Drawings - Mechanical - 2.pdf

PDF 5 MB Posted

Attached to
Biloxi Building 1 Renovation - Biloxi, MS -- Y1DA
Solicitation number
QSE--36C10F24R50025
Issued by

About this file

This document appears to be drawings related to a federal construction contract opportunity for the renovation of Building 1 in Biloxi, Mississippi. The drawings provide detailed mechanical, plumbing, and HVAC system details for the building renovation, including new piping, equipment, and system configurations for the 3rd through 5th floors, crawl space, and attic.

The related federal contract opportunity is for the Biloxi Building 1 Renovation project. The Solicitation Number is QSE--36C10F24R50025, and the opportunity type is a Solicitation. The Description states the contractor shall provide all qualified supervision, labor, materials, transportation, and equipment necessary to complete the renovation of Building 1, including selective demolition, exterior building envelope alterations, and interior renovation. The work will primarily occur on unoccupied floors and within the crawl spaces and attic, with limited work on the occupied 2nd floor. The period of performance is 912 calendar days from the Notice to Proceed, and the project magnitude is between $50M to $100M. Wage Rate Requirements (Construction) apply.

View the file

Other files

File Type Posted
S02_Solicitation Amendment 0003.pdf PDF
C28_02821319 TILE AND MASTIC AND BRICK COATING ABATEMENT.pdf PDF
C28_02833313 LEAD PAINT REMOVAL.pdf PDF
P12_AE Addendum Two.pdf PDF
SolicitationAmendment0004.pdf PDF
P03_Justification and Approval - TekTone Nurse Call System - revised 05.24.24.pdf PDF
P12_Asbestos Report - 01.03.2022.pdf PDF
SolicitationAmendment0003.pdf PDF
52.219-28 Post-Award Small Business Program Rerepresentation.pdf PDF
Wage Determination - Harrison County MS.pdf PDF
QSE 36C10F24R50025.pdf PDF
P12_Asbestos Report - 07.06.2017.pdf PDF
S05_RFI Questions and Answers.pdf PDF
P12_Lead Based Paint Analysis - Bldg 1 - 01.11.2017.pdf PDF
S02_117300 CEILING MOUNTED PATIENT LIFTS - Revised.pdf PDF
P12_Asbestos Report - 05.06.2008.pdf PDF
P12_Addendum 1 - 05.14.2024.pdf PDF
S04_Biloxi Bldg 1 Reno - Pre-Proposal Conference Attendees.pdf PDF
SolicitationAmendment0002.pdf PDF
SolicitationAmendment0001.pdf PDF
QSE 36C10F24R50025.pdf PDF
Wage Determination - Harrison County MS.pdf PDF
52.219-28 Post-Award Small Business Program Rerepresentation.pdf PDF
Drawings - Architectural - 3.pdf PDF
General Contractor Reference Form.docx DOCX document
Drawings - Telecommunication.pdf PDF
Drawings - Architectural - 4.pdf PDF
Drawings - Reference.pdf PDF
VA Biloxi 4th Floor Footwall.pdf PDF
Drawings - Architectural - 1.pdf PDF
Building 1 Inventory - d.pdf PDF
Adec Submittal - VA Biloxi.pdf PDF
Drawings - Electrical - 2.pdf PDF
LOCQ7780-03-SWS-Biloxi VA Dental Lab.pdf PDF
Justification and Approval - Siemens Security and Video Surveillance System.pdf PDF
Past Performance Questionnaire.docx DOCX document
A-dec Floor Plan - VA Biloxi - Elevations.pdf PDF
Drawings - Structural - 2.pdf PDF
Specifications Volume II.pdf PDF
Biloxi VA Reno B1 - Set H.pdf PDF
Drawings - Plumbing - 1.pdf PDF
Drawings - Structural - 1.pdf PDF
VA Biloxi Patient Room Footwall Typical Elevation.pdf PDF
Justification and Approval - Herman Miller Compass Patient Care Modular System.pdf PDF
Solicitation.pdf PDF
000000 Cover Page Appendix.pdf PDF
Justification and Approval - ESTIII Fire Alarm System.pdf PDF
Drawings - General.pdf PDF
A-dec Floor Plan - VA Biloxi - Preliminary.pdf PDF
Drawings - Plumbing - 2.pdf PDF
Show 40 more

Latest 50 of 64 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

G

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

5" CHWS

5" CHWR

4" HWS

4" HWR

5" HWR

5" HWS

8" CHWR

8" CHWS

3/4" CHWS

3/4" CHWR3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" CHWS

3/4" CHWR

8" CHWS

8" CHWR

5" HWS

5" HWR

8" CHWS

8" CHWR

5" HWS

5" HWR

H W

R

H W

S

C H

W R

C H

W S

4" CHWS

4" CHWR

3" HWS

3" HWR

4" CHWS

4" CHWR

3" HWS

3" HWR

1" HWR

1" HWS

1 1/4" CHWR

1 1/4" CHWS

3/4"

CHWR/S

3/4' HWS/R

1" CHWR/S

1' HWS/R

3/4"

CHWR/S

3/4' HWS/R

3/4"

CHWR/S

3/4' HWS/R

1" CHWR/S

1' HWS/R

5" CHWS

5" CHWR

3" HWS

3" HWR

TURN UP IN EXISTING SHAFT.

ROUTE UP TO ATTIC LEVEL.

FROM EXISTING MECHANICAL

ROOM IN BUILDING 53.

UP TO

EXISTING FCU

UP TO

EXISTING FCU

UP TO

EXISTING FCU

UP TO

EXISTING FCU

UP TO

EXISTING FCU

UP TO

EXISTING FCU

UP TO

EXISTING FCU

UP TO

EXISTING FCU

UP TO

EXISTING FCU

UP TO ATTIC LEVEL.

PIPING SERVES

EXISTING AHU-5, 6,

AND 10 IN ATTIC.

UP TO 1ST FLOOR.

PIPING SERVES AHU-1,

2, 3, 4 AND 11 IN

MEZZANINE

UP TO

1ST

FLOOR

REMOVE EXISTING PIPING

AND CAP AT ELBOW GOING

UP.

EXISTING PIPING TO AHU 7, 8,

AND 9 IN BASMENT TO REMAIN

REMOVE EXISTING PIPING

REMOVE EXISTING PIPING AS

INDICATED AND PREPARE FOR

NEW CONNECTION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

C R e v it L o c a l F ile s \I C

T

B L D

G

M e c h a n ic a l C

D S

A a ro n .C

.M e y e r.

rv t

/1

/2

:0

:5

P M

MP100

CRAWLSPACE PIPING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY

197 238

1/8" = 1'-0"MS101 MP100

1 CRAWL SPACE PIPING

N O

R T

HGENERAL SHEET NOTES:

1. CONTRACTORS SHALL REVIEW ROUTING OF

PIPING PRIOR TO BID. ROUTING SHOWN IS ONE

POTENTIAL ROUTE WITH FINAL ROUTE UP TO

INSTALLING CONTRACTOR TO DETERMINE.

2. CONTRACTORS SHALL COORDINATE ROUTING

OF PIPING WITH EXISTING CONDITIONS.

KEYED NOTES:

1. CONNECT TO EXISTING 3/4" CHWR/S 3/4' HWS/R

UP TO EXISTING FCU'S ON 1ST FLOOR

2. CONNECT TO EXISTING 5"CHWS/R AND 4"

HWS/R.

3. CONNECT TO EXISTING 4"CHWS/R AND 3"

HWS/R.

4. CONNECT TO EXISTING 5"CHWS/R AND 3"

HWS/R.

Revisions: Date:

UPUP

10 11 12 13

G

F

E

D

C

B

A

CENTRAL STAIR

1A101

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

2" HWR

2" HWS

2" CHWS

2" CHWR

PROVIDE SHUT-OFF

VALVES AND CAP FOR

FUTURE

M H

11 12

G

F

E

D

C

B

A

CENTRAL STAIR

2A101

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

2" HWR

2" HWS

2" CHWS

2" CHWR

PROVIDE SHUT-OFF

VALVES AND CAP FOR

FUTURE

M H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

C R e v it L o c a l F ile s \I C

T

B L D

G

M e c h a n ic a l C

D S

A a ro n .C

.M e y e r.

rv t

/1

/2

:0

:5

P M

MP101

EXISTING 1ST & 2ND FLOORS -

HVAC PIPING

RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY

198 238

1/8" = 1'-0"MP101

1 EXISTING 1ST FLOOR - HVAC PIPING

1/8" = 1'-0"MP101

2 EXISTING 2ND FLOOR - HVAC PIPING

N O

R T

H

N O

R T

H

S

S

S

S S

S

S S

S

S S SS

S S

S

S

S

S S

S S

S

S S

S S

SS S

S

S S

S

S

SS S

S

S

S

S

S S

S S

S S

S

S

S

S S

S

S S

S

S S

S S

S

S S

S S

S S

S S

S

S

S

S

S

S

S S

S

S S

S S

S S

S

S

S SS

S

S S

S

S

S S

S S

S

S

S

S S

S

S SS S

S S

S

S

S

S

S

S SS S S SS SSS SS

S

S

S SS

S

S

S

S

S

S

S

S S

S

S S S

S

S S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

G

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

MH301

VAV

5-01

VAV

5-03 VAV

5-04

VAV

5-05

VAV

5-06

VAV

5-08

VAV

5-09

VAV

5-10

VAV

5-11

VAV

5-12

VAV

5-14

VAV

5-15

VAV

5-21

VAV

5-22

VAV

5-23

VAV

5-24

VAV

5-26

VAV

5-27

VAV

5-28

VAV

5-29

VAV

5-25

VAV

5-30

VAV

5-31

VAV

5-32

VAV

5-33

VAV

5-02

VAV

5-18

VAV

5-19

VAV

5-20

VAV

5-17

VAV

5-16

3/4" HWR

3/4" HWS

1" HWR

1" HWS

1 1/2" HWR

1 1/2" HWS

1 1/2" HWR

1 1/2" HWS

1" HWR

1" HWS

1" HWR

1" HWS

H W

R

H W

S

1" HWS

1" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR3/4" HWS

3/4" HWS

3/4" HWR

PATIENT ROOM 1

3B114

PATIENT ROOM 2

3B116

PATIENT ROOM 3

3B118

PATIENT ROOM 4

3B119

CLEAN EQUIPMENT STORAGE

3B121

M D

D

IC

TA

TI

O N

3B

PATIENT ROOM 5

3B123 PATIENT ROOM 6

3B124

WHEELCHAIR ALCOVE

3B102

ELECTRICAL ROOM

3B101

PATIENT CENTERED CARE

3B103

MEDICAL GAS STORAGE

3B104

CRASH CART

3B105

HAC

3B106

CLEAN UTILITY

3B107

CLEAN LINEN

3B108

KINESIOTHERAPY

3B109

WEST STAIR

3B110

PATIENT ROOM 7 - NEGATIVE

PRESSURE

3B111

UNASSIGNED

3B113

PATIENT BATHROOM

3B111A

ANTE ROOM

3B111B

PATIENT BATHROOM

3B114A

PATIENT BATHROOM

3B116A

PATIENT BATHROOM

3B118A

PATIENT BATHROOM

3B119A

PATIENT BATHROOM

3B123A

PATIENT BATHROOM

3B124A

CORRIDOR

C3-104

CENTRAL STAIR

3A101

MALE TOILET

3A102

FEMALE TOILET

3A103

FAMILY TOILET

3A104

WAITING / LOUNGE

3A105

FAMILY CONSULTATION

3A106

MECHANICAL SHAFT

3A107

SOILED LINEN

3A110

ENGINEERING

3A111

HEAD NURSE / ASSISTANT MANAGER

3A112

MEDICATION ROOM

3A114

NOURISHMENT STATION

3A115

PATIENT ROOM 8

3A117

PATIENT ROOM 9

3A118

MD DICTATION

3A120

IMD SUPPLY STORAGE

3A121

PATIENT ROOM 10

3A122

PATIENT ROOM 11

3A123

BARIATRIC PATIENT ROOM 12

3A125

CONFERENCE / REPORT ROOM

3A128

PATIENT BATHROOM

3A117A PATIENT BATHROOM

3A118A

PATIENT BATHROOM

3A122A

PATIENT BATHROOM

3A123A

BARIATRIC PATIENT BATHROOM

3A125A

HAC

3A127

TELEMETRY

3A130

BARIATRIC PATIENT BATHROOM

3A131A

BARIATRIC PATIENT ROOM 13 - NEG.

PRESS.

3A131

ANTE ROOM

3A131BEAST STAIR

3A133

PHARMACY CUBICLES

3A134

MALE LOCKERS

3A137

STAFF TOILET

3A136

STAFF SHOWER

3A135

CORRIDOR

3A141

STAFF LOUNGE

3A138

FEMALE LOCKERS

3A139

TELECOMM

3A140

SOILED UTILITY

3A142

NURSE STATION

3A109A

CORRIDOR

C3-105

CORRIDOR

C3-103

NURSE SERVER

3A124

CORRIDOR

C3-109

NURSE SERVER

3A132

CORRIDOR

C3-101

NURSE SERVER

3B112

NURSE SERVER

3B125

CORRIDOR

C3-107

NURSE SERVER

3A126

NURSE SERVER

3A119

NURSE SERVER

3B120

NURSE SERVER

3B117

NURSE SERVER

3B115

AFCV-5E2

AFCV-5S1

AFCV-5E1

MH301

VAV

5-38

VAV

5-37

VAV

5-36

VAV

5-35

VAV

5-40

VAV

5-39

M H

H W

S

H W

R

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1" CHWS

1" CHWR

PROVIDE SHUT-OFF

VALVES AND CAP FOR

FUTURE

3/4" HWS

3/4" HWR

1" HWR

1" HWS

AFCV-5S2

T

T

T

T

T

T

T

T

T

T T T

T

T

T

T

T

TTT

T

TT

T

T

T

TT

T

T

TT

T

T

CO

H

T

T

H T H

T

H

H

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

C R e v it L o c a l F ile s \I C

T

B L D

G

M e c h a n ic a l C

D S

A a ro n .C

.M e y e r.

rv t

/1

/2

:0

:0

P M

MP102

3RD FLOOR - HVAC PIPING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY

199 238

1/8" = 1'-0"MH301 MP102

1 3RD FLOOR - HVAC PIPING

N O

R T

H

GENERAL SHEET NOTES:

1. RUN-OUTS TO VAV BOXES SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

2. LOCATE ALL EQUIPMENT ABOVE SUSPENDED

CEILINGS OR NEAR A CEILING ACCESS

HATCHES OR PANELS AND MOUNTED AS LOW

TO THE CEILING AS POSSIBLE TO ALLOW FOR

PROPER SERVICING. LOCATE EQUIPMENT TO

PROVIDE ACCESSIBILITY FROM THE CEILING

ACCESS POINT TO AREAS OR PARTS OF THE

EQUIPMENT THAT REQUIRE PERIODIC

MAINTENANCE.

S

S

S S

S

S S

S

S S SS

S S

S

S

S

S S

S S

S S

SS S

S

S S

S

S S

S

S

S

S

S S

S S

S S

S

S

S S

S S

S S

S

S S

S S

S

S S

S S

S

S

S

S

S

S SS

S

S S

S S

S S

S

S

S SS

S

S S

S

S

S

S S

S

S

S

S S

S

S SS S

S S

S

S S

S S

S

S

S

S

S SSS SS S S SS S

S

S

S

S

S S S

S

S

S

S

S

S S

S

S S

S

S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

G

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

CL

MH301

VAV

6-01 VAV

6-03

VAV

6-04

VAV

6-05

VAV

6-06

VAV

6-08

VAV

6-09

VAV

6-10

VAV

6-11

VAV

6-12

VAV

6-14

VAV

6-15

VAV

6-21

VAV

6-22

VAV

6-23

VAV

6-24

VAV

6-26

VAV

6-27

VAV

6-28

VAV

6-29

VAV

6-25

VAV

6-30

VAV

6-31

VAV

6-32

VAV

6-33

VAV

6-02

VAV

6-19

VAV

6-18

VAV

6-17

VAV

6-16

VAV

6-20

3/4" HWR

3/4" HWS

1" HWR

1" HWS

1" HWR

1" HWS

1 1/4" HWR

1 1/4" HWS

1 1/2" HWR

1 1/2" HWS

1 1/2" HWR

1 1/2" HWS

1" HWR

1" HWS

1" HWR

1" HWS

H W

R

H W

S

3/4" HWS 3/4" HWR 1" HWS

1" HWR

3/4" HWS 3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

PATIENT ROOM 1

4B114

PATIENT ROOM 2

4B116

PATIENT BATHROOM

4B116A

PATIENT BATHROOM

4B114A

PATIENT BATHROOM

4B118A

PATIENT BATHROOM

4B119A

PATIENT ROOM 3

4B118

PATIENT ROOM 4

4B119

CLEAN EQUIPMENT STORAGE

4B121

M D

D

IC

TA

TI

O N

4B

PATIENT ROOM 5

4B123

PATIENT BATHROOM

4B123A

PATIENT BATHROOM

4B124A

PATIENT ROOM 6

4B124

ENGINEERING

4A111

SOILED LINEN

4A110

STAFF EDUCATION

4A112

MEDICATION ROOM

4A114

NOURISHMENT STATION

4A115

PATIENT ROOM 8

4A117

PATIENT BATHROOM

4A117A

PATIENT BATHROOM

4A118A

PATIENT ROOM 9

4A118

IMD SUPPLY STORAGE

4A121

M D

D

IC

TA

TI

O N

4A

PATIENT ROOM 10

4A122

PATIENT BATHROOM

4A122A

PATIENT BATHROOM

4A123A

PATIENT ROOM 11

4A123

BARIATRIC PATIENT ROOM 12

4A125

BARIATRIC PATIENT BATHROOM

4A125A

CONFERENCE / REPORT ROOM

4A128

BED STORAGE

4A130

BARIATRIC PATIENT BATHROOM

4A131A

BARIATRIC PATIENT ROOM 13 - NEG.

PRESS.

4A131

M.O.D. ROOM

4A134

EAST STAIR

4A133

STAFF TOILET

4A136

STAFF SHOWER

4A135

MALE LOCKERS

4A137

STAFF LOUNGE

4A138FEMALE LOCKERS

4A139

TELECOMM

4A140

SOILED UTILITY

4A142

CORRIDOR

4A141

ANTE ROOM

4A131B

CENTRAL STAIR

4A101

MALE TOILET

4A102

FEMALE TOILET

4A103

FAMILY TOILET

4A104

FAMILY CONSULTATION

4A106

MECHANICAL SHAFT

4A107

CORRIDOR

C4-104

WAITING / LOUNGE

4A105

ELECTRICAL ROOM

4B101

PATIENT CENTERED CARE

4B103

MEDICAL GAS STORAGE

4B104

CRASH CART

4B105

HAC

4B106

CLEAN UTILITY

4B107CLEAN LINEN

4B108

KINESIOTHERAPY

4B109

WHEELCHAIR ALCOVE

4B102

WEST STAIR

4B110

PATIENT ROOM 7 - NEGATIVE

PRESSURE

4B111

PATIENT BATHROOM

4B111A

UNASSIGNED

4B113

ANTE ROOM

4B111B

CORRIDOR

C4-103

NURSE STATION

4A109A

CORRIDOR

C4-105

CORRIDOR

C4-101

CORRIDOR

C4-107

NURSE SERVER

4B120

NURSE SERVER

4B125 NURSE SERVER

4A119

NURSE SERVER

4A124

NURSE SERVER

4A132

NURSE SERVER

4B112

HAC

4A127

NURSE SERVER

4B115 NURSE SERVER

4B117

NURSE SERVER

4A126

M.O.D. BATHROOM

4A134A

CORRIDOR

C4-109

AFCV-6E2

AFCV-6E1

MH301

MH301

MH301

VAV

6-36 VAV

6-35

VAV

6-37

VAV

6-38

VAV

6-40

VAV

6-39

M H

3/4" HWR

3/4" HWS

H W

R

H W

S

1 1/4" HWR

1 1/4" HWS

1" CHWS

1" CHWR PROVIDE SHUT-OFF

VALVES AND CAP FOR

FUTURE

3/4" HWR

3/4" HWS

AFCV-6S2

AFCV-6S1

T

T

T

T

T

T

T

T

T

T T T

T

T

T

T

T

TT

T

T

TT

T

T

T

TT

T

TT

T

T

T

CO

H

T

T

H T H

T

H

H

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

C R e v it L o c a l F ile s \I C

T

B L D

G

M e c h a n ic a l C

D S

A a ro n .C

.M e y e r.

rv t

/1

/2

:0

:1

P M

MP103

4TH FLOOR - HVAC PIPING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY

200 238

1/8" = 1'-0"MH301 MP103

1 4TH FLOOR - HVAC PIPING

N O

R T

H

SPECIAL CONDITION NOTES:

1. HEATING WATER SUPPLY AND RETURN PIPING FOR

THIS FLOOR HAS BEEN FABRICATED AND IS ON SITE.

CONTRACTOR SHALL INSTALL, TEST, AND INSULATE

ALL PIPING AS PART OF THIS CONTRACT.

2. REFER TO AS BUILT DRAWINGS IN APPENDIX FOR

MORE INFORMATION.

3. CONTRACTOR SHALL FIELD VERIFY ON SITE PIPING

PRIOR TO SUBMITTING BIDS.

4. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY

DISCREPANCIES WITH ITEMS ON SITE.

GENERAL SHEET NOTES:

1. RUN-OUTS TO VAV BOXES SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

2. LOCATE ALL EQUIPMENT ABOVE SUSPENDED

CEILINGS OR NEAR A CEILING ACCESS

HATCHES OR PANELS AND MOUNTED AS LOW

TO THE CEILING AS POSSIBLE TO ALLOW FOR

PROPER SERVICING. LOCATE EQUIPMENT TO

PROVIDE ACCESSIBILITY FROM THE CEILING

ACCESS POINT TO AREAS OR PARTS OF THE

EQUIPMENT THAT REQUIRE PERIODIC

S SS

S

S

SS S

S S

S

S SS S

S

S S

S S

S

S

S

S

S S

S

S S

S

S

S S

S

SS

SS

S S

S S

S S

S

S

S

S

S S

S

S

S S

S

SS S

SS S

S S

S

S S

S S

S SS

S SS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

G

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

VAV

10-01

VAV

10-32

VAV

10-07

VAV

10-08

VAV

10-33

VAV

10-11

VAV

10-14

VAV

10-16

VAV

10-18

VAV

10-19

VAV

10-26

VAV

10-09

VAV

10-06

VAV

10-05

VAV

10-04

VAV

10-02

VAV

10-15

VAV

10-17

VAV

10-34

VAV

10-20

VAV

10-22

VAV

10-21

VAV

10-23

VAV

10-24

VAV

10-12

VAV

10-27

VAV

10-13

1" HWR

1" HWS 1 1/2" HWS

1 1/2" HWR 1 1/2" HWR

1 1/2" HWS

1" HWR

1" HWS

3/4" HWR

3/4" HWS

H W

R

H W

S

1" HWR 1" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

1/2" HWS

1/2" HWR

IMD SUPPLY

5B122 PANORAMIC X-RAY

5B123

STERILE INSTR. STORAGE

5B128

SOILED UTILITY

5B130

EQUIPMENT STORAGE

5B135

UNISEX TOILET

5B136

DENTIST WORKSTATIONS

5B129

OPERATORY TREATMENT GENERAL

AREA

5B131

HAC

5A110

ENGINEERING

5A111

STAFF LOUNGE

5A112

MALE TOILETS / LOCKERS

5A113

FEMALE TOILETS / LOCKERS

5A114

SCRUBS DISTRIBUTION

5A108

CRASH CART

5A115

PHYSICIANS CUBICLES

5A117

FILE ROOM

5A118

COPY ROOM

5A119

OFFICE

5A120

SUPPLY STORAGE

5A121

DIRECTORS CONFERENCE ROOM

5A122

MENS TOILET ROOM

5A124PIPE ACCESS

5A125

WOMENS TOILET ROOM

5A126

HAC

5A127

EAST STAIR

5A128

STAFF LOUNGE

5A130

OFFICE

5A131

CUBICLES

5A134

OFFICE

5A132

OFFICE

5A133

TELECOMM

5A135

CENTRAL STAIR

5A101

FAMILY TOILET

5A102

MEDICAL CONFERENCE

5A103

DENTAL CONFERENCE

5A105

MECHANICAL SHAFT

5A106

LOBBY / LOUNGE

C5-105

ELECTRICAL ROOM

5B102

WAITING

5B103

RECEPTION / SECRETARY

5B104

COPY ROOM

5B105

DENTAL SERVICE CHIEF OFFICE

5B106

MEDICATION ROOM

5B109

AO OFFICE

5B107

SHIPPING/ RECEIVING ROOM

5B110

WEST STAIR

5B111

TOILET ROOM

5B112

SOILED UTILITY

5B114

OPERATORY TREATMENT GENERAL

AREA

5B115

CORRIDOR

C5-104A

CORRIDOR

C5-104

CORRIDOR

C5-107A

CORRIDOR

C5-109

CORRIDOR

C5-102C

CORRIDOR

C5-106

CORRIDOR

C5-103CORRIDOR

C5-102

DENTAL TREATMENT ROOM 1

5B116

DENTAL TREATMENT ROOM 2

5B117

DENTAL TREATMENT ROOM 3

5B118

DENTAL TREATMENT ROOM 4

5B119

DENTAL TREATMENT ROOM 5

5B120

DENTAL TREATMENT ROOM 6

5B121

DENTAL TREATMENT ROOM 7

5B125

DENTAL TREATMENT ROOM 8

5B126

DENTAL TREATMENT ROOM 9 -

SPECIAL NEEDS

5B127

DENTAL TREATMENT ROOM 10-

SPECIAL NEEDS

5B132

DENTAL TREATMENT ROOM 11

5B133

DENTAL TREATMENT ROOM 12

5B134

DENTAL LAB

5B113

MH301

MH301

LOCKABLE COVER

VAV

10-10

VAV

10-30

VAV

10-31

VAV

10-25

VAV

10-03

VAV

10-28

VAV

10-29

M H

1" CHWS

1" CHWR

PROVIDE SHUT-OFF

VALVES AND CAP FOR

FUTURE

AVERAGE SENSORS TO

CONTROL VAV 10-33

ACCESS HATCH

1" HWR

1" HWS

1 1/4" HWR

1 1/4" HWS

1 1/2" HWR

1 1/2" HWS

1 1/4" HWR

1 1/4" HWS

1" HWR

1" HWS

AVERAGE SENSORS TO

CONTROL VAV 10-04

T

T

T

T

T

T

T

T

T T T

T

T

T

T T

T T

T

T T T

T

T

T

T

T CO

CO

CO

CO

H

T

TS

TS

T

T

T

TS

TS

H

CO CO

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

C R e v it L o c a l F ile s \I C

T

B L D

G

M e c h a n ic a l C

D S

A a ro n .C

.M e y e r.

rv t

/1

/2

:0

:2

P M

MP104

5TH FLOOR -HVAC PIPING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY

201 238

1/8" = 1'-0"MH301 MP104

1 5TH FLOOR - HVAC PIPING

N O

R T

H

SPECIAL CONDITION NOTES:

1. HEATING WATER SUPPLY AND RETURN PIPING FOR

THIS FLOOR HAS BEEN FABRICATED AND IS ON SITE.

CONTRACTOR SHALL INSTALL, TEST, AND INSULATE

ALL PIPING AS PART OF THIS CONTRACT.

2. REFER TO AS BUILT DRAWINGS IN APPENDIX FOR

MORE INFORMATION.

3. CONTRACTOR SHALL FIELD VERIFY ON SITE PIPING

PRIOR TO SUBMITTING BIDS.

4. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY

DISCREPANCIES WITH ITEMS ON SITE.

GENERAL SHEET NOTES:

1. RUN-OUTS TO VAV BOXES SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

2. LOCATE ALL EQUIPMENT ABOVE SUSPENDED

CEILINGS OR NEAR A CEILING ACCESS

HATCHES OR PANELS AND MOUNTED AS LOW

TO THE CEILING AS POSSIBLE TO ALLOW FOR

PROPER SERVICING. LOCATE EQUIPMENT TO

PROVIDE ACCESSIBILITY FROM THE CEILING

ACCESS POINT TO AREAS OR PARTS OF THE

EQUIPMENT THAT REQUIRE PERIODIC

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

G

F

E

D

C

B

A

ELEVATOR EQUIP ROOM

6B102

CENTRAL STAIR

6B103

ELECTRICAL ROOM

6B100A

ELECTRICAL ROOM

6B100B

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

RADIO ROOM

6B104

ALCOVE

6B105

VFD-EF-1

VFD-EF-2

CWS/R AND HWS/R FROM CRAWLSPACE

AHU-6

HEPA FILTER RACK

VAV

6-34

VAV

5-34

AHU-10

AHU-5

EX-EF-3

VFD

EXISTING

EHAUST

FAN TO

REMAIN

EX-EF-1

VFD

EXISTING

EHAUST

FAN TO

REMAIN

6" CHWS

6" CHWR

1" HWS

1" HWR

3" CHWR

3" CHWS

3" CHWR

T

T

T

T

MH302

MH302

MH302

3/4" HWS

3/4" HWR

1" HWS

3" CHWS

3" CHWR

T T

VFD-EF-3

VFD-EF-4

M H

VFD-AHU-5S

VFD-AHU-5R VFD-AHU-10R

VFD-AHU-10S

VFD-AHU-6R

VFD-AHU-6S

CENTRAL STAIR

6B103

ELECTRICAL ROOM

6B100A

ELECTRICAL ROOM

6B100B

VAV

6-44

VAV

6-41

VAV

6-42

VAV

6-43HEPA-1

HEPA-2

HEPA FILTER RACK

SHUT-OFF VALVES

1 1/2" MCD TO FLOOR DRAIN.

SEE DETAIL

MH302

MH302

MH302

1 1/2" MCD TO FLOOR DRAIN.

SEE DETAIL

EXISTING TRASH CHUTE

TO BE REMOVED

EXISTING LAUNDRY

CHUTE

ACCESS HATCH

BCU-1

BCU-3

3/4" HWR

3/4" HWS

1" CHWR

1" CHWS

1/2" HWR

1/2" HWS

BCU-2

3/4" HWR

3/4" HWS

1" HWR

3/4" HWS

3/4" HWR

1" CHWR

1" CHWS

1" CHWS

1" CHWR

3/4" HWS

3/4" HWR

1" CHWS

1" CHWR

3/4" HWS

3/4" HWR

1" CHWS

1" CHWR

3/4" HWS

1" MCD

ROUTE CONDENSATE TO

NEAREST FLOOR DRAIN

1" MCD

ROUTE CONDENSATE TO

NEAREST FLOOR DRAIN

ROUTE CONDENSATE TO

NEAREST FLOOR DRAIN

1" MCD

T H

MOUNT ON NEAREST

STRUCTURAL MEMBER

T H

MOUNT ON NEAREST

STRUCTURAL MEMBER

T H

MOUNT ON NEAREST

STRUCTURAL MEMBER

1" CHWS/R VALVE AND

CAP FOR FUTURE.

4" CHWS

4" CHWR

1" HWR

1" HWS

1 1/2" MCD TO FLOOR

DRAIN. SEE DETAIL

REMOVE EXISTING CWS AND CWR

PIPING FROM OUTSIDE OF ELEVATOR

MACHINE ROOM BACK TO MAINS AND

CAP. CONNECT EXISTING PIPING TO

NEW PIPING AS INDICATED.

REMOVE EXISTING CHILLED

WATER PIPING FROM OUTSIDE

OF ELEVATOR MACHINE BACK

TO MAINS AND CAP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

C R e v it L o c a l F ile s \I C

T

B L D

G

M e c h a n ic a l C

D S

A a ro n .C

.M e y e r.

rv t

/1

/2

:0

:2

P M

MP105

ATTIC - HVAC PIPING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY

202 238

1/8" = 1'-0"MH301 MP105

1 ATTIC - HVAC PIPING

N O

R T

H

GENERAL SHEET NOTES:

1. RUN-OUTS TO VAV BOXES SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

- WATER INTRUSION FIX 2017 02 15

UP

SEE SHEET

MS101 FOR

CONTINUATION

EXISTING 6" HWS/R

FROM BUILDING#3.

SEE SHEET MS101

FOR CONTINUATION

EX_53HWP-2

EX_53HWP-1

8" CHWR

ET-1

8" CHWS

5" HWS

5" HWR

BUILDING 53 MECHANICAL

ROOM

EXISTING 5" HWS

EXISTING 5" HWR

EXISTING AIR

SEPARATOR

M H

CHILLED WATER

ISOLATION

VALVES

EXISTING HWS/R

TO BLDG #53.

NEW 3" CHWS/R TO

BLDG #53.

HOT WATER

ISOLATION VALVES

CHILLED WATER

ISOLATION

VALVES

3" CHWR

8" CHWS

3" CHWR

8" CHWS

8" CHWR

CHILLED WATER

ISOLATION

VALVES

SEE SHEET MS101

FOR CONTINUATION

8" CHWR

8" CHWS

8" CHWR

3" CHWS

SEE SHEET MS101

FOR CONTINUATION

INSTALL FLOW MEASURING STATIONS

WITH BTU METERS IN BUILDING 53

MECHANICAL ROOM. SENSORS CAN BE

INSTALLED WITHIN TUNNEL BETWEEN

BUILDING 53 AND BUILDING 1.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

C R e v it L o c a l F ile s \I C

T

B L D

G

M e c h a n ic a l C

D S

A a ro n .C

.M e y e r.

rv t

/1

/2

:0

:2

P M

MP106

BUILDING 53 MECHANICAL ROOM RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY

203 238

1/4" = 1'-0"MS101 MP106

1 BLDG 53 MECH ROOM

N O

R T

H

GENERAL SHEET NOTES:

1. CONTRACTORS SHALL REVIEW ROUTING OF

PIPING PRIOR TO BID.

2. CONTRACTORS SHALL COORDINATE ROUTING

OF PIPING WITH EXISTING CONDITIONS.

C W R

CWR

CWR

CWR

CWR

C

WR

C W R

CWS

CWS

CWS

C W S

CWS

C W S

8" C W S

8" C W R

N

EW

R

ETAIN

IN

G

W

ALL

TBM #1

GRASS

O A K

42" OAK

48" MAG

48" MAG

36"OAK

O A K

G R A S S

G R A S S

G R A S S

G R A S S

G R A S S

GRASS

G R A S S

40" OAK

GRASS

GRASS

"O A K

G R A S S

48" OAK

M A G N O

LIA

"O A K

"O A K

"P

IN

E

"P

IN

E

"P

IN

E

"P

IN

E

44" OAK

O A K

C L U S T E R

O A K

O A K

C L U S T E R

"O A K

O A K

RETAININGWALL

CONC

F

LU

M E

A/C

WALK

D

NEW 5" HWS/R

TO BUILDING #1

NEW 8" CWS/R

TO BUILDING #1

SEE SHEET MP106

FOR

CONTINUATION

8"CHWR

8"CHWS

5"HWS

5"HWR

TURN UP IN EXISTING INCINERATOR SHAFT

SEE SHEET MP100 FOR

ADDITIONAL WORK IN THIS

AREA

EXISTING

6"HWS/R

6"HWR

6"HWS

6"HWR

6"HWS

6"H W

R 6"H W

S

6"H W

R

6"H W

S

"H

W S

"H

W R

REMOVE EXISTING SECONDARY CHILLED WATER PUMPS SERVING

BLDG#1 & 53. REPLACE WITH SCHWP-1 AND SCHWP-2 WITH NEW

VFD'S. CONTRACTOR SHALL FIELD VERIFY LOCATION, EQUIPMENT,

AND WORK REQUIRED PRIOR TO BID. CONTRACTOR SHALL NOTIFY

R.E. AND ENGINEER OF ANY CONCERNS.

8"CHWR

8"CHWS

5"HWS

5"HWR

MP106

MP100

8"CHWS

8"CHWR

6"CHWR

6"CHWS

EXISTING

8"CHWS/R

TO REMAIN

EXISTING

6"CHWS/R TO

BE REMOVED

3"CHWR

CONNECT TO EXISTING

3" CHWS/R RISER TO ATTIC

8"CHWS

8"CHWR

3"CHWS

NEW 8" CHWS/R

NEW 3" CHWS/R

COORDINATE BUILDING OUTAGE

WITH OWNER PRIOR TO MAKING

NEW CONNECTIONS.

GENERAL NOTE:

REMOVE PIPING AS INDICATED

AND PREPARE FOR NEW

CONNECTIONS AS INDICATED.

4"CHWR

4"CHWS

3"HWS

3"HWR

"C

H W

R 6 "C

H W

S "H

W S

"H

W R

CONTRACTOR SHALL FIELD VERIFY ROUTING OF NEW

PIPING UNDER EXISTING BUILDINGS PRIOR TO BID. PATH

INDICATED IS GENERAL ROUTING WHICH MAY REQUIRE

ADDITIONAL OFFSETS AND PIPING TO BYPASS EXISTING

UTILITIES AND CRAWL SPACE CONDITIONS. CONTACT R.E.

AND ENGINEER OF ANY CONCERNS PRIOR TO BID.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

C R e v it L o c a l F ile s \I C

T

B L D

G

M e c h a n ic a l C

D S

A a ro n .C

.M e y e r.

rv t

/1

/2

:0

:3

P M

MS101

SITE PLAN - HVAC RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY

171 238

1" = 20'-0"MS101

1 SITE - HVAC N

O

R T

H

GENERAL HVAC NOTES :

1. CONTRACTORS SHALL REVIEW ROUTING OF

PIPING PRIOR TO BID.ROUTING SHOWN IS ONE

POTENTIAL ROUTE WITH FINAL ROUTE UP TO

INSTALLING CONTRACTOR TO DETERMINE.

2. CONTRACTORS SHALL COORDINATE ROUTING

OF PIPING WITH EXISTING CONDITIONS.

File details come from the government source that posted it. Updated .