About this file

This technical exhibit outlines the key performance standards and metrics for a federal contract to provide calibration and repair services at an Air Force Primary Standards Laboratory. Key requirements include maintaining accuracy of calibrations to within defined thresholds, meeting turnaround time standards for service completion, and adhering to procedures for facility control, equipment maintenance, and database upkeep. Performance is evaluated on a monthly basis across various process areas, with allowed defect rates specified for each standard. The contractor must also comply with records management and property control regulations.

A second draft solicitation and supporting documents are provided relating to the recompete of an Air Force contract for calibration services at the Primary Standards Laboratory. The opportunity involves the Department of the Air Force contracting with an incumbent or new provider to handle calibrations, repairs, and technical manual development at the facility. The final RFP is scheduled for release on January 31, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to AFPSL Recompete, newest first.
File Type Posted
Solicitation Amendment FA226320R00020004 SF 30.pdf PDF
AFPSL Recompete Section L Rev 3.docx DOCX document
Solicitation Amendment FA226320R00020003 SF 30.pdf PDF
FA226320R0002 AFPSL_Questions.docx DOCX document
AFPSL Recompete Section L Rev 2.docx DOCX document
Section L Attachment 2 PPI Tool Instructions Rev 1.docx DOCX document
AFPSL Draft RFP Questions and Responses2.docx DOCX document
Attachment 5a_Facilities Lease Agreement.docx DOCX document
AFPSL Recompete Incentive Plan.docx DOCX document
AFPSL Recompete PWS.docx DOCX document
AFPSL Recompete Section M.docx DOCX document
Attachment 6_GFE Usage Fee.docx DOCX document
Attachment 3_Radioactive Material List.doc DOC document
Solicitation - FA226320R0002.pdf PDF
DOL CBA Rev2.pdf PDF
Attachment 7_ Accreditation Areas.xlsx XLSX spreadsheet
Data Requirements.pdf PDF
Section L Attachment 2 PPI Tool Instructions.docx DOCX document
Attachment 2a_Workload.xlsx XLSX spreadsheet
Attachment 5e_AFPSL Measurement Capabilities.docx DOCX document
AFPSL Recompete Section L.docx DOCX document
Attachment 2b_Turnaround Time Exceptions.xlsx XLSX spreadsheet
Section L Attachment 1 Solicitation_Cross_Reference_Matrix.docx DOCX document
Attachment 4_Data Requirements Cross Reference.docx DOCX document
Attachment 5b_GFE List.xlsx XLSX spreadsheet
DOL Wage Determination.pdf PDF
AFPSL_5_Year_Accredited_Cal Items Shipped - Bidder's Library.xlsx XLSX spreadsheet
21-2 - US AFPSL Calibration Procedure TOs - 8 March 2016 - Bidder's Library.pdf PDF
AFPSL Draft RFP Questions and Responses2.docx DOCX document
AFPSL Cal Software list - Bidder's Library.xlsx XLSX spreadsheet
AFPSL_Priority_Workload - Bidder's Library.xlsx XLSX spreadsheet
Note64 report - Bidder's Library.xlsx XLSX spreadsheet
33K-1-100-1 - Bidder's Library.pdf PDF
AFPSL_5_Year_Commercial_Calibration_Data - Bidder's Library.xlsx XLSX spreadsheet
TO 00-20-14_20190131 - Bidder's Library.pdf PDF
AFPSL_5_Year_History_Listing - Bidder's Library.xlsx XLSX spreadsheet
Draft Solicitation - FA226320R0002.pdf PDF
Section L Attachment 2 PPI Tool Instructions.docx DOCX document
AFPSL Recompete Section M 20191217.docx DOCX document
AFPSL Recompete Incentive Plan.docx DOCX document
DOL CBA Rev2.pdf PDF
Tech Exhibit 3_Radioactive Material List.doc DOC document
Tech Exhibit 6_GFE Usage Fee.doc DOC document
AFPSL Draft RFP Questions and Responses.docx DOCX document
Tech Exhibit 5a_Facilities Lease Agreement.docx DOCX document
Tech Exhibit 2b_Turnaround Time Exceptions.xlsx XLSX spreadsheet
Tech Exhibit 5e_AFPSL Measurement Capabilities.doc DOC document
Tech Exhibit 5b_GFE List.xlsx XLSX spreadsheet
Tech Exhibit 4_Data Requirements Cross Reference.docx DOCX document
Tech Exhibit 7_ Accreditation Areas.xlsx XLSX spreadsheet
Show all 50

AFPSL Recompete has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Service Delivery Summary (SDS) Technical Exhibit 1
ITEM #REQUIRED SERVICE PWS para.STANDARD Performance ObjectivePERFORMANCE REQUIRED THRESHOLDMETHOD OF SURVEILLANCEAPPLIES TO: LAB T.O.
1.00ACCURACY
1.01ACCURACY OF CALIBRATIONS 1.4, 1.5, 5.1.7.3, 5.1.8.8, 5.1.8.8.1, 5.1.8.10, 5.1.8.11, 5.1.8.12, 5.1.8.13, 5.1.8.14, 5.1.8.15, 5.1.8.16, 5.1.8.17, 5.1.8.18, 5.1.8.19, 5.1.9.4, 5.1.9.5, 5.1.12ENSURE ALL AFPSL CALIBRATIONS ARE ACCURATE.

MAJOR DEFECTS: 1. THE ITEM IS UNSAFE OR HAZARDOUS TO USE, OR 2. THE ITEM DOES NOT MEET CALIBRATION ACCURACIES FOR ALL FUNCTIONS CERTIFIED, 3. ALSO AS DEFINED IN T.O. 00-20-14 AND PWS PARAGRAPH 2.1.19.

MINOR DEFECTS: ANY DEFECT THAT IS NOT MAJOR. ALSO MAJOR OR MINOR DEFECTS AS DEFINED IAW T.O. 00-20-14, AND THIS PWSTO ALLOW CONTRACTOR TO EXCEED THIS ELEMENT, ONE MAJOR DEFECT IS ALLOWED PER MONTH OF QUALITY PRODUCTION. TWO MINOR DEFECTS ALLOWED PER MONTH OF QULAITY PRODUCTION.RANDOM SAMPLINGLAB
1.02ACCURACY OF T.O. DEVELOPMENT 5.1.8.15, 5.1.8.17.1, 5.2.1.1, 5.2.1.2, 5.2.3, 5.2.4ALL T.O DEVELOPMENT, REVISIONS, AND REWRITES ARE ACCURATE.

MAJOR DEFECTS: THOSE DEFECTS THAT DO NOT ACHIEVE THE REQUIRED CALIBRATION PARAMETERS OF THE ITEM TO BE CALIBRATED. ALSO, AS DEFINED IN PWS PARAGRAPH 2.1.19.

MINOR DEFECTS: THOSE DEFECTS THAT DO NOT AFFECT THE REQUIRED CALIBRATION PARAMETERS.NEW AND REWRITE 1 or 10% (WHICHEVER IS GREATER) REJECTS ALLOWED. REVISIONS/CHANGES 1 or 2% of SAMPLE (WHICHEVER IS GREATER) REJECTS ALLOWED. REJECT = T.O. WITH ONE MAJOR OR MORE THAN TWO MINOR DEFECTS. LOT SIZE IS MONTHLY REVIEWEDNEW & REWRITE: ONE HUNDRED PERCENT INSPECTION REVISION/CHANGE: ONE HUNDRED PERCENT INSPECTION, RANDOM SAMPLING AFTER 6 MONTHS ACCEPTABLE PERFORMANCET.O.
1.03ACCURACY OF RADIAC CALIBRATIONS 1.4, 5.1.7.3, 5.1.8.8, 5.1.8.8.1, 5.1.8.10, 5.1.8.11, 5.1.8.12, 5.1.8.13, 5.1.8.14, 5.1.8.15, 5.1.8.16, 5.1.8.17, 5.1.8.18, 5.1.8.19, 5.1.9.4, 5.1.9.5, 5.1.12ENSURE ALL RADIAC CALS ARE ACCURATE.

MAJOR DEFECTS: 1. THE ITEM IS UNSAFE OR HAZARDOUS TO USE, OR 2. THE ITEM DOES NOT MEET CAL ACCURACIES FOR ALL FUNCTIONS CERTIFIED, 3 ALSO AS DEFINED IN T.O. 00-20-14 AND PWS PARAGRAPH 2.2.19.

MINOR DEFECTS: ANY DEFECT THAT IS NOT A MAJOR. ALSO MAJOR OR MINOR DEFECTS AS DEFINED IN T.O. 00-20-14 AND THIS PWS. 1% OR LESS MAJOR DEFECTS OF LOT ALLOWED

2% OR LESS MINOR DEFECTS OF LOT ALLOWED

** LOT SIZE IS MONTHLY PRODUCTION MINUS BATCHED ITEMS.

(TOTAL ITEMS IN THE BATCHES).

FOR BATCHED ITEMS 1 MAJOR DEFECT IS ALLOWED OR 2 MINOR DEFECTS. **LOT SIZE IS MONTHLY PRODUCTION OF BATCHES.RANDOM SAMPLINGRADIAC LAB ONLY
2.00FACILITY CONTROL 5.1.4, 5.1.5, 5.1.6, 5.1.9.4.3MUST MAINTAIN FACILITY TO OPERATING SPECIFICATIONS IAW T.O. 00-20-14, AND THIS PWSENVIRONMENTAL SYSTEMS WILL BE WITHIN TOLERANCE 90% OF TIME. ALL OUT OF TOLERANCE CONDITIONS WILL BE ANNOTATED AND CORRECTIVE ACTIONS DOCUMENTEDRANDOM SAMPLINGLAB
3.00MAINTAIN AFPSL MEASUREMENT AREA CAPABILITIES 5.1.8.8.1, 5.1.12ENSURE REGULAR PROCEDURES FOR MAINTAINING MEASUREMENT AREA ASSURANCE ARE FOLLOWED AND ACCURATE RECORDS DOCUMENTING THE RESULTS OF THESE PROCEDURES ARE AVAILABLE.ONE OR 25% OF SAMPLE, (WHICHEVER IS GREATER), DEFECTS ALLOWED PER MONTH. LOT SIZE IS ALL AFPSL MEASUREMENT AREASRANDOM SAMPLINGLAB
4.00SERVICE CUSTOMERS WITHIN ALLOTTED TIME
4.01SERVICE CUSTOMERS WITHIN ALLOTTED TURN-AROUND-TIME 5.1.8.1, 5.1.8.2, 5.1.8.3, 5.1.8.4, 5.1.8.4.1, 5.1.8.4.2, 5.1.9.1, 5.1.9.4.1, 5.1.8.7.1, 5.1.13.2ENSURE WORK FLOW TIMES DO NOT EXCEED THOSE STANDARDS DEFINED IN THIS PWS3% DEFECTS ALLOWED PER MONTH. IF THRESHOLD IS EXCEEDED, 0% DEFECTS ALLOWED 15 DAYS BEYOND TURN-AROUND-TIME; WRITTEN JUSTIFICATION REQUIRED FOR ALL ITEMS EXCEEDING TURN-AROUND-TIME BY 10 DAYS OR MORE. LOT SIZE IS MONTHLY PRODUCTION.ONE HUNDRED PERCENT INSPECTIONLAB
4.02SERVICE CUSTOMERS WITHIN ALLOTTED TURN-AROUND-TIME 5.1.8.1, 5.1.8.2, 5.1.8.3, 5.1.8.4, 5.1.8.4.1, 5.1.8.4.2, 5.1.9.1, 5.1.9.4.1, 5.1.8.7.1, 5.1.13.2ENSURE WORK FLOW TIMES DO NOT EXCEED STANDARDS DEFINED IN THIS PWS2 "BATCHED ITEM" DEFECTS ALLOWED PER MONTH AND 0.75% "NON-BATCHED ITEM" DEFECTS ALLOWED PER MONTH. IF THRESHOLD IS EXCEEDED, 0% DEFECTS ALLOWED 5 DAYS BEYOND TURN-AROUND-TIME; WRITTEN JUSTIFICATION REQUIRED FOR ALL ITEMS EXCEEDING TURN-AROUND-TIME. LOT SIZE IS MONTHLY PRODUCTION.ONE HUNDRED PERCENT INSPECTIONRADIAC LAB ONLY
4.03SERVICE TO CUSTOMERS WITHIN ALLOTED TURN-AROUND-TIME FOR T.O. DEVELOPMENT 5.2.1.2.4, 5.2.1.4, 5.2.1.5.2, 5.2.1.6ENSURE WORKFLOW TIMES DO NOT EXCEED THOSE STANDARDS DEFINED IN THIS PWS10% NEW T.O. DEFECTS ALLOWED PER MONTH; 10% REWRITE DEFECTS ALLOWED PER MONTH; 1% REVISION/CHANGE DEFECTS ALLOWED PER MONTH. IF THRESHOLD IS EXCEEDED, 0% DEFECTS ALLOWED 5 DAYS BEYOND TURN-AROUND-TIME; WRITTEN JUSTIFICATION REQUIRED FOR ALL ITEMS EXCEEDING TURN-AROUND-TIME. LOT SIZE IS MONTHLY PRODUCTION.ONE HUNDRED PERCENT INSPECTION PWS 5.2.7 RANDOM SAMPLINGT.O.
4.04SERVICE CUSTOMERS WITHIN ALLOTTED TURN-AROUND-TIME
5.1.9.1ENSURE WORK FLOW TIMES DO NOT EXCEED THOSE STANDARDS DEFINED IN THIS PWSNO FIRST ARTICLE TESTING ITEM DEFECTS ALLOWED PER MONTH; NO MORE THAN 1 OR 10% (WHICHEVER IS GREATER) PRODUCTION ARTICLE TEST ITEM DEFECTS ALLOWED PER MONTH; AND NO ITEMS REMAINING PENDING AS OF END OF MONTH THAT ARE 30 DAYS OR MORE BEYOND DUE DATE.ONE HUNDRED PERCENT INSPECTIONLAB - Acceptance Testing
4.05SERVICE CUSTOMERS WITHIN ALOTTED TURN-AROUND-TIMEENSURE WORK FLOW TIMES DO NOT EXCEED THOSE STANDARDS DEFINED IN THIS PWS3% DEFECTS ALLOWED PER MONTH. IF THRESHOLD IS EXCEEDED, 0% DEFECTS ALLOWED 15 DAYS BEYOND TURN-AROUND-TIME; WRITTEN JUSTIFICATION REQUIRED FOR ALL ITEMS EXCEEDING TURN-AROUND-TIME BY 10 DAYS OR MORE. LOT SIZE IS MONTHLY PRODUCTION.ONE HUNDRED PERCENT INSPECTIONLAB (FMS)
5.00DATABASE MAINTENANCE
5.01MAINTAIN PMEL AUTOMATED MANAGEMENT SYSTEM (LABMET) 5.1.8.7.4, 5.1.8.17ENSURE ALL LABMET ENTRIES ARE ACCURATE FOR ALL TMDE SUPPORTED, AND ALL DATA LISTINGS ARE PRODUCED AND DISTRIBUTED IAW THIS PWS3% OR LESS DEFECTS OF MONTHLY PRODUCTION ALLOWEDRANDOM SAMPLINGLAB
6.00MAINTAIN PUBLICATION T.O. & CPIN LIBRARIES 5.1.8.9, 5.2.5MUST BE MAINTAINED IAW T.O.s 00-5-1 AND 00-5-3; AND AFI 33-3605.2.5 THREE NONCONFORMATIES PER AUDIT 5.1.8.9 AUDITED AS PART OF 1.01 & 1.02 THREE NONCONFORMATIES PER MONTHRANDOM SAMPLINGT.O. & LAB
7.00LOGISTICS
7.01RECEIPT PROCESSING 5.1.8.1, 5.1.9.1100% OF ALL ASSETS ARE ENTERED INTO COMPUTER RECORDS.
(LABMET ENTRIES NOT LATER THAN ONE WORK DAY AFTER RECEIPT)EIGHT DEFECTS ARE ALLOWED. LOT SIZE IS MONTHLY RECEIPTSRANDOM SAMPLINGLAB
7.02STORE AND LOCATE EQUIPMENT 5.1.7.2.3, 5.1.8.4.5, 5.1.10.5, 5.1.10.6, 5.1.10.7100% OF ALL ASSETS ARE ASSIGNED WAREHOUSE LOCATIONS, AND STORED WITHIN THREE WORKDAYS AFTER RECEIPTTWO DEFECTS ARE ALLOWED. LOT SIZE IS MONTHLY RECEIPTSRANDOM SAMPLINGLAB
7.03PACKAGING 5.1.11, 5.2.7.1ALL ITEMS SHIPPED SHALL BE PACKAGED IAW TRANSPORTATION PACKAGING ORDER (TPO) OR SPECIAL PACKAGING INSTRUCTION (SPI). (AFMAN 24-204, AFI 24-602, CFR TITLE 49, AND MIL-STD-2073-1)1% DEFECTS ARE ALLOWED. LOT SIZE IS TOTAL SHIPPED PER MONTH T.O. TWO DEFECTS ALLOWEDRANDOM SAMPLING T.O. USE OF CUSTOMER COMPLAINTSLAB & T.O.
8.00PROPERTY CONTROL 4.1.2, 5.1.10.1.1, 5.1.10.9.1, 5.1.10.9.2, 5.1.10.9.3, 5.1.10.9.4, 5.1.10.10, 5.1.10.11, 5.1.10.22PROPERTY CONTROL SYSTEM IS ADMINISTERED IAW FAR 45.5ALL PROPERTY WILL BE MAINTAINED TO CONTRACTOR/GOVERNMENT AGREED CONDITION. LOT SIZE IS TOTAL ACCOUNTABLE PROPERTY.SYSTEM SURVEYS DOD 4161.2-M, OR RANDOM SAMPLING DCMA FUNCTIONLAB
9.00INVENTORY ACCURACY 1.2.3.4.1, 3.1.1, 3.1.2, 3.1.3, 3.1.4, 5.1.10.3, 5.1.10.8, 5.1.10.9.1, 5.1.10.9.2100% OF ALL GOVERNMENT FURNISHED EQUIPMENT MUST BE INVENTORIED.2% DEFECTS OF ITEMS AUDITED ARE ALLOWED.RANDOM SAMPLINGLAB
10.00RESPOND TO REPORTS REQUIRED IN TECHNICAL EXHIBIT 4RESPOND WITH ACCURATE SUBMISSIONS AND WITHIN TIMES SPECIFIED FOR THESE REPORTS.PERFORMANCE REQUIREMENT IS TWO DEFECTIVE REPORTS. LOT SIZE IS NUMBER OF REPORTS PER MONTH
NO DEFECTS OF CDRL A010ONE HUNDRED PERCENT INSPECTIONLAB & T.O.

Technical Exhibit 1 (SDS).xls