EXHIBIT B - Subcontractor Consent and Reference Form 36C24423R0148 .pdf

PDF 140 KB Posted

Attached to
Z1DA--646-19-103 UD Reno 6E 48 Hour Observation
Solicitation number
36C24423R0148
Issued by

About this file

This document is a subcontractor consent and reference form for a federal solicitation seeking services for the renovation of observation rooms and replacement of air handling units at the VA Pittsburgh Healthcare System facilities. The solicitation is identified as number 36C24423R0148 and concerns project numbers 646-19-103 and 646-22-204. Any subcontractors named in the prime contractor's proposal must complete this form to provide consent for their past performance information to be shared with the prime contractor during the evaluation process. The form also requires subcontractors to list at least two references and details of relevant prior work. The completed forms are to be submitted by the prime contractor as part of their proposal. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4.

View the file

Other files

File Type Posted
64619103_Division 21_08312023.pdf PDF
36C24423R0148 0004_1.docx DOCX document
36C24423R0148 0004.pdf PDF
36C24423R0148 0003.pdf PDF
36C24423R0148 0003_1.docx DOCX document
FLOORING_082323.pdf PDF
36C24423R0148 0002_1.docx DOCX document
36C24423R0148 0002.pdf PDF
Sign in sheet_Redacted.pdf PDF
SSJ_Corner Guard(s) 8.21_Redacted.pdf PDF
SSJ_Curtain tracks(s) 8.21_Redacted.pdf PDF
SSJ_Cambria Quartz Countertop(s)8.21_Redacted.pdf PDF
SSJ_Wilsonart Laminate(s) 8.21_Redacted.pdf PDF
SSJ_ASI Lockers(s) 8.21_Redacted.pdf PDF
SSJ_Mapei_Grout(s) 8.21_Redacted.pdf PDF
SSJ_Interface_LVt(s) 8.21_Redacted.pdf PDF
ssj gooseneck faucets_powers assembly(s) 8.21._Redacted.pdf PDF
SSJ_Sherwin Williams_Paint(s) 8.21_Redacted.pdf PDF
SSJ_Daltile Tile_Rittenhouse(s) 8.21_Redacted.pdf PDF
36C24423R0148 0001.pdf PDF
SSJ_Lumicor Wall Panel(s) 8.21_Redacted.pdf PDF
36C24423R0148 0001_1.docx DOCX document
SSJ_Handrails(s) 8.21_Redacted.pdf PDF
SSJ_Window Shades(s) 8.21_Redacted.pdf PDF
SSJ_DuPont Corian(s) 8.21_Redacted.pdf PDF
SSJ Arjo Patient Lifts JA FY23(s) 8.21._Redacted.pdf PDF
SSJ_Mannington_BioSpec_Vinyl(s) 8.21_Redacted.pdf PDF
SSJ_Stonhard Flooring(s) 8.21_Redacted.pdf PDF
MEDICAL CENTER REQUIREMENTS - PITTSBURGH.pdf PDF
36C24423R0148 8-3-2023 r1.pdf PDF
64619103_IFB_BP2_Specifications_051723.pdf PDF
64619103_IFB_BP2_Drawings_051723.pdf PDF
Wage Determination PA PA20230077 6.30.2023.pdf PDF
EXHIBIT E - Past Performance Questionnaire 36C24420R0148.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24423R148.pdf PDF
36C24423R0148_2.docx DOCX document
EXHIBIT A - Statement of Prior Experience UD Reno 6E 48 Hour Observation.pdf PDF
36C24423R0148 8-3-23.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT B – SUBCONTRACTOR CONSENT AND REFERENCE FORM

PART 1 - INSTRUCTIONS:

Subcontractor and/or Teaming Partner Consent for the release of Past Performance Information including references to the Prime Contractor:

Each Subcontractor and/or Teaming Partner named by the Offeror in Exhibit A, Part 2 must complete an Exhibit B - Subcontractor Consent and Reference Form to be considered.

Past Performance information concerning Subcontractors and Teaming Partners cannot be disclosed to a private party without the Subcontractor’s or Teaming Partner’s consent.

Because a Prime Contractor is a private party, the Government will need that consent before disclosing Subcontractor/Teaming Partner Performance information to the Prime during exchanges.

Two (2) Subcontractor’s references are also required to be completed on this form. Separate written references for Subcontractors may also be included and are encouraged; however, Subcontractors do not need to send out Past Performance Questionnaires to references included only on this form. Subcontractor may attach associated written references to this form.

Offeror may elect to have Subcontractors also submit Relevant Prior Project Experience on up to one (1) Exhibit A, Part 1 form. Projects described on Exhibit A forms shall have Past

Performance Questionnaires (PPQs) sent to associated reference contacts regardless of Prime

(Offering) or Sub Contractor status. Offeror cannot be a POC for a Subcontractor on the

Exhibit A form, and cannot be a written reference in Exhibit B.

The completed consent forms with any reference attachments shall be submitted to the

Offering Prime Contractor for submission in the proposal.

PART 2 - SUBCONTRACTOR CONSENT:

(name of subcontracted firm) is currently planning on participating as a Subcontractor and or Teaming Partner with (Prime Contractor or name of entity submitting proposal) in responding to the Request for Proposal Number 36C244223R0203148

646-19-103 UD Reno 6E 48 Hour Observation, Project 646-22-204 “UD 1W/2W AHU

Replacement” VA Pittsburgh Healthcare System (VAPHS) at University Drive Division, Pittsburgh, PA 15215, issued by the VAPHS, 1010 Delafield Road, Pittsburgh, PA 15215, Contract Specialist -– Elijah McIntoshJohn Mignogna

We understand that the Government is placing increased emphasis on

Past Performance in order to obtain best value in source selections. In order to facilitate the proposal review and evaluation process, we are signing this consent form to allow the Government to discuss our Past

Performance information with the Prime Contractor during the source selection process.

(Signature) (Title, Company of Individual with authority to sign for and legally bind the company)

Address:

City/State/Zip Code: Date:

PART 3 - SUBCONTRACTOR’S REFERENCE LIST (REQUIRED):

1. Project Title and Contract No.

Describe your role (Prime/Sub) and work performed:

Reference POC Name, Title, Organization:

Phone: Email Address:

2. Project Title and Contract No.

Describe your role (Prime/Sub) and work performed:

Reference POC Name, Title, Organization:

Phone: Email Address:

File details come from the government source that posted it. Updated .