Encl 2_ELINs Schedule.xlsx
XLSX spreadsheet 200 KB Posted
- Attached to
- Indefinite Delivery/Indefinite Quantity (IDIQ) Custodial, Pest Control, and Grounds Maintenance Service Contract at U. S. Marine Corps Air Station (MCAS) Iwakuni, Japan Federal contract opportunity
- Solicitation number
- N4008426R1026
About this file
This is an Exhibit Line Item Numbers (ELINs) Schedule for an Indefinite Delivery/Indefinite Quantity (IDIQ) custodial, pest control, and grounds maintenance service contract at U.S. Marine Corps Air Station (MCAS) Iwakuni, Japan. The contract includes four Contract Line Items (CLINs): CLIN 0001 for Base Period Recurring Work, CLIN 0002 for Base Period Non-Recurring Work, CLIN 0003 for 1st Option Period Recurring Work, and CLIN 0004 for 1st Option Period Non-Recurring Work. Each period of performance is one year with specific dates to be established at contract award.
The recurring work pricing schedule (CLINs 0001 and 0003) includes 21 primary ELINs covering custodial services, pest control, and grounds maintenance across multiple funding entities including the Station, 36th Contingency Response Group, Air Mobility Command, Family Housing, DoDEA, Navy, DeCA (Commissary and CDC), USACE, AFN, DLA (Disposition and Distribution), NCIS, POL, VMGR-152, and Chapel. Each entity has specific service frequency requirements based on referenced custodial inventory, floor plans, and MCICOM service level standards. The non-recurring work pricing schedule (CLINs 0002 and 0004) contains approximately 89 unit-priced task (UPT) line items and unit-priced labor (UPL) items, including detailed custodial services (waste removal, cleaning tasks, restroom and facility cleaning), grounds maintenance services (grass cutting, landscaping, tree trimming, vegetation control), and specialized work such as sediment removal from six Atago Retention Ponds with required environmental sampling and reporting per Japan Environmental Governing Standards. All prices are to be provided in Japanese Yen (YEN), with quantities and unit pricing to be completed by the contractor during the proposal phase.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4008426R1026 AMD 0001.pdf | ||
| Encl 4_Experience Data Sheet AMD 1.pdf | ||
| Request for Information Questions and Responses.pdf | ||
| Encl 1_PWS_CPG_Iwakuni_w_combined.pdf | ||
| Encl 5_PPQ_with Japanese Translation.docx | DOCX document | |
| Encl 9_MCASO 3070.2B.pdf | ||
| Encl 6_RFI Form.xlsx | XLSX spreadsheet | |
| Encl 8_APPENDIX A-JN-INDIVIDUAL ACKNOWLEDGEMENT AND MEMORANDUM OF UNDERSTANDING FOR COMPLIANCE WITH MCASO.pdf | ||
| Encl 10_MCASO 5500.2W Appendix.pdf | ||
| Solicitation - N4008426R1026.pdf | ||
| Encl 3_Safety.docx | DOCX document | |
| Encl 4_Experience Data Sheet.docx | DOCX document | |
| Encl 7_APPENDIX A-INDIVIDUAL ACKNOWLEDGEMENT AND MEMORANDUM OF UNDERSTANDING FOR COMPLIANCE WITH MCASO.pdf | ||
| Encl 11_MCASO 5500.2W MCAS Iwakuni Access Control.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A01 Base R
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS (ELINS) |
| CONTRACT # (will be added after contract award) |
| EXHIBIT A - CLIN 0001 |
| Period of Performance (POP): One (1) year. Specific dates will be established at time of contract award. |
| Line Item 0001 Recurring Work Price - Base Period | ||||||
| PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 through A021 | ||||||
| ELIN/Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | |
| STATION (ST) | ||||||
| 1503010 | Custodial | |||||
| - Prestige | ||||||
| 1 | AA | Services for Station-funded facilities/spaces indicated as Prestige in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the COLS 2 frequencies specified per the MCICOM COLS listed in J-1503010-03. | 12 | MO | ¥ - | |
| - Standard | ||||||
| 1 | AB | Services for Station-funded facilities/spaces indicated as Standard in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the COLS 3 Full Additional Measure Level 3 frequencies specified per the MCICOM COLS listed in J-1503010-03. | 12 | MO | ¥ - | |
| - Iwakuni City | ||||||
| 1 | AC | Services for designated Station-funded facilities/spaces in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the service frequencies agreed-upon by Iwakuni City listed in J-1503010-06. | 12 | MO | ¥ - | |
| - CYP Facilities | ||||||
| 1 | AD | Services for Station-funded facilities/spaces indicated as Governed Service Areas in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified for Mandated Service Classes for CYP Facilities in J-1503010-07. | 12 | MO | ¥ - |
| 1503020 | Pest Control | ||||
| 2 | AA | Services for Station-funded facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-06 performed at the frequencies specified therein. | 12 | MO | ¥ - |
| 2 | AB | Pest Control Service Orders for Station-funded facilities/spaces. | 30 | EA | ¥ - |
| 2 | AC | Pest Management Reporting per Spec Item 3.3 for Station-funded facilities/spaces | 12 | MO | ¥ - |
| 1503050 | Grounds Maintenance | ||||
| 3 | AA | Spec Item 3.1 Improved Grounds: Services for Station-funded areas indicated as Prestige in the site maps for Improved Grounds Areas provided in J-1503050-06 performed as specified in the PWS per MCICOM COLS 2 (Prestige) listed in J-1503050-05. | 12 | MO | ¥ - |
| 3 | AB | Spec Item 3.1 Improved Grounds: Services for Station-funded areas indicated as COLS 3 in the site maps for Improved Grounds Areas provided in J-1503050-06 performed as specified in the PWS per MCICOM COLS 3 Full Base Measures listed in J-1503050-05. | 12 | MO | ¥ - |
| 3 | AC | Spec Item 3.2 Operational Areas: Services for Station-funded areas indicated as Station-funded in the site maps for Operational Areas provided in J-1503050-17 (Atago Hills Clear Zones), J-1503050-18 (SOFU Communication Site), and Main Base Security Fence and Spider Fence Areas provided in J-1503050-12 performed as specified in the PWS. | 12 | MO | ¥ - |
| 3 | AD | Spec Item 3.3 Storm Drainage Systems: Services for Station-funded areas indicated as Station-funded in the site maps for Storm Drainage Maps provided in J-1503050-20 performed as specified in the PWS. | 12 | MO | ¥ - |
| 3 | AE | Spec Item 3.4 Atago Retention Ponds: Services for Station-funded areas indicated as Station-funded in the site map and specific detailes of each pond for Atago Rtention Ponds provided in J-1503050-19 performed as specified in the PWS. | 12 | MO | ¥ - |
STATION Subtotal ¥ -
| 36TH CONTINGENCY RESPONSE GROUP (36 CRG) (STATION REIMBURSABLE) | |||||
| 1503010 | Custodial | ||||
| 4 | AA | Services for 36 CRG-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
36CRG Subtotal ¥ -
| AIR MOBILITY COMMAND (AMC) (STATION REIMBURSABLE) | |||||
| 1503010 | Custodial | ||||
| 5 | AA | Services for AMC-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
AMC Subtotal ¥ -
| FAMILY HOUSING (FH) | |||||
| 1503010 | Custodial | ||||
| 6 | AA | Services for Family Housing-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
| 1503020 | Pest Control | |||||
| 7 | AA | Services for Family Housing-funded facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-06 performed at the frequencies specified therein. | 12 | MO | ¥ - | |
| 7 | AB | Pest Control Service Orders for Family Housing-funded facilities/spaces. | 220 | EA | ¥ - | |
| 7 | AC | Pest Management Reporting per Spec Item 3.3 for Family Housing-funded facilities/spaces | 12 | MO | ¥ - | |
| BP13 | ¥ - |
| 1503050 | Grounds Maintenance | |||||
| 8 | AA | Spec Item 3.1 Improved Grounds: Services for Family Housing-funded areas indicated as Prestige in the site maps for Improved Grounds Areas provided in J-1503050-06, excluding Vacant Family Housing (FH) Grounds services, performed as specified in the PWS per MCICOM COLS 2 (Prestige) listed in J-1503050-05. | 12 | MO | ¥ - | |
| 8 | AB | Spec Item 3.1 Improved Grounds: Services for Family Housing-funded areas indicated as COL 3 in the site maps for Improved Grounds Areas provided in J-1503050-06, excluding Vacant Family Housing (FH) Grounds services, performed as specified in the PWS per MCICOM COLS 3 Full Base Measures listed in J-1503050-05. | 12 | MO | ¥ - | |
| 8 | AC | Spec Item 3.1 Vacant Family Housing (FH) Grounds: Services for a maximum of 400 vacant FH areas designated by the FH Office per month performed as specified in the PWS per MCICOM COLS 3 Full Base Measures listed in J-1503050-05. | 12 | MO | ¥ - | |
| 8 | AD | Spec Item 3.3 Storm Drainage Systems: Services for Family Housing-funded areas indicated as Family Housing-funded in the site maps for Storm Drainage Maps provided in J-1503050-20 performed as specified in the PWS. | 12 | MO | ¥ - | |
| 8 | AE | Spec Item 3.4 Atago Retention Ponds: Services for Family Housing-funded areas indicated as Housing-funded in the site map and specific detailes of each pond for Atago Rtention Ponds provided in J-1503050-19 performed as specified in the PWS. | 12 | MO | ¥ - | |
| BP21 | ¥ - | |||||
| FAMILY HOUSING Subtotal | ¥ - |
| DEPARTMENT OF DEFENSE EDUCATION ACTIVITY (DoDEA) | |||||
| 1503010 | Custodial | ||||
| 9 | AA | Services for DoDEA-funded facilities/spaces, Bldgs. 9550, 9551, 9553 and 9555, listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified therein. | 12 | MO | ¥ - |
| 9 | AB | Services for DoDEA-funded facilities/spaces, Bldg. 9556, listed in the Custodial Inventory and Floor Plans for provided in J-1503010-08 performed at the frequencies specified therein. | 12 | MO | ¥ - |
| 1503050 | Grounds Maintenance | ||||
| 10 | AA | Spec Item 3.1 Improved Grounds: Services for DoDEA-funded areas indicated as COLS 3 in the site maps for Improved Grounds Areas provided in J-1503050-06 performed as specified in the PWS per MCICOM COLS 3 Full Base Measures listed in J-1503050-05. | 12 | MO | ¥ - |
DoDEA Subtotal ¥ -
| NAVY | |||||
| 1503010 | Custodial | ||||
| - Prestige | |||||
| 11 | AA | Services for Navy-funded facilities/spaces indicated as Prestige in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the Prestige frequencies specified per the CNIC Service Level Standards listed in J-1503010-05. | 12 | MO | ¥ - |
| - Standard | |||||
| 11 | AB | Services for Navy-funded facilities/spaces indicated as Standard in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the Standard frequencies specified per the CNIC Service Level Standards listed in J-1503010-05. | 12 | MO | ¥ - |
NAVY Subtotal ¥ -
| DEFENSE COMMISSARY AGENCY (DeCA) COMMISSARY STORE | |||||
| 1503010 | Custodial | ||||
| 12 | AA | Services for DeCA Commissary Store-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
DeCA COMMISSARY STORE Subtotal ¥ -
| DeCA CENTRAL DISTRIBUTION CENTER (CDC) | |||||
| 1503010 | Custodial | ||||
| 13 | AA | Services for DeCA CDC-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
DeCA CDC Subtotal ¥ -
| U.S. ARMY CORPS OF ENGINEERS (USACE) | |||||
| 1503010 | Custodial | ||||
| 14 | AA | Services for USACE-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
USACE Subtotal ¥ -
| AMERICAN FORCES NETWORK (AFN) | |||||
| 1503010 | Custodial | ||||
| 15 | AA | Services for AFN-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
AFN Subtotal ¥ -
| DEFENSE LOGISTICS AGENCY (DLA) DISPOSITION | |||||
| 1503010 | Custodial | ||||
| 16 | AA | Services for DLA Disposition-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
DLA DISPOSITION Subtotal ¥ -
| DLA DISTRIBUTION | |||||
| 1503010 | Custodial | ||||
| 17 | AA | Services for DLA Distribition-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
DLA DISTRIBUTION Subtotal ¥ -
| NAVAL CRIMINAL INVESTIGATIVE SERVICE (NCIS) | |||||
| 1503010 | Custodial | ||||
| 18 | AA | Services for NCIS-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
NCIS Subtotal ¥ -
| PETROLEUM, OIL AND LUBRICANTS (POL) | |||||
| 1503010 | Custodial | ||||
| 19 | AA | Services for POL-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
POL Subtotal ¥ -
| MARINE AERIAL REFUELER TRANSPORT SQUADRON 152 (VMGR-152) | |||||
| 1503010 | Custodial | ||||
| 20 | AA | Services for VMGR-152-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
VMGR-152 Subtotal ¥ -
| CHAPEL | |||||
| 1503010 | Custodial | ||||
| 21 | AA | Services for Chapel-funded facilities/spaces listed in the Custodial Inventory and Floor Plans provided in J-1503010-08 performed at the frequencies specified by the applicable service frequencies listed in J-1503010-05. | 12 | MO | ¥ - |
CHAPEL Subtotal ¥ -
| TOTAL RECURRING WORK - BASE PERIOD | ¥ - | |
| MO = Month, EA = Each |
&"Times New Roman,Regular"CUI//FEDCON [when filled in] SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY &"Times New Roman,Regular"CUI//FEDCON [when filled in] SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
A02 Base N-R
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS (ELINS) |
| CONTRACT # (will be added after contract award) |
| EXHIBIT A - CLIN 0002 |
| Period of Performance (POP): One (1) year. Specific dates will be established at time of contract award. |
| Line Item 0002 Non-Recurring Work - Base Period |
| PROVIDE PRICES FOR NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A902 |
| Part Number (ELIN) | Part Name (Product) | Long Description | Estimated Quantity | Unit of Issue (UOI) | Price | Extended Price (Price x Estimated Quantity) | |
| Unit Priced Task (UPT) Work | |||||||
| 1503010 Custodial | |||||||
| A700 | Emptying Waste Containers | The Contractor shall empty a waste container and ensure it is clean and sanitary. Waterproof liners shall be replaced if soiled or unserviceable. All waste that is dropped during the waste removal process shall be picked up and properly disposed of. All spills that occur during the waste removal process shall be properly treated and cleaned. All collected waste shall be moved to a designated waste container or waste deposit area. | 2 | EA | ¥ - | ||
| 1 | Emptying Recycling Containers | The Contractor shall empty a recycling container and ensure it is clean and sanitary. Waterproof liners shall be replaced if soiled or unserviceable. All recyclable material that is dropped during the removal process shall be picked up. All spills that occur during the removal process shall be properly treated and cleaned. All collected recyclable material shall be moved to the designated building collection site. | 2 | EA | ¥ - | ||
| 2 | Low Area Cleaning | The Contractor shall dust and wipe clean all furniture and fixtures (e.g., partitions, radiators, hand rails, grilles, ledges, sills, walls, moldings, baseboards, doors, and light fixtures) to a maximum height of 2.5 meters above floor level. The Contractor shall ensure the surfaces are clean. | |||||
| *The square meterage will be based on the floor area of the room. e.g., If this service is ordered for one (1) SM, the work will include cleaning all surfaces within the 1 SM floor area up to a height of 2.5 meters. | 200 | SM | ¥ - | ||||
| 3 | Lunch/Break Room Cleaning | The Contractor shall clean sinks, countertops, trash containers, exterior surfaces of kitchen appliances (e.g., refrigerators, cooking equipment, coffee makers), and dining areas, including tables and chairs. If present, soap and paper towel dispensers shall be refilled. |
The Contractor shall collect all waste from the lunch/break room and move it to a designated waste container or waste deposit area. All waste that is dropped during the waste removal process shall be picked up and properly disposed of.
| *The square meterage will be based on the floor area of the room. The unit price shall cover the cost of cleaning all the items listed above (sinks, tables, etc.) that are located within the area. | 100 | SM | ¥ - | |
| 4 | High Area Cleaning (up to four meters) | The Contractor shall dust and wipe clean all surfaces above 2.5 meters from floor level up to 4 meters (e.g., overhead piping and conduits, light fixtures, ceiling fans, vents, ducts, furniture tops, and ceiling areas). |
The Contractor shall clean the exterior and interior surfaces of the light fixture.
The Contractor shall ensure that overhead fixtures are protected from damage.
High area cleaning includes removal of all debris created, including debris falling into low areas.
| *The square meterage will be based on the floor area of the room. e.g., If this service is ordered for one (1) SM, the work will include cleaning all surfaces within the 1 SM floor area from a height of 2.5 meters up to 4 meters. | 150 | SM | ¥ - | |
| 5 | High Area Cleaning (up to seven meters) | The Contractor shall dust and wipe clean all surfaces above 2.5 meters from floor level up to 7 meters (e.g., overhead piping and conduits, light fixtures, ceiling fans, vents, ducts, furniture tops, and ceiling areas). |
The Contractor shall clean the exterior and interior surfaces of the light fixture.
The Contractor shall ensure that overhead fixtures are protected from damage.
High area cleaning includes removal of all debris created, including debris falling into low areas.
| *The square meterage will be based on the floor area of the room. e.g., If this service is ordered for one (1) SM, the work will include cleaning all surfaces within the 1 SM floor area from a height of 2.5 meters up to 7 meters. | 150 | SM | ¥ - |
| 6 | Interior Window Cleaning | ||
| (No Fall Protection required) | The Contractor shall clean windows and adjacent areas including window sashes, sills, woodwork, and other surroundings of glass to ensure surfaces are free of dirt and provide a clear, streak-, smudge- and mark-free appearance. |
If screens are present, the Contractor shall remove and clean the screen such that it is free of debris and dust before reinstalling over cleaned windows. Work will not be considered complete until screens are reinstalled.
| *This line item is for cleaning interior windows that will not require fall protection for cleaning. | 100 | SM | ¥ - |
| 7 | Exterior Window Cleaning | ||
| (No Fall Protection required) | The Contractor shall clean windows and adjacent areas including window sashes, sills, woodwork, and other surroundings of glass to ensure surfaces are free of dirt and provide a clear, streak-, smudge- and mark-free appearance. |
If screens are present, the Contractor shall remove and clean the screen such that it is free of debris and dust before reinstalling over cleaned windows. Work will not be considered complete until screens are reinstalled.
| *This line item is for cleaning exterior windows that will not require fall protection for cleaning. | 100 | SM | ¥ - | |||
| 8 | Window Blinds Cleaning | The Contractor shall clean both sides of blinds and all associated accessories (e.g., head rails, cords, tapes, cornices). Blinds may be removed for cleaning. If removed, work will not be considered complete until they are reinstalled, dried for use, and function as initially intended. | 50 | SM | ¥ - | |
| 9 | Entrance Cleaning | The Contractor shall clean entrance surfaces including, but not limited to, doors, associated transoms, and sidelights. |
Surfaces shall be free of all dirt and provide a clear, streak-, smudge- and mark-free appearance regardless of height.
| All doors, including hardware, shall be disinfected. | 50 | SM | ¥ - | |||
| 10 | Interior Glass Surfaces Cleaning | The Contractor shall clean glass surfaces (such as interior doors, partitions, and walls) to ensure the surfaces are free of all dirt and provide a clear, streak-, smudge- and mark-free appearance regardless of height. | 50 | SM | ¥ - | |
| 11 | Drinking Fountains Cleaning | The Contractor shall clean a drinking fountain to ensure all of its surfaces are free of graffiti, stains, smudges, and scale. Surfaces shall be properly disinfected. | 3 | EA | ¥ - | |
| 12 | Light Fixture Cleaning | |||||
| (No Fall Protection required) | The Contractor shall clean all interior and exterior surfaces of a light fixture. If the lamp or bulb is removed for cleaning, it shall be properly reinstalled upon completion of the cleaning. The Contractor shall conduct an operational check prior to and after cleaning the light fixture. | 10 | EA | ¥ - | ||
| 13 | Wall and Ceiling Area Cleaning | The Contractor shall clean interior wall surfaces to a maximum height of 3 meters above floor level. Surfaces shall include, but are not limited to, baseboards, footing, and handrails. |
Additionally, spider webs on the ceiling areas shall be removed regardless of height.
All debris and dust that are dropped during cleaning services shall be picked up and properly disposed of.
| *The unit price per SM is based on the wall surface area to be cleaned. | 150 | SM | ¥ - | |||
| 14 | Door Cleaning | The Contractor shall clean both sides of doors and all associated fixtures (e.g., doorknobs and handles, door stops, door closures), door lights, and frames. Doorknobs and handles shall be disinfected. | 50 | SM | ¥ - | |
| 15 | Sweeping and Dust Mopping | The Contractor shall sweep or dust mop the floor to ensure it is free of debris and dust. | 50 | SM | ¥ - | |
| 16 | Vacuuming Carpets and Rugs | The Contractor shall vacuum carpets and/or rugs to ensure they are free of debris and dust. | 50 | SM | ¥ - | |
| 17 | Cleaning Walk-off Mats (up to 2 square meters) | The Contractor shall clean a walk-off mat and the surface below the mat to ensure they are free of debris, dust, and visible soil. After cleaning, the mat shall be returned to its original location. | 5 | EA | ¥ - | |
| 18 | Spray Cleaning and Buffing | The Contractor shall spray clean and buff the floor to ensure it is clean and presents a sightly appearance. There shall be no buildup or residue on baseboards, mop boards, cove base, and kick plates. Floor products used shall result in a non-slip finish. | 300 | SM | ¥ - | |
| 19 | Wet Mopping | The Contractor shall wet mop the floor to ensure it is clean. Scuff marks, spots, dried stains, and any other foreign substances not embedded in the floor shall be removed. | 50 | SM | ¥ - | |
| 20 | Stripping, Coating, and Buffing | The Contractor shall strip, coat, and buff the floor to ensure it is clean and sightly. There shall be no buildup or residue on baseboards, mop boards, cove base, and kick plates. The Contractor shall apply sufficient coats of product to protect floors from traffic and use. Floor products used shall result in a non-slip finish. | 1,000 | SM | ¥ - | |
| 21 | Carpet and Rug Deep Cleaning | The Contractor shall deep clean carpets and/or rugs to ensure they are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Deep cleaned carpets and/or rugs shall be dry and passable for the cleaning to be complete. | 5,000 | SM | ¥ - | |
| 22 | Floor Scrubbing | The Contractor shall scrub clean the floor to ensure it is clean and sightly. The floor shall be free of stains and odors. | 50 | SM | ¥ - | |
| 23 | Restroom Services (up to 5 fixtures) | The Contractor shall clean all components and exterior surfaces of furnishings and fixtures, including but not limited to floors, walls, ceilings, doors (both sides), interior windows, partitions, light fixtures, toilets, urinals, sinks, counter tops, soap and paper towel dispensers, hand dryers, mirrors, trash containers, air conditioners (A/C) and diffusers, shower curtains, and lockers. |
The Contractor shall disinfect the floors, doors (both sides), walls, partitions, fixtures (e.g., toilets, urinals, sinks including faucets), dispensers, hand dryers, mirrors, the exterior of lockers, countertops, and shower areas.
Restroom supplies (e.g., toilet paper, toilet seat covers, urinal deodorant cakes or pads, liquid hand soap, and paper towels) shall be filled to capacity and available.
| The Contractor shall empty all waste containers and replace waterproof liners. All waste that is dropped during the waste removal process shall be picked up. All collected waste shall be moved to the designated waste container or waste deposit area. | 2 | EA | ¥ - | |
| 24 | Restroom Services (6 - 10 fixtures) | The Contractor shall clean all components and exterior surfaces of furnishings and fixtures, including but not limited to floors, walls, ceilings, doors (both sides), interior windows, partitions, light fixtures, toilets, urinals, sinks, counter tops, soap and paper towel dispensers, hand dryers, mirrors, trash containers, air conditioners (A/C) and diffusers, shower curtains, and lockers. |
The Contractor shall disinfect the floors, doors (both sides), walls, partitions, fixtures (e.g., toilets, urinals, sinks including faucets), dispensers, hand dryers, mirrors, the exterior of lockers, countertops, and shower areas.
Restroom supplies (e.g., toilet paper, toilet seat covers, urinal deodorant cakes or pads, liquid hand soap, and paper towels) shall be filled to capacity and available.
| The Contractor shall empty all waste containers and replace waterproof liners. All waste that is dropped during the waste removal process shall be picked up. All collected waste shall be moved to the designated waste container or waste deposit area. | 2 | EA | ¥ - | |
| 25 | Restroom Services (11 - 15 fixtures) | The Contractor shall clean all components and exterior surfaces of furnishings and fixtures, including but not limited to floors, walls, ceilings, doors (both sides), interior windows, partitions, light fixtures, toilets, urinals, sinks, counter tops, soap and paper towel dispensers, hand dryers, mirrors, trash containers, air conditioners (A/C) and diffusers, shower curtains, and lockers. |
The Contractor shall disinfect the floors, doors (both sides), walls, partitions, fixtures (e.g., toilets, urinals, sinks including faucets), dispensers, hand dryers, mirrors, the exterior of lockers, countertops, and shower areas.
Restroom supplies (e.g., toilet paper, toilet seat covers, urinal deodorant cakes or pads, liquid hand soap, and paper towels) shall be filled to capacity and available.
| The Contractor shall empty all waste containers and replace waterproof liners. All waste that is dropped during the waste removal process shall be picked up. All collected waste shall be moved to the designated waste container or waste deposit area. | 2 | EA | ¥ - | |
| 26 | Group Shower/Locker Room Cleaning (less than 100 square meters) | The Contractor shall clean all components and exterior surfaces of furnishings and fixtures in a group shower/locker room less than 100 SM in size, including but not limited to floors, walls, ceilings, doors (both sides), interior windows, partitions, light fixtures, toilets, urinals, sinks, counter tops, soap and paper towel dispensers, hand dryers, mirrors, trash containers, air conditioners (A/C) and diffusers, shower curtains, and lockers. |
The Contractor shall disinfect the floors, doors (both sides), walls, partitions, fixtures (e.g., toilets, urinals, sinks including faucets), dispensers, hand dryers, mirrors, the exterior of lockers, countertops, and shower areas.
The Contractor shall ensure all supplies (e.g., toilet paper, toilet seat protectors/covers, soap, and paper towels) in the group shower/locker room are filled to capacity and available.
The Contractor shall empty all waste containers in the area and replace waterproof liners. All waste that is dropped during the waste removal process shall be picked up. All collected waste shall be moved to the designated waste container or waste deposit area.
| The Contractor shall ensure only male employees provide services for male group shower/locker rooms and female employees for female group shower/locker rooms. | 1 | EA | ¥ - | |
| 27 | Group Shower/Locker Room Cleaning (100 - 200 square meters) | The Contractor shall clean all components and exterior surfaces of furnishings and fixtures in a group shower/locker room between 100 SM and 200 SM in size, including but not limited to floors, walls, ceilings, doors (both sides), interior windows, partitions, light fixtures, toilets, urinals, sinks, counter tops, soap and paper towel dispensers, hand dryers, mirrors, trash containers, air conditioners (A/C) and diffusers, shower curtains, and lockers. |
The Contractor shall disinfect the floors, doors (both sides), walls, partitions, fixtures (e.g., toilets, urinals, sinks including faucets), dispensers, hand dryers, mirrors, the exterior of lockers, countertops, and shower areas.
The Contractor shall ensure all supplies (e.g., toilet paper, toilet seat protectors/covers, soap, and paper towels) in the group shower/locker room are filled to capacity and available.
The Contractor shall empty all waste containers in the area and replace waterproof liners. All waste that is dropped during the waste removal process shall be picked up. All collected waste shall be moved to the designated waste container or waste deposit area.
| The Contractor shall ensure only male employees provide services for male group shower/locker rooms and female employees for female group shower/locker rooms. | 1 | EA | ¥ - | |
| 28 | Group Shower/Locker Room Cleaning (over 200 up to 300 square meters) | The Contractor shall clean all components and exterior surfaces of furnishings and fixtures in a group shower/locker room over 200 SM up to 300 SM in size, including but not limited to floors, walls, ceilings, doors (both sides), interior windows, partitions, light fixtures, toilets, urinals, sinks, counter tops, soap and paper towel dispensers, hand dryers, mirrors, trash containers, air conditioners (A/C) and diffusers, shower curtains, and lockers. |
The Contractor shall disinfect the floors, doors (both sides), walls, partitions, fixtures (e.g., toilets, urinals, sinks including faucets), dispensers, hand dryers, mirrors, the exterior of lockers, countertops, and shower areas.
The Contractor shall ensure all supplies (e.g., toilet paper, toilet seat protectors/covers, soap, and paper towels) in the group shower/locker room are filled to capacity and available.
The Contractor shall empty all waste containers in the area and replace waterproof liners. All waste that is dropped during the waste removal process shall be picked up. All collected waste shall be moved to the designated waste container or waste deposit area.
| The Contractor shall ensure only male employees provide services for male group shower/locker rooms and female employees for female group shower/locker rooms. | 1 | EA | ¥ - | |||
| 29 | Debris Removal | The Contractor shall remove all debris (e.g., trash, fallen leaves) from the designated area to ensure a sightly appearance. The Contractor shall deposit all debris in the designated waste container or waste deposit area. | 3,000 | SM | ¥ - | |
| 30 | Emptying Perimeter Waste Containers | The Contractor shall empty a perimeter waste container and replace waterproof liners. All waste that is dropped during the waste removal process and waste around the container shall be picked up and properly disposed of. All waste shall be moved to a designated waste container or waste deposit area. | 3 | EA | ¥ - | |
| 31 | Exterior Wall Cleaning | The Contractor shall clean exterior wall surfaces to a maximum height of 3 meters above ground level. The exterior-facing surfaces of doors, including hardware, and windows within this range shall be cleaned as part of the cleaning. | 100 | SM | ¥ - | |
| 32 | Exterior Floor Cleaning | The Contractor shall clean the designated exterior floor surfaces. The Contractor shall use any and all appropriate method(s) necessary to remove all dirt, debris, spilled drinks, stains, and other unsightly materials. | 200 | SM | ¥ - | |
| 33 | Emergency Cleaning for Occupied Unit - up to 15 SM | The Contractor shall clean the damaged area in an occupied unit caused by a home emergency. |
Home emergencies include but are not limited to water leaks, and sink and toilet backflows.
The damaged area shall be restored to a clean, sightly, and habitable condition.
Note 1: The unit price for this ELIN shall include the cleaning of an affected area up to 15 SM. If cleaning of areas exceeding this size is required, the Government may order additional quantity or request a separate quotation.
| Note 2: This ELIN is strictly for cleaning and restoration of the affected area to a habitable condition and does not include repairs to the source of the emergency (e.g., plumbing or structural repairs) or any other repair work such as carpet replacement. | 40 | EA | ¥ - | |
| 34 | BOQ/BEQ Change of Occupancy Standard Cleaning - up to 250 SF | The Contractor shall provide the following Change of Occupancy Standard Cleaning services for a BOQ or BEQ unit up to 250 SF (approx. 23 SM) in size: |
• Floors: Sweep, vacuum, or mop all floors. Clean baseboards. Vacuum under beds and refrigerators.
• Walls and Corners: Wipe down walls and corners to remove dust, dirt, and minor stains.
• Windows: Clean interior window glass, Wipe windowsills and frames.
• Furniture: Clean desks, chairs, shelves, and other furniture. Remove dust and debris from surfaces.
• Lighting Fixtures and Switches: Wipe down light fixtures. Clean and sanitize light switches and electrical outlet covers.
• Appliances: Clean the interior and exterior surfaces of refrigerator, microwave, and stovetop. Wipe appliance doors and handles.
• Kitchen Area: Clean kitchen counters. Wipe down the exterior surfaces of cabinets and drawers, including knobs and handles. Clean sinks and faucets.
• Bathroom: Clean and sanitize all bathroom fixtures and surfaces, including but not limited to:
- Countertops and vanity surfaces (including around sinks and fixtures)
- Sinks, faucets, and mirrors (removal of soap scum, water spots, and buildup)
- Interior and exterior surfaces of cabinets and drawers
- Shelving units
- Toilet (interior bowl, exterior surfaces, lid, seat, rim, and base)
- Towel racks, hooks, and toilet paper holders
- Shower walls, floors, doors/curtains, and fixtures
- Tile and grout on walls and floors
- Door surfaces, frames, and handles
- Light fixtures and switch plates
- Exterior surfaces of vent covers and exhaust fans
- Floors (swept and mopped, including corners)
- Baseboards and trim
- Trash receptacles (emptied, cleaned, and sanitized)
• HVAC: Wipe down A/C unit surfaces. Remove dust from accessible filters.
• Doors: Wipe door surfaces, frames, and handles
| Note: The unit is expected to be vacant of all personal belongings and trash prior to the commencement of work. However, the Contractor shall be responsible for removing and properly disposing of any items remaining in the unit. | 1,022 | UN | ¥ - | |
| 35 | BOQ/BEQ Change of Occupancy Standard Cleaning - over 250 SF up to 450 SF | The Contractor shall provide the following Change of Occupancy Standard Cleaning services for a BOQ or BEQ unit over 250 SF (approx. 23 SM) up to 450 SF (approx. 42 SM) in size: |
• Floors: Sweep, vacuum, or mop all floors. Clean baseboards. Vacuum under beds and refrigerators.
• Walls and Corners: Wipe down walls and corners to remove dust, dirt, and minor stains.
• Windows: Clean interior window glass, Wipe windowsills and frames.
• Furniture: Clean desks, chairs, shelves, and other furniture. Remove dust and debris from surfaces.
• Lighting Fixtures and Switches: Wipe down light fixtures. Clean and sanitize light switches and electrical outlet covers.
• Appliances: Clean the interior and exterior surfaces of refrigerator, microwave, and stovetop. Wipe appliance doors and handles.
• Kitchen Area: Clean kitchen counters. Wipe down the exterior surfaces of cabinets and drawers, including knobs and handles. Clean sinks and faucets.
• Bathroom: Clean and sanitize all bathroom fixtures and surfaces, including but not limited to:
- Countertops and vanity surfaces (including around sinks and fixtures)
- Sinks, faucets, and mirrors (removal of soap scum, water spots, and buildup)
- Interior and exterior surfaces of cabinets and drawers
- Shelving units
- Toilet (interior bowl, exterior surfaces, lid, seat, rim, and base)
- Towel racks, hooks, and toilet paper holders
- Shower walls, floors, doors/curtains, and fixtures
- Tile and grout on walls and floors
- Door surfaces, frames, and handles
- Light fixtures and switch plates
- Exterior surfaces of vent covers and exhaust fans
- Floors (swept and mopped, including corners)
- Baseboards and trim
- Trash receptacles (emptied, cleaned, and sanitized)
• HVAC: Wipe down A/C unit surfaces. Remove dust from accessible filters.
• Doors: Wipe door surfaces, frames, and handles
| Note: The unit is expected to be vacant of all personal belongings and trash prior to the commencement of work. However, the Contractor shall be responsible for removing and properly disposing of any items remaining in the unit. | 418 | UN | ¥ - | |
| 36 | BOQ/BEQ Change of Occupancy Deep Cleaning - up to 250 SF | The Contractor shall provide the following Change of Occupancy Deep Cleaning services for a BOQ or BEQ unit up to 250 SF (approx. 23 SM) in size, in addition to all BOQ/BEQ Change of Occupancy Standard Cleaning tasks listed in A735: |
• Floors: Strip and wax hard surface floors. Perform carpet deep cleaning where applicable.
• Walls and Corners: Remove heavy dirt, marks, and stains. Remove stickers, tape, and residue.
• Ceilings: Remove dust and cobwebs. Inspect and clean areas showing mildew or buildup.
• Windows and Blinds: Clean window blinds.
• Furniture: Deep clean furniture surfaces and remove buildup or stains.
• Kitchen: Deep clean kitchen surfaces and remove grease buildup. Clean inside cabinets and drawers.
• Appliances: Move all appliances as necessary to clean behind and beneath them.
• Bathroom: Scrub shower walls, floors, and fixtures to remove soap scum and buildup. Clean tile grout to remove buildup and mildew. Clean the interior of exhaust fans.
Upon completion of cleaning services, the unit shall be:
- Free of trash, debris, dust, and stains
- Clean and sanitized
- Ready for Unaccompanied Housing inspection and new resident occupancy
Note 1: The unit is expected to be vacant of all personal belongings and trash prior to the commencement of work. However, the Contractor shall be responsible for removing and properly disposing of any items remaining in the unit.
| Note 2: The unit price for this ELIN shall include all the tasks including those listed in the A735. This price will not be an additional charge to the Standard Cleaning ELIN. | 104 | UN | ¥ - | |
| 37 | BOQ/BEQ Change of Occupancy Deep Cleaning - over 250 SF up to 450 SF | The Contractor shall provide the following Change of Occupancy Deep Cleaning services for a BOQ or BEQ unit over 250 SF (approx. 23 SM) up to 450 SF (approx. 42 SM) in size, in addition to all BOQ/BEQ Change of Occupancy Standard Cleaning tasks listed in A736: |
• Floors: Strip and wax hard surface floors. Perform carpet deep cleaning where applicable.
• Walls and Corners: Remove heavy dirt, marks, and stains. Remove stickers, tape, and residue.
• Ceilings: Remove dust and cobwebs. Inspect and clean areas showing mildew or buildup.
• Windows and Blinds: Clean window blinds.
• Furniture: Deep clean furniture surfaces and remove buildup or stains.
• Kitchen: Deep clean kitchen surfaces and remove grease buildup. Clean inside cabinets and drawers.
• Appliances: Move all appliances as necessary to clean behind and beneath them.
• Bathroom: Scrub shower walls, floors, and fixtures to remove soap scum and buildup. Clean tile grout to remove buildup and mildew. Clean the interior of exhaust fans.
Upon completion of cleaning services, the unit shall be:
- Free of trash, debris, dust, and stains
- Clean and sanitized
- Ready for Unaccompanied Housing inspection and new resident occupancy
Note 1: The unit is expected to be vacant of all personal belongings and trash prior to the commencement of work. However, the Contractor shall be responsible for removing and properly disposing of any items remaining in the unit.
Note 2: The unit price for this ELIN shall include all the tasks including those listed in the A736. This price will not be an additional charge to the Standard Cleaning ELIN. 90 UN ¥ -
| 1503050 Grounds Maintenance and Landscaping | ||
| 38 | Grass Cutting (flat ground, less than one foot (30 cm) in height) - up to 10 SM | The Contractor shall provide all labor, materials and equipment to cut grass in designated areas, up to 10 square meters. Grass (inclusive of weeds and other invasive vegetation) shall be cut to a uniform height of 25 mm (1 inch). |
All clippings and debris shall be removed and properly disposed of.
| This work only applies to flat grounds where the grass does not exceed one foot (30 cm) in height. | 100 | EA | ¥ - | |
| 39 | Grass Cutting (flat ground, less than one foot (30 cm) in height) - up to 100 SM | The Contractor shall provide all labor, materials and equipment to cut grass in designated areas, up to 100 square meters. Grass (inclusive of weeds and other invasive vegetation) shall be cut to a uniform height of 25 mm (1 inch). |
All clippings and debris shall be removed and properly disposed of.
| This work only applies to flat grounds where the grass does not exceed one foot (30 cm) in height. | 50 | EA | ¥ - | |
| 40 | Grass Cutting (flat ground, less than three feet (91 cm) in height) - up to 10 SM | The Contractor shall provide all labor, materials and equipment to cut grass in designated areas, up to 10 square meters. Grass (inclusive of weeds and other invasive vegetation) shall be cut to a uniform height of 25 mm (1 inch). |
All clippings and debris shall be removed and properly disposed of.
| This work only applies to flat grounds where the grass does not exceed three feet (91 cm) in height. | 100 | EA | ¥ - | |
| 41 | Grass Cutting (flat ground, less than three feet (91 cm) in height) - up to 100 SM | The Contractor shall provide all labor, materials and equipment to cut grass in designated areas, up to 100 square meters. Grass (inclusive of weeds and other invasive vegetation) shall be cut to a uniform height of 25 mm (1 inch). |
All clippings and debris shall be removed and properly disposed of.
| This work only applies to flat grounds where the grass does not exceed three feet (91 cm) in height. | 50 | EA | ¥ - | |
| 42 | Grass Cutting (slope ground, less than three feet (91 cm) in height) - up to 10 SM | The Contractor shall provide all labor, materials and equipment to cut grass in designated areas, up to 10 square meters. Grass (inclusive of weeds and other invasive vegetation) shall be cut to a uniform height of 25 mm (1 inch). |
All clippings and debris shall be removed and properly disposed of.
| This work only applies to slope grounds where the grass does not exceed three feet (91 cm) in height. | 100 | EA | ¥ - | |
| 43 | Grass Cutting (slope ground, less than three feet (91 cm) in height) - up to 100 SM | The Contractor shall provide all labor, materials and equipment to cut grass in designated areas, up to 100 square meters. Grass (inclusive of weeds and other invasive vegetation) shall be cut to a uniform height of 25 mm (1 inch). |
All clippings and debris shall be removed and properly disposed of.
| This work only applies to slope grounds where the grass does not exceed three feet (91 cm) in height. | 50 | EA | ¥ - | |
| 44 | Grass Cutting (flat ground, less than five feet (152 cm) in height) - up to 10 SM | The Contractor shall provide all labor, materials and equipment to cut grass in designated areas, up to 10 square meters. Grass (inclusive of weeds and other invasive vegetation) shall be cut to a uniform height of 25 mm (1 inch). |
All clippings and debris shall be removed and properly disposed of.
| This work only applies to flat grounds where the grass does not exceed five feet (152 cm) in height. | 100 | EA | ¥ - | |
| 45 | Grass Cutting (flat ground, less than five feet (152 cm) in height) - up to 100 SM | The Contractor shall provide all labor, materials and equipment to cut grass in designated areas, up to 100 square meters. Grass (inclusive of weeds and other invasive vegetation) shall be cut to a uniform height of 25 mm (1 inch). |
All clippings and debris shall be removed and properly disposed of.
| This work only applies to flat grounds where the grass does not exceed five feet (152 cm) in height. | 50 | EA | ¥ - | |
| 46 | Grass Cutting (slope ground, less than five feet (152 cm) in height) - up to 10 SM | The Contractor shall provide all labor, materials and equipment to cut grass in designated areas, up to 10 square meters. Grass (inclusive of weeds and other invasive vegetation) shall be cut to a uniform height of 25 mm (1 inch). |
All clippings and debris shall be removed and properly disposed of.
| This work only applies to slope grounds where the grass does not exceed five feet (152 cm) in height. | 100 | EA | ¥ - | |
| 47 | Grass Cutting (slope ground, less than five feet (152 cm) in height) - up to 100 SM | The Contractor shall provide all labor, materials and equipment to cut grass in designated areas, up to 100 square meters. Grass (inclusive of weeds and other invasive vegetation) shall be cut to a uniform height of 25 mm (1 inch). |
All clippings and debris shall be removed and properly disposed of.
| This work only applies to slope grounds where the grass does not exceed five feet (152 cm) in height. | 50 | EA | ¥ - | |||
| 48 | Edging - up to 10 LM | The Contractor shall provide all labor, materials and equipment to edge where grass meets concrete surface and ensure the edging is uniform in appearance in designated areas up to 10 linear meters. All clippings and debris shall be removed and properly disposed of. | 100 | EA | ¥ - | |
| 49 | Edging - up to 100 LM | The Contractor shall provide all labor, materials and equipment to edge where grass meets concrete surface and ensure the edging is uniform in appearance in designated areas up to 100 linear meters. All clippings and debris shall be removed and properly disposed of. | 20 | EA | ¥ - | |
| 50 | Lawn Services - up to 10 SM | The Contractor shall provide all labor, materials and equipment to provide lawn services in designated areas, up to 10 square meters. Lawn services, including aeration, de-thatching, fertilization and overseeding shall be performed per Spec Item 3.1.1.3. | 50 | EA | ¥ - | |
| 51 | Lawn Services - up to 100 SM | The Contractor shall provide all labor, materials and equipment to provide lawn services in designated areas, up to 100 square meters. Lawn services, including aeration, de-thatching, fertilization and overseeding shall be performed per Spec Item 3.1.1.3. | 20 | EA | ¥ - |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .