Drawings - Structural - 1.pdf
PDF 1 MB Posted
- Solicitation number
- QSE--36C10F24R50025
About this file
This document contains structural drawings and specifications related to a federal contract opportunity for the renovation of Building 1 in Biloxi, Mississippi.
The key details are:
- The renovation involves selective demolition, exterior building envelope alterations, and interior renovation of areas within Building 1. Work will occur on the unoccupied 3rd, 4th, and 5th floors, as well as in the crawl spaces and attic. Upgrades include the HVAC, plumbing, electrical, telecommunication, and fire protection systems. There will also be limited structural, mechanical, and electrical work related to the underside of the 3rd floor structure within the occupied 2nd floor areas.
- The contract period of performance is 912 calendar days from receipt of Notice to Proceed. The project magnitude is between $50 million and $100 million.
- The contractor will be responsible for monitoring the existing Building 1 foundation system through a separate, qualified consultant throughout the duration of the project.
- Wage Rate Requirements (Construction) apply.
View the file
Other files
Show 40 more
Latest 50 of 64 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THE STRUCTURAL PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE REQUIREMENTS OF THE
INTERNATIONAL BUILDING CODE 2012 EDITION.
2. THE STRUCTURAL DOCUMENTS ARE TO BE USED IN CONJUNCTION WITH THE ARCHITECTURAL DOCUMENTS.
3. USE THESE NOTES IN CONJUNCTION WITH THE SPECIFICATIONS. IF A CONFLICT EXISTS, THE MORE STRINGENT
REQUIREMENT GOVERNS.
4. REVIEW ALL CONTRACT DOCUMENTS, DIMENSIONS AND SITE CONDITIONS AND COORDINATE WITH FIELD DIMENSIONS AND PROJECT SHOP DRAWINGS PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES IN WRITING TO THE VA RESIDENT ENGINEER AND STRUCTURAL ENGINEER OF RECORD (SEOR). DO NOT CHANGE SIZE OR DIMENSIONS OF STRUCTURAL MEMBERS WITHOUT THE WRITTEN INSTRUCTION FROM
THE VA RESIDENT ENGINEER AND SEOR.
5. PROTECT EXISTING FACILITIES, STRUCTURES AND UTILITY LINES FROM ALL DAMAGE. EACH CONTRACTOR SHALL PROTECT HIS WORK, ADJACENT PROPERTY AND THE PUBLIC. EACH CONTRACTOR IS SOLELY RESPONSIBLE FOR
DAMAGE OR INJURY DUE TO HIS ACT OR NEGLECT.
6. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SAFETY AND CONSTRUCTION PROCEDURES.
7. DO NOT SCALE DRAWINGS; USE DIMENSIONS.
8. REFER TO ARCHITECTURAL AND MECHANICAL DRAWINGS FOR SIZE AND LOCATION OF OPENINGS IN STRUCTURE
NOT SHOWN ON STRUCTURAL DRAWINGS.
9. DETAILS LABELED “TYPICAL DETAILS” ON THE DRAWINGS APPLY TO ALL SITUATIONS THAT APPLY WHETHER OR NOT THEY ARE KEYED IN AT EACH LOCATION. QUESTIONS REGARDING APPLICABILITY OF TYPICAL DETAILS SHALL BE RESOLVED BY THE VA RESIDENT ENGINEER AND STRUCTURAL ENGINEER OF RECORD (SEOR).
10. DESIGN LOADS AND CRITERIA:
A. ROOF LIVE LOAD 20 PSF
B. ROOF DEAD LOAD 15 PSF
C. LOBBIES 100 PSF
D. RESEARCH AND EDUCATION 100 PSF
E. ADMINISTRATIVE SERVICES 50 PSF
F. CLINICAL AND SUPPORT SERVICES 60 PSF
G. WARD ROOMS 60 PSF
H. FILE ROOMS 125 PSF
I. CORRIDORS IN WARDS 60 PSF
J. CORRIDORS, ALL OTHERS 100 PSF
K. MECHANICAL ROOM 150 PSF
L. PARTITIONS 15 PSF
M. WIND DESIGN CRITERIA (ASCE 7-10)
a. WIND SPEED (ULTIMATE) 175 MPH
b. WIND SPEED (NOMINAL) 136 MPH
c. EXPOSURE CATEGORY D
d. RISK CATEGORY IV
e. ENCLOSURE CLASSIFICATION ENCLOSED BUILDING
f. INTERNAL PRESSURE COEFFICIENT±0.18
N. SEISMIC DESIGN CRITERIA
a. SEISMIC IMPORTANCE FACTOR (I) 1.50
b. RISK CATEGORY IV
c. SITE CLASS D
d. SEISMIC DESIGN CATEGORY C
e. SEISMIC FORCE RESISTING SYSTEM EXISTING ORDINARY CONCRETE FRAME WITH
SEISMICALLY UPGRADED STEEL BRACED FRAMES
f. ANALYSIS PROCEDURE EQUIVALENT LATERAL FORCE
g. MAPPED SPECTRAL RESPONSE ACCELERATIONS
Ss 0.103 g S1 0.057 g
h. DESIGN BASE SHEAR 0.055 W
i. RESPONSE MODIFICATION COEFFICIENT
GENERAL NOTES
Sds 0.110 g Sd1 0.090 g
1. ALL STEEL WORK (INCLUDING FABRICATION AND ERECTION) SHALL
CONFORM TO THE AISC MANUAL OF STEEL CONSTRUCTION 14TH
EDITION AND PROJECT SPECIFICATIONS, USE THE FOLLOWING:
A. ROLLED WIDE-FLANGE SHAPES, ASTM A992, GRADE 50.
B. PLATES BARS A36.
C. COLD-FORMED STEEL TUBING: ASTM A500, GRADE B.
D. HOT-FORMED STEEL TUBING: ASTM A501.
E. STEEL PIPE: ASTM A53, TYPE E OR S, GRADE B.
2. USE STRUCTURAL STEEL THAT IS FULLY WELDABLE WITHIN GRADES
AND FROM ANY GRADE TO ANY OTHER GRADE. WELD ALL SHOP
CONNECTIONS, U.N.O.
3. ALL SHOP AND FIELD WELDING SHALL CONFORM TO THE
STRUCTURAL WELDING CODE AWS D1.1, LATEST EDITION,
PUBLISHED BY THE AMERICAN WELDING SOCIETY (AWS). USE
ELECTRODES CONFORMING TO AWS D1.1, E70 SERIES, U.N.O.
SHOW ALL SHOP WELDS ON THE FABRICATION DRAWINGS AND ALL
FIELD WELDS ON THE ERECTION DRAWINGS.
4. ALL SHOP AND FIELD WELDERS, WELDING OPERATORS, AND
TACKERS SHALL BE CERTIFIED ACCORDING TO AWS PROCEDURES
FOR THE WELDING PROCESS AND WELDING POSITION USED.
5. ALL JOINT WELDING PROCEDURES TO BE USED SHALL BE
PREPARED BY THE FABRICATOR OR CONTRACTOR AS WRITTEN
PROCEDURE SPECIFICATIONS AND SUBMITTED TO THE VA RESIDENT
ENGINEER AND STRUCTURAL ENGINEER OF RECORD (SEOR) FOR THEIR
RECORD. ALL JOINT WELDING PROCEDURES SHALL BE QUALIFIED PRIOR
TO USE ACCORDING TO AWS PROCEDURES.
6. A325 BOLTS:
A. A325 BOLTS SHALL CONFORM TO ASTM A 325 TYPE 1, HIGH
STRENGTH BOLTS FOR STRUCTURAL STEEL JOINTS. DO NOT
USE TYPE 2 BOLTS.
B. PROVIDE HARDENED WASHERS CONFORMING TO ASTM F 436.
PLACE HARDENED WASHERS UNDER PART BEING TURNED.
C. LOAD INDICATOR WASHERS SHALL BE USED ON ALL A325 BOLTS.
D. ALL BOLTS SHALL BE NEW AND DOMESTICALLY MANUFACTURED.
DO NOT REUSE BOLTS. USE ONLY NON-GALVANIZED
NUTS AND BOLTS THAT ARE CLEAN, RUST-FREE, AND WELL
LUBRICATED. BOLTS AND NUTS SHALL BE WAX DIPPED BY THE
BOLT SUPPLIER OR LUBRICATED WITH JOHNSON'S STICK WAX 140.
7. CUT, DRILL, OR PUNCH HOLES PERPENDICULAR TO METAL SURFACES.
DO NOT FLAME CUT HOLES OR ENLARGE HOLES BY BURNING.
8. SPLICING OF STRUCTURAL STEEL MEMBERS IN THE FIELD OR IN THE
SHOP IS PROHIBITED EXCEPT WHERE INDICATED ON THE DRAWINGS.
9. DO NOT PAINT STEEL SURFACES IN CONTACT WITH CONCRETE. DO
NOT APPLY FINISH COAT AND LIMIT PRIME COAT TO 2 MILS AT
FAYING SURFACES OF SLIP CRITICAL BOLTED CONNECTIONS,
SURFACES TO BE WELDED AND TOP SURFACES OF BEAMS AND
TRUSSES TO RECEIVE STEEL STUDS AND/OR SUPPORTING METAL
FLOOR AND ROOF DECKING. USE PRIMER WHICH HAS A MIN. CLASS
A SLIP COEFFICIENT (0.33).
10. REFER TO SPECIFICATIONS FOR PAINTING OF STRUCTURAL STEEL
11. SUBMIT STRUCTURAL STEEL SHOP DRAWINGS TO CONTRACTOR AND
THE VA RESIDENT ENGINEER AND STRUCTURAL ENGINEER OF
RECORD (SEOR) FOR REVIEW BEFORE FABRICATION.
12. PROVIDE TEMPORARY BRACING OR SHORING AS NECESSARY TO INSURE A
STABLE STRUCTURE DURING CONSTRUCTION. CONSTRUCTION BRACING AND
SHORING TO BE DESIGNED AND SUPPLIED BY CONTRACTOR.
13. DO NOT REPRODUCE THE STRUCTURAL DRAWINGS FOR USE AS SHOP
DRAWINGS.
14. NO CUTTING OF SECTIONS, FLANGES, WEBS OR ANGLES SHALL BE
ALLOWED WITHOUT WRITTEN APPROVAL FROM THE RESIDENT ENGINEER.
15. ALL EXPOSED STEEL MEMBERS & CONNECTIONS SHALL BE HOT DIP
GALVANIZED PRIOR TO FABRICATION. ALL CONNECTIONS SHALL BE PRE
DRILLED AND/OR WELDED PRIOR TO HOT DIP GALVANIZING.
STRUCTURAL STEEL
2. FOLLOW MANUFACTURER'S SPECIFICATIONS FOR USE AND INSTALLATION.
3. INSTALL AND MAINTAIN A MINIMUM EMBEDMENT IN ACCORDANCE WITH
MANUFACTURER'S SPECIFICATIONS, OR AS SPECIFIED ON DRAWINGS.
4. DIAMETER OF HOLE SHALL BE AS RECOMMENDED BY MANUFACTURER FOR
THE PARTICULAR PRODUCT SPECIFIED ON DRAWINGS.
5. UNLESS NOTED, ANCHOR SPACING AND ANCHOR EDGE DISTANCE SHALL
BE ACCORDING TO THE MANUFACTURER'S MOST CURRENT PUBLICATION
IN ORDER TO DEVELOP MAXIMUM WORKING LOADS.
1. USE MECHANICAL EXPANSION ANCHORS, SCREW ANCHORS, OR
EPOXY/POLYESTER RESIN ADHESIVE ANCHORS AS INDICATED ON THE
DRAWINGS. ADHESIVE ANCHORS SHALL BE HILTI HIT HY-200 OR APPROVED
EQUIVALENT. CONCRETE OR MASONRY SCREW ANCHORS SHALL BE SIMPSON
STRONG-TIE TITEN HD HEAVY-DUTY SCREWS, OR APPROVED EQUIVALENT.
6. DO NOT EXCEED MANUFACTURER'S MAX. RECOMMENDED TIGHTENING
TORQUE.
7. ALL ANCHORS SHALL BE INSTALLED AS PER MANUFACTURER'S
RECOMMENDATIONS AND UNDER MANUFACTURER'S SUPERVISION IN ORDER
TO DEVELOP THE MOST CURRENT PUBLISHED WORKING LOADS.
8. ALL EPOXIED ANCHORING SHALL BE TESTED AFTER INSTALLATION AT
CONTRACTOR'S EXPENSE. A MINIMUM OF 10% OF EACH DAY'S APPLICATION
AND NO LESS THAN 2 SHALL BE TESTED BY APPLYING A TENSION LOAD OF
1000 POUNDS TO THE EMBEDDED ANCHOR. IF A TEST APPLICATION FAILS, ALL
APPLICATIONS FOR THAT DAY SHALL BE TESTED. TESTING PROCEDURES AND
RESULTS SHALL BE SUBMITTED AND APPROVED BY THE VA RESIDENT ENGINEER
AND STRUCTURAL ENGINEER OF RECORD (SEOR). UPON REPAIR, RE-TEST FAILED
ANCHOR LOCATIONS.
ANCHORING SYSTEMS
9. WHEN DRILLING FOR NEW ANCHORS, DO NOT CUT EXISTING REINFORCEMENT.
EXISTING REINFORCEMENT MAY BE LOCATED USING ONE OF THE FOLLOWING
METHODS:
A. X-RAY SCANS.
B. DRILL SMALL PILOT HOLES NO LARGER THAN 1/8"Ø.
10. IF EXISTING REINFORCEMENT IS ENCOUNTERED, CEASE DRILLING IMMEDIATELY.
FILL HOLE WITH EPOXY GROUT AND SHIFT DRILL BIT AWAY FROM REINFORCEMENT
A MINIMUM OF 2". MODIFY THE CONNECTING STEEL PLATE OR MEMBER AS
REQUIRED FOR THE RELOCATED HOLE.
1. USE STRUCTURAL CONCRETE AND CONCRETING PRACTICES CONFORMING
TO ACI-301, ACI-318, AND PROPORTION CONCRETE IN ACCORDANCE WITH
ACI-318 CH. 4 AND MEETING A MINIMUM ULTIMATE COMPRESSIVE STRENGTH
IN 28 DAYS AS FOLLOWS:
-ALL CONCRETE 4000 PSI
PROVIDE CURRENT (MAX 1 YEAR OLD) STATISTICAL DATA FOR EACH
CONCRETE MIX DESIGN SUBMITTED.
2. FOR TYPICAL APPLICATIONS, SLABS AND BEAMS PROVIDE 4" SLUMP WITH A
TOLERANCE OF ±1".
3. WHERE CONCENTRATION OF REINFORCING STEEL HINDERS PROPER
CONSOLIDATION OF CONCRETE USE CONCRETE CONTAINING A
SUPERPLASTICIZING (H.R.W.R.) ADMIXTURE, ASTM C494 TYPE F. SLUMP
AFTER ADDITION OF SUPERPLASTICIZER SHALL BE 9"±1".
4. IF CONCRETE IS PUMPED, SLUMP MAY BE INCREASED TO 6" AT THE TRUCK,
PROVIDED THE SLUMP SPECIFIED IN NOTE 2 IS MAINTAINED AT THE
DISCHARGE END.USE A MINIMUM 4- INCH PUMP, UNLESS PRE-APPROVED BY
THE VA RESIDENT ENGINEER AND STRUCTURAL ENGINEER OF RECORD
(SEOR). TAKE CONCRETE SAMPLES FOR SLUMP AT TRUCK AND AT
DISCHARGE END.
5. USE ASTM A-615 GR. 60 FOR ALL REINFORCING STEEL, CONFORM TO ACI-301,
ACI-315, ACI-318, AND CRSI "MANUAL OF STANDARD PRACTICE:. ALL
REINFORCING SHALL BE ACCURATELY PLACED, RIGIDLY SUPPORTED AND
FIRMLY TIED IN PLACE WITH BAR SUPPORTS AND SPACERS IN ACCORDANCE
WITH THE ABOVE REQUIREMENTS.
6. USE PLAIN, COLD-DRAWN, ELECTRICALLY WELDED, STEEL WIRE FABRIC
CONFORMING TO ASTM A-185. SUPPLY IN FLAT SHEETS ONLY. LAP SPLICES
SHALL BE MEASURED BETWEEN OUTERMOST CROSS WIRES OF EACH FABRIC
SHEET AND SHALL BE NOT LESS THAN TWICE THE SPACING OF THE CROSS
WIRES PLUS TWO (2) INCHES
REINFORCED CONCRETE
1. USE 9/16” DEEP GAGE 22 METAL DECK CONFORMING TO ASTM A653 WITH A MINIMUM
YIELD STRENGTH OF 33 KSI WITH PROTECTIVE COATING CONFORMING TO ASTM A-653 G90.
a. Sp = 0.070 in3/FT
b. Sn = 0.070 in3/FT
c. Ip = 0.024 in4/FT
d. In = 0.024 in4/FT
2. DESIGN AND MANUFACTURE THE DECK IN ACCORDANCE WITH THE
"SPECIFICATIONS FOR DESIGN OF LIGHT-GAUGE COLD-FORMED
STEEL STRUCTURAL MEMBERS", AND CONFORM TO THE STEEL
DECK INSTITUTE'S RECOMMENDED SPECIFICATIONS.
3. ERECT AND ANCHOR DECK UNITS IN ACCORDANCE WITH THE
MANUFACTURER'S SPECIFICATIONS AND ERECTION DRAWINGS.
UNLESS MORE STRINGENT REQUIREMENTS ARE GIVEN ON PLANS
OR DETAILS, ATTACH DECK TO SUPPORTS WITH A MINIMUM OF #10
SCREWS AT EACH SUPPORT, SUCH THAT THE AVERAGE
ATTACHMENT SPACING DOES NOT EXCEED 12" O.C. ATTACH SIDE
LAPS WITH #10 SCREWS AT 12" O.C. MAXIMUM.
4. USE MINIMUM 2" THICK REGULAR WEIGHT CONCRETE SLAB ABOVE
TOP OF DECK. MINIMUM COMPRESSIVE STRENGTH OF CONCRETE
IS 4000 PSI AT 28 DAYS, TYP U.N.O.
5. REINFORCE SLAB WITH 6x6 - W2.1xW2.1 PLACED MID-DEPTH
OF SLAB.
NON - COMPOSITE FLOOR DECK
3 3 3 3
3 3
3 3
3 3 3 3
3 3
1 1 1 1
1 1
2 2
2 2
2 2
2 2
1 12 2 2
2 2
2 2
1 1
2 2
NEGATIVE ZONE 1
AREA
-98 -92
10 SF 50 SF
WIND PRESSURE DIAGRAM
CLADDING PRESSURES ROOF
-171 -139 -89 -126
100 SF
NEGATIVE ZONE 2
-253 -215 -199NEGATIVE ZONE 3
62 49 44ALL POSITIVE ZONES
AREA
-98 -89
10 SF 100 SF
CLADDING PRESSURES WALLS
-180 -144 -80
-107
500 SF
98 85 71ALL POSITIVE ZONES
NEGATIVE ZONE 4
NEGATIVE ZONE 5
BASE PRESSURE = 91 PSF
PRESSURES ARE ULTIMATE
OVERHANG SOFFIT PRESSURE EQUALS ADJACENT WALL PRESSURE
(WHICH INCLUDES INTERNAL PRESSURE OF 16.4 PSF)
OVERHANG ZONE 2
OVERHANG ZONE 3
-200 -200 -200 -337 -261 -228
1. DO NOT CUT EXISTING STRUCTURAL MEMBERS UNLESS SPECIFICALLY
DETAILED IN THE CONTRACT DOCUMENTS OR UNLESS APPROVED BY
THE VA RESIDENT ENGINEER AND STRUCTURAL ENGINEER OF RECORD
(SEOR).
2. NEW OPENINGS LARGER THAN 12” SHOULD BE COORDINATED AND
APPROVED BY THE VA RESIDENT ENGINEER AND STRUCTURAL
ENGINEER OF RECORD (SEOR).
3. MULTIPLE SMALL HOLES IN CLUSTER WITH TOTAL AREA GREATER
THAN ONE SQUARE FOOT SHOULD BE COORDINATED AND APPROVED
BY THE VA RESIDENT ENGINEER AND STRUCTURAL ENGINEER OF
RECORD (SEOR).
4. NO CUTTING OR CORING OF BEAMS IS ALLOWED.
5. AVOID CUTTING OF JOISTS WHERE POSSIBLE.
6. LOCATE/MARK HOLES AND NOTIFY THE VA RESIDENT ENGINEER AND
STRUCTURAL ENGINEER OF RECORD (SEOR) PRIOR TO CUTTING HOLES.
7. WHERE EXISTING JOISTS ARE CUT, JOISTS SHOULD BE REPAIRED AS
DETAILED ON THE REPAIR DETAIL SHEETS.
8. WHERE EXISTING SLABS ARE CUT, SLABS SHOULD BE REPAIRED AS
DETAILED ON THE REPAIR DETAIL SHEETS.
9. SLAB INFILL FOR OPENINGS GREATER THAN 12” SHALL BE
ACCOMPLISHED UTILIZING SLAB ON METAL DECK. SEE REPAIR DETAIL
SHEETS.
RENOVATION NOTES
1. THIS "STATEMENT OF SPECIAL INSPECTIONS" HAS BEEN PREPARED IN ACCORDANCE WITH IBC
2012, SECTION 1704.
2. CONTRACTOR SHALL EMPLOY ONE OR MORE PRE-COORDINATED AND GOVERNMENT-APPROVED
SPECIAL INSPECTORS TO PROVIDE SPECIAL INSPECTIONS DURING CONSTRUCTION.
3. SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO DEMONSTRATES COMPETENCE, TO
THE SATISFACTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE, FOR INSPECTION OF THE
PARTICULAR TYPE OF CONSTRUCTION OR OPERATION REQUIRING SPECIAL INSPECTION.
A. SPECIAL INSPECTIONS, FOR THIS CONTRACT, ARE NOT REQUIRED FOR THE MAIN
WIND FORCE RESISTING SYSTEMS.
4. SPECIAL INSPECTION AGENCY SHALL SUBMIT INSPECTION REPORTS DURING CONSTRUCTION FOR VERIFICATION, INCLUDING FINAL REPORTS IN ACCORDANCE WITH SECTION 1704.2.4 OF IBC 2012.
5. SPECIAL INSPECTOR SHALL USE THE LATEST ISSUE OF THE STRUCTURAL DRAWINGS FOR THE
INSPECTION OF THIS STRUCTURE. SHOP FABRICATION DRAWINGS SHALL NOT BE USED FOR
INSPECTION PURPOSES.
6. THESE INSPECTIONS DO NOT RELAX THE REQUIREMENTS OF IBC 2012 AND OTHER REQUIREMENTS
INCLUDED IN DIVISION 1 SPECIFICATIONS AND GENERAL CONDITIONS.
7. THE CONTRACTOR SHALL PROVIDE A STATEMENT OF RESPONSIBILITY PER IBC 2012 SECTION 1704.4.
STATEMENT OF SPECIAL INSPECTIONS
FLOOR COLUMNS
Fy (KSI) F'c (KSI) F'c (KSI)
ATTIC
LEVEL 5
LEVEL 4
LEVEL 3
33 2.0 2.0
60 2.5 2.0
60 3.6 3.2
60 2.7
MATERIAL STRENGTHS OF EXISTING CONCRETE AND
REINFORCEMENT ASSUMED FOR RENOVATION:
3.5
LEVEL 2 60 2.0 2.0
LEVEL 1 60 2.0 2.0
11.
SPECIAL INSPECTIONS FOR FRP
DURING THE INSTALLATION OF THE FRP SYSTEM,
DAILY INSPECTION WILL BE CONDUCTED AND WILL
INCLUDE:
CONTINUOUS PERIODIC
AMBIENT TEMPERATURE, RELATIVE HUMIDITY, AND
GENERAL WEATHER OBSERVATION X-
SURFACE TEMPERATURE OF CONCRETE X-
SURFACE DRYNESS PER ACI 503.4 X-
SURFACE PREPARATION METHODS AND RESULTING
PROFILE USING THE ICRI - SURFACE - PROFILE -
CHIPS
X-
QUALITY DESCRIPTION OF SURFACE CLEANLINESS X-
TYPE OF AUXILIARY HEAT SOURCE, IF APPLICABLE X-
WIDTH OF CRACKS NOT INJECTED WITH EPOXY X-
FIBER OR PRECURED LAMINATE BATCH NUMBER(S)
AND APPROXIMATE LOCATION IN STRUCTURE X-
BATCH NUMBERS, MIXTURE RATIOS, MIXING TIMES,
AND QUALITATIVE DESCRIPTIONS OF THE
APPEARANCE OF ALL MIXED RESINS, INCLUDING
PRIMERS, PUTTIES, SATURANTS, ADHESIVES, AND
COATINGS MIXED FOR THE DAY
X-
OBSERVATIONS OF PROGRESS OF CURE OF RESINS X-
CONFORMANCE WITH INSTALLATION PROCEDURES -X
PULL - OFF TEST RESULTS: BOND STRENGTH,
FAILURE MODE, AND LOCATION -X
FRP PROPERTIES FROM TESTS OF FIELD SAMPLE
PANELS OR WITNESS PANELS, IF REQUIRED X-
LOCATION AND SIZE OF ANY DELAMINATIONS OR
AIR VOIDS -X
GENERAL PROGRESS OF WORK -X
"a"
5 5 5
WIND LOAD ZONE WALL DIAGRAM
"a" = 7'-2"
2 1
WOOD
1. WOOD SPECIES SHALL BE SOUTHERN PINE #2 WITH THE FOLLOWING MINIMUM
PROPERTIES:
Fb = 1200 PSI Fv = 90 PSI E = 1.6x10^6 PSI
1. PROVIDE LINTELS OVER ALL OPENINGS AND RECESSES IN MASONRY
CONSTRUCTION.
2. THE STRUCTURAL DOCUMENTS REFLECT THE BEST ATTEMPT TO IDENTIFY
ALL WALL PENETRATIONS IN THE EXISTING AND NEW CONSTRUCTION.
PENETRATIONS NOT IDENTIFIED ON THE DOCUMENTS ARE TO BE TREATED IN
A MANNER SIMILAR TO THE IDENTIFIED LOCATIONS. LINTELS IN NON-BEARING
MASONRY WALL OPENINGS CAN BE SIZED IN ACCORDANCE WITH THE NOTE
BELOW. LINTELS ARE NOT REQUIRED OVER OPENINGS THAT ARE 12" WIDE
OR LESS AND AT LEAST 1 COURSE BELOW THE TOP OF THE WALL.
3. ALL LINTELS SHALL HAVE A MINIMUM OF 8" END BEARING.
4. ALL LINTELS IN EXTERIOR WALL CONSTRUCTION SHALL BE HOT-DIP
GALVANIZED, UNO.
5. FOR ALL OPENINGS NOT OTHERWISE DETAILED OR SCHEDULED, MINIMUM
LINTELS SHALL BE:
MASONRY LINTELS
0 TO 2'-0"
SPAN
5/16" PLATE
(3/4" LESS THAN THE WALL WIDTH)
STEEL OPTION (FOR
EACH 4-INCH OF
MASONRY WIDTH)
2'-0" TO 4'-0" L3 1/2x3 1/2x1/4 4'-0" TO 6'-0" L4x3 1/2x5/16 (LLV) 6'-0" TO 8'-0" L5x3 1/2x5/16 (LLV)
8'-0" TO 10'-0" L6x3 1/2x3/8 (LLV)
ALL ANGLES THAT ARE BACK TO BACK SHALL BE WELDED TOP AND BOTTOM
3" AT 12" MINIMUM.
STRUCTURAL NOTES
S001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATE BUILDING 1
03/10/2023 MLA WHLRevisions: Date:
BID DOCUMENTS
520-317X
Dwg. of
BILOXI, MISSISSIPPI
15090
710/27/2023
SPECIAL INSPECTIONS FOR STRUCTURAL STEEL
SPECIAL INSPECTION OF STRUCTURAL STEEL SHALL
BE IN ACCORDANCE WITH THE QUALITY ASSURANCE
INSPECTION REQUIREMENTS OF IBC 1705.2 AND
AISC 360.
CONTINUOUS PERIODIC
-X
MANUFACTURER CERTIFICATIONS FOR WELDING
CONSUMABLES AVAILABLE -X
WELDER IDENTIFICATION SYSTEM X-
CONFIGURATION AND FINISH OF ACCESS HOLES X-
MANUFACTURER'S CERTIFICATE FOR FASTENER
MATERIALS
X-FASTENERS MARKED IN ACCORDANCE WITH ASTM
REQUIREMENTS
X-
FASTENER ASSEMBLIES OF SUITABLE CONDITION
ARE POSITIONED AS REQUIRED.
X-
DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED
CONNECTIONS
X-
OTHER STEEL INSPECTIONS:
MATERIAL IDENTIFICATION (TYPE AND GRADE) X
FIT UP OF WELDS INCLUDING GEOMETRY X
CHECK WELDING EQUIPMENT - X
PROPER BOLTING PROCEDURE FOR JOINT DETAIL
- X
- X
CONNECTING ELEMENTS, INCLUDING APPROPRIATE
FAYING SURFACE CONDITION AND HOLE
PREPARATION, IF SPECIFIED, MEET APPLICABLE
REQUIREMENTS
CONTROL AND HANDLING OF WELD CONSUMABLES
USE OF QUALIFIED WELDERS
WPS FOLLOWED
- X
- X
- XWELDS CLEANED
X -SIZE, LENGTH AND LOCATION OF WELDS
X -WELDS MEET VISUAL ACCEPTANCE CRITERIA
X -REPAIR ACTIVITIES
X -DOCUMENT ACCEPTANCE OR REJECTION OF
WELDED JOINT OR MEMBER
X -
BOLTING:
PROPER FASTENERS SELECTED FOR THE JOINT
- X
WELDING:
WELDING PROCEDURE SPECIFICATIONS (WPS)
AVAILABLE
FASTENER ASSEMBLIES OF SUITABLE CONDITIONS,
PLACED IN ALL HOLES AND WASHERS ARE
POSITIONED AS REQUIRED
- X
- X
JOINT BROUGHT TO SNUG-TIGHT CONDITION PRIOR
TO PRETENSIONING
FASTENER COMPONENT NOT TURNED BY THE
WRENCH PREVENTED FROM ROTATING
-X
X-VERIFY COMPLIANCE OF FABRICATED STEEL WITH
THE DETAILS ON APPROVED SHOP DRAWINGS
VERIFY COMPLIANCE OF ERECTED STEEL WITH
THE DETAILS ON APPROVED ERECTION DRAWINGS
X-
PERIODIC INSPECTION TO OCCUR A MINIMUM OF ONCE DAILY.
SPECIAL INSPECTIONS FOR
CONCRETE CONSTRUCTION
IBC 1705.3 CONTINUOUS PERIODIC
INSPECT REINFORCING STEEL AND PLACEMENT
X-
INSPECTION OF ANCHORS POST- INSTALLED IN
HARDENED CONCRETE -X
VERIFY USE OF APPROVED DESIGN MIX X-
INSPECT CONCRETE PLACEMENT FOR PROPER
APPLICATION TECHNIQUE -X
INSPECT FOR MAINTENANCE OF SPECIFIED CURING
TEMPERATURE AND TECHNIQUES X-
INSPECTION OF REINFORCING STEEL WELDING IN
ACCORDANCE WITH STEEL CONSTRUCTION
PERFORM SLUMP AND AIR CONTENT TESTS, AND
DETERMINE THE TEMPERATURE OF CONCRETE -X
INSPECTION OF FORMWORK FOR SHAPE, LOCATION,
DIMENSIONS OF THE CONCRETE MEMBER BEING
FORMED
- X
X-
PERIODIC INSPECTION TO OCCUR A MINIMUM OF ONCE DAILY.
1. THE FOLLOWING REQUIREMENTS IN NO WAY REDUCE OR LIMIT ANY ADDITIONAL
REQUIREMENTS OF SPECIFICATIONS.
2. REVIEW OF SUBMITTALS BY THE STRUCTURAL ENGINEER IS FOR GENERAL CONFORMANCE
WITH THE DESIGN CONCEPT AS PRESENTED BY THE CONTRACT DOCUMENTS. NO DETAILED
CHECK OF QUANTITIES OR DIMENSIONS WILL BE MADE. ONLY THOSE SHOP DRAWINGS
REQUIRED BY THE CONTRACT DOCUMENTS TO BE SUBMITTED WILL BE REVIEWED. ALL
OTHERS WILL BE RETURNED WITHOUT COMMENT.
3. IN ACCORDANCE WITH THE SPECIFICATIONS SUBMIT A COPY OF THE SHOP DRAWING
SUBMITTAL REGISTER TO THE STRUCTURAL ENGINEER, SHOWING DATES OF SUBMITTAL FOR
EACH SPECIFIC STRUCTURAL SECTION OF THE WORK, CONSISTENT WITH THE FOLLOWING
CRITERIA:
ALLOW ADEQUATE TIME FOR TRANSIT AND PROCESSING BEFORE FABRICATION. THE
STRUCTURAL ENGINEER WILL REVIEW AN AVERAGE SUBMITTAL WITHIN 10 WORKING DAYS OF
RECEIPT.
SCHEDULE AND SUBMIT SHOP DRAWINGS FOR SPECIFIC COMPONENTS SUCH AS FRP AND
STRUCTURAL STEEL.
SUBMIT SHOP DRAWINGS IN A TIMELY MANNER, CONSISTENT WITH THE ABOVE
REQUIREMENTS.
4. ALL CHANGES AND ADDITIONS MADE ON RESUBMITTALS MUST BE CLEARLY FLAGGED AND
NOTED. THE PURPOSE OF THE RESUBMITTALS MUST BE CLEARLY NOTED ON THE LETTER OF
TRANSMITTAL. ARCHITECT/ENGINEER REVIEW WILL BE LIMITED TO THE ITEMS CAUSING THE
RESUBMITTAL.
5. RESPONSIBILITIES OF DETAILERS AND FABRICATORS AND VENDORS:
GENERAL- SUBMIT SHOP DRAWINGS AND ANY OTHER SPECIAL INFORMATION NECESSARY
FOR PROPER FABRICATION, ERECTION, AND PLACEMENT OF STRUCTURAL FABRICATIONS.
INCLUDE PLANS, ELEVATIONS, AND SECTIONS. CLEARLY SHOW ANCHORAGES,
CONNECTIONS, AND ACCESSORY ITEMS. THE DETAILER MUST INTERPRET THE CONTRACT
DOCUMENTS AND CLEARLY CONVEY THIS INTERPRETATION TO THE FIELD IN THE FORM OF
PLACING OR ERECTION DRAWINGS
FRP REINFORCING DETAILER- PROVIDE PLACING DRAWINGS FOR FABRICATION AND PLACING
OF REINFORCING THESE DRAWINGS SHALL INCLUDE, BUT ARE NOT LIMITED TO THE
FOLLOWING: MATERIALS, SCHEDULES, DETAILS, PLACING DETAILS, PLACING PLANS, AND
PLACING ELEVATIONS.
6. SEE SECTION TITLED "SHOP DRAWINGS REQUIRING INPUT BY A SPECIALTY ENGINEER" FOR
ADDITIONAL CRITERIA APPLICABLE TO SHOP DRAWINGS.
1. FRP AND OTHER ACCESSORIES TO COMPRISE A COMPLETE SYSTEM SHALL BE
DESIGNED AND PROVIDED BY THE VENDOR
2. CONNECTIONS OF THE FRP STRENGTHENING SYSTEMS TO THE STRUCTURE
SHALL BE DESIGNED AND PROVIDED BY THE VENDOR
3. SUBMIT DESIGN CALCULATIONS AND DRAWINGS STAMPED BY A REGISTERED
PROFESSIONAL ENGINEER.
4. FOR MINIMUM FRP REINFORCEMENT FABRIC REQUIREMENTS, SEE SPECIFICATION
03 56 00.
5. FRP SHALL BE DESIGNED IN ACCORDANCE WITH ACI 440.2R-08.
5. SHOP DRAWINGS AND CALCULATIONS MUST BE PREPARED UNDER THE DIRECT
SUPERVISION AND CONTROL OF THE SPECIALTY ENGINEER.
6. SHOP DRAWINGS AND CALCULATIONS REQUIRE THE SEAL, DATE AND SIGNATURE OF
THE SPECIALTY ENGINEER. COMPUTER PRINTOUTS ARE AN ACCEPTABLE SUBSTITUTE
FOR MANUAL COMPUTATIONS PROVIDED THEY ARE ACCOMPANIED BY SUFFICIENT
DESCRIPTIVE INFORMATION TO PERMIT THEIR PROPER EVALUATION. SUCH
DESCRIPTIVE INFORMATION SHALL BEAR THE SEAL AND SIGNATURE OF THE SPECIALTY
ENGINEER AS AN INDICATION THAT HE HAS ACCEPTED RESPONSIBILITY FOR THE
RESULTS.
7. REVIEW BY THE STRUCTURAL ENGINEER OF SUBMITTALS LIMITED TO VERIFYING THE
FOLLOWING:
THAT THE SPECIALTY ENGINEER HAS UNDERSTOOD THE DESIGN INTENT AND HAS USED
THE SPECIFIED STRUCTURAL CRITERIA. (NO DETAILED CHECK OF CALCULATIONS WILL
BE MADE.)
THAT THE CONFIGURATION SET FORTH IN THE STRUCTURAL SUBMITTALS IS
CONSISTENT WITH THE CONTRACT DOCUMENTS. (NO DETAILED CHECK OF DIMENSIONS
OR QUANTITIES WILL BE MADE.)
1. SPECIALTY ENGINEER:
DEFINITION - A REGISTERED PROFESSIONAL ENGINEER WHO SPECIALIZES IN AND WHO
UNDERTAKES THE DESIGN OF STRUCTURAL COMPONENTS OR STRUCTURAL SYSTEMS
INCLUDED IN A SPECIFIC SUBMITTAL PREPARED FOR THIS PROJECT.
SHALL BE:
AN EMPLOYEE OR OFFICER OF A FABRICATOR VENDOR.
AN EMPLOYEE OR OFFICER OF AN ENTITY SUPPLYING COMPONENTS TO A VENDOR.
AN INDEPENDENT CONSULTANT RETAINED BY THE FABRICATOR OR HIS SUPPLIER.
2. THE FOLLOWING SYSTEMS AND COMPONENTS AS A MINIMUM REQUIRE FABRICATION
AND INSTALLATION DRAWINGS WITH INPUT BY A SPECIALTY ENGINEER INCLUDE, BUT
ARE NOT LIMITED TO: WINDOW SYSTEMS, CURTAINWALL SYSTEMS, ROOF SYSTEMS AND
FRP STRENGTHENING SYSTEMS.
3. THE SPECIALTY ENGINEER OR MANUFACTURER SHALL DESIGN, PROVIDE, AND INSTALL
THEIR COMPONENTS AND THE COMPONENT CONNECTIONS TO THE PRIMARY
STRUCTURE PER THE LOAD CRITERIA STATED IN THESE NOTES OR THE CURRENT
GOVERNING BUILDING CODES, WHICHEVER IS MORE STRINGENT.
4. SUBMITTALS SHALL CLEARLY IDENTIFY THE SPECIFIC PROJECT AND APPLICABLE
CODES, LIST THE DESIGN CRITERIA, AND SHOW ALL DETAILS AND PLANS NECESSARY
FOR PROPER FABRICATION AND INSTALLATION. CALCULATIONS AND SHOP DRAWINGS
SHALL IDENTIFY SPECIFIC PRODUCT UTILIZED. GENERIC PRODUCTS WILL NOT BE
ACCEPTED.
FRP STRENGTHENINGSHOP DRAWING SUBMITTALS
SHOP DRAWINGS REQUIRING INPUT BY A SPECIALTY ENGINEER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATE BUILDING 1
03/10/2023 MLA WHLRevisions: Date:
BID DOCUMENTS
520-317X
Dwg. of
BILOXI, MISSISSIPPI
15090
STRUCTURAL NOTES
S002
A.
B.
C.
A.
B.
A.
B.
A.
B.
6. FRP INSTALLATION SHALL BE PRIORITY OVER OTHER IMPROVEMENTS SHOWN IN
THESE DOCUMENTS. WHERE CONFLICTS OCCUR, THE CONTRACTOR SHALL
COORDINATE WITH FRP DESIGNER AND SEOR.
7. SOME FRP REPAIRS WERE PREVIOUSLY COMPLETED. CONTRACTOR TO FIELD
VERIFY FULL EXTENTS OF EXISTING REPAIRS IN PLACE PRIOR TO DESIGNING OR
INSTALLING ANY NEW FRP REPAIRS.
10/27/2023
UP
UP
9 10
10 11
12 13
13 14
GG
F F
EE
D D
C C
BB
AA
40+15 PSF 40+15 PSF
100psf
100psf reducible
125psf 125psf
150psf
40+15 PSF
50+15psf
50+15psf
50+15psf
40+15 PSF
60psf 60psf60psf
40+15 PSF
50+15psf
50+15psf
UPUP
UPUP
9 10
10 11
12 13
13 14
GG
F F
EE
DD
CC
BB
AA
3.1 3.1
40+15 PSF 40+15 PSF
100psf
100psf reducible
125psf 125psf
150psf
40+15 PSF
50+15psf
50+15psf
50+15psf
60psf 60psf
40+15 PSF40+15 PSF
50+15psf
50+15psf
60psf
THIRD FLOOR
FOURTH FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATE BUILDING 1
03/10/2023 MLA WHLRevisions: Date:
BID DOCUMENTS
520-317X
Dwg. of
BILOXI, MISSISSIPPI
15090
FLOOR LOAD MAP
S003
PLAN NORTH
PLAN NORTH
9 10
10 11
12 13
13 14
GG
F F
EE
DD
CC
BB
AA
50+15 PSF
100 PSF
125 PSF
125 PSF
125 PSF
50+15 PSF
50+15 PSF
50+15 PSF
50+15 PSF
50+15 PSF
50+15 PSF
80 PSF 80 PSF
80 PSF
150 PSF
50+15 PSF
100 PSF
reducible
100 PSF 100 PSF
9 10
10 11
12 13
13 14
GG
F F
EE
DD
CC
BB
AA
150 PSF
40 PSF 40 PSF 40 PSF
150 PSF 150 PSF
40 PSF
FIFTH FLOOR
ATTIC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATE BUILDING 1
03/10/2023 MLA WHLRevisions: Date:
BID DOCUMENTS
520-317X
Dwg. of
BILOXI, MISSISSIPPI
15090
FLOOR LOAD MAP
S004
PLAN NORTH
EXISTING PILE
CAP, TYP.
EXISTING PILE
CAP, TYP.
EXISTING BEAM , TYP.
EXISTING BEAM , TYP.
277' - 7"
11' - 9 1/2" 13' - 0" 11' - 9 1/2" 14' - 9 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 14' - 9 1/2" 14' - 3" 13' - 1" 14' - 3" 14' - 9 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 14' - 9 1/2" 11' - 9 1/2" 13' - 0" 11' - 9 1/2"
1/ 2"
1/ 2"
1 2 3 4 5 6 7 8 9
11 12
14 15 16 17 18 19 20 21 22
G
F
E
D
C
B
A
1 1 1 1 1 1 1
1 1 1 1
1 1
11111
2 2
1/8" = 1'-0"1 PILE MONITORING PLAN
PLAN NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATE BUILDING 1
03/10/2023 MLA WHLRevisions: Date:
BID DOCUMENTS
520-317X
Dwg. of
BILOXI, MISSISSIPPI
15090
PILE MONITORING PLAN
SF090
PILE MONITORING PROCEDURE:
1. PURPOSE AND SCOPE
KEYNOTES:
AFFIX AN ELEVATION MONITORING TARGET TO FACE OF BUILDING AT COLUMN LOCATION.
a. THE PILE REMEDIATION STUDY PREPARED BY SCHMIDT CONSULTING GROUP, INC., DATED DECEMBER 2017, IDENTIFIED SEVERAL EXISTING FOUNDATION ELEMENTS (PILES AND PILE CAPS) AS BEING POTENTIALLY DEFICIENT WHEN SUBJECTED TO DESIGN LIVE AND WIND LOADS. A PILE STRENGTHENING PLAN WAS PREPARED UTILIZING NEW STRUCTURAL BEAMS TO DISTRIBUTE LOADS FROM DEFICIENT PILES AND PILE CAPS TO FOUNDATIONS WITH AVAILABLE REMAINING CAPACITY. WHERE IT WAS NOT FEASIBLE TO DISTRIBUTE LOADS, NEW HELICAL PILES WERE TO BE ADDED TO
IMPROVE THE EXISTING FOUNDATION'S BEARING CAPACITY.
IT IS THE INTENT OF THE VA TO MONITOR THE EXISTING BUILDING STRUCTURE TO ASCERTAIN IF THERE IS EVIDENCE OF FOUNDATION FAILURE IN LIEU OF IMPLEMENTING THE PILE STRENGTHENING PLAN. IF THE OUTCOME OF THE MONITORING PLAN DETERMINES THAT SETTLEMENT IS OCCURRING, A FULL IMPLEMENTATION OF THE ORIGINAL PILE STRENGTHENING PLAN MAY BE REQUIRED.
THE PURPOSE OF THIS PLAN IS TO IDENTIFY EXISTING FOUNDATION ELEMENTS THAT HAVE BEEN DETERMINED TO BE POTENTIALLY DEFICIENT AND INSTITUTE AN OPTICAL MONITORING PLAN TO
MEASURE DIFFERENTIAL FOUNDATION SETTLEMENT.
b.
c.
2. PILE MONITORING SURVEY POINTS
a. THE GENERAL CONTRACTOR SHALL ENGAGE A SURVEYOR TO ESTABLISH SURVEY POINTS AS DESCRIBED BELOW.
THE SURVEYOR SHALL INSTALL A BENCHMARK AT A POINT OF KNOWN ELEVATION, INDEPENDENT OF THE BUILDING. THIS CAN BE A FOUNDATION CORNER OF A NEIGHBORING BUILDING, AN EXISTING SURVEYING BENCHMARK, OR A PERMANENT SITE MONUMENT SUCH AS A FLAGPOLE FOUNDATION.
THE SURVEYOR SHALL INSTALL VISIBLE SURVEY TARGETS AT CONVENIENT, CONSISTENT ELEVATIONS AT THE COLUMNS INDICATED BY THIS PLAN. WHEREVER POSSIBLE, THE TARGET SHOULD BE AFFIXED DIRECTLY TO THE FACE OF THE EXISTING CONCRETE COLUMNS. IF THE FACE OF THE STRUCTURE IS NOT ACCESSIBLE DUE TO ARCHITECTURAL COVERINGS, THE TARGET SHALL BE
AFFIXED AS NEAR AS POSSIBLE TO THE ACTUAL COLUMN.
TARGETS INSIDE THE CRAWLSPACE SHALL BE AFFIXED TO STRUCTURAL COLUMNS ON THE MOST CONVENIENT FACE.
THE TARGET SHALL CONSIST OF A MARK WITH VISIBLE CROSS-HAIRS. ALTERNATELY, THE SURVEYOR MAY DRILL A SCREW OR INSTALL A SMALL LEDGE WITH ADHESIVE ON THE FACE OF THE COLUMN UPON WHICH A MEASURING ROD MAY BE SET. THE SURVEYOR SHALL OBTAIN APPROVAL OF THE TARGET TYPE AND APPEARANCE FROM THE OWNER PRIOR TO INSTALLING.
IN AREAS FREQUENTLY ACCESSED BY BUILDING PERSONNEL OR THE PUBLIC, THE TARGET SHALL BE ACCOMPANIED BY SIGNAGE WITH THE FOLLOWING STATEMENT: "BUILDING MONITORING
TARGET - DO NOT REMOVE".
EACH TARGET SHALL BE ASSIGNED A UNIQUE IDENTIFYING NUMBER OR SET OF GRID COORDINATES.
b.
c.
d.
e.
f.
3. INITIAL PILE MONITORING BASELINE ELEVATION SURVEY
a. THE SURVEYOR SHALL PERFORM A BASELINE ELEVATION SURVEY OF THE POINTS INDICATED PRIOR TO BEGINNING ANY FURTHER IMPROVEMENTS TO THE BUILDING.
THE SURVEYOR SHALL TABULARIZE THE RESULTS OF THE INITIAL BASELINE ELEVATION SURVEY AND PROVIDE TO THE OWNER, CONTRACTOR, ARCHITECT AND ENGINEER.b.
4. PERIODIC PILE MONITORING
a. THE SURVEYOR SHALL PERFORM PERIODIC ELEVATION SURVEYS TO DETERMINE IF ANY DIFFERENTIAL SETTLEMENT HAS OCCURRED.
THE FREQUENCY OF SURVEYS SHALL BE NOT LESS THEN ONCE PER MONTH FOR THE DURATION OF CONSTRUCTION IMPROVEMENTS.
ADDITIONAL SURVEYS SHALL BE PERFORMED AFTER ANY SIGNIFICANT LOADING EVENT, SUCH AS A MEASURABLE EARTHQUAKE OR A WIND EVENT WITH SUSTAINED WINDSPEEDS EXCEEDING 70 MPH.
AFTER EACH SURVEY, THE SURVEYOR SHALL TABULARIZE THE RESULTS, WITH ANY DIFFERENCES FROM THE ORIGINAL BASELINE SURVEY AND FROM THE PRIOR SURVEY CLEARLY NOTED.
AFTER COMPLETION OF CONSTRUCTION IMPROVEMENTS, ELEVATION SURVEYS SHALL BE PERFORMED NOT LESS THAN ONCE EVERY THREE MONTHS FOR A DURATION OF TWO YEARS.
MONITORING FOR THE DURATION OF THE PROJECT AND FOR A PERIOD OF ONE YEAR AFTER COMPLETION OF THE PROJECT SHALL BE PERFORMED BY A TESTING LAB CONTRACTED BY THE GENERAL
CONTRACTOR, WITH REPORTING TO THE CHIEF ENGINEER.
MONITORING AFTER THE FIRST YEAR FOLLOWING COMPLETION OF THE PROJECT WILL BE THE RESPONSIBILITY OF THE MEDICAL CENTER.
b.
c.
d.
e.
5. PILE MOVEMENT ASSESSMENT
a. ANY RECORDED DIFFERENTIAL SETTLEMENTS EXCEEDING 1/4-INCH SHALL BE EVALUATED BY A STRUCTURAL ENGINEER. IN THIS CASE, IMPLEMENTATION OF ALL OR A PORTION OF THE ORIGINAL PILE
STRENGTHENING MAY BE REQUIRED.
IF NO SETTLEMENT GREATER 1/4-INCH IS RECORDED DURING A TWO YEAR PERIOD FOLLOWING CONSTRUCTION, THE PILE MONITORING PROGRAM MAY BE DISCONTINUED AT THE DISCRETION OF THE
OWNER.
b.
2 AFFIX AN ELEVATION MONITORING TARGET TO FACE OF CONCRETE COLUMN IN CRAWLSPACE.
g.
f.
g.
10+2
8+2
FF
9 10
10 11
12 13
13 14
GG
EE
DD
CC
BB
AA
6"
= BEAM SHEAR IN EXCESS OF ALLOWABLE
(OCCURS @ MIDSPAN, 6'-0" TYPICAL LENGTH)
EXCESS SHEAR LOADS:
ALONG GRID LINE C & D = 2 KIPS
ALONG GRID LINE E = 3 KIPS
ALONG GRID LINE F = 6 KIPS
REMOVE CEILING AS REQUIRED AND REFER TO 1/S143.
LEGEND:
6'-0"
277'-7" 11'-9 1/2" 13'-0" 11'-9 1/2" 14'-9 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 14'-9 1/2" 14'-3" 13'-1" 14'-3" 14'-9 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 14'-9 1/2" 11'-9 1/2" 13'-0" 11'-9 1/2"11'-9 1/2" 13'-0" 11'-9 1/2" 14'-9 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 14'-9 1/2" 14'-3" 13'-1" 14'-3" 14'-9 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 14'-9 1/2" 11'-9 1/2" 13'-0" 11'-9 1/2"
EXISTING 1/2"
EXPANSION JOINT
A = ACCESS HATCH
E = EXISTING EXHAUST TO REMAIN, FIELD VERIFY LOCATION AND SIZE
N = NEW EXHAUST, COORDINATE LOCATION WITH ARCH AND MEP DRAWINGS
C = EXISTING RUBBISH CHUTE TO BE INFILLED PER DETAIL 4/S142.
E D
E
'-7
'-0
'-5
'-1
1/
2"
'-0
'-1
1/
2"
'-5
OPEN
OPEN
OPEN
OPEN
2'-3 1/8"
1'-8 1/8"
5' -1
/4
1/
2"
A
= EXISTING JOIST SPANS TYP. FLOOR 2" CONCRETE SLAB OVER
8" JOIST (8"+2") @ 25" O.C., TYP., U.N.O.
= EXISTING JOIST SPANS TYP. FLOOR 2" CONCRETE SLAB OVER
10" JOIST (10"+2") @ 25" O.C., TYP., U.N.O.
FOR BEAM LOCATIONS & SIZES REFERENCE EXISTING DRAWINGS OR
VERIFY IN FIELD.
8+2
8+2
8+2
8+2
8+2
8+2
+2
+2
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+
+2
+2
+2
+2
+2
+2
+2
+2
PLUMBING CHASE THROUGH CONCRETE FLOOR, COORDINATE WITH MEP
DRAWINGS. MAXIMUM PERMITTED SIZE FOR PLUMBING HOLES IS 4"
DIAMETER. IF NEW CHASE IS PARALLEL TO CONCRETE JOIST SPANS,
LOCATE OPENINGS TO AVOID CUTTING JOISTS.
IF NEW CHASE IS PERPENDICULAR TO CONCRETE JOIST SPANS, OR IF THE
NEW OPENINGS OTHERWISE CUT THROUGH JOISTS, PROVIDE ADDITIONAL
SUPPORT PER SHEET S140. REFER TO DETAILS 1, 2 OR 3 AS APPROPRIATE,
DEPENDING ON HOW MANY ADJACENT JOISTS ARE CUT.
DO NOT CUT ANY PRIMARY BEAMS OR COLUMNS
HOLES FOR
PLUMBING, TYP.
277'-7"
THIRD FLOOR GENERAL NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH MECHANICAL / ELECTRICAL FOR
THE INSTALLATION OF FRP REPAIRS WHERE OBSTRUCTIONS EXIST.
S143
S143
S143
2. ALL DIMENSIONS FOR NEW OPENINGS ARE APPROXIMATE. VERIFY IN FIELD TO AVOID
CONFLICTS WITH EXISTING CONSTRUCTION.
3. THE DIMENSIONS OF ALL EXISTING OPENINGS SHOWN ARE TO BE VERIFIED IN THE FIELD.
44 4 4 4
4. PENETRATIONS FOR INDIVIDUAL PLUMBING LOCATIONS NOT SHOWN ON THIS PLAN SHALL BE
LOCATED TO AVOID CONCRETE JOISTS WHERE POSSIBLE. IF CONCRETE JOIST CANNOT BE
AVOIDED AND MUST BE PENETRATED, PROVIDE REINFORCEMENT PER 1/S140. DO NOT
PENETRATE PRIMARY CONCRETE BEAMS UNDER ANY CIRCUMSTANCES.
OPEN
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
E
EXISTING STEEL
CROSS-BRACE
5 PATCH HOLES IN CONCRETE FLOOR. FOR RECTANGULAR HOLES BETWEEN CONCRETE
JOISTS, REFER TO 1/S142. FOR SMALLER HOLES, REFER TO 3 AND 4/S142.
CONTRACTOR TO COORDINATE WITH ARCHITECTURAL PLANS AND FIELD VERIFY
LOCATIONS OF ALL HOLES TO BE PATCHED. THERE MAY BE MORE OPENINGS TO BE
PATCHED THAN ARE SHOWN ON PLAN.
EXIST. CHUTE
TO BE INFILLED.
C
D = EXISTING RUBBISH CHUTE TO BE MODIFIED FOR NEW OPENING - REFER
TO ARCHITECT FOR ADDITIONAL DETAILS.
5. CONTRACTOR TO NOTIFY STRUCTURAL ENGINEER OF RECORD (SEOR) OF ANY
UNDOCUMENTED PENETRATIONS, INCLUDING SIZE AND LOCATION.
6. THE EXTENTS OF DETERIORATION AND DAMAGE TO THE UNDERSIDE OF THE THIRD FLOOR
CONCRETE SLAB IS UNKNOWN. AS PART OF THE RENOVATIONS, THE CONTRACTOR SHALL
REMOVE PORTIONS OF THE SECOND FLOOR CEILING FINISHES AS REQUIRED BY OTHER
DISCIPLINES (REFER TO ARCHITECTURAL AND MEP DRAWINGS). ANY DISCOVERED
DETERIORATION SHALL BE DOCUMENTED AND REPORTED TO THE STRUCTURAL ENGINEER
OF RECORD (SEOR).
7. FOR BUDGETARY PURPOSES, THE CONTRACTOR SHALL ASSUME THE FOLLOWING:
a. APPROXIMATELY 4000 SF OF CONCRETE SURFACES WILL BE CLEANED AND PATCHED
WITH A REPAIR GROUT, SUCH AS SIKATOP.
b. APPROXIMATELY 25 SF OF HOLES WILL BE PATCHED SIMILAR TO DETAIL 1/S142.
c. APPROXIMATELY 20 INDIVIDUAL HOLES WILL BE PATCHED SIMILAR TO DETAIL 3/S142.
d. APPROXIMATELY 20 INDIVIDUAL HOLES WILL BE PATCHED SIMILAR TO DETAIL 4/S142.
FRP REINFORCING AT COLUMN BY
FRP DESIGNER, TYP ALL SHOWN
WITH BLACK BOX. SEE LOAD
PLANS ON S003 AND S004 AND
CONCEPTUAL DETAILS ON S143
EXISTING STEEL
CROSS-BRACE
8. VISUALLY INSPECT EXISTING WELDS ON CROSS-BRACE LOCATIONS. NOTIFY RE FOR
APPROVAL OF DEFECT REPAIR. INSPECT AND COAT WITH WITH PRIMER AFTER REPAIRING
WELDS.
9. VISUALLY INSPECT ALL EXISTING BOLTS. FULLY TIGHTEN ANY BOLTS THAT ARE LOOSE OR
HAVE GAP SPACE BETWEEN FRAME AND BOLT HEAD.
10. REFER TO DRAWING AE102 FOR INFORMATION REGARDING PHASING OF WORK ON THE
SECOND FLOOR.
1/8" = 1'-0"1 THIRD FLOOR FRAMING PLAN
PLAN NORTH
FINISH FLOOR EL. 52'-6" (VIF)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATE BUILDING 1
03/10/2023 MLA WHLRevisions: Date:
BID DOCUMENTS
520-317X
Dwg. of
BILOXI, MISSISSIPPI
15090
THIRD FLOOR FRAMING PLAN
SF100
1210/27/2023
+2
+2
8+2
8+2
8+
8+
8+
8+
8+
+2
+2
+2
+2
+2
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+2
8+2
8+2
+2
+2
+2
EXISTING 1/2"
EXPANSION JOINT
N
N
E D
N
N
OPEN
OPEN
OPEN
OPEN
OPEN
= INDICATES FRP BEAM REPAIRS PREVIOUSLY
COMPLETED.
LEGEND:
A = ACCESS HATCH.
E = EXISTING EXHAUST TO REMAIN, FIELD VERIFY LOCATION AND SIZE.
N = NEW EXHAUST, COORDINATE LOCATION WITH ARCH AND MEP DRAWINGS.
C = EXISTING RUBBISH CHUTE TO BE INFILLED. REFER TO S160 FOR
ADDITIONAL SLAB REPAIR INFORMATION.
= EXISTING JOIST SPANS TYP. FLOOR 2" CONCRETE SLAB OVER
8" JOIST (8"+2") @ 25" O.C., TYP., U.N.O.
= EXISTING JOIST SPANS TYP. FLOOR 2" CONCRETE SLAB OVER
10" JOIST (10"+2") @ 25" O.C., TYP., U.N.O.
FOR BEAM LOCATIONS & SIZES REFERENCE EXISTING DRAWINGS OR
VERIFY IN FIELD.
2' - 3 1/8" 1' - 8 1/8"
1/
2"
A
1/
2"
1'
8"
1' - 10" 10 1/2" 2' - 2"2'
4"
6'
0" 1'
8"
1' - 10" 1' - 9 3/8"
2' - 2" 8 7/8"
2'
0"
/8
= AREAS OF DAMAGED CONCRETE, REFER TO S160.
8+2
10+2
C
EXISTING CHUTE
TO BE INFILLED.
E
S140
FOURTH FLOOR GENERAL NOTES:
S140
1. ALL DIMENSIONS FOR NEW OPENINGS ARE APPROXIMATE. VERIFY IN
FIELD TO AVOID CONFLICTS WITH EXISTING CONSTRUCTION.
2. THE DIMENSIONS OF ALL EXISTING OPENINGS SHOWN ARE TO BE
VERIFIED IN THE FIELD.
S140
S140
5'
1/
4"
9 10
10 11
12 13
13 14
GG
F F
EE
DD
CC
BB
AA
11' - 9 1/2" 13' - 0" 11' - 9 1/2" 14' - 9 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 14' - 9 1/2" 14' - 3" 13' - 1" 14' - 3" 14' - 9 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 14' - 9 1/2" 11' - 9 1/2" 13' - 0" 11' - 9 1/2"
0"
5"
1/
2"
0"
1/
2"
5 1
/32
3. PENETRATIONS FOR INDIVIDUAL PLUMBING LOCATIONS NOT SHOWN ON
THIS PLAN SHALL BE LOCATED TO AVOID CONCRETE JOISTS WHERE
POSSIBLE. IF CONCRETE JOIST CANNOT BE AVOIDED AND MUST BE
PENETRATED, PROVIDE REINFORCEMENT PER 1/S140. DO NOT PENETRATE
PRIMARY CONCRETE BEAMS UNDER ANY CIRCUMSTANCES.
EXISTING STEEL
CROSS-BRACE
4. CONTRACTOR TO NOTIFY STRUCTURAL ENGINEER OF RECORD (SEOR) OF
ANY UNDOCUMENTED PENETRATIONS, INCLUDING SIZE AND LOCATION.
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
EXISTING STEEL
CROSS-BRACE
P = EXISTING PENETRATION THROUGH SLAB TO BE INFILLED. REFER TO
S160 FOR ADDITIONAL SLAB REPAIR INFORMATION.
P
D = EXISTING RUBBISH CHUTE TO BE MODIFIED FOR NEW OPENING - REFER
TO ARCHITECT FOR ADDITIONAL DETAILS.
P
E
PLUMBING CHASE THROUGH CONCRETE FLOOR, COORDINATE WITH
MEP DRAWINGS. IF NEW CHASE IS PARALLEL TO CONCRETE JOIST
SPANS, LOCATE OPENINGS TO AVOID CUTTING JOISTS.
IF NEW CHASE IS PERPENDICULAR TO CONCRETE JOIST SPANS, OR
IF THE NEW OPENINGS OTHERWISE CUT THROUGH JOISTS, PROVIDE
ADDITIONAL SUPPORT PER SHEET S140. REFER TO DETAILS 1, 2 OR
3 AS APPROPRIATE, DEPENDING ON HOW MANY ADJACENT JOISTS
ARE CUT.
DO NOT CUT ANY PRIMARY BEAMS OR COLUMNS
5. CONTRACTOR TO COORDINATE THE IMPROVEMENTS SHOWN ON THIS
SHEET WITH ADDITIONAL CONCRETE REPAIRS ON S160 AND WITH WATER
INTRUSION REPAIRS ON S401 - S408.
FIELD VERIFY LOCATION OF JOISTS. NEW
PLUMBING OPENINGS SHALL NOT CUT JOISTS
SUPPORTING THE EXISTING OPENING
FIELD VERIFY LOCATION OF JOISTS. NEW
PLUMBING OPENINGS SHALL NOT CUT JOISTS
SUPPORTING THE EXISTING OPENING
6. A PATIENT LIFT TRACK SUPPORT SYSTEM IS TO BE INSTALLED ON THE
UNDERSIDE OF THE FOURTH FLOOR. THE DESIGN AND LAYOUT IS BY
OTHERS. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL
INFORMATION.
7. THE ANCHORAGE OF THE PATIENT LIFT TRACK SUPPORT SYSTEM TO THE
EXISTING CONCRETE STRUCTURE SHALL BE DESIGNED BY THE
CONTRACTOR PER THE SYSTEM MANUFACTURER'S REQUIREMENTS.
8. PROVIDE TRACK LIGHTING SUPPORTS WHERE REQUIRED BY ARCHITECT.
REFER TO THE REFLECTED CEILING PLAN FOR LOCATIONS. REFER TO 6 AND
7/S142 FOR ATTACHMENT DETAILS.
FRP REINFORCING AT COLUMN BY
FRP DESIGNER, TYP ALL SHOWN
WITH BLACK BOX. SEE LOAD PLANS
ON S003 AND S004 AND
CONCEPTUAL DETAILS ON S143
EXISTING STEEL
CROSS-BRACE
9. VISUALLY INSPECT EXISTING WELDS ON CROSS-BRACE LOCATIONS. NOTIFY
RE FOR APPROVAL OF DEFECT REPAIR. INSPECT AND COAT WITH WITH
PRIMER AFTER REPAIRING WELDS.
10. VISUALLY INSPECT ALL EXISTING BOLTS. FULLY TIGHTEN ANY BOLTS THAT
ARE LOOSE OR HAVE GAP SPACE BETWEEN FRAME AND BOLT HEAD.
1/8" = 1'-0"1 FOURTH FLOOR FRAMING PLAN
PLAN NORTH
FINISH FLOOR EL. 65'-6" (VIF)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATE BUILDING 1
03/10/2023 MLA WHLRevisions: Date:
BID DOCUMENTS
520-317X
Dwg. of
BILOXI, MISSISSIPPI
15090
FOURTH FLOOR FRAMING PLAN
SF110
1310/27/2023
+2
N
8+2
8+2
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+
8+
+2
+2
+2
+2
+2
8+
8+
8+
8+
8+2
8+2
8+2
+2
+2
+2
SLAB AND JOIST FRP REPAIRS
PREVIOUSLY COMPLETED
EXISTING
1/2" EXPANSION
JOINT
N
E
N
OPEN
OPEN
OPEN
OPEN
OPEN
8+
+2
A
LEGEND:
A = ACCESS HATCH.
E = EXISTING EXHAUST TO REMAIN, FIELD VERIFY LOCATION AND SIZE.
N = NEW EXHAUST, COORDINATE LOCATION WITH ARCH AND MEP DRAWINGS.
C = EXISTING RUBBISH CHUTE TO BE INFILLED. REFER TO S161 FOR
ADDITIONAL SLAB REPAIR INFORMATION.
= EXISTING JOIST SPANS TYP. FLOOR 2" CONCRETE SLAB OVER
8" JOIST (8"+2") @ 25" O.C., TYP., U.N.O.
= EXISTING JOIST SPANS TYP. FLOOR 2" CONCRETE SLAB OVER
10" JOIST (10"+2") @ 25" O.C., TYP., U.N.O.
FOR BEAM LOCATIONS & SIZES REFERENCE EXISTING DRAWINGS OR
VERIFY IN FIELD.
= AREAS OF DAMAGED CONCRETE, REFER TO S161.
1'
8"
11'-5" 1' - 10"
4" 2' - 2"
2'
4"
2' - 3 1/8" 1' - 8 1/8"
5'
1/
4"
1/ 2"
1' - 10" 1' - 7"
3'
3/
4" 1'
8"
8+2
10+2
S150
VERTICAL SUPPORT FOR
PANORAMIC X-RAY,
COORDINATE LOCATION
W/ ARCH.
S151
S140
N
S140
C
EXISTING CHUTE
TO BE INFILLED.
S140
E
FIFTH FLOOR GENERAL NOTES:
S140
9 10
10 11
12 13
13 14
GG
F F
EE
DD
CC
BB
AA
11' - 9 1/2" 13' - 0" 11' - 9 1/2" 14' - 9 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 14' - 9 1/2" 14' - 3" 13' - 1" 14' - 3" 14' - 9 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 12' - 11 1/2" 14' - 9 1/2" 11' - 9 1/2" 13' - 0" 11' - 9 1/2"
0"
5"
1/
2"
0"
1/
2"
5 1
/32
1. ALL DIMENSIONS FOR NEW OPENINGS ARE APPROXIMATE. VERIFY IN FIELD
TO AVOID CONFLICTS WITH EXISTING CONSTRUCTION.
2. THE DIMENSIONS OF ALL EXISTING OPENINGS SHOWN ARE TO BE VERIFIED
IN THE FIELD.
3. PENETRATIONS FOR INDIVIDUAL PLUMBING LOCATIONS NOT SHOWN ON
THIS PLAN SHALL BE LOCATED TO AVOID CONCRETE JOISTS WHERE
POSSIBLE. IF CONCRETE JOIST CANNOT BE AVOIDED AND MUST BE
PENETRATED, PROVIDE REINFORCEMENT PER 1/S140. DO NOT PENETRATE
PRIMARY CONCRETE BEAMS UNDER ANY CIRCUMSTANCES.
4. CONTRACTOR TO NOTIFY STRUCTURAL ENGINEER OF RECORD (SEOR) OF
ANY UNDOCUMENTED PENETRATIONS, INCLUDING SIZE AND LOCATION.
'-6
/8
INDICATES FRP BEAM REPAIRS PREVIOUSLY COMPLETED.
P
P = EXISTING PENETRATION THROUGH SLAB TO BE INFILLED. REFER TO S161
FOR ADDITIONAL SLAB REPAIR INFORMATION.
D
D = EXISTING RUBBISH CHUTE TO BE MODIFIED FOR NEW OPENING - REFER TO
ARCHITECT FOR ADDITIONAL DETAILS.
PLUMBING CHASE THROUGH CONCRETE FLOOR, COORDINATE WITH MEP
DRAWINGS. IF NEW CHASE IS PARALLEL TO CONCRETE JOIST SPANS,
LOCATE OPENINGS TO AVOID CUTTING JOISTS.
IF NEW CHASE IS PERPENDICULAR TO CONCRETE JOIST SPANS, OR IF THE
NEW OPENINGS OTHERWISE CUT THROUGH JOISTS, PROVIDE ADDITIONAL
SUPPORT PER SHEET S140. REFER TO DETAILS 1, 2 OR 3 AS APPROPRIATE,
DEPENDING ON HOW MANY ADJACENT JOISTS ARE CUT.
DO NOT CUT ANY PRIMARY BEAMS OR COLUMNS
5. CONTRACTOR TO COORDINATE THE IMPROVEMENTS SHOWN ON THIS
SHEET WITH ADDITIONAL CONCRETE REPAIRS ON S161 AND WITH WATER
INTRUSION REPAIRS ON S401 - S408.
6. A PATIENT LIFT TRACK SUPPORT SYSTEM IS TO BE INSTALLED ON THE
UNDERSIDE OF THE FIFTH FLOOR. THE DESIGN AND LAYOUT IS BY OTHERS.
REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
7. THE ANCHORAGE OF THE PATIENT LIFT TRACK SUPPORT SYSTEM TO THE
EXISTING CONCRETE STRUCTURE SHALL BE DESIGNED BY THE
CONTRACTOR PER THE SYSTEM MANUFACTURER'S REQUIREMENTS.
8. PROVIDE TRACK LIGHTING SUPPORTS WHERE REQUIRED BY ARCHITECT.
REFER TO THE REFLECTED CEILING PLAN FOR LOCATIONS. REFER TO 6 AND
7/S142 FOR ATTACHMENT DETAILS.
FRP REINFORCING AT COLUMN BY
FRP DESIGNER, TYP ALL SHOWN
WITH BLACK BOX. SEE LOAD PLANS
ON S003 AND S004 AND
CONCEPTUAL DETAILS ON S143
FRP REINFORCING PRESENT AT
COLUMN. FRP DESIGNER TO VERIFY
IF MODIFICATION IS REQUIRED
FRP REINFORCING
PRESENT AT COLUMN.
FRP DESIGNER TO
VERIFY IF MODIFICATION
IS REQUIRED
9. VISUALLY INSPECT EXISTING WELDS ON CROSS-BRACE LOCATIONS. NOTIFY
RE FOR APPROVAL OF DEFECT REPAIR. INSPECT AND COAT WITH WITH
PRIMER AFTER REPAIRING WELDS.
10. VISUALLY INSPECT ALL EXISTING BOLTS. FULLY TIGHTEN ANY BOLTS THAT
ARE LOOSE OR HAVE GAP SPACE BETWEEN FRAME AND BOLT HEAD.
1/8" = 1'-0"1 FIFTH FLOOR FRAMING PLAN
PLAN NORTH
FINISH FLOOR EL. 78'-6" (VIF)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATE BUILDING 1
03/10/2023 MLA WHLRevisions: Date:
BID DOCUMENTS
520-317X
Dwg. of
BILOXI, MISSISSIPPI
15090
FIFTH FLOOR FRAMING PLAN
SF120
1410/27/2023
5' -1
5/
8"
P
9 10
10 11
12 13
13 14
GG
F F
EE
DD
CC
BB
AA
11'-9 1/2" 13'-0" 11'-9 1/2" 14'-9 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 14'-9 1/2" 14'-3" 13'-1" 14'-3" 14'-9 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 12'-11 1/2" 14'-9 1/2" 11'-9 1/2" 13'-0" 11'-9 1/2"
'-0
'-5
'-1
0 1 /2"
'-0
'-1 0 1
/2"
'-5 1/
N
6+2
6+26+26+2
6+
6+2 6+2 6+2
6+2
A
6+2 6+2 6+2
6+2 6+2 6+2
6+2
6+2 6+2 6+2 COORDINATE ROOF VENT
LOCATIONS WITH MECHANICAL
ATTIC GENERAL NOTES:
1. ALL DIMENSIONS FOR NEW OPENINGS ARE APPROXIMATE. VERIFY IN FIELD TO AVOID CONFLICTS
WITH EXISTING CONSTRUCTION.
2. THE DIMENSIONS OF ALL EXISTING OPENINGS SHOWN ARE TO BE VERIFIED IN THE FIELD.
3. THE DISTRIBUTED WEIGHT OF NEW MECHANICAL EQUIPMENT AND ASSOCIATED STRUCTURAL
SUPPORT SHALL NOT EXCEED 150 PSF.
4' -0
4' - 8" 5'-2"
2' -8
5' - 8"
4' -0
4'-0"
2'
8"
W12x26 W12x26
W12x26
W 8x
W8x18
= SHADED AREA INDICATES REGION OF JOIST STRENGTHENING
PREVIOUSLY COMPLETED FOR AHU REPLACEMENT.
= ALL EXISTING ATTIC FLOORS ARE 2" SLAB ON 6" JOISTS @ 25" O.C. (2"+6")
LEGEND:
N
N
E
N
E
N
OPEN
OPEN
OPEN
2'-0" 6 7/8"
9' -1
1/
4"
1' -8
1'
/8
3' -4
1' - 1 1/8" 2' - 0"
4' -1
/4
1'
-4
1' - 6"1'-10 3/4"
9' -3
/8
1'
-8
7 3/4" 2'-0"
11'-8 5/8"
1'-5 7/8"
1/
4" 1'
-5
A = ACCESS HATCH
E = EXISTING EXHAUST TO REMAIN, FIELD VERIFY LOCATION AND SIZE
N = NEW EXHAUST
C = EXISTING RUBBISH CHUTE TO BE INFILLED. REFER TO S162 FOR
ADDITIONAL SLAB REPAIR INFORMATION.
V = NEW OPENING FOR ROOF VENT ABOVE, COORDINATE LOCATION WITH
ARCHITECT AND MECHANICAL DRAWINGS. REFER TO 5/S151.
2'-3 1/8" 1'-8 1/8"
5' -1
/4
1/
2"
6+
6+
6+
6+
6+
6+
6+
6+
6+
6+
6+
S140 2 S140
S140
S140 3 S151
S151
S140
S140
S140
V
V V
V
S151
S151
= NEW LINTEL IN EXISTING MASONRY WALL. REFER TO ARCHITECT FOR OPENING
SIZE AND LOCATION. REFER TO GENERAL NOTES AND SCHEDULE ON SHEET S001
FOR LINTEL SIZE.
NEW EXHAUST IN
EXISTING OPENING
NEW EXHAUST IN
EXISTING OPENING
N N
N
COORDINATE ROOF
VENT LOCATIONS
WITH MECHANICAL
N
W12x26
W 8x
L
L
SF130
S140
D = EXISTING RUBBISH CHUTE TO BE MODIFIED FOR NEW OPENING - REFER
TO ARCHITECT FOR ADDITIONAL DETAILS.
P = EXISTING PENETRATION THROUGH SLAB TO BE INFILLED. REFER TO
SHEETS S162 FOR ADDITIONAL SLAB REPAIR INFORMATION.
P
WHERE NEW AHU INTERFERES WITH
(E) ATTIC POSTS, REFER TO 8/S142
WHERE NEW AHU INTERFERES WITH
(E) ATTIC POSTS, REFER TO 8/S142
WHERE NEW AHU INTERFERES WITH
(E) ATTIC POSTS, REFER TO 8/S142
D
C
S151
P
SF130
S141
TYP 1'-11 7/8"
2'-4 5/8"
5' -2
/8
8'-9"
2' -0
/8
2' -8
/8
4. REFER TO ARCHITECTURAL AND MECHANICAL ROOF PLANS FOR LOCATIONS OF EXISTING
OPENINGS AND EQUIPMENT TO BE REMOVED. OPENINGS LARGER THAN 16"x16" MAY BE PATCHED
PER DETAIL 8/S151.
5. A PATIENT LIFT TRACK SUPPORT SYSTEM IS TO BE INSTALLED ON THE UNDERSIDE OF THE ATTIC
FLOOR. THE DESIGN AND LAYOUT IS BY OTHERS. REFER TO ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
6. THE ANCHORAGE OF THE PATIENT LIFT TRACK SUPPORT SYSTEM TO THE EXISTING CONCRETE
STRUCTURE SHALL BE DESIGNED BY THE CONTRACTOR PER THE SYSTEM MANUFACTURER'S
REQUIREMENTS.
7. PROVIDE TRACK LIGHTING SUPPORTS WHERE REQUIRED BY ARCHITECT. REFER TO THE REFLECTED
CEILING PLAN FOR LOCATIONS. REFER TO 6 AND 7/S142 FOR ATTACHMENT DETAILS.
FRP REINFORCING
PRESENT AT COLUMN.
FRP DESIGNER TO
VERIFY IF
MODIFICATION IS
REQUIRED
FRP REINFORCING PRESENT
AT COLUMN. FRP DESIGNER
TO VERIFY IF MODIFICATION
IS REQUIRED
FRP REINFORCING AT COLUMN BY
FRP DESIGNER, TYP ALL SHOWN
WITH BLACK BOX. SEE LOAD PLANS
ON S003 AND S004 AND CONCEPTUAL
DETAILS ON S143
FRP REINFORCING
PRESENT AT
COLUMN. FRP
DESIGNER TO
VERIFY IF
MODIFICATION IS
REQUIRED
FRP REINFORCING
PRESENT AT
COLUMN. FRP
DESIGNER TO
VERIFY IF
MODIFICATION IS
REQUIRED
S150
(E) FLOOR
HATCH
10'-7" 6" 3'-1" 3'-6" 3'-6"
1'-4"
5'- 0"
FACE OF (E) WALL
8"
'-4
2'- 6"
EACH
SIDE 7'-
3" 3'-
4"
HSS3x3 x3/
BP2
HSS3x3x3/8
BP1
HSS3x3x3/8
BP1
HSS3x3x3/8
BP2
10'-7"
5'-3" (NOTE 5)
1'-4"
HOIST TROLLEY - SIZED
AS REQUIRED FOR BEAM,
RATED FOR 2000 LB HOIST
CAPACITY, MINIMUM 11
'-4
5'-4" (NOTE 5)
W10x26
W10x26
S1 0x
H
OI
ST
B
EA
M
10 11 12 13
D
C
B
A
EXISTING ROOF OPENING AT OLD CHIMNEY, TO BE PATCHED
AS FOLLOWS:
1. REMOVE EXISTING COVERING AND CLEAN STRUCTURE
TO RECEIVE NEW ATTACHMENT.
2. VERIFY SIZE OF OPENING DOES NOT EXCEED 9'-0"x9'-0".
3. PLACE NEW GALVANIZED 3" x 18 GA METAL ROOF DECK, WITH MINIMUM 8" OF BEARING ON ALL SIDES.
4. FASTEN PERIMETER OF ROOF DECK TO CONCRETE OR
MASONRY WITH 3/16"Ø TITEN SCREWS @ 6" OC.
( 1 3/4" EMBED). SCREWS TO HAVE MINIMUM EDGE
DISTANCE OF 4".
5. IF EXISTING CONSTRUCTION DOES NOT PERMIT
INSTALLATION AS DESCRIBED ABOVE, CONTACT THE
STRUCTURAL ENGINEER OF RECORD (SEOR) FOR
ADDITIONAL INSTRUCTIONS.
1/8" = 1'-0"1 ATTIC FRAMING PLAN
PLAN NORTH
FINISH FLOOR EL. 92'-5" (VIF)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .