36C24423R0148 0001.pdf

PDF 140 KB Posted

Attached to
Z1DA--646-19-103 UD Reno 6E 48 Hour Observation
Solicitation number
36C24423R0148
Issued by

About this file

This document contains an amendment to a solicitation for construction services. The amendment extends the proposal due date to September 12, 2023 at 4:00 PM EST due to the Labor Day holiday. It also provides answers to bidder questions, including clarification that the mechanical enclosure on the roof was awarded under a separate contract and will be complete prior to this project's mobilization. Proposed work includes tasks on the 4th floor roof and adjacent areas for mechanical, electrical, and utility tie-ins. The amendment defines requirements for brand name justification and approvals, medical center standards, and responses to requests for information.

The related opportunity provides additional details about the solicitation. Specifically, it is numbered 36C24423R0148 and seeks proposals for renovations to the 6th floor 48-hour observation unit at the Veterans Affairs Medical Center in Pittsburgh, Pennsylvania. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 4.

View the file

Other files

File Type Posted
64619103_Division 21_08312023.pdf PDF
36C24423R0148 0004_1.docx DOCX document
36C24423R0148 0004.pdf PDF
36C24423R0148 0003.pdf PDF
36C24423R0148 0003_1.docx DOCX document
FLOORING_082323.pdf PDF
36C24423R0148 0002_1.docx DOCX document
36C24423R0148 0002.pdf PDF
Sign in sheet_Redacted.pdf PDF
SSJ_Corner Guard(s) 8.21_Redacted.pdf PDF
SSJ_Curtain tracks(s) 8.21_Redacted.pdf PDF
SSJ_Cambria Quartz Countertop(s)8.21_Redacted.pdf PDF
SSJ_Wilsonart Laminate(s) 8.21_Redacted.pdf PDF
SSJ_ASI Lockers(s) 8.21_Redacted.pdf PDF
SSJ_Mapei_Grout(s) 8.21_Redacted.pdf PDF
SSJ_Interface_LVt(s) 8.21_Redacted.pdf PDF
ssj gooseneck faucets_powers assembly(s) 8.21._Redacted.pdf PDF
SSJ_Sherwin Williams_Paint(s) 8.21_Redacted.pdf PDF
SSJ_Daltile Tile_Rittenhouse(s) 8.21_Redacted.pdf PDF
SSJ_Lumicor Wall Panel(s) 8.21_Redacted.pdf PDF
36C24423R0148 0001_1.docx DOCX document
SSJ_Handrails(s) 8.21_Redacted.pdf PDF
SSJ_Window Shades(s) 8.21_Redacted.pdf PDF
SSJ_DuPont Corian(s) 8.21_Redacted.pdf PDF
SSJ Arjo Patient Lifts JA FY23(s) 8.21._Redacted.pdf PDF
SSJ_Mannington_BioSpec_Vinyl(s) 8.21_Redacted.pdf PDF
SSJ_Stonhard Flooring(s) 8.21_Redacted.pdf PDF
MEDICAL CENTER REQUIREMENTS - PITTSBURGH.pdf PDF
36C24423R0148 8-3-2023 r1.pdf PDF
64619103_IFB_BP2_Specifications_051723.pdf PDF
64619103_IFB_BP2_Drawings_051723.pdf PDF
Wage Determination PA PA20230077 6.30.2023.pdf PDF
EXHIBIT B - Subcontractor Consent and Reference Form 36C24423R0148 .pdf PDF
EXHIBIT E - Past Performance Questionnaire 36C24420R0148.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24423R148.pdf PDF
36C24423R0148_2.docx DOCX document
EXHIBIT A - Statement of Prior Experience UD Reno 6E 48 Hour Observation.pdf PDF
36C24423R0148 8-3-23.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

646-24-1-5669-0001

646-19-103

36C244

Department of Veterans Affairs

Network Contracting Office 4

36C244

Department of Veterans Affairs

Network Contracting Office 4

To all Offerors/Bidders

36C24423R0148

X x x

** HOUR & DATE for Receipt of Offers is EXTENDED to: September 12th 2023 16:00 EST

The purpose of this amendment is the change the due date of this solicitation, provide Justification and Approvals for Brand Name Only items and answer submitted RFI's

1) The proposal due date is changed to September 12th 2023 to 16:00 EST due to the Labor Day Holiday.

2) Please see the attached document for RFI answers and clarification.

3) Brand Name Only items JA's attached.

Elijah Mcintosh

Pre-Bid Clarifications:

• ECO51 - Medical Center Requirements for VAPHS apply and have been provided in

PDF format.

• GI002:

o Clarification of Note #2, For this project there is work on 4NE Roof

(Mechanical/Electrical and related), but the new mechanical enclosure was awarded via separate project already underway and will be complete prior to mobilization for this contract. MEP work will also be in adjacent spaces to the site as needed for utility routing and tie-ins.

o As indicated, Work performed between 7am – 4:30 pm typical; off-tour and/or weekend work shall be provided when COR deems necessary for heavy demolition, high-impact utility / access outages, work causing heavy noise, impact or vibration to adjacent occupied areas.

o When planning for requested ILSMs/Outages, the 72-hour notice to Hospital

Users via FMS Projects requires Contractor Team to identify and begin planning potential outages a minimum 1-2 weeks in advance of the Facility notifications.

• GI003: Bidders shall reference and provide pricing breakout in their Proposal addressing the Bid Deducts outlined on Sheet GI003.

• SF107: Drawings depict work in 6TH Floor Ceiling (Disregard references to 7th Floor).

Reinforcing shall be coordinated directly between Prime (successful bidder) and ARJO

(Jack Schrader; 240.444.2251; Jack.Schrader@arjo.com), Patient Lift Manufacturer as needed as subcontractor to Prime, as needed.

• Sheet I601 and 602 Finish Corrections:

o FLOORING section -

EPY-1 Epoxy Flooring Style/Color should read: STONTEC /

COLOR: DAKOTA BRONZE – SMALL FLAKES INCLUDE SATIN CHROME

CAP

EPYB-1 Epoxy Flooring Style/Color should read: STONTEC /

COLOR: DAKOTA BRONZE – SMALL FLAKES INCLUDE SATIN CHROME

CAP

o MISCELLANEOUS FINISHES section –

DOOR Product Properties should read: 1-3/4” REGEND (RI) – SOLIDWOOD;

Style/Color should read: STANDARD STAIN TO MATCH: PEREGRINE #1607

• IG601 thru IG603 – Signage will be completed by VAPHS Activations. These sheets shall be used for reference by Contractor to plan for and avoid conflicts with VA Provided signage.

• VA Pittsburgh clarified that the inside face of all exterior walls in B1 (where this project is located) were coated in an ACM containing mastic when initially constructed. IE, in addition to notes at PD105 re: concealed ACM, the Prime shall be responsible for testing and mitigation/monitoring of any Asbestos Containing Materials encountered if/when mailto:Jack.Schrader@arjo.com anchoring to, cutting through, or otherwise disturbing existing ACM in the completion of the solicited scope for this project.

• P700: Reference J&A Forms for Standard Plumbing Fixture and coordinate fixtures at

P700 to integrate Facility Standard Thermostatic Mixing Valves, Gooseneck Faucet, Etc.

RFI questions and Responses Questions Answers

Can the due date be extended because of the Labor Day holiday?

Yes, The due date is now September 12th

2023 16:00 EST.

Page 6 of 70 indicates that completed Exhibit’s A, B, D and E should be placed in Volume II. Page 9 of 70 indicates Exhibit’s a, B, D and E should be placed in Volume I.

What volume should they be in?

They should be in both sections.

Please clarify that proposal is to be emailed.

Page 14 of 70 indicates that Volume II should be separated by tabbed dividers.

This proposal should be emailed only to John.Mignogna@va.gov. The order of the documents should flow in order as requested in the RFP but there does not need to be blank page dividers included.

In the specifications and the drawings, it references putting a shed over the HVAC equipment on the roof. Hasn’t this work been completed under a separate contract?

As noted in the Pre-Bid Clarification, “Clarification of Note #2, For this project there is work on 4NE Roof (Mechanical/Electrical and related), but the new mechanical enclosure was awarded via separate project already underway and will be complete prior to mobilization for this contract. MEP work will also be in adjacent spaces to the site as needed for utility routing and tie-ins.”

There are conflicting specification requirements for the above ground water, copper type K.

The water distribution specifications in Division 22 job specifications call for Copper, Type K -solder up to 2” and 2-1/2” -6” grooved.

The Materials list on the plumbing set drawings P001 line #4 calls out for domestic water supply piping located above the finished floor Shall be pro-press copper piping system.

Please advise on which specification we are to follow.

Per the COR – “it is now VA standard to Propress up to 2” K copper and Groove 2 ½” and larger” mailto:John.Mignogna@va.gov

See attached document: SSJ_ASI Lockers(s) 8.21_Redacted.

See attached document: SSJ_Corner Guard(s) 8.21_Redacted.

See attached document: SSJ_Daltile Tile_Rittenhouse(s) 8.21_Redacted.

See attached document: SSJ_Interface_LVt(s) 8.21_Redacted.

See attached document: SSJ_Mannington_BioSpec_Vinyl(s) 8.21_Redacted.

See attached document: MEDICAL CENTER REQUIREMENTS - PITTSBURGH.

See attached document: SSJ_Cambria Quartz Countertop(s)8.21_Redacted.

See attached document: SSJ_Curtain tracks(s) 8.21_Redacted.

See attached document: SSJ_Handrails(s) 8.21_Redacted.

See attached document: SSJ_Lumicor Wall Panel(s) 8.21_Redacted.

See attached document: SSJ_Sherwin Williams_Paint(s) 8.21_Redacted.

See attached document: SSJ_Mapei_Grout(s) 8.21_Redacted.

See attached document: SSJ_Stonhard Flooring(s) 8.21_Redacted.

See attached document: SSJ_Wilsonart Laminate(s) 8.21_Redacted.

See attached document: SSJ_DuPont Corian(s) 8.21_Redacted.

See attached document: SSJ Arjo Patient Lifts JA FY23(s) 8.21._Redacted.

See attached document: SSJ_Window Shades(s) 8.21_Redacted.

See attached document: ssj gooseneck faucets_powers assembly(s) 8.21._Redacted.

End of Document

File details come from the government source that posted it. Updated .