FLOORING_082323.pdf

PDF 4 MB Posted

Attached to
Z1DA--646-19-103 UD Reno 6E 48 Hour Observation
Solicitation number
36C24423R0148
Issued by

About this file

This document package includes construction documents for a flooring renovation project at a Department of Veterans Affairs medical center. The project scope involves renovating patient rooms and common areas on the 6th East floor to accommodate 48-hour observation needs. The construction documents provide a floor finish plan, room finish schedule, and finish legends specifying luxury vinyl tile, epoxy, sheet vinyl, and other flooring materials for corridors, patient rooms, bathrooms, and support spaces. Wall finishes include paint, wall protection, and ceramic tile. The related federal contract opportunity is solicitation number 36C24423R0148 for project number 646-19-103 to renovate the 6th East unit at the Pittsburgh VA medical center. The solicitation was issued by the VA Veterans Health Administration VISN 4. The document package provides product and installation details to support the procurement of renovation construction services.

View the file

Other files

File Type Posted
64619103_Division 21_08312023.pdf PDF
36C24423R0148 0004_1.docx DOCX document
36C24423R0148 0004.pdf PDF
36C24423R0148 0003.pdf PDF
36C24423R0148 0003_1.docx DOCX document
36C24423R0148 0002_1.docx DOCX document
36C24423R0148 0002.pdf PDF
Sign in sheet_Redacted.pdf PDF
SSJ_Corner Guard(s) 8.21_Redacted.pdf PDF
SSJ_Curtain tracks(s) 8.21_Redacted.pdf PDF
SSJ_Cambria Quartz Countertop(s)8.21_Redacted.pdf PDF
SSJ_Wilsonart Laminate(s) 8.21_Redacted.pdf PDF
SSJ_ASI Lockers(s) 8.21_Redacted.pdf PDF
SSJ_Mapei_Grout(s) 8.21_Redacted.pdf PDF
SSJ_Interface_LVt(s) 8.21_Redacted.pdf PDF
ssj gooseneck faucets_powers assembly(s) 8.21._Redacted.pdf PDF
SSJ_Sherwin Williams_Paint(s) 8.21_Redacted.pdf PDF
SSJ_Daltile Tile_Rittenhouse(s) 8.21_Redacted.pdf PDF
36C24423R0148 0001.pdf PDF
SSJ_Lumicor Wall Panel(s) 8.21_Redacted.pdf PDF
36C24423R0148 0001_1.docx DOCX document
SSJ_Handrails(s) 8.21_Redacted.pdf PDF
SSJ_Window Shades(s) 8.21_Redacted.pdf PDF
SSJ_DuPont Corian(s) 8.21_Redacted.pdf PDF
SSJ Arjo Patient Lifts JA FY23(s) 8.21._Redacted.pdf PDF
SSJ_Mannington_BioSpec_Vinyl(s) 8.21_Redacted.pdf PDF
SSJ_Stonhard Flooring(s) 8.21_Redacted.pdf PDF
MEDICAL CENTER REQUIREMENTS - PITTSBURGH.pdf PDF
36C24423R0148 8-3-2023 r1.pdf PDF
64619103_IFB_BP2_Specifications_051723.pdf PDF
64619103_IFB_BP2_Drawings_051723.pdf PDF
Wage Determination PA PA20230077 6.30.2023.pdf PDF
EXHIBIT B - Subcontractor Consent and Reference Form 36C24423R0148 .pdf PDF
EXHIBIT E - Past Performance Questionnaire 36C24420R0148.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24423R148.pdf PDF
36C24423R0148_2.docx DOCX document
EXHIBIT A - Statement of Prior Experience UD Reno 6E 48 Hour Observation.pdf PDF
36C24423R0148 8-3-23.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORRIDOR

C6C1

CHASE

6C110

CORRIDOR

C6C4

OFFICE

6N102A

OFFICE

6N105

TOILET

6N104 H.A.C

6N103

OFFICE

6N105

TELE.CLO.

6N109

DISTR.

6N108

LOBBY

6N100

OFFICE

6N101A

OFFICE

6N101B

CORRIDOR

C6C3

ELECT/TELE

CLOS.

6C110

CORRIDOR

C6E1

CORRIDOR

C6E2

TOILET

6W125

INFUSIONS

6E105

TOILET

6E105A

H.A.C.

6E1113

WAITING ROOM

6E1114

CHECK-IN

6E1115

PATIENT

ROOM

6E1116

TOILET /

SHOWER

6E1116A

TOILET /

SHOWER

6E1117A

OFFICE

6N102B

PATIENT

ROOM

6E1117

SOILED

UTILITY

6E108

EQUIPMENT

STORAGE

6E106

LINEN

STORAGE

6E110

BREAK

ROOM

6E111 MEDS

6E112

TOILET

6E107

TOILET /

SHOWER

6E118A

PATIENT

ROOM

6E1118

PATIENT

ROOM

6E1119

TOILET /

SHOWER

6E120A

PATIENT

ROOM

6E120

TOILET /

SHOWER

6E121A

PATIENT

ROOM

6E122

PATIENT

ROOM

6E121

CORRIDOR

C6C6

PATIENT

ROOM

6E124

PATIENT

ROOM

6E125

PATIENT

ROOM

6E126

OFFICE

6E110

PATIENT

ROOM

6E129

PATIENT

ROOM

6E130

PATIENT

ROOM

6E131

PATIENT

ROOM

6E132

TOILET /

SHOWER

6E123A

TOILET /

SHOWER

6E125A

TOILET /

SHOWER

6E126A

TOILET /

SHOWER

6E129A

TOILET /

SHOWER

6E130A

TOILET /

SHOWER

6E132A

TOILET /

SHOWER

6E131A

STORAGE

6E134

LOCKER

ALCOVE

6E133

PATIENT

ROOM

6E123

NOURISHMENT

6E113PP

PP

FEC FEC

CLEAN

SUPPLY

6E109

ELECTRICAL

ROOM

6E110A

ELECTRICAL

ROOM

C6E1A

ALCOVE

C6E1B

ALCOVE

C6E1D

ALCOVE

C6E1E

ALCOVE

C6E1F

ALCOVE

C6E1G

ALCOVE

C6E2B

ALCOVE

C6E2C

ALCOVE

C6E1H

NURSE

STATION

6E112A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

6\

-1

_V A2

-1

7- D

-0

9_ Pi tts bu rg h_

ID

IQ

\6

- U

D R en ov at e

6E as t f or

8H r O bs er va tio n\

0-

D es ig n

D oc um en ts \4

-D ra w in gs

-B P2

\6

-1 9-

3-

AF

6.

dw g 5/

4/

:1 4:

A

M

ISSUE FOR BID

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

UD RENOVATE 6 EAST FOR 48HR

OBSERVATION

PITTSBURGH, PA

646-19-103

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 16-128

3300 Dundee Rd Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. VA244-17-D-002935% SCHEMATIC DESIGN SUBMISSION 11/16/2020

50% DESIGN DEVELOPMENT SUBMISSION 01/18/2021

75% DESIGN DEVELOPMENT SUBMISSION 03/15/2021

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/21/2021

ISSUED FOR BID 08/04/2021

05/17/2023

ISSUED FOR BID - NOT FOR CONSTRUCTION

ISSUED FOR BID 05/17/2023

FLOOR FINISH PLAN

CZ LH/DM I106

XXXXX

0X-WPXX

FINISH GENERAL NOTES

A. FOLLOW MANUFACTURER'S REQUIREMENTS FOR SUB-FLOOR PREPARATION.

B. FLOOR LEVELING AS NECESSARY BASED ON SUB-FLOOR CONDITION.

C. REFER TO I601 AND I602 FOR ROOM FINISH SCHEDULE AND LEGEND.

D. ALIGN EDGE OF FLOORING WITH EDGE OF CEILING AND COLUMN.

XX FINISH PLAN LEGEND

LVT - 1

REFER TO ROOM

FINISH SCHEDULE

LVT - 2

REFER TO ROOM

FINISH SCHEDULE

LVT - 3

REFER TO ROOM

FINISH SCHEDULE

LVT - 4

REFER TO ROOM

FINISH SCHEDULE

LVT - 5

REFER TO ROOM

FINISH SCHEDULE

LVT - 6

REFER TO ROOM

FINISH SCHEDULE

EPY - 1

REFER TO ROOM

FINISH SCHEDULE

SC

REFER TO ROOM

FINISH SCHEDULE

CT-1

REFER TO ROOM

FINISH SCHEDULETS-# FLOOR TRANSITION

TAG

WALL FINISH TYPE

REFER TO ROOM

FINISH SCHEDULE

WALL GUARDS- SEE A501 FOR DETAILS

WP-1 = SURFACE MOUNTED C.G. 1-1/2" WING

WP-2 = SURFACE MOUNTED C.G. 3-1/2" WING

WP-4 = END WALL PROTECTOR

SEE ROOM FINISH SCHEDULE AND A501 FOR

ADDITIONAL INFORMATION AND MOUNTING DETAILS.

1 HR FIRE BARRIER

2 HR FIRE BARRIER

SMOKE BARRIER

WALL PROTECTION NOTES

NO FLOORING

WORK

VHAPTHLandoR Line

VHAPTHLandoR Line

VHAPTHLandoR Underline

VHAPTHLandoR Text Box 10'-0"

VHAPTHLandoR Text Box

CPT-1

VHAPTHLandoR Text Box

LVT-7

VHAPTHLandoR Text Box

LVT-3

VHAPTHLandoR Text Box

LVT-1

VHAPTHLandoR Text Box

LVT-4

Note Revised Vertical Direction

VHAPTHLandoR Text Box

LVT-6

VHAPTHLandoR Text Box

LVT-6

VHAPTHLandoR Text Box

LVT-6

VHAPTHLandoR Text Box

LVT-7

VHAPTHLandoR Text Box

LVT-1

Note Revised Vertical Direction

VHAPTHLandoR Text Box LVT-1 and 2

VHAPTHLandoR Text Box

LVT-1

Note Direction

VHAPTHLandoR Text Box

LVT-1

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

EPY-1

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-5/6

VHAPTHLandoR Text Box

LVT-1

Interface Studio Set A007 / A00704 Espresso 25cm x 1m

VHAPTHLandoR Text Box

LVT-2

Interface Brushed Lines A016 / A01609 Paraffin 25cm x 1m

VHAPTHLandoR Text Box

LVT-3

Interface Ridge / Fersco Valley A02302 Shade 50cm x 50cm

VHAPTHLandoR Text Box

LVT-4

Interface Brushed Lines A016 / A01612 Soft Shadow 25cm x 1m

VHAPTHLandoR Text Box

LVT-7

Interface Brushed Lines A016 / A01620 Teal Oxide 25cm x 1m

VHAPTHLandoR Text Box LVT-5/6 - Sheet/Weldrod Mannington BioSpec Choices BioSpec SR 67369 Bedrock 6'6" Width/Cove Base

VHAPTHLandoR Text Box

EPY-1

Stonhard Stontec Dakota Bronze Small Flakes Cove Base

VHAPTHLandoR Text Box

CPT-1

Interface Play the Angle Rising Signs

147590AK0G

107196 Chromium 25cm x 1m -Ashlar Install

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

6\

-1

_V A2

-1

7- D

-0

9_ Pi tts bu rg h_

ID

IQ

\6

- U

D R en ov at e

6E as t f or

8H r O bs er va tio n\

0-

D es ig n

D oc um en ts \4

-D ra w in gs

-B P2

\6

-1 9-

3-

AF

6.

dw g 5/

4/

:1 4:

A

M

ISSUE FOR BID

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

UD RENOVATE 6 EAST FOR 48HR

OBSERVATION

PITTSBURGH, PA

646-19-103

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 16-128

3300 Dundee Rd Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. VA244-17-D-002935% SCHEMATIC DESIGN SUBMISSION 11/16/2020

50% DESIGN DEVELOPMENT SUBMISSION 01/18/2021

75% DESIGN DEVELOPMENT SUBMISSION 03/15/2021

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/21/2021

ISSUED FOR BID 08/04/2021

05/17/2023

ISSUED FOR BID - NOT FOR CONSTRUCTION

ISSUED FOR BID 05/17/2023

ROOM FINISH SCHEDULE

CZ/PB DB/LH I601

ROOM FINISH SCHEDULE

ROOM NO. ROOM NAME

FLOOR BASE

WALLS

CEILING

REMARKSNorth West South East

Material Color Material Color Material Finish Color Material Finish Color Material Finish Color Material Finish Color Type Height

C6C1 CORRIDOR LVT LVT-1/2 VINYL VB-3 EXIST'G PAINT P-2 EXIST'G PAINT P-1 EXIST'G / GWB PAINT P-1 EXIST'G PAINT P-1 ACT-1 7'-5" / 8'-6"

C6C3 CORRIDOR LVT LVT-1/2 VINYL VB-3 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 ACT-1 8'-0"

C6C4 CORRIDOR LVT LVT-1/2 VINYL VB-3 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1/P-3 EXIST'G PAINT P-1 ACT-1 8'-6"

C6C6 CORRIDOR LVT LVT-1/2 VINYL VB-3 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 ACT-1 8'-0"

6W125 TOILET EPOXY EPY-1 EPOXY EPYB-1 GWB CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 EXIST'G CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 GWB/P-6 8'-0'

6E105 INFUSIONS LVT LVT-1/3 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G WP/PAINT WP-8/P-1/P-2 GWB PAINT P-1 ACT-1/2 8'-6" GWB SOFFIT, P-7

6E105A TOILET EPOXY EPY-1 EPOXY EPYB-1 GWB CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 EXIST'G CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 GWB/P-6 8'-0"

6E106 EQUIPMENT STORAGE SHEET LVT-6 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-1 EXIST'G WP/PAINT WP-8/P-1 ACT-1 8'-0"

6E107 TOILET EPOXY EPY-1 EPOXY EPYB-1 GWB CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 EXIST'G CERAMIC TILE / WALL

PROTECTION CT-1/2/3 WP-1 GWB/P-6 8'-0"

6E108 SOILED UTILTY SHEET LVT-6 VINYL COVE VB-5 GWB WP/PAINT WP-8/WP-9/P-1 GWB WP/PAINT WP-8/WP-9/P-1 GWB WP/PAINT WP-8/P-1 EXIST'G WP/PAINT WP-8/WP-9/P-1 ACT-1 8'-0"

6E109 CLEAN SUPPLY SHEET LVT-6 VINYL COVE VB-5 GWB PAINT P-1 GWB PAINT P-1 GWB WP/PAINT WP-8/P-1 EXIST'G PAINT P-1 ACT-1 8'-0"

6E110 OFFICE CPT CPT-1 VINYL VB-2 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G PAINT P-1 ACT-1 8'-0"

6E110A ELECTRICAL ROOM SC SC-1 N/A N/A GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB/P-6 8'-0"

6E111 BREAK ROOM LVT LVT-4 VINYL VB-3 GWB PAINT P-1 GWB PAINT P-3 GWB PAINT P-1 EXIST'G PAINT P-8 ACT-1 8'-0"

6E112 MEDS LVT LVT-2 VINYL COVE VB-5 GWB PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 ACT-1 8'-0"

6E112A NURSE STATION LVT LVT-2 VINYL VB-1 NA GWB PAINT P-1/P-6 EXIST'G PAINT P-1 GWB PAINT P-1 ACT-2 8'-0"

6E112B NOURISHMENT LVT LVT-1 VINYL COVE VB-5 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"

6E113 HAC EPOXY EPY-1 EPOXY EPYB-1 GWB PAINT P-4 EXIST'G PAINT P-4 GWB PAINT P-4 GWB PAINT P-4 - -

6E114 WAITING ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-2 ACT-2 / GWB 7'-0" / 8'-0"

6E114A CHECK-IN LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-2 ACT-1 8'-0"

6E115 LINEN STORAGE LVT LVT-1 VINYL VB-3 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"

6E116 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"

6E116A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E117 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"

6E117A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E118 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"

6E118A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E119 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"

6E120 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"

6E120A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E121 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"

6E121A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E122 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"

6E123 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"

6E123A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E124 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"

6E125 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"

6E125A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E126 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"

6E126A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E129 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-2 EXT WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 ACT-1 8'-6"

6E129A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E130 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 ACT-1 8'-6"

6E130A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E131 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 ACT-1 8'-6"

6E131A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E132 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 ACT-1 8'-6"

6E132A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"

6E133 LOCKER ALCOVE LVT LVT-4 VINYL VB-3 GWB PAINT P-8 GWB PAINT P-8 GWB PAINT P-8 N/A GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.

6E134 STORAGE LVT LVT-4 VINYL VB-3 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"

C6E1 CORRIDOR WSF LVT-3/4 VINYL VB-3 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 ACT-1 8'-0"

C6E1A ELECTRICAL ROOM SC SC-1 N/A N/A GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB/P-6 8'-0"

C6E1B ALCOVE LVT LVT-4 VINYL VB-3 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 N/A GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.

C6E1D ALCOVE LVT LVT-4 VINYL VB-3 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 N/A GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.

C6E1E ALCOVE LVT LVT-4 VINYL VB-3 N/A GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.

C6E1F ALCOVE LVT LVT-4 VINYL VB-3 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 N/A GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.

C6E1G ALCOVE LVT LVT-4 VINYL VB-3 N/A GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB/ P-6 8'-0" SOLID SURFACE @ 48" A.F.F.

C6E1H ALCOVE LVT LVT-4 VINYL VB-3 N/A GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.

C6E2 CORRIDOR LVT LVT-3/4 VINYL VB-3 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 ACT-1 8'-0"

C6E2B ALCOVE LVT LVT-4 VINYL VB-3 GWB WP/PAINT WP-7/P-8 N/A GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.

C6E2C ALCOVE LVT LVT-3/4 VINYL VB-3 N/A GWB WP/PAINT WP-7/P-8 EXIST'G WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.

GENERAL NOTES: ABBREVIATIONS

A.

SKIM COAT ALL WALLS TO REMAIN WHERE EXISTING FINISHES ARE REMOVED. LEAVE WALLS SMOOTH FOR

INSTALLATION OF NEW FINISHES.

ACT ACOUSTICAL CEILING

TILE GWB: GYPSUM BOARD P: PAINT WP: WALL

PROTECTION

ETR: EXISTING TO REMAIN LVT: LUXURY VINYL TILE PT: PORCELAIN TILE WSF: WELDED SEAM

SHEET FLR.

EPY: EPOXY CS: SEALED

CONCRETE SS: SOLID SURFACE

NOTES:

1. REVIEW ELEVATIONS FOR LOCATIONS OF FINISH MATERIALS.

NOTE: ALL FINISH

COLORS TO BE

VERIFIED BY

VETERANS

HEALTHCARE SYSTEM

INTERIOR DESIGNER.

USE SHEET NORTH

FOR ALL WALL FINISH

REFERENCES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

6\

-1

_V A2

-1

7- D

-0

9_ Pi tts bu rg h_

ID

IQ

\6

- U

D R en ov at e

6E as t f or

8H r O bs er va tio n\

0-

D es ig n

D oc um en ts \4

-D ra w in gs

-B P2

\6

-1 9-

3-

AF

6.

dw g 5/

4/

:1 4:

A

M

ISSUE FOR BID

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

UD RENOVATE 6 EAST FOR 48HR

OBSERVATION

PITTSBURGH, PA

646-19-103

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 16-128

3300 Dundee Rd Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. VA244-17-D-002935% SCHEMATIC DESIGN SUBMISSION 11/16/2020

50% DESIGN DEVELOPMENT SUBMISSION 01/18/2021

75% DESIGN DEVELOPMENT SUBMISSION 03/15/2021

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/21/2021

ISSUED FOR BID 08/04/2021

05/17/2023

ISSUED FOR BID - NOT FOR CONSTRUCTION

ISSUED FOR BID 05/17/2023

ROOM FINISH LEGEND

CZ/PB DB/LH I602

INTERIORS DRAWINGS
I106 FLOOR FINISH PLAN
I601 ROOM FINISH SCHEDULE
I602 ROOM FINISH LEGEND

File details come from the government source that posted it. Updated .