EXHIBIT A - Statement of Prior Experience UD Reno 6E 48 Hour Observation.pdf

PDF 170 KB Posted

Attached to
Z1DA--646-19-103 UD Reno 6E 48 Hour Observation
Solicitation number
36C24423R0148
Issued by

About this file

This document contains an exhibit for a federal solicitation opportunity related to HVAC system upgrades at a Veterans Affairs medical center. The exhibit requests information on an offeror's relevant prior experience, including details on up to two past projects, names and contact information for project references, as well as experience working with major subcontractors. For the solicitation, offerors should describe their HVAC subcontractor and the scope of work to be performed, and list up to two recent joint projects with that subcontractor. The solicitation number is 36C24423R0148 for HVAC renovations at the Veterans Affairs medical center in Reno, Nevada, with an agency point of contact at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4. Responses to the exhibit will be used to evaluate offerors' qualifications for the project.

View the file

Other files

File Type Posted
64619103_Division 21_08312023.pdf PDF
36C24423R0148 0004_1.docx DOCX document
36C24423R0148 0004.pdf PDF
36C24423R0148 0003.pdf PDF
36C24423R0148 0003_1.docx DOCX document
FLOORING_082323.pdf PDF
36C24423R0148 0002_1.docx DOCX document
36C24423R0148 0002.pdf PDF
Sign in sheet_Redacted.pdf PDF
SSJ_Corner Guard(s) 8.21_Redacted.pdf PDF
SSJ_Curtain tracks(s) 8.21_Redacted.pdf PDF
SSJ_Cambria Quartz Countertop(s)8.21_Redacted.pdf PDF
SSJ_Wilsonart Laminate(s) 8.21_Redacted.pdf PDF
SSJ_ASI Lockers(s) 8.21_Redacted.pdf PDF
SSJ_Mapei_Grout(s) 8.21_Redacted.pdf PDF
SSJ_Interface_LVt(s) 8.21_Redacted.pdf PDF
ssj gooseneck faucets_powers assembly(s) 8.21._Redacted.pdf PDF
SSJ_Sherwin Williams_Paint(s) 8.21_Redacted.pdf PDF
SSJ_Daltile Tile_Rittenhouse(s) 8.21_Redacted.pdf PDF
36C24423R0148 0001.pdf PDF
SSJ_Lumicor Wall Panel(s) 8.21_Redacted.pdf PDF
36C24423R0148 0001_1.docx DOCX document
SSJ_Handrails(s) 8.21_Redacted.pdf PDF
SSJ_Window Shades(s) 8.21_Redacted.pdf PDF
SSJ_DuPont Corian(s) 8.21_Redacted.pdf PDF
SSJ Arjo Patient Lifts JA FY23(s) 8.21._Redacted.pdf PDF
SSJ_Mannington_BioSpec_Vinyl(s) 8.21_Redacted.pdf PDF
SSJ_Stonhard Flooring(s) 8.21_Redacted.pdf PDF
MEDICAL CENTER REQUIREMENTS - PITTSBURGH.pdf PDF
36C24423R0148 8-3-2023 r1.pdf PDF
64619103_IFB_BP2_Specifications_051723.pdf PDF
64619103_IFB_BP2_Drawings_051723.pdf PDF
Wage Determination PA PA20230077 6.30.2023.pdf PDF
EXHIBIT B - Subcontractor Consent and Reference Form 36C24423R0148 .pdf PDF
EXHIBIT E - Past Performance Questionnaire 36C24420R0148.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24423R148.pdf PDF
36C24423R0148_2.docx DOCX document
36C24423R0148 8-3-23.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1 – RELEVANT PRIOR PROJECT EXPERIENCE

Prime Contractors prepare no more than two (2) Part 1 forms for submission. Subcontractors may prepare up to one (1) Part 1 form for submission by the Prime. Prime Contractor submit up to three (3) total Part 1 forms from your team. Offeror cannot be a POC below nor a reference in Exhibit B for a Subcontractor on their team.

Provide the information requested below in this format for one project/contract being described. Describe a project that contributes relevant experience and knowledge to your firm, considering the project being solicited. Use a separate form for each project/contract being described. Projects may be ongoing and cannot have been completed greater than 5 years prior to the solicitation issue date. Provide frank, concise comments regarding YOUR

FIRM’S experience and knowledge gained on the contracts you present. Utilize this form or reproduce the format of this Exhibit. Each Part 1 form response is limited to four (4) pages in this format.

A. Your Company Name:

B. Submitting as: Prime (Offering) or Sub Contractor (check one).

C. Name of Project/Contract being described:

D. Contract Details:

1. Briefly describe scope of work provided/performed as Prime or Sub

Contractor (check one and state trade if Subcontractor). Provide details in section E below.

2. Contract Number:

3. Contract Type:

4. Original Contract $ Value:

5. Current/Final Contract $ Value:

6. If the $ Values in C.4 and C.5 above are not equal, provide a brief description of the reason(s) for the difference, including contract Modifications:

7. Approximate project area in square feet:

8. Completion Date (full contract close-out):

a. Original Contract Completion Date:

b. Current Percent Complete:

c. Estimated/Actual Completion Date:

d. Explain the primary cause for any Schedule modifications:

E. Details of work performed on the contract being described.

1. Provide a detailed description of the work performed directly by your firm and its present employees under the contract.

2. Describe why you believe the work your firm performed is Very Relevant, Relevant or

Semi-Relevant to the solicited project.

3. (For Prime Contractors) Indicate what elements of work were performed by your major subcontractors, the names of those subcontractors, and indicate whether those subcontractors will be used on the project to be awarded under this solicitation.

F. Points of Contact (POC) for the project’s Owner/Government Agency (or Prime Contractor if Subcontractor is completing form): Contracting Officer, COR, Project Manager, Inspector, FMS Supervisor, etc. Include Agency/Owner/Contractor name, POC name, title, current phone number and email address for each, up to two.

1.

2.

End of Part 1 – Relevant Prior Project Experience – Prepare and send Exhibit E – Past

Performance Questionnaire (PPQ) to each of the reference contact(s) for each of the no more than four (4) total Construction Projects submitted under Exhibit A, Part 1.

See below for Exhibit A, Part 2.

PART 2 – JOINT EXPERIENCE WITH MAJOR SUBCONTRACTORS

Prime Contractors (only) complete one (1) Part 2 form to identify your primary Subcontractors for the project being solicited, and to highlight your joint project experience with them.

A. On the following pages, name major Subcontractors and/or Teaming Partners to be utilized on the contract being solicited. Describe the principle and mutually exclusive scopes of work each Subcontractor in each major trade will perform on the solicited project. As a minimum, provide the name(s) of subcontractor(s) to be utilized for the one (1) major specialty trade indicated in the form below. Up to one (1) additional subcontracted trade or Teaming Partner may be included on the form. For each

Subcontractor or Teaming Partner indicated, list up to two (2) previous or current projects worked on with that party in the past five (5) years and provide the additional data requested below. Offerors are required to have each Subcontractor or

Teaming Partner named in Exhibit A, Part 2 complete a Subcontractor Consent and

Reference Form (Exhibit B), submitted by Offeror.

Begin on the next page. Each trade described shall utilize one page, up to two trades total.

1. Trade: HVAC Systems

a. HVAC Subcontractor:

1) Number of Projects teamed with this Prime Contractor in the past five

(5) years:

2) Principle scope of work to be performed by Subcontractor:

3) Recent projects performed jointly with Subcontractor/Partner:

Project

Name

Owner /

Contact name/

Phone/

Email

Contract completion date or ongoing

Approx. size, SF

Final total project

$ Value

Percent $ Value by

Subcontractor/Partner

Brief scope of work performed by

Subcontractor

2. Trade:

a. Subcontractor:

1) Number of Projects teamed with this Prime Contractor in the past five

(5) years:

2) Principle scope of work to be performed by Subcontractor:

3) Recent projects performed jointly with Subcontractor/Partner:

Project

Name

Owner /

Contact name/

Phone/

Email

Contract completion date or ongoing

Approx. size, SF

Final total project

$ Value

Percent $ Value by

Subcontractor/Partner

Brief scope of work performed by

Subcontractor

End of Part 2 – Joint Experience with Major Subcontractors

File details come from the government source that posted it. Updated .