is from Department of Defense standard source selection guidance.

84
Draft Data Requirements

Draft_Data_Requirements.pdf, containing the Contract Data Requirements List (CDRL) is viewable, but can’t be printed.

Will the government provide a copy of this document that can be printed?

PDF security features are disabled and document is printable

85
Section L Paragraph 5

It is not clear as to the format for the past performance volume. Are the Consent Authorization Letters (5.2) and Organizational Structure Change History (5.4.2) to be included in the PPI tool?

Please provide guidance as to the structure and the instructions for preparing and submitting Volume III – Past Performance. For example electronic v. printed, any page restrictions, etc.

PPI Instructions will be included in RFP as an Attachment to Section L.

86
Section B

Regarding CLINs 0007, 0007AA and 0007AB (and associated CLINS for period of performance), CLINS AA and AB appear to be sub-CLINS of 0007 yet they are not necessarily related.

Should they be separate CLINS? Also, what is the contract type for Project Plans (CLIN 0007, 0016, etc.)?

CLIN 0007AA will require project plans for training of AFMETCAL employees by the contractor. The majority of the time a government employee spends in the laboratory will be charged to existing work orders, as they will be observing and assisting in calibration setups and data acquisition. This CLIN will allow a marginal charge to the project plans for any technician/engineering time that is spent explicitly training the government employee versus simply explaining work-in-process. Each plan will be pre-negotiated for 416 hours total for a one year period per employee, however, cost will not be 416 technician hours.

CLIN 0007AB will require project plans for specialized training (AFMETCAL directed or requested)

87
Section L 1.1

The paragraph that follows L.1.1.B. Support Tasks that begins “The pricing arrangement for this contract…” states the AFPSL Operations CLIN is firm fixed price with an incentive fee. This conflicts with Schedule B which states the Operations of the AFPSL is firm fixed price (i.e. CLIN 0002 and 0003).

Please clarify the pricing arrangement for these CLINs. If there is an incentive fee, will the government provide a plug figure for the fee? Is the offeror required to segregate FFP operations costs and incentive fees on CLINS 0002 and 0003?

CON-IT error, Pricing arrangement for CLINs 0002 and 0003 is FFP w/ Performance Incentive

Incentive plan will be included in final RFP release

88
PWS 5.1.8.18.1
Is the contractor responsible for paying these costs? If so, are they reimbursable?
This will be part of the shipping department. Costs are part of CLIN 0002, Calibration Services, AFPSL Operations and subsequent CLINs of same name, and firm fixed price. Repair data will be included in Bidder’s Library.
89
PWS 5.1.10.12.1
Is the contractor responsible for paying these costs? If so, are they reimbursable?
The parts and material are cost reimbursable. The labor is part of the fixed price.
90
PWS 5.1.10.23
Is the contractor responsible for paying these costs? If so, are they reimbursable?
This will be part of the shipping department. Costs are part of CLIN 0002, Calibration Services, AFPSL Operations and subsequent CLINs of same name, and firm fixed price. Repair data will be included in Bidder’s Library.

Shipping costs are paid directly by the Government. The PWS asks for the most economical method.

91
PWS 5.1.11
Is the contractor responsible for paying these costs? If so, are they reimbursable?
All packing material used should be part of the shipping department estimate and included in CLIN 0002, Calibration Services, AFPSL Operations and subsequent CLINs of same name.
92
PWS 1.3
Should the costs for obtaining and maintaining ISO/IEC 17025 accreditation in the measurement areas identified in Tech Exhibit 7 be included in CLIN 0002 and subsequent option year CLINs?
Yes, it shall be included in CLIN 0002, Calibration Services, AFPSL Operations and subsequent CLINs of same name.

RADIAC accreditation will be included in CLIN 0003, RADIAC Calibration Services and subsequent CLINs of same name

93
Section L Table 3.1

There seems to be some ambiguity when looking at the requirements for this area. Table 3.1 - Proposal Organization II-Attach calls it a Technical Manual Production Plan (TMPP).The title of the Subfactor in both Section L & M is Technical Manual Quality Plan and references PWS paragraph 5.2. Technical Exhibit 4, Data Requirements Cross Reference for CDRL A028 indicates PWS references 5.2 33K-Series Cal TOs and 5.2.3, Quality Control. IAW PWS 5.2 & 5.2.3, the technical order quality plan is part of the TMPP.

Does the government want only the quality portion of the TMPP or the entire TMPP that includes the quality plan?

The Government requires the entire TMPP to include the quality plans.

94
Section L Table 3.1

Table 3.1 indicates that there are two portions of Volume II, the volume itself (II) and II – Attach. It is not clear between Table 3.1 and paragraphs 4.2.4-4.2.9, the information that belongs in each. It could be inferred that Subfactors 1 and 2 belong in Vol II and Subfactors 3, 4, & 5 belong in II – Attach. Also, Table 3.1, II – Attach makes reference to a Transition Plan. However, the paragraph reference given is not valid and there’s no other mention of a Transition Plan in Section L or M.

Question: Please clarify the proposal organization and what belongs in each section of Volume II, as well as the requirements for a Transition Plan.

PWS is updated with Transition Plan requirements and will be provided in final RFP release.

Section L Table 3.1 was updated to include PWS reference.

95
Section B CLIN 0001 and CLINs 0002-0010

The period that the transition activities (CLIN 0001) cover is the same as the contract performance activity in CLINs 0002-0010. CLINs for both transition activities and the first performance period are 1 Jul 2020 – 31 December 2020.

Did the government intend for the transition period to be the same as the first contract performance period?

The initial transition period will be three months. Then, the awardee will conduct AFPSL operations on their own for the final three months of the calendar year.

96
Section L Table 3.1

Table 3.1 indicates two sections for Volume II - Technical, II and II-Attach. Paragraph 4.2.4 indicates a single volume, outlined with nine sections (including the five Subfactors), with no mention of the II and II-Attach identified in Table 3.1.

Should the technical volume be organized IAW paragraph 4.2.4 as a single volume with five Subfactors or IAW Table 3.1 as a volume (II) with attachments (II-Attach)?

Whichever the government decides, please align Table 3.1 and paragraph 4.2.4 to clarify the Technical Volume organization and where each Subfactor shall be addressed.

Table 3.1 and paragraph 4.2.4 will be aligned appropriately

97
Section L 4.2

Assuming the government intends to publish TE-5e AFPSL Measurement Capabilities, each offeror would have the information necessary to develop the information required to populate Section 2 of the MACD for each of the areas. Merely asking the bidders to submit an approach for a single area does not demonstrate a company’s capability to develop Section 2 of a MACD for a primary standards laboratory.

How many AFPSL measurement areas does the government intend each offeror to demonstrate compliance with PWS paragraph 5.1.8.8.1, to include methods used to validate measurement uncertainty and ensure traceability, to record, maintain, and analyze historical data, provide statistical processes and analysis to validate measurement uncertainties, and processes to validate measurement uncertainties against other DoD services and industry.

The Government’s expectation is for the contractor is to provide measurement area assurance in all areas. The purpose of Section L 4.2.9: Subfactor 5 is to demonstrate an overall understanding in order to produce an effective MACD.

98
Section L 3.0, 3.1, Table 3.1, 4.2.2

The Volume Title Column states, “Transition Plan (as described in paragraph 4.2.2 Sub factor 4)”.

We are unable to find Paragraph 4.2.2, Sub factor 4, as it relates to the Transition Plan in Section L of this RFP.

Please provide either a CDRL for the Transition Plan or specific instruction for the preparation of the Transition Plan document.

Transition plan will be included in Section II – Attachments as part of the technical proposal.

Reference PWS Section 7

99
PWS 5.1.1.3, 5.1.8.7.2, 5.1.9.4.5

We note that the reference to the Funds and Man-Hours Expenditure Report, D1-FNCL-80331 in the draft solicitation is to an expired Data Item Description. The current version is 80331A. This supports to inference that this is a legacy reference.

The DID to which the Tech Exhibit cites (DI-FNCL-80331, superseded by DI-FNCL-80331A) explicitly states that it is not applicable to fixed-price contracts, as shown below. (both 80331A and Tech Exhibit 4 are linked) The Use/Relationship section of 80331A reads:

This report provides Government visibility into contractor expenditures for labor, materials, travel and other contract charges. It tracks these expenditures against baseline values, and provides to-completion estimates.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID is applicable to time and material, research and development and other contracts where use of Cost Performance Reporting (CPR) or Cost/Schedule Status Reporting (C/SSR) are not appropriate. It is not applicable on fixed-price contracts. It is acquired on a periodic basis.

It is not intended that all the requirements contained herein should be applied to every contract or program phase. Portions of this DID are subject to deletion tailoring depending on the management requirements of the solicitation/contract in which it is applied.

This DID is related to DI-A-5016, Project Planning/Actual Progress Chart (Other than fixed price contracts), and DI-FNCL-80003, Man-Hour Expenditure Chart.

This DID supersede DI-FNCL-80331.

(1) Please eliminate reference to the A010 Funds and Man-Hour Expenditure Report for all fixed price CLINs and clarify the requirement to submit the report for any remaining CLINs.

(2) Please include the current Funds and Man-Hour Expenditure Report with the final solicitation.

PWS 5.1.1.3 will be updated roughly as follows “The contractor shall submit a Cost Performance Report for each CLIN that is cost reimbursable CLIN type for the metrology effort. Efforts that are a fixed type CLIN do not need to be included in this report. (CDRL A010, DI-FNCL-80331A, Funds and Man-hour Expenditure Report)

The format of the report will be at contractor discretion with government approval.

100
Section L 3.1
The Transition Plan, mentioned in Table 3.1 as a part of Volume II-Attach, is not described in Section 4.2.2. Would the Government please detail the requirements for this Plan and for the Transition Period?
Transition plan will be included in Section II – Attachments as part of the technical proposal.

Reference PWS Section 7

Transition is 3 months (1 July 2020 – 30 September 2020). Remaining 3 months contractor is responsible for full operation of the lab.

101
Section L 3.1

The CDRLs mentioned in Table 3.1, CDRL A002, CDRL A028, and Section 2 of CDRL A025 are to be delivered as a part of Volume II Attach. However, the DIDs for these, numbered OT-xxxx-xxxxx appear to be tailored for the specific requirements of the AFPSL and are not available on the DLA Assist website. Would the Government please provide them as soon as possible to enable offerors to provide a responsive proposal?

All DiDs were attached with the draft RFP. Some DiDs are tailored to specific AFPSL requirements and will be posted again with the final RFP