Drawings - Mechanical - 2.pdf
PDF 5 MB Posted
- Solicitation number
- QSE--36C10F24R50025
About this file
This document appears to be drawings related to a federal construction contract opportunity for the renovation of Building 1 in Biloxi, Mississippi. The drawings provide detailed mechanical, plumbing, and HVAC system details for the building renovation, including new piping, equipment, and system configurations for the 3rd through 5th floors, crawl space, and attic.
The related federal contract opportunity is for the Biloxi Building 1 Renovation project. The Solicitation Number is QSE--36C10F24R50025, and the opportunity type is a Solicitation. The Description states the contractor shall provide all qualified supervision, labor, materials, transportation, and equipment necessary to complete the renovation of Building 1, including selective demolition, exterior building envelope alterations, and interior renovation. The work will primarily occur on unoccupied floors and within the crawl spaces and attic, with limited work on the occupied 2nd floor. The period of performance is 912 calendar days from the Notice to Proceed, and the project magnitude is between $50M to $100M. Wage Rate Requirements (Construction) apply.
View the file
Other files
Show 40 more
Latest 50 of 64 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
G
F
E
D
C
B
A
7.4
F.8
F.3
B.4
B.7
D.8
D.2
B.8
B.2
10.8 12.2
5" CHWS
5" CHWR
4" HWS
4" HWR
5" HWR
5" HWS
8" CHWR
8" CHWS
3/4" CHWS
3/4" CHWR3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" CHWS
3/4" CHWR
8" CHWS
8" CHWR
5" HWS
5" HWR
8" CHWS
8" CHWR
5" HWS
5" HWR
H W
R
H W
S
C H
W R
C H
W S
4" CHWS
4" CHWR
3" HWS
3" HWR
4" CHWS
4" CHWR
3" HWS
3" HWR
1" HWR
1" HWS
1 1/4" CHWR
1 1/4" CHWS
3/4"
CHWR/S
3/4' HWS/R
1" CHWR/S
1' HWS/R
3/4"
CHWR/S
3/4' HWS/R
3/4"
CHWR/S
3/4' HWS/R
1" CHWR/S
1' HWS/R
5" CHWS
5" CHWR
3" HWS
3" HWR
TURN UP IN EXISTING SHAFT.
ROUTE UP TO ATTIC LEVEL.
FROM EXISTING MECHANICAL
ROOM IN BUILDING 53.
UP TO
EXISTING FCU
UP TO
EXISTING FCU
UP TO
EXISTING FCU
UP TO
EXISTING FCU
UP TO
EXISTING FCU
UP TO
EXISTING FCU
UP TO
EXISTING FCU
UP TO
EXISTING FCU
UP TO
EXISTING FCU
UP TO ATTIC LEVEL.
PIPING SERVES
EXISTING AHU-5, 6,
AND 10 IN ATTIC.
UP TO 1ST FLOOR.
PIPING SERVES AHU-1,
2, 3, 4 AND 11 IN
MEZZANINE
UP TO
1ST
FLOOR
REMOVE EXISTING PIPING
AND CAP AT ELBOW GOING
UP.
EXISTING PIPING TO AHU 7, 8,
AND 9 IN BASMENT TO REMAIN
REMOVE EXISTING PIPING
REMOVE EXISTING PIPING AS
INDICATED AND PREPARE FOR
NEW CONNECTION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENTS
520-317X
Dwg. of
C R e v it L o c a l F ile s \I C
T
B L D
G
M e c h a n ic a l C
D S
A a ro n .C
.M e y e r.
rv t
/1
/2
:0
:5
P M
MP100
CRAWLSPACE PIPING RENOVATE BUILDING 1
BILOXI, MISSISSIPPI
10/27/2023 SCOPRZ AARMEY
197 238
1/8" = 1'-0"MS101 MP100
1 CRAWL SPACE PIPING
N O
R T
HGENERAL SHEET NOTES:
1. CONTRACTORS SHALL REVIEW ROUTING OF
PIPING PRIOR TO BID. ROUTING SHOWN IS ONE
POTENTIAL ROUTE WITH FINAL ROUTE UP TO
INSTALLING CONTRACTOR TO DETERMINE.
2. CONTRACTORS SHALL COORDINATE ROUTING
OF PIPING WITH EXISTING CONDITIONS.
KEYED NOTES:
1. CONNECT TO EXISTING 3/4" CHWR/S 3/4' HWS/R
UP TO EXISTING FCU'S ON 1ST FLOOR
2. CONNECT TO EXISTING 5"CHWS/R AND 4"
HWS/R.
3. CONNECT TO EXISTING 4"CHWS/R AND 3"
HWS/R.
4. CONNECT TO EXISTING 5"CHWS/R AND 3"
HWS/R.
Revisions: Date:
UPUP
10 11 12 13
G
F
E
D
C
B
A
CENTRAL STAIR
1A101
F.8
F.3
B.4
B.7
D.8
D.2
B.8
B.2
10.8 12.2
2" HWR
2" HWS
2" CHWS
2" CHWR
PROVIDE SHUT-OFF
VALVES AND CAP FOR
FUTURE
M H
11 12
G
F
E
D
C
B
A
CENTRAL STAIR
2A101
F.8
F.3
B.4
B.7
D.8
D.2
B.8
B.2
10.8 12.2
2" HWR
2" HWS
2" CHWS
2" CHWR
PROVIDE SHUT-OFF
VALVES AND CAP FOR
FUTURE
M H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENTS
520-317X
Dwg. of
C R e v it L o c a l F ile s \I C
T
B L D
G
M e c h a n ic a l C
D S
A a ro n .C
.M e y e r.
rv t
/1
/2
:0
:5
P M
MP101
EXISTING 1ST & 2ND FLOORS -
HVAC PIPING
RENOVATE BUILDING 1
BILOXI, MISSISSIPPI
10/27/2023 SCOPRZ AARMEY
198 238
1/8" = 1'-0"MP101
1 EXISTING 1ST FLOOR - HVAC PIPING
1/8" = 1'-0"MP101
2 EXISTING 2ND FLOOR - HVAC PIPING
N O
R T
H
N O
R T
H
S
S
S
S S
S
S S
S
S S SS
S S
S
S
S
S S
S S
S
S S
S S
SS S
S
S S
S
S
SS S
S
S
S
S
S S
S S
S S
S
S
S
S S
S
S S
S
S S
S S
S
S S
S S
S S
S S
S
S
S
S
S
S
S S
S
S S
S S
S S
S
S
S SS
S
S S
S
S
S S
S S
S
S
S
S S
S
S SS S
S S
S
S
S
S
S
S SS S S SS SSS SS
S
S
S SS
S
S
S
S
S
S
S
S S
S
S S S
S
S S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
G
F
E
D
C
B
A
7.4
F.8
F.3
B.4
B.7
D.8
D.2
B.8
B.2
10.8 12.2
MH301
VAV
5-01
VAV
5-03 VAV
5-04
VAV
5-05
VAV
5-06
VAV
5-08
VAV
5-09
VAV
5-10
VAV
5-11
VAV
5-12
VAV
5-14
VAV
5-15
VAV
5-21
VAV
5-22
VAV
5-23
VAV
5-24
VAV
5-26
VAV
5-27
VAV
5-28
VAV
5-29
VAV
5-25
VAV
5-30
VAV
5-31
VAV
5-32
VAV
5-33
VAV
5-02
VAV
5-18
VAV
5-19
VAV
5-20
VAV
5-17
VAV
5-16
3/4" HWR
3/4" HWS
1" HWR
1" HWS
1 1/2" HWR
1 1/2" HWS
1 1/2" HWR
1 1/2" HWS
1" HWR
1" HWS
1" HWR
1" HWS
H W
R
H W
S
1" HWS
1" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR3/4" HWS
3/4" HWS
3/4" HWR
PATIENT ROOM 1
3B114
PATIENT ROOM 2
3B116
PATIENT ROOM 3
3B118
PATIENT ROOM 4
3B119
CLEAN EQUIPMENT STORAGE
3B121
M D
D
IC
TA
TI
O N
3B
PATIENT ROOM 5
3B123 PATIENT ROOM 6
3B124
WHEELCHAIR ALCOVE
3B102
ELECTRICAL ROOM
3B101
PATIENT CENTERED CARE
3B103
MEDICAL GAS STORAGE
3B104
CRASH CART
3B105
HAC
3B106
CLEAN UTILITY
3B107
CLEAN LINEN
3B108
KINESIOTHERAPY
3B109
WEST STAIR
3B110
PATIENT ROOM 7 - NEGATIVE
PRESSURE
3B111
UNASSIGNED
3B113
PATIENT BATHROOM
3B111A
ANTE ROOM
3B111B
PATIENT BATHROOM
3B114A
PATIENT BATHROOM
3B116A
PATIENT BATHROOM
3B118A
PATIENT BATHROOM
3B119A
PATIENT BATHROOM
3B123A
PATIENT BATHROOM
3B124A
CORRIDOR
C3-104
CENTRAL STAIR
3A101
MALE TOILET
3A102
FEMALE TOILET
3A103
FAMILY TOILET
3A104
WAITING / LOUNGE
3A105
FAMILY CONSULTATION
3A106
MECHANICAL SHAFT
3A107
SOILED LINEN
3A110
ENGINEERING
3A111
HEAD NURSE / ASSISTANT MANAGER
3A112
MEDICATION ROOM
3A114
NOURISHMENT STATION
3A115
PATIENT ROOM 8
3A117
PATIENT ROOM 9
3A118
MD DICTATION
3A120
IMD SUPPLY STORAGE
3A121
PATIENT ROOM 10
3A122
PATIENT ROOM 11
3A123
BARIATRIC PATIENT ROOM 12
3A125
CONFERENCE / REPORT ROOM
3A128
PATIENT BATHROOM
3A117A PATIENT BATHROOM
3A118A
PATIENT BATHROOM
3A122A
PATIENT BATHROOM
3A123A
BARIATRIC PATIENT BATHROOM
3A125A
HAC
3A127
TELEMETRY
3A130
BARIATRIC PATIENT BATHROOM
3A131A
BARIATRIC PATIENT ROOM 13 - NEG.
PRESS.
3A131
ANTE ROOM
3A131BEAST STAIR
3A133
PHARMACY CUBICLES
3A134
MALE LOCKERS
3A137
STAFF TOILET
3A136
STAFF SHOWER
3A135
CORRIDOR
3A141
STAFF LOUNGE
3A138
FEMALE LOCKERS
3A139
TELECOMM
3A140
SOILED UTILITY
3A142
NURSE STATION
3A109A
CORRIDOR
C3-105
CORRIDOR
C3-103
NURSE SERVER
3A124
CORRIDOR
C3-109
NURSE SERVER
3A132
CORRIDOR
C3-101
NURSE SERVER
3B112
NURSE SERVER
3B125
CORRIDOR
C3-107
NURSE SERVER
3A126
NURSE SERVER
3A119
NURSE SERVER
3B120
NURSE SERVER
3B117
NURSE SERVER
3B115
AFCV-5E2
AFCV-5S1
AFCV-5E1
MH301
VAV
5-38
VAV
5-37
VAV
5-36
VAV
5-35
VAV
5-40
VAV
5-39
M H
H W
S
H W
R
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
1" CHWS
1" CHWR
PROVIDE SHUT-OFF
VALVES AND CAP FOR
FUTURE
3/4" HWS
3/4" HWR
1" HWR
1" HWS
AFCV-5S2
T
T
T
T
T
T
T
T
T
T T T
T
T
T
T
T
TTT
T
TT
T
T
T
TT
T
T
TT
T
T
CO
H
T
T
H T H
T
H
H
T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENTS
520-317X
Dwg. of
C R e v it L o c a l F ile s \I C
T
B L D
G
M e c h a n ic a l C
D S
A a ro n .C
.M e y e r.
rv t
/1
/2
:0
:0
P M
MP102
3RD FLOOR - HVAC PIPING RENOVATE BUILDING 1
BILOXI, MISSISSIPPI
10/27/2023 SCOPRZ AARMEY
199 238
1/8" = 1'-0"MH301 MP102
1 3RD FLOOR - HVAC PIPING
N O
R T
H
GENERAL SHEET NOTES:
1. RUN-OUTS TO VAV BOXES SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
2. LOCATE ALL EQUIPMENT ABOVE SUSPENDED
CEILINGS OR NEAR A CEILING ACCESS
HATCHES OR PANELS AND MOUNTED AS LOW
TO THE CEILING AS POSSIBLE TO ALLOW FOR
PROPER SERVICING. LOCATE EQUIPMENT TO
PROVIDE ACCESSIBILITY FROM THE CEILING
ACCESS POINT TO AREAS OR PARTS OF THE
EQUIPMENT THAT REQUIRE PERIODIC
MAINTENANCE.
S
S
S S
S
S S
S
S S SS
S S
S
S
S
S S
S S
S S
SS S
S
S S
S
S S
S
S
S
S
S S
S S
S S
S
S
S S
S S
S S
S
S S
S S
S
S S
S S
S
S
S
S
S
S SS
S
S S
S S
S S
S
S
S SS
S
S S
S
S
S
S S
S
S
S
S S
S
S SS S
S S
S
S S
S S
S
S
S
S
S SSS SS S S SS S
S
S
S
S
S S S
S
S
S
S
S
S S
S
S S
S
S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
G
F
E
D
C
B
A
7.4
F.8
F.3
B.4
B.7
D.8
D.2
B.8
B.2
10.8 12.2
CL
MH301
VAV
6-01 VAV
6-03
VAV
6-04
VAV
6-05
VAV
6-06
VAV
6-08
VAV
6-09
VAV
6-10
VAV
6-11
VAV
6-12
VAV
6-14
VAV
6-15
VAV
6-21
VAV
6-22
VAV
6-23
VAV
6-24
VAV
6-26
VAV
6-27
VAV
6-28
VAV
6-29
VAV
6-25
VAV
6-30
VAV
6-31
VAV
6-32
VAV
6-33
VAV
6-02
VAV
6-19
VAV
6-18
VAV
6-17
VAV
6-16
VAV
6-20
3/4" HWR
3/4" HWS
1" HWR
1" HWS
1" HWR
1" HWS
1 1/4" HWR
1 1/4" HWS
1 1/2" HWR
1 1/2" HWS
1 1/2" HWR
1 1/2" HWS
1" HWR
1" HWS
1" HWR
1" HWS
H W
R
H W
S
3/4" HWS 3/4" HWR 1" HWS
1" HWR
3/4" HWS 3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
PATIENT ROOM 1
4B114
PATIENT ROOM 2
4B116
PATIENT BATHROOM
4B116A
PATIENT BATHROOM
4B114A
PATIENT BATHROOM
4B118A
PATIENT BATHROOM
4B119A
PATIENT ROOM 3
4B118
PATIENT ROOM 4
4B119
CLEAN EQUIPMENT STORAGE
4B121
M D
D
IC
TA
TI
O N
4B
PATIENT ROOM 5
4B123
PATIENT BATHROOM
4B123A
PATIENT BATHROOM
4B124A
PATIENT ROOM 6
4B124
ENGINEERING
4A111
SOILED LINEN
4A110
STAFF EDUCATION
4A112
MEDICATION ROOM
4A114
NOURISHMENT STATION
4A115
PATIENT ROOM 8
4A117
PATIENT BATHROOM
4A117A
PATIENT BATHROOM
4A118A
PATIENT ROOM 9
4A118
IMD SUPPLY STORAGE
4A121
M D
D
IC
TA
TI
O N
4A
PATIENT ROOM 10
4A122
PATIENT BATHROOM
4A122A
PATIENT BATHROOM
4A123A
PATIENT ROOM 11
4A123
BARIATRIC PATIENT ROOM 12
4A125
BARIATRIC PATIENT BATHROOM
4A125A
CONFERENCE / REPORT ROOM
4A128
BED STORAGE
4A130
BARIATRIC PATIENT BATHROOM
4A131A
BARIATRIC PATIENT ROOM 13 - NEG.
PRESS.
4A131
M.O.D. ROOM
4A134
EAST STAIR
4A133
STAFF TOILET
4A136
STAFF SHOWER
4A135
MALE LOCKERS
4A137
STAFF LOUNGE
4A138FEMALE LOCKERS
4A139
TELECOMM
4A140
SOILED UTILITY
4A142
CORRIDOR
4A141
ANTE ROOM
4A131B
CENTRAL STAIR
4A101
MALE TOILET
4A102
FEMALE TOILET
4A103
FAMILY TOILET
4A104
FAMILY CONSULTATION
4A106
MECHANICAL SHAFT
4A107
CORRIDOR
C4-104
WAITING / LOUNGE
4A105
ELECTRICAL ROOM
4B101
PATIENT CENTERED CARE
4B103
MEDICAL GAS STORAGE
4B104
CRASH CART
4B105
HAC
4B106
CLEAN UTILITY
4B107CLEAN LINEN
4B108
KINESIOTHERAPY
4B109
WHEELCHAIR ALCOVE
4B102
WEST STAIR
4B110
PATIENT ROOM 7 - NEGATIVE
PRESSURE
4B111
PATIENT BATHROOM
4B111A
UNASSIGNED
4B113
ANTE ROOM
4B111B
CORRIDOR
C4-103
NURSE STATION
4A109A
CORRIDOR
C4-105
CORRIDOR
C4-101
CORRIDOR
C4-107
NURSE SERVER
4B120
NURSE SERVER
4B125 NURSE SERVER
4A119
NURSE SERVER
4A124
NURSE SERVER
4A132
NURSE SERVER
4B112
HAC
4A127
NURSE SERVER
4B115 NURSE SERVER
4B117
NURSE SERVER
4A126
M.O.D. BATHROOM
4A134A
CORRIDOR
C4-109
AFCV-6E2
AFCV-6E1
MH301
MH301
MH301
VAV
6-36 VAV
6-35
VAV
6-37
VAV
6-38
VAV
6-40
VAV
6-39
M H
3/4" HWR
3/4" HWS
H W
R
H W
S
1 1/4" HWR
1 1/4" HWS
1" CHWS
1" CHWR PROVIDE SHUT-OFF
VALVES AND CAP FOR
FUTURE
3/4" HWR
3/4" HWS
AFCV-6S2
AFCV-6S1
T
T
T
T
T
T
T
T
T
T T T
T
T
T
T
T
TT
T
T
TT
T
T
T
TT
T
TT
T
T
T
CO
H
T
T
H T H
T
H
H
T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENTS
520-317X
Dwg. of
C R e v it L o c a l F ile s \I C
T
B L D
G
M e c h a n ic a l C
D S
A a ro n .C
.M e y e r.
rv t
/1
/2
:0
:1
P M
MP103
4TH FLOOR - HVAC PIPING RENOVATE BUILDING 1
BILOXI, MISSISSIPPI
10/27/2023 SCOPRZ AARMEY
200 238
1/8" = 1'-0"MH301 MP103
1 4TH FLOOR - HVAC PIPING
N O
R T
H
SPECIAL CONDITION NOTES:
1. HEATING WATER SUPPLY AND RETURN PIPING FOR
THIS FLOOR HAS BEEN FABRICATED AND IS ON SITE.
CONTRACTOR SHALL INSTALL, TEST, AND INSULATE
ALL PIPING AS PART OF THIS CONTRACT.
2. REFER TO AS BUILT DRAWINGS IN APPENDIX FOR
MORE INFORMATION.
3. CONTRACTOR SHALL FIELD VERIFY ON SITE PIPING
PRIOR TO SUBMITTING BIDS.
4. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY
DISCREPANCIES WITH ITEMS ON SITE.
GENERAL SHEET NOTES:
1. RUN-OUTS TO VAV BOXES SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
2. LOCATE ALL EQUIPMENT ABOVE SUSPENDED
CEILINGS OR NEAR A CEILING ACCESS
HATCHES OR PANELS AND MOUNTED AS LOW
TO THE CEILING AS POSSIBLE TO ALLOW FOR
PROPER SERVICING. LOCATE EQUIPMENT TO
PROVIDE ACCESSIBILITY FROM THE CEILING
ACCESS POINT TO AREAS OR PARTS OF THE
EQUIPMENT THAT REQUIRE PERIODIC
S SS
S
S
SS S
S S
S
S SS S
S
S S
S S
S
S
S
S
S S
S
S S
S
S
S S
S
SS
SS
S S
S S
S S
S
S
S
S
S S
S
S
S S
S
SS S
SS S
S S
S
S S
S S
S SS
S SS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
G
F
E
D
C
B
A
7.4
F.8
F.3
B.4
B.7
D.8
D.2
B.8
B.2
10.8 12.2
VAV
10-01
VAV
10-32
VAV
10-07
VAV
10-08
VAV
10-33
VAV
10-11
VAV
10-14
VAV
10-16
VAV
10-18
VAV
10-19
VAV
10-26
VAV
10-09
VAV
10-06
VAV
10-05
VAV
10-04
VAV
10-02
VAV
10-15
VAV
10-17
VAV
10-34
VAV
10-20
VAV
10-22
VAV
10-21
VAV
10-23
VAV
10-24
VAV
10-12
VAV
10-27
VAV
10-13
1" HWR
1" HWS 1 1/2" HWS
1 1/2" HWR 1 1/2" HWR
1 1/2" HWS
1" HWR
1" HWS
3/4" HWR
3/4" HWS
H W
R
H W
S
1" HWR 1" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
1/2" HWS
1/2" HWR
IMD SUPPLY
5B122 PANORAMIC X-RAY
5B123
STERILE INSTR. STORAGE
5B128
SOILED UTILITY
5B130
EQUIPMENT STORAGE
5B135
UNISEX TOILET
5B136
DENTIST WORKSTATIONS
5B129
OPERATORY TREATMENT GENERAL
AREA
5B131
HAC
5A110
ENGINEERING
5A111
STAFF LOUNGE
5A112
MALE TOILETS / LOCKERS
5A113
FEMALE TOILETS / LOCKERS
5A114
SCRUBS DISTRIBUTION
5A108
CRASH CART
5A115
PHYSICIANS CUBICLES
5A117
FILE ROOM
5A118
COPY ROOM
5A119
OFFICE
5A120
SUPPLY STORAGE
5A121
DIRECTORS CONFERENCE ROOM
5A122
MENS TOILET ROOM
5A124PIPE ACCESS
5A125
WOMENS TOILET ROOM
5A126
HAC
5A127
EAST STAIR
5A128
STAFF LOUNGE
5A130
OFFICE
5A131
CUBICLES
5A134
OFFICE
5A132
OFFICE
5A133
TELECOMM
5A135
CENTRAL STAIR
5A101
FAMILY TOILET
5A102
MEDICAL CONFERENCE
5A103
DENTAL CONFERENCE
5A105
MECHANICAL SHAFT
5A106
LOBBY / LOUNGE
C5-105
ELECTRICAL ROOM
5B102
WAITING
5B103
RECEPTION / SECRETARY
5B104
COPY ROOM
5B105
DENTAL SERVICE CHIEF OFFICE
5B106
MEDICATION ROOM
5B109
AO OFFICE
5B107
SHIPPING/ RECEIVING ROOM
5B110
WEST STAIR
5B111
TOILET ROOM
5B112
SOILED UTILITY
5B114
OPERATORY TREATMENT GENERAL
AREA
5B115
CORRIDOR
C5-104A
CORRIDOR
C5-104
CORRIDOR
C5-107A
CORRIDOR
C5-109
CORRIDOR
C5-102C
CORRIDOR
C5-106
CORRIDOR
C5-103CORRIDOR
C5-102
DENTAL TREATMENT ROOM 1
5B116
DENTAL TREATMENT ROOM 2
5B117
DENTAL TREATMENT ROOM 3
5B118
DENTAL TREATMENT ROOM 4
5B119
DENTAL TREATMENT ROOM 5
5B120
DENTAL TREATMENT ROOM 6
5B121
DENTAL TREATMENT ROOM 7
5B125
DENTAL TREATMENT ROOM 8
5B126
DENTAL TREATMENT ROOM 9 -
SPECIAL NEEDS
5B127
DENTAL TREATMENT ROOM 10-
SPECIAL NEEDS
5B132
DENTAL TREATMENT ROOM 11
5B133
DENTAL TREATMENT ROOM 12
5B134
DENTAL LAB
5B113
MH301
MH301
LOCKABLE COVER
VAV
10-10
VAV
10-30
VAV
10-31
VAV
10-25
VAV
10-03
VAV
10-28
VAV
10-29
M H
1" CHWS
1" CHWR
PROVIDE SHUT-OFF
VALVES AND CAP FOR
FUTURE
AVERAGE SENSORS TO
CONTROL VAV 10-33
ACCESS HATCH
1" HWR
1" HWS
1 1/4" HWR
1 1/4" HWS
1 1/2" HWR
1 1/2" HWS
1 1/4" HWR
1 1/4" HWS
1" HWR
1" HWS
AVERAGE SENSORS TO
CONTROL VAV 10-04
T
T
T
T
T
T
T
T
T T T
T
T
T
T T
T T
T
T T T
T
T
T
T
T CO
CO
CO
CO
H
T
TS
TS
T
T
T
TS
TS
H
CO CO
T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENTS
520-317X
Dwg. of
C R e v it L o c a l F ile s \I C
T
B L D
G
M e c h a n ic a l C
D S
A a ro n .C
.M e y e r.
rv t
/1
/2
:0
:2
P M
MP104
5TH FLOOR -HVAC PIPING RENOVATE BUILDING 1
BILOXI, MISSISSIPPI
10/27/2023 SCOPRZ AARMEY
201 238
1/8" = 1'-0"MH301 MP104
1 5TH FLOOR - HVAC PIPING
N O
R T
H
SPECIAL CONDITION NOTES:
1. HEATING WATER SUPPLY AND RETURN PIPING FOR
THIS FLOOR HAS BEEN FABRICATED AND IS ON SITE.
CONTRACTOR SHALL INSTALL, TEST, AND INSULATE
ALL PIPING AS PART OF THIS CONTRACT.
2. REFER TO AS BUILT DRAWINGS IN APPENDIX FOR
MORE INFORMATION.
3. CONTRACTOR SHALL FIELD VERIFY ON SITE PIPING
PRIOR TO SUBMITTING BIDS.
4. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY
DISCREPANCIES WITH ITEMS ON SITE.
GENERAL SHEET NOTES:
1. RUN-OUTS TO VAV BOXES SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
2. LOCATE ALL EQUIPMENT ABOVE SUSPENDED
CEILINGS OR NEAR A CEILING ACCESS
HATCHES OR PANELS AND MOUNTED AS LOW
TO THE CEILING AS POSSIBLE TO ALLOW FOR
PROPER SERVICING. LOCATE EQUIPMENT TO
PROVIDE ACCESSIBILITY FROM THE CEILING
ACCESS POINT TO AREAS OR PARTS OF THE
EQUIPMENT THAT REQUIRE PERIODIC
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
G
F
E
D
C
B
A
ELEVATOR EQUIP ROOM
6B102
CENTRAL STAIR
6B103
ELECTRICAL ROOM
6B100A
ELECTRICAL ROOM
6B100B
7.4
F.8
F.3
B.4
B.7
D.8
D.2
B.8
B.2
10.8 12.2
RADIO ROOM
6B104
ALCOVE
6B105
VFD-EF-1
VFD-EF-2
CWS/R AND HWS/R FROM CRAWLSPACE
AHU-6
HEPA FILTER RACK
VAV
6-34
VAV
5-34
AHU-10
AHU-5
EX-EF-3
VFD
EXISTING
EHAUST
FAN TO
REMAIN
EX-EF-1
VFD
EXISTING
EHAUST
FAN TO
REMAIN
6" CHWS
6" CHWR
1" HWS
1" HWR
3" CHWR
3" CHWS
3" CHWR
T
T
T
T
MH302
MH302
MH302
3/4" HWS
3/4" HWR
1" HWS
3" CHWS
3" CHWR
T T
VFD-EF-3
VFD-EF-4
M H
VFD-AHU-5S
VFD-AHU-5R VFD-AHU-10R
VFD-AHU-10S
VFD-AHU-6R
VFD-AHU-6S
CENTRAL STAIR
6B103
ELECTRICAL ROOM
6B100A
ELECTRICAL ROOM
6B100B
VAV
6-44
VAV
6-41
VAV
6-42
VAV
6-43HEPA-1
HEPA-2
HEPA FILTER RACK
SHUT-OFF VALVES
1 1/2" MCD TO FLOOR DRAIN.
SEE DETAIL
MH302
MH302
MH302
1 1/2" MCD TO FLOOR DRAIN.
SEE DETAIL
EXISTING TRASH CHUTE
TO BE REMOVED
EXISTING LAUNDRY
CHUTE
ACCESS HATCH
BCU-1
BCU-3
3/4" HWR
3/4" HWS
1" CHWR
1" CHWS
1/2" HWR
1/2" HWS
BCU-2
3/4" HWR
3/4" HWS
1" HWR
3/4" HWS
3/4" HWR
1" CHWR
1" CHWS
1" CHWS
1" CHWR
3/4" HWS
3/4" HWR
1" CHWS
1" CHWR
3/4" HWS
3/4" HWR
1" CHWS
1" CHWR
3/4" HWS
1" MCD
ROUTE CONDENSATE TO
NEAREST FLOOR DRAIN
1" MCD
ROUTE CONDENSATE TO
NEAREST FLOOR DRAIN
ROUTE CONDENSATE TO
NEAREST FLOOR DRAIN
1" MCD
T H
MOUNT ON NEAREST
STRUCTURAL MEMBER
T H
MOUNT ON NEAREST
STRUCTURAL MEMBER
T H
MOUNT ON NEAREST
STRUCTURAL MEMBER
1" CHWS/R VALVE AND
CAP FOR FUTURE.
4" CHWS
4" CHWR
1" HWR
1" HWS
1 1/2" MCD TO FLOOR
DRAIN. SEE DETAIL
REMOVE EXISTING CWS AND CWR
PIPING FROM OUTSIDE OF ELEVATOR
MACHINE ROOM BACK TO MAINS AND
CAP. CONNECT EXISTING PIPING TO
NEW PIPING AS INDICATED.
REMOVE EXISTING CHILLED
WATER PIPING FROM OUTSIDE
OF ELEVATOR MACHINE BACK
TO MAINS AND CAP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENTS
520-317X
Dwg. of
C R e v it L o c a l F ile s \I C
T
B L D
G
M e c h a n ic a l C
D S
A a ro n .C
.M e y e r.
rv t
/1
/2
:0
:2
P M
MP105
ATTIC - HVAC PIPING RENOVATE BUILDING 1
BILOXI, MISSISSIPPI
10/27/2023 SCOPRZ AARMEY
202 238
1/8" = 1'-0"MH301 MP105
1 ATTIC - HVAC PIPING
N O
R T
H
GENERAL SHEET NOTES:
1. RUN-OUTS TO VAV BOXES SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
- WATER INTRUSION FIX 2017 02 15
UP
SEE SHEET
MS101 FOR
CONTINUATION
EXISTING 6" HWS/R
FROM BUILDING#3.
SEE SHEET MS101
FOR CONTINUATION
EX_53HWP-2
EX_53HWP-1
8" CHWR
ET-1
8" CHWS
5" HWS
5" HWR
BUILDING 53 MECHANICAL
ROOM
EXISTING 5" HWS
EXISTING 5" HWR
EXISTING AIR
SEPARATOR
M H
CHILLED WATER
ISOLATION
VALVES
EXISTING HWS/R
TO BLDG #53.
NEW 3" CHWS/R TO
BLDG #53.
HOT WATER
ISOLATION VALVES
CHILLED WATER
ISOLATION
VALVES
3" CHWR
8" CHWS
3" CHWR
8" CHWS
8" CHWR
CHILLED WATER
ISOLATION
VALVES
SEE SHEET MS101
FOR CONTINUATION
8" CHWR
8" CHWS
8" CHWR
3" CHWS
SEE SHEET MS101
FOR CONTINUATION
INSTALL FLOW MEASURING STATIONS
WITH BTU METERS IN BUILDING 53
MECHANICAL ROOM. SENSORS CAN BE
INSTALLED WITHIN TUNNEL BETWEEN
BUILDING 53 AND BUILDING 1.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENTS
520-317X
Dwg. of
C R e v it L o c a l F ile s \I C
T
B L D
G
M e c h a n ic a l C
D S
A a ro n .C
.M e y e r.
rv t
/1
/2
:0
:2
P M
MP106
BUILDING 53 MECHANICAL ROOM RENOVATE BUILDING 1
BILOXI, MISSISSIPPI
10/27/2023 SCOPRZ AARMEY
203 238
1/4" = 1'-0"MS101 MP106
1 BLDG 53 MECH ROOM
N O
R T
H
GENERAL SHEET NOTES:
1. CONTRACTORS SHALL REVIEW ROUTING OF
PIPING PRIOR TO BID.
2. CONTRACTORS SHALL COORDINATE ROUTING
OF PIPING WITH EXISTING CONDITIONS.
C W R
CWR
CWR
CWR
CWR
C
WR
C W R
CWS
CWS
CWS
C W S
CWS
C W S
8" C W S
8" C W R
N
EW
R
ETAIN
IN
G
W
ALL
TBM #1
GRASS
O A K
42" OAK
48" MAG
48" MAG
36"OAK
O A K
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
GRASS
G R A S S
40" OAK
GRASS
GRASS
"O A K
G R A S S
48" OAK
M A G N O
LIA
"O A K
"O A K
"P
IN
E
"P
IN
E
"P
IN
E
"P
IN
E
44" OAK
O A K
C L U S T E R
O A K
O A K
C L U S T E R
"O A K
O A K
RETAININGWALL
CONC
F
LU
M E
A/C
WALK
D
NEW 5" HWS/R
TO BUILDING #1
NEW 8" CWS/R
TO BUILDING #1
SEE SHEET MP106
FOR
CONTINUATION
8"CHWR
8"CHWS
5"HWS
5"HWR
TURN UP IN EXISTING INCINERATOR SHAFT
SEE SHEET MP100 FOR
ADDITIONAL WORK IN THIS
AREA
EXISTING
6"HWS/R
6"HWR
6"HWS
6"HWR
6"HWS
6"H W
R 6"H W
S
6"H W
R
6"H W
S
"H
W S
"H
W R
REMOVE EXISTING SECONDARY CHILLED WATER PUMPS SERVING
BLDG#1 & 53. REPLACE WITH SCHWP-1 AND SCHWP-2 WITH NEW
VFD'S. CONTRACTOR SHALL FIELD VERIFY LOCATION, EQUIPMENT,
AND WORK REQUIRED PRIOR TO BID. CONTRACTOR SHALL NOTIFY
R.E. AND ENGINEER OF ANY CONCERNS.
8"CHWR
8"CHWS
5"HWS
5"HWR
MP106
MP100
8"CHWS
8"CHWR
6"CHWR
6"CHWS
EXISTING
8"CHWS/R
TO REMAIN
EXISTING
6"CHWS/R TO
BE REMOVED
3"CHWR
CONNECT TO EXISTING
3" CHWS/R RISER TO ATTIC
8"CHWS
8"CHWR
3"CHWS
NEW 8" CHWS/R
NEW 3" CHWS/R
COORDINATE BUILDING OUTAGE
WITH OWNER PRIOR TO MAKING
NEW CONNECTIONS.
GENERAL NOTE:
REMOVE PIPING AS INDICATED
AND PREPARE FOR NEW
CONNECTIONS AS INDICATED.
4"CHWR
4"CHWS
3"HWS
3"HWR
"C
H W
R 6 "C
H W
S "H
W S
"H
W R
CONTRACTOR SHALL FIELD VERIFY ROUTING OF NEW
PIPING UNDER EXISTING BUILDINGS PRIOR TO BID. PATH
INDICATED IS GENERAL ROUTING WHICH MAY REQUIRE
ADDITIONAL OFFSETS AND PIPING TO BYPASS EXISTING
UTILITIES AND CRAWL SPACE CONDITIONS. CONTACT R.E.
AND ENGINEER OF ANY CONCERNS PRIOR TO BID.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BID DOCUMENTS
520-317X
Dwg. of
C R e v it L o c a l F ile s \I C
T
B L D
G
M e c h a n ic a l C
D S
A a ro n .C
.M e y e r.
rv t
/1
/2
:0
:3
P M
MS101
SITE PLAN - HVAC RENOVATE BUILDING 1
BILOXI, MISSISSIPPI
10/27/2023 SCOPRZ AARMEY
171 238
1" = 20'-0"MS101
1 SITE - HVAC N
O
R T
H
GENERAL HVAC NOTES :
1. CONTRACTORS SHALL REVIEW ROUTING OF
PIPING PRIOR TO BID.ROUTING SHOWN IS ONE
POTENTIAL ROUTE WITH FINAL ROUTE UP TO
INSTALLING CONTRACTOR TO DETERMINE.
2. CONTRACTORS SHALL COORDINATE ROUTING
OF PIPING WITH EXISTING CONDITIONS.