Drawings - Architectural - 1.pdf

PDF 16 MB Posted

Attached to
Biloxi Building 1 Renovation - Biloxi, MS -- Y1DA
Solicitation number
QSE--36C10F24R50025
Issued by

About this file

This document appears to be a set of architectural drawings related to the renovation of Building 1 in Biloxi, MS under Solicitation Number QSE--36C10F24R50025.

The solicitation is for the Biloxi Building 1 Renovation, which requires the contractor to provide all qualified supervision, labor, materials, transportation, and equipment necessary to complete the renovation. This includes selective demolition, exterior building envelope alterations, and interior renovation of areas within Building 1. The work will occur on unoccupied floors 3, 4, and 5, as well as in crawl spaces and the attic. The project will include upgrades to the interior utilities and building systems, such as replacement of HVAC, plumbing, electrical, telecommunication, chilled water, and modifications to the fire protection systems. There will also be limited structural, mechanical, and electrical work on the 2nd floor. The contractor must monitor the existing Building 1 foundation system throughout the project. The period of performance is 912 calendar days from the Notice to Proceed, and the project magnitude is between $50M to $100M. Wage Rate Requirements (Construction) apply.

View the file

Other files

File Type Posted
S02_Solicitation Amendment 0003.pdf PDF
C28_02821319 TILE AND MASTIC AND BRICK COATING ABATEMENT.pdf PDF
C28_02833313 LEAD PAINT REMOVAL.pdf PDF
P12_AE Addendum Two.pdf PDF
SolicitationAmendment0004.pdf PDF
P03_Justification and Approval - TekTone Nurse Call System - revised 05.24.24.pdf PDF
P12_Asbestos Report - 01.03.2022.pdf PDF
SolicitationAmendment0003.pdf PDF
52.219-28 Post-Award Small Business Program Rerepresentation.pdf PDF
Wage Determination - Harrison County MS.pdf PDF
QSE 36C10F24R50025.pdf PDF
P12_Asbestos Report - 07.06.2017.pdf PDF
S05_RFI Questions and Answers.pdf PDF
P12_Lead Based Paint Analysis - Bldg 1 - 01.11.2017.pdf PDF
S02_117300 CEILING MOUNTED PATIENT LIFTS - Revised.pdf PDF
P12_Asbestos Report - 05.06.2008.pdf PDF
P12_Addendum 1 - 05.14.2024.pdf PDF
S04_Biloxi Bldg 1 Reno - Pre-Proposal Conference Attendees.pdf PDF
SolicitationAmendment0002.pdf PDF
SolicitationAmendment0001.pdf PDF
QSE 36C10F24R50025.pdf PDF
Wage Determination - Harrison County MS.pdf PDF
52.219-28 Post-Award Small Business Program Rerepresentation.pdf PDF
Drawings - Architectural - 3.pdf PDF
General Contractor Reference Form.docx DOCX document
Drawings - Telecommunication.pdf PDF
Drawings - Architectural - 4.pdf PDF
Drawings - Reference.pdf PDF
VA Biloxi 4th Floor Footwall.pdf PDF
Building 1 Inventory - d.pdf PDF
Adec Submittal - VA Biloxi.pdf PDF
Drawings - Electrical - 2.pdf PDF
LOCQ7780-03-SWS-Biloxi VA Dental Lab.pdf PDF
Justification and Approval - Siemens Security and Video Surveillance System.pdf PDF
Past Performance Questionnaire.docx DOCX document
A-dec Floor Plan - VA Biloxi - Elevations.pdf PDF
Drawings - Structural - 2.pdf PDF
Specifications Volume II.pdf PDF
Biloxi VA Reno B1 - Set H.pdf PDF
Drawings - Plumbing - 1.pdf PDF
Drawings - Structural - 1.pdf PDF
VA Biloxi Patient Room Footwall Typical Elevation.pdf PDF
Justification and Approval - Herman Miller Compass Patient Care Modular System.pdf PDF
Solicitation.pdf PDF
000000 Cover Page Appendix.pdf PDF
Justification and Approval - ESTIII Fire Alarm System.pdf PDF
Drawings - General.pdf PDF
A-dec Floor Plan - VA Biloxi - Preliminary.pdf PDF
Drawings - Mechanical - 2.pdf PDF
Drawings - Plumbing - 2.pdf PDF
Show 40 more

Latest 50 of 64 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10.27.2023

FF

L

K

REMOVE

PORTION OF

EXISTING WALL

3710.27.2023

AD502

CHUTE &

SHAFT

REFER TO SHEET AE102 FOR PHASING/SEQUENCING NOTES

APPLICABLE TO WORK ON THIS FLOOR

AD501

E

LAUNDRY

CHUTE

THIRD FLOOR PLAN - DEMOLITION

U

SL

OP

E

SL

OP

E

SLOPESLOPE

w w w

U

U

U U

U

U

U

UU

Y

Y

Y

Y

YX

X X

U

ZZ1ZZ1

CHAPELCHAPEL

BUILDING

BUILD

ING 1

BUILDING 1

XX

X

X

03.10.202310.27.2023

Sim

UP

LAUNDRY

CHUTE

LAUNDRY

CHUTE

FOURTH FLOOR PLAN - EXISTING & DEMOLITION

FIFTH FLOOR PLAN - EXISTING & DEMOLITION

U

4 Sim w w w w w w

Y

Y

Y

Y

Y

Y

Y

Y

X

X

Y

Z

Z

X

X

U

U

U

U

U

U

U U

U

U

U

U

U

U

UU

U

U

ZZ1

ZZ1

ZZ1

ZZ1

D40

Sim D401

13 Sim

D401

D40

U

X

XXX

U X X

XX

X

X

X

X

03.10.202310.27.2023

LAUNDRY

CHUTE

S

U

ATTIC FLOOR PLAN - EXISTING & DEMOLITION

ZZ.1

U

U

U U

SAW CUT AND REMOVE EXISTING

MASONRY WALL AS REQUIRED TO

INSTALL HOLLOW METAL FRAME

AND DOOR. VERIFY EXISTING SUPPORT

CONDITIONS @ FRAME HEAD IS ADEQUATE

S

U

V

V V

Vw

D

D D

V

D w w w w M

C

M

C

C

EXISTING

BUILDING

4210.27.2023

Q

M w

V

V V V

X X X

R

PAINT AND STORE RAILS FOR

STOREFRONT

R PAINT

EXTERIOR PAINTING AND

SILICONE ELASTOMERIC

- SEE DEMOLITION ELEVATION KEYNOTES

ON SHEET AD202

FOR DORMER/ LOUVER

DEMOLITION SEE ELEVATION

6/AD503

AD301

PARTIAL NORTH ELEVATION PARTIAL NORTH ELEVATION

1st Floor

13' - 0" 2nd Floor

3rd Floor

4th Floor

5th Floor

Attic

26' - 0"

0' - 0"

39' - 0"

52' - 0"

66' - 0"

1st Floor

13' - 0" 2nd Floor

3rd Floor

4th Floor

5th Floor

Attic

26' - 0"

0' - 0"

39' - 0"

52' - 0"

66' - 0"

AD505

CLEAN AND PREPARE MASONRY FOR

EXTERIOR PAINTING AND

SILICONE ELASTOMERIC COATING,

SEE DEMOLITION ELEVATION

KEYNOTE ON SHEET AD202

ALL EXISTING STRUCTURAL

MEMBERS TO REMAIN

WOOD FRAMING TO

REMAIN. VERIFY

CONDITION. REPLACE

WHERE IS DETERIORATED

REMOVE ALL WOOD

TRIM

REMOVE PUNCHED WINDOWS

AND WOOD SUPPORTS AT

ATTIC

REMOVE PUNCHED WINDOWS

AND WOOD SUPPORTS AT

ATTIC

CLEAN & PREPARE MASONRY

TYP ALL FLOORS

- SEE DEMOLITION ELEVATION

KEYNOTES ON SHEET AD202

REMOVE PUNCHED WINDOWS

AND WOOD SUPPORTS AT

3RD, 4TH, 5TH FLOORS AND

ATTIC

CLEAN & PREPARE ALL

EXISTING WOOD SURFACES

FOR WATERPROOF COATING

REMOVE, CLEAN, PAINT, AND

STORE RAILS FOR REUSE,

ALL FLOORS TYP

REMOVE SHUTTERS AND

STORE FOR REUSE

REMOVE PUNCHED WINDOWS

AND WOOD SUPPORTS AT

3RD, 4TH, 5TH FLOORS AND

ATTIC

REMOVE ALL GUTTERS AND

DOWNSPOUTS TYP

REMOVE COPPER CAP FLASHING

REMOVE WOOD TRIM

REMOVE AND STORE ALL WOOD

BALUSTERS

METAL FLASHING TO REMAIN

REMOVE WOOD TRIM

OPEN

METAL FLASHING AT ROOF TO

REMAIN

REMOVE WOOD TRIM

REMOVE COPPER CAP FLASHING

PLASTER COLUMN TO

REMAIN

REMOVE SHUTTERS AND

STORE FOR REUSE. TYP

REMOVE PUNCHED WINDOWS

AND WOOD SUPPORTS AT

3RD, 4TH, 5TH FLOORS AND

ATTICCLEAN & PREPARE MASONRY

TYP ALL FLOORS

- SEE DEMOLITION ELEVATION

KEYNOTES ON SHEET AD202

AD212

FOR SECTION THROUGH

INTERMEDIATE MEMBER

@ COLUMN LOCATION

SEE 3/AD212

ENLARGED ELEVATION / SECTIONENLARGED ELEVATION

ENLARGED ELEVATION / SECTION

ENLARGED ELEVATION / SECTION ENLARGED ELEVATION / SECTION

ENLARGED ELEVATION / SECTION

CLEAN & PREPARE MASONRY

TYP ALL FLOORS

- SEE DEMOLITION ELEVATION

KEYNOTES ON SHEET AD202

CLEAN & PREPARE MASONRY

TYP ALL FLOORS

- SEE DEMOLITION ELEVATION

KEYNOTES ON SHEET AD202

WOOD FRAMINGE TO

REMAIN, REMOVE

AND REPLACE IF

DETERIORATED.

TYPICAL AT PORCH

REMOVE ALL

WOOD BALUSTERS

TO BE STORED FOR

REUSE

18 21 20 19 18 14 13

2 3 4 20

3 2 B C F

9 5 4 10 11 12 13

AREA OF EXISTING

PAINTED

TONGUE AND GROOVE

COLUMN SURROUND

TO BE REMOVED

REMOVE EXISTING PUNCHED

WINDOW UNIT IN ITS ENTIRETY

INCLUDING ALL SURROUNDING

WOOD SUPPORTS

F

THIRD FLOOR ELEVATION THIRD FLOOR ELEVATION THIRD FLOOR ELEVATION THIRD FLOOR ELEVATION THIRD FLOOR ELEVATION

THIRD FLOOR ELEVATION THIRD FLOOR ELEVATION THIRD FLOOR ELEVATION

THIRD FLOOR ELEVATION THIRD FLOOR ELEVATION THIRD FLOOR ELEVATION THIRD FLOOR ELEVATION

THIRD FLOOR ELEVATION THIRD FLOOR ELEVATION THIRD FLOOR ELEVATION

AT 5TH

FLOOR

ONLY

SEE STRUCTURAL

DRAWING, SHEET S404

9 13 1112

A A AAB 12 11 10

FOURTH FLOOR SFW OPENING ESW FOURTH FLOOR SFW OPENING ESW FIFTH FLOOR PW SS

THIRD FLOOR PW CSE THIRD FLOOR PW CSW

THIRD FLOOR PW CSS

SEE STRUCTURAL

DRAWING, SHEET S404

SURROUND

CLOSURE

REMOVE EXISTING FAILING PORTION OF

MASONRY UNIT WALL FULL HEIGHT AT

INTERIOR SEE STRUCTURAL SHEET

REMOVE EXISTING STOREFRONT WINDOW

ASSEMBLY TYPICAL 3RD 4TH & 5TH FLOORS

REMOVE EXISTING FAILING

PORTION OF MASONRY UNIT

WALL FULL HEIGHT AT

INTERIOR. SEE STRUCTURAL

SHEET S404

EXISTING FAILING

PORTION OF MASONRY UNIT

WALL FULL HEIGHT AT INTERIOR

SEE STRUCTURAL SHEET S404

REMOVE EXISTING FAILING PORTION

OFMASONRY UNIT WALL FULL HEIGHT

AT INTERIOR. SEE STRUCTURAL

SHEET S404

REMOVE EXISTING STORE

FRONT WINDOW

ASSEMBLY TYPICAL 3RD

4TH & 5TH FLOOR

REMOVE EXISTING FAILING PORTION OF

MASONRY UNIT WALL FULL HEIGHT AT

INTERIOR. SEE STRUCTURAL SHEET S404

REMOVE EXISTING FAILING PORTION

OF MASONRY UNIT WALL FULL HEIGHT

AT INTERIOR. SEE STRUCTURAL

SHEET S404

REMOVE EXISTING FALLING

PORTION OF MASONRY UNIT WALL

FULL HEIGHT AT INTERIOR. SEE

STRUCTURAL SHEET S404

REMOVE EXISTING STOREFRONT

WINDOW ASSEMBLY TYPICAL 3RD

4TH AND 5TH FLOOR

THIRD FLOOR

THIRD FLOOR

THIRD FLOOR

THIRD FLOOR THIRD FLOOR THIRD FLOOR - THIRD FLOOR

THIRD FLOOR

REMOVE

REMOVE EXISTING PAINT/TEXTURE &

WOOD ENCLOSURE DOWN TO BELOW

THIRD FLOOR LINE SEE WALL

SECTION 2/AD301 SEE 1/AE502 FOR

WORK TYP.

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING PAINT/TEXTURE &

WOOD ENCLOSURE DOWN TO BELOW

THIRD FLOOR LINE SEE WALL

SECTION 2/AD301 SEE 1/AE502 FOR

WORK TYP.

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING

PAINT/COATING AT ALL

EXISTING MASONRY IN

PREPARATION FOR PAINT

AND SILICONE

ELASTOMERIC COATING

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301

SEE 1/AE502 WORK TYP

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/COATING AT ALL

EXISTING MASONRY IN PREPARATION FOR

PAINT AND SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/COATING AT

ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

SEE 1/AE502 WORK TYP.

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301

SEE 1/AE502 WORK TYP

REMOVE EXISTING

PAINT/TEXTURE & WOOD

ENCOSURE DOWN TO BELOW

THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

SEE 1/AE502 WORK TYP.

THIRD FLOOR

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE WOOD BUCK

SUPPORTS ALL SIDES

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING PAINT/COATING AT ALL EXISTING MASONRY

IN PREPARATION FOR PAINT AND SILICONE ELASTOMERIC

COATING

REMOVE EXISTING

PAINT/TEXTURE & WOOD

ENCOSURE DOWN TO BELOW

THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301

SEE 1/AE502 WORK TYP

REMOVE EXISTING LOOSE MORTAR IN

PREPARATION FOR MASONRY MAINTENANCE

REMOVE EXISTING PAINT/TEXTURE

& WOOD SURROUND DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

STONE LEDGE BELOW CLEAN &

PREP FOR MORTAR REPAIR.

PREFINISHED METAL FLASHING

BELOW - REMOVE AND PREP FOR

REPLACEMENT

REMOVE EXISTING PAINT/TEXTURE

& WOOD SURROUND DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

REMOVE EXISTING FAILING PORTION OF MASONRY

UNIT WALL FULL HEIGHT AT INTERIOR. SEE STRUCTURAL

SHEET S404

REMOVE EXISTING FAILING

PORTION OF MASONRY

UNIT WALL FULL HEIGHT AT

INTERIOR. SEE STRUCTURAL

SHEET S404

REMOVE EXISTING STOREFRONT

WINDOW ASSEMBLY, TYPICAL 3RD

4TH & 5TH FLOORS

THIRD FLOOR THIRD FLOOR

SECOND FLOOR EXPANSION JOINT

ASSEMBLY

REMOVE EXISTING FAILING

PORTION OF MASONRY

UNIT WALL FULL HEIGHT AT

INTERIOR. SEE STRUCTURAL

SHEET S404

REMOVE EXISTING

STOREFRONT WINDOW

ASSEMBLY TYPICAL 3RD

4TH & 5TH FLOOR

THIRD FLOOR

REMOVE EXISTING PAINT/COATING AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/TEXTURE PANEL AND ALL

ASSOCIATED CAULKING AT EXISTING EXPANSION JOINT

ASSEMBLY BEWTEEN BUILDINGS 1 & 53. PREP EXTERIOR

WALL FOR NEW EXPANSION JOINT ASSEMBLY.

REMOVE EXISTING LOOSE MORTAR IN

PREPARATION FOR MASONRY MAINTENANCE

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

SEE 1/AE502 WORK TYP.

REMOVE EXISTING PAINT/COATING AT

ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

SEE 1/AE502 WORK TYP.

REMOVE EXISTING PAINT/COATING AT ALL

EXISTING MASONRY IN PREPARATION FOR

PAINT AND SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE MORTAR IN

PREPARATION FOR MASONRY

MAINTENANCE

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

SEE 1/AE502 WORK TYP.

1 1/2" THICK WOOD

DECK BOARDS

EXISTING WOOD STUDS&

PLATES TO REMAIN

FOR ADDITIONAL

FRAMING INFORMATION

SEE 7/AD503

LOOSEN ROOF PANELS TO

ALLOW ACCESS TO FLASHING

AND FASTENERS FOR DEDUCT

ALTERNATE

REMOVE EXISTING METAL

ROOF IN ITS ENTIRETY UNDER

BASE BID

DEMO DORMER VENT SECTION DEMO DORMER JAMB DETAIL

DEMO DORMER HEAD DETAIL

DEMO DORMER VENT SIDE ELEVATION DEMO DORMER VENT FRONT ELEVATION DEMO DORMER VENT SECTION DEMO DORMER SILL DETAIL

LOOSEN ROOF PANELS TO

ALLOW ACCESS TO FLASHING

AND FASTENERS FOR DEDUCT

ALTERNATE

DEMO DORMER VENT SECTION

SELF ADHERING ROOFING

MEMBRANE; RUN FROM

UNDER LOUVER TO 12" MIN

DOWN ROOF DECK; TIE

INTO EXIST MEMBRANE

EXISTING BLOCKING TO REMAIN,

WRAP IN SELF ADHERING

ROOFING MEMBRANE

EXIST PLYWD SHEATHING W/

ROOFING FELT; REMOVE

ROOFING FELT IN ITS ENTIRETY.

NOTIFY ARCHITECT AND

RESIDENT ENGINEER OF ANY

EVIDENCE OF DETERIORATED

PLYWD

EXIST PLYWD SHEATHING W/

ROOFING FELT; REMOVE

ROOFING FELT IN ITS ENTIRETY.

NOTIFY ARCHITECT AND

RESIDENT ENGINEER OF ANY

EVIDENCE OF DETERIORATED

PLYWD/WOOD

EXIST PLYWD SHEATHING TO

REMAIN

EXIST PLYWD SHEATHING W/

ROOFING FELT; REMOVE ROOFING

FELT IN ITS ENTIRETY. NOTIFY

ARCHITECT AND RESIDENT

ENGINEER OF ANY EVIDENCE OF

DETERIORATED PLYWD/WOOD

EXIST PLYWD SHEATHING W/

ROOFING FELT; REMOVE

ROOFING FELT IN ITS ENTIRETY.

NOTIFY ARCHITECT AND

RESIDENT ENGINEER OF ANY

EVIDENCE OF DETERIORATED

PLYWD/WOOD

PREFIN ALUM LOUVER

PREFIN ALUM SUBSILL W/ END

DAMS SET IN BED OF MASTIC

FLAT ROOF EDGE DETAIL 3

NOTE:

FOR ADDITIONAL NOTES AND

INFORMATION SEE OTHER DETAILS

ON THIS SHEET

VERIFY CONDITION

Demo Window Wall Detail

LOOSEN ROOF PANELS TO ALLOW

ACCESS TO TRIM AND TO INSTALL

NEW ROOFING MEMBRANE

REMOVE WOOD EAVE TRIM IN

ITS ENTIRETY

TO REMAIN

VERIFY

CONDITION

REMOVE WOOD EAVE TRIM IN

ITS ENTIRETY

REMOVE EXISTING BUILT-UP

ROOFING

EXISTING STRUCTURE TO REMAIN

VERIFY CONDITION

VERIFY CONDITION

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION

FOR MASONRY MAINTENANCE

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE STANDING SEAM

CLEAT AS REQUIRED TO

REMOVE WOOD TRIM &

INSTALL ROOFING

MEMBRANE

REMOVE METAL EDGE CAP &

CONTINUOUS CLIP AS

REQUIRED TO REMOVE

WOOD TRIM & INSTALL

ROOFING MEMBRANE

EXISTING WOOD FRAMING TO REMAIN

VERIFY CONDITION AND CONFIGURATION

REMOVE WOOD SOFFIT AND FASCIA TRIM.

VERIFY CONDITION AND CONFIGURATION

OF EXISTING WOOD BLOCKING

EMOVELOOSEN THRU WALL FLASHING TO ALLOW

REMOVE OF METAL FLASHING/ROOF, CLEAN

AND PREP FOR REUSE

R

REMOVE WINDOW ACCESSORIES

AND FASTENERS IN ITS ENTIRETY

SAWCUT AND REMOVE "+/- OF

CLAY BLOCK FOR THE NEW GROUT

SEE STRUCTURAL

REMOVE BLOCKING AND

FASTENERS IN ITS ENTIRETY

3 4 45

DEMO WINDOW JAMB DETAIL

DEMO WINDOW SILL DETAIL BUILDING SECTION @ OPENINGS - CALLOUT 4 BUILDING SECTION @ OPENINGS

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING PAINT/COATING AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE MORTAR IN

PREPARATION FOR MASONRY MAINTENANCE

LOOSEN THRU WAL FLASHING TO ALLOW

REMOVE OF METAL FLASHING/ROOF, CLEAN

AND PREP FOR REUSE

REMOVE

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

1 DEMO WINDOW HEAD DETAIL

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE MORTAR IN

PREPARATION FOR MASONRY MAINTENANCE

5410.27.2023

5510.27.2023

5610.27.2023

5710.27.2023

5810.27.2023

Drawings - Architectural - 1a
Drawings - Architectural - 1b

File details come from the government source that posted it. Updated .