FLOORING_082323.pdf
PDF 4 MB Posted
- Attached to
- Z1DA--646-19-103 UD Reno 6E 48 Hour Observation
- Solicitation number
- 36C24423R0148
About this file
This document package includes construction documents for a flooring renovation project at a Department of Veterans Affairs medical center. The project scope involves renovating patient rooms and common areas on the 6th East floor to accommodate 48-hour observation needs. The construction documents provide a floor finish plan, room finish schedule, and finish legends specifying luxury vinyl tile, epoxy, sheet vinyl, and other flooring materials for corridors, patient rooms, bathrooms, and support spaces. Wall finishes include paint, wall protection, and ceramic tile. The related federal contract opportunity is solicitation number 36C24423R0148 for project number 646-19-103 to renovate the 6th East unit at the Pittsburgh VA medical center. The solicitation was issued by the VA Veterans Health Administration VISN 4. The document package provides product and installation details to support the procurement of renovation construction services.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CORRIDOR
C6C1
CHASE
6C110
CORRIDOR
C6C4
OFFICE
6N102A
OFFICE
6N105
TOILET
6N104 H.A.C
6N103
OFFICE
6N105
TELE.CLO.
6N109
DISTR.
6N108
LOBBY
6N100
OFFICE
6N101A
OFFICE
6N101B
CORRIDOR
C6C3
ELECT/TELE
CLOS.
6C110
CORRIDOR
C6E1
CORRIDOR
C6E2
TOILET
6W125
INFUSIONS
6E105
TOILET
6E105A
H.A.C.
6E1113
WAITING ROOM
6E1114
CHECK-IN
6E1115
PATIENT
ROOM
6E1116
TOILET /
SHOWER
6E1116A
TOILET /
SHOWER
6E1117A
OFFICE
6N102B
PATIENT
ROOM
6E1117
SOILED
UTILITY
6E108
EQUIPMENT
STORAGE
6E106
LINEN
STORAGE
6E110
BREAK
ROOM
6E111 MEDS
6E112
TOILET
6E107
TOILET /
SHOWER
6E118A
PATIENT
ROOM
6E1118
PATIENT
ROOM
6E1119
TOILET /
SHOWER
6E120A
PATIENT
ROOM
6E120
TOILET /
SHOWER
6E121A
PATIENT
ROOM
6E122
PATIENT
ROOM
6E121
CORRIDOR
C6C6
PATIENT
ROOM
6E124
PATIENT
ROOM
6E125
PATIENT
ROOM
6E126
OFFICE
6E110
PATIENT
ROOM
6E129
PATIENT
ROOM
6E130
PATIENT
ROOM
6E131
PATIENT
ROOM
6E132
TOILET /
SHOWER
6E123A
TOILET /
SHOWER
6E125A
TOILET /
SHOWER
6E126A
TOILET /
SHOWER
6E129A
TOILET /
SHOWER
6E130A
TOILET /
SHOWER
6E132A
TOILET /
SHOWER
6E131A
STORAGE
6E134
LOCKER
ALCOVE
6E133
PATIENT
ROOM
6E123
NOURISHMENT
6E113PP
PP
FEC FEC
CLEAN
SUPPLY
6E109
ELECTRICAL
ROOM
6E110A
ELECTRICAL
ROOM
C6E1A
ALCOVE
C6E1B
ALCOVE
C6E1D
ALCOVE
C6E1E
ALCOVE
C6E1F
ALCOVE
C6E1G
ALCOVE
C6E2B
ALCOVE
C6E2C
ALCOVE
C6E1H
NURSE
STATION
6E112A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
6\
-1
_V A2
-1
7- D
-0
9_ Pi tts bu rg h_
ID
IQ
\6
- U
D R en ov at e
6E as t f or
8H r O bs er va tio n\
0-
D es ig n
D oc um en ts \4
-D ra w in gs
-B P2
\6
-1 9-
3-
AF
6.
dw g 5/
4/
:1 4:
A
M
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UD RENOVATE 6 EAST FOR 48HR
OBSERVATION
PITTSBURGH, PA
646-19-103
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 16-128
3300 Dundee Rd Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. VA244-17-D-002935% SCHEMATIC DESIGN SUBMISSION 11/16/2020
50% DESIGN DEVELOPMENT SUBMISSION 01/18/2021
75% DESIGN DEVELOPMENT SUBMISSION 03/15/2021
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/21/2021
ISSUED FOR BID 08/04/2021
05/17/2023
ISSUED FOR BID - NOT FOR CONSTRUCTION
ISSUED FOR BID 05/17/2023
FLOOR FINISH PLAN
CZ LH/DM I106
XXXXX
0X-WPXX
FINISH GENERAL NOTES
A. FOLLOW MANUFACTURER'S REQUIREMENTS FOR SUB-FLOOR PREPARATION.
B. FLOOR LEVELING AS NECESSARY BASED ON SUB-FLOOR CONDITION.
C. REFER TO I601 AND I602 FOR ROOM FINISH SCHEDULE AND LEGEND.
D. ALIGN EDGE OF FLOORING WITH EDGE OF CEILING AND COLUMN.
XX FINISH PLAN LEGEND
LVT - 1
REFER TO ROOM
FINISH SCHEDULE
LVT - 2
REFER TO ROOM
FINISH SCHEDULE
LVT - 3
REFER TO ROOM
FINISH SCHEDULE
LVT - 4
REFER TO ROOM
FINISH SCHEDULE
LVT - 5
REFER TO ROOM
FINISH SCHEDULE
LVT - 6
REFER TO ROOM
FINISH SCHEDULE
EPY - 1
REFER TO ROOM
FINISH SCHEDULE
SC
REFER TO ROOM
FINISH SCHEDULE
CT-1
REFER TO ROOM
FINISH SCHEDULETS-# FLOOR TRANSITION
TAG
WALL FINISH TYPE
REFER TO ROOM
FINISH SCHEDULE
WALL GUARDS- SEE A501 FOR DETAILS
WP-1 = SURFACE MOUNTED C.G. 1-1/2" WING
WP-2 = SURFACE MOUNTED C.G. 3-1/2" WING
WP-4 = END WALL PROTECTOR
SEE ROOM FINISH SCHEDULE AND A501 FOR
ADDITIONAL INFORMATION AND MOUNTING DETAILS.
1 HR FIRE BARRIER
2 HR FIRE BARRIER
SMOKE BARRIER
WALL PROTECTION NOTES
NO FLOORING
WORK
VHAPTHLandoR Line
VHAPTHLandoR Line
VHAPTHLandoR Underline
VHAPTHLandoR Text Box 10'-0"
VHAPTHLandoR Text Box
CPT-1
VHAPTHLandoR Text Box
LVT-7
VHAPTHLandoR Text Box
LVT-3
VHAPTHLandoR Text Box
LVT-1
VHAPTHLandoR Text Box
LVT-4
Note Revised Vertical Direction
VHAPTHLandoR Text Box
LVT-6
VHAPTHLandoR Text Box
LVT-6
VHAPTHLandoR Text Box
LVT-6
VHAPTHLandoR Text Box
LVT-7
VHAPTHLandoR Text Box
LVT-1
Note Revised Vertical Direction
VHAPTHLandoR Text Box LVT-1 and 2
VHAPTHLandoR Text Box
LVT-1
Note Direction
VHAPTHLandoR Text Box
LVT-1
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
EPY-1
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-5/6
VHAPTHLandoR Text Box
LVT-1
Interface Studio Set A007 / A00704 Espresso 25cm x 1m
VHAPTHLandoR Text Box
LVT-2
Interface Brushed Lines A016 / A01609 Paraffin 25cm x 1m
VHAPTHLandoR Text Box
LVT-3
Interface Ridge / Fersco Valley A02302 Shade 50cm x 50cm
VHAPTHLandoR Text Box
LVT-4
Interface Brushed Lines A016 / A01612 Soft Shadow 25cm x 1m
VHAPTHLandoR Text Box
LVT-7
Interface Brushed Lines A016 / A01620 Teal Oxide 25cm x 1m
VHAPTHLandoR Text Box LVT-5/6 - Sheet/Weldrod Mannington BioSpec Choices BioSpec SR 67369 Bedrock 6'6" Width/Cove Base
VHAPTHLandoR Text Box
EPY-1
Stonhard Stontec Dakota Bronze Small Flakes Cove Base
VHAPTHLandoR Text Box
CPT-1
Interface Play the Angle Rising Signs
147590AK0G
107196 Chromium 25cm x 1m -Ashlar Install
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
6\
-1
_V A2
-1
7- D
-0
9_ Pi tts bu rg h_
ID
IQ
\6
- U
D R en ov at e
6E as t f or
8H r O bs er va tio n\
0-
D es ig n
D oc um en ts \4
-D ra w in gs
-B P2
\6
-1 9-
3-
AF
6.
dw g 5/
4/
:1 4:
A
M
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UD RENOVATE 6 EAST FOR 48HR
OBSERVATION
PITTSBURGH, PA
646-19-103
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 16-128
3300 Dundee Rd Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. VA244-17-D-002935% SCHEMATIC DESIGN SUBMISSION 11/16/2020
50% DESIGN DEVELOPMENT SUBMISSION 01/18/2021
75% DESIGN DEVELOPMENT SUBMISSION 03/15/2021
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/21/2021
ISSUED FOR BID 08/04/2021
05/17/2023
ISSUED FOR BID - NOT FOR CONSTRUCTION
ISSUED FOR BID 05/17/2023
ROOM FINISH SCHEDULE
CZ/PB DB/LH I601
ROOM FINISH SCHEDULE
ROOM NO. ROOM NAME
FLOOR BASE
WALLS
CEILING
REMARKSNorth West South East
Material Color Material Color Material Finish Color Material Finish Color Material Finish Color Material Finish Color Type Height
C6C1 CORRIDOR LVT LVT-1/2 VINYL VB-3 EXIST'G PAINT P-2 EXIST'G PAINT P-1 EXIST'G / GWB PAINT P-1 EXIST'G PAINT P-1 ACT-1 7'-5" / 8'-6"
C6C3 CORRIDOR LVT LVT-1/2 VINYL VB-3 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 ACT-1 8'-0"
C6C4 CORRIDOR LVT LVT-1/2 VINYL VB-3 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1/P-3 EXIST'G PAINT P-1 ACT-1 8'-6"
C6C6 CORRIDOR LVT LVT-1/2 VINYL VB-3 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 ACT-1 8'-0"
6W125 TOILET EPOXY EPY-1 EPOXY EPYB-1 GWB CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 EXIST'G CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 GWB/P-6 8'-0'
6E105 INFUSIONS LVT LVT-1/3 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G WP/PAINT WP-8/P-1/P-2 GWB PAINT P-1 ACT-1/2 8'-6" GWB SOFFIT, P-7
6E105A TOILET EPOXY EPY-1 EPOXY EPYB-1 GWB CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 EXIST'G CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 GWB/P-6 8'-0"
6E106 EQUIPMENT STORAGE SHEET LVT-6 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-1 EXIST'G WP/PAINT WP-8/P-1 ACT-1 8'-0"
6E107 TOILET EPOXY EPY-1 EPOXY EPYB-1 GWB CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 GWB CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 EXIST'G CERAMIC TILE / WALL
PROTECTION CT-1/2/3 WP-1 GWB/P-6 8'-0"
6E108 SOILED UTILTY SHEET LVT-6 VINYL COVE VB-5 GWB WP/PAINT WP-8/WP-9/P-1 GWB WP/PAINT WP-8/WP-9/P-1 GWB WP/PAINT WP-8/P-1 EXIST'G WP/PAINT WP-8/WP-9/P-1 ACT-1 8'-0"
6E109 CLEAN SUPPLY SHEET LVT-6 VINYL COVE VB-5 GWB PAINT P-1 GWB PAINT P-1 GWB WP/PAINT WP-8/P-1 EXIST'G PAINT P-1 ACT-1 8'-0"
6E110 OFFICE CPT CPT-1 VINYL VB-2 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 EXIST'G PAINT P-1 ACT-1 8'-0"
6E110A ELECTRICAL ROOM SC SC-1 N/A N/A GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB/P-6 8'-0"
6E111 BREAK ROOM LVT LVT-4 VINYL VB-3 GWB PAINT P-1 GWB PAINT P-3 GWB PAINT P-1 EXIST'G PAINT P-8 ACT-1 8'-0"
6E112 MEDS LVT LVT-2 VINYL COVE VB-5 GWB PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 EXIST'G PAINT P-1 ACT-1 8'-0"
6E112A NURSE STATION LVT LVT-2 VINYL VB-1 NA GWB PAINT P-1/P-6 EXIST'G PAINT P-1 GWB PAINT P-1 ACT-2 8'-0"
6E112B NOURISHMENT LVT LVT-1 VINYL COVE VB-5 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"
6E113 HAC EPOXY EPY-1 EPOXY EPYB-1 GWB PAINT P-4 EXIST'G PAINT P-4 GWB PAINT P-4 GWB PAINT P-4 - -
6E114 WAITING ROOM LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-2 ACT-2 / GWB 7'-0" / 8'-0"
6E114A CHECK-IN LVT LVT-1 VINYL VB-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-2 ACT-1 8'-0"
6E115 LINEN STORAGE LVT LVT-1 VINYL VB-3 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"
6E116 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"
6E116A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E117 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"
6E117A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E118 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"
6E118A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E119 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"
6E120 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"
6E120A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E121 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"
6E121A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E122 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"
6E123 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"
6E123A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E124 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"
6E125 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"
6E125A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E126 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 ACT-1 8'-6"
6E126A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E129 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-2 EXT WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 ACT-1 8'-6"
6E129A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E130 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 EXIST'G WP/PAINT WP-8/P-1 ACT-1 8'-6"
6E130A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 EXIST'G WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E131 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 ACT-1 8'-6"
6E131A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E132 PATIENT ROOM SHEET LVT-5 VINYL COVE VB-5 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 GWB WP/PAINT WP-8/P-2 GWB WP/PAINT WP-8/P-1 ACT-1 8'-6"
6E132A TOILET/SHOWER EPOXY EPY-1 EPOXY EPYB-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB WALL PROTECTION WP-1 GWB/P-6 8'-0"
6E133 LOCKER ALCOVE LVT LVT-4 VINYL VB-3 GWB PAINT P-8 GWB PAINT P-8 GWB PAINT P-8 N/A GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.
6E134 STORAGE LVT LVT-4 VINYL VB-3 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 ACT-1 8'-0"
C6E1 CORRIDOR WSF LVT-3/4 VINYL VB-3 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 ACT-1 8'-0"
C6E1A ELECTRICAL ROOM SC SC-1 N/A N/A GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB PAINT P-1 GWB/P-6 8'-0"
C6E1B ALCOVE LVT LVT-4 VINYL VB-3 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 N/A GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.
C6E1D ALCOVE LVT LVT-4 VINYL VB-3 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 N/A GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.
C6E1E ALCOVE LVT LVT-4 VINYL VB-3 N/A GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.
C6E1F ALCOVE LVT LVT-4 VINYL VB-3 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 N/A GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.
C6E1G ALCOVE LVT LVT-4 VINYL VB-3 N/A GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB/ P-6 8'-0" SOLID SURFACE @ 48" A.F.F.
C6E1H ALCOVE LVT LVT-4 VINYL VB-3 N/A GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.
C6E2 CORRIDOR LVT LVT-3/4 VINYL VB-3 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 EXIST'G / GWB PAINT P-1 ACT-1 8'-0"
C6E2B ALCOVE LVT LVT-4 VINYL VB-3 GWB WP/PAINT WP-7/P-8 N/A GWB WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.
C6E2C ALCOVE LVT LVT-3/4 VINYL VB-3 N/A GWB WP/PAINT WP-7/P-8 EXIST'G WP/PAINT WP-7/P-8 GWB WP/PAINT WP-7/P-8 GWB/P-6 8'-0" SOLID SURFACE @ 48" A.F.F.
GENERAL NOTES: ABBREVIATIONS
A.
SKIM COAT ALL WALLS TO REMAIN WHERE EXISTING FINISHES ARE REMOVED. LEAVE WALLS SMOOTH FOR
INSTALLATION OF NEW FINISHES.
ACT ACOUSTICAL CEILING
TILE GWB: GYPSUM BOARD P: PAINT WP: WALL
PROTECTION
ETR: EXISTING TO REMAIN LVT: LUXURY VINYL TILE PT: PORCELAIN TILE WSF: WELDED SEAM
SHEET FLR.
EPY: EPOXY CS: SEALED
CONCRETE SS: SOLID SURFACE
NOTES:
1. REVIEW ELEVATIONS FOR LOCATIONS OF FINISH MATERIALS.
NOTE: ALL FINISH
COLORS TO BE
VERIFIED BY
VETERANS
HEALTHCARE SYSTEM
INTERIOR DESIGNER.
USE SHEET NORTH
FOR ALL WALL FINISH
REFERENCES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
6\
-1
_V A2
-1
7- D
-0
9_ Pi tts bu rg h_
ID
IQ
\6
- U
D R en ov at e
6E as t f or
8H r O bs er va tio n\
0-
D es ig n
D oc um en ts \4
-D ra w in gs
-B P2
\6
-1 9-
3-
AF
6.
dw g 5/
4/
:1 4:
A
M
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UD RENOVATE 6 EAST FOR 48HR
OBSERVATION
PITTSBURGH, PA
646-19-103
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 16-128
3300 Dundee Rd Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. VA244-17-D-002935% SCHEMATIC DESIGN SUBMISSION 11/16/2020
50% DESIGN DEVELOPMENT SUBMISSION 01/18/2021
75% DESIGN DEVELOPMENT SUBMISSION 03/15/2021
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/21/2021
ISSUED FOR BID 08/04/2021
05/17/2023
ISSUED FOR BID - NOT FOR CONSTRUCTION
ISSUED FOR BID 05/17/2023
ROOM FINISH LEGEND
CZ/PB DB/LH I602
| INTERIORS DRAWINGS |
| I106 FLOOR FINISH PLAN |
| I601 ROOM FINISH SCHEDULE |
| I602 ROOM FINISH LEGEND |
File details come from the government source that posted it. Updated .