This document appears to be a set of drawings for the plumbing component of a renovation project for Building 1 in Biloxi, Mississippi. The related federal contract opportunity is a solicitation from the Department of Veterans Affairs Office of Construction and Facilities Management for the Biloxi Building 1 Renovation project.

The solicitation requires the contractor to provide all qualified supervision, labor, materials, transportation, and equipment necessary to complete the renovation, including selective demolition, exterior building envelope alterations, and interior renovation of areas within Building 1. The work involves upgrades to the interior utilities and building systems, such as replacement of HVAC, plumbing, electrical, telecommunication systems, chilled water systems, and modifications to the fire protection systems. There will also be limited structural, mechanical, and electrical work related to the underside of the 3rd floor structure within the occupied areas of the 2nd floor, as well as site restoration. The period of performance is 912 calendar days from the receipt of the Notice to Proceed, and the project magnitude is between $50M to $100M. The solicitation is subject to Wage Rate Requirements (Construction).

View the file

Other files

File Type Posted
S02_Solicitation Amendment 0003.pdf PDF
C28_02821319 TILE AND MASTIC AND BRICK COATING ABATEMENT.pdf PDF
C28_02833313 LEAD PAINT REMOVAL.pdf PDF
P12_AE Addendum Two.pdf PDF
SolicitationAmendment0004.pdf PDF
P03_Justification and Approval - TekTone Nurse Call System - revised 05.24.24.pdf PDF
P12_Asbestos Report - 01.03.2022.pdf PDF
SolicitationAmendment0003.pdf PDF
52.219-28 Post-Award Small Business Program Rerepresentation.pdf PDF
Wage Determination - Harrison County MS.pdf PDF
QSE 36C10F24R50025.pdf PDF
P12_Asbestos Report - 07.06.2017.pdf PDF
S05_RFI Questions and Answers.pdf PDF
P12_Lead Based Paint Analysis - Bldg 1 - 01.11.2017.pdf PDF
S02_117300 CEILING MOUNTED PATIENT LIFTS - Revised.pdf PDF
P12_Asbestos Report - 05.06.2008.pdf PDF
P12_Addendum 1 - 05.14.2024.pdf PDF
S04_Biloxi Bldg 1 Reno - Pre-Proposal Conference Attendees.pdf PDF
SolicitationAmendment0002.pdf PDF
SolicitationAmendment0001.pdf PDF
QSE 36C10F24R50025.pdf PDF
Wage Determination - Harrison County MS.pdf PDF
52.219-28 Post-Award Small Business Program Rerepresentation.pdf PDF
Drawings - Architectural - 3.pdf PDF
General Contractor Reference Form.docx DOCX document
Drawings - Telecommunication.pdf PDF
Drawings - Architectural - 4.pdf PDF
Drawings - Reference.pdf PDF
VA Biloxi 4th Floor Footwall.pdf PDF
Drawings - Architectural - 1.pdf PDF
Building 1 Inventory - d.pdf PDF
Adec Submittal - VA Biloxi.pdf PDF
Drawings - Electrical - 2.pdf PDF
LOCQ7780-03-SWS-Biloxi VA Dental Lab.pdf PDF
Justification and Approval - Siemens Security and Video Surveillance System.pdf PDF
Past Performance Questionnaire.docx DOCX document
A-dec Floor Plan - VA Biloxi - Elevations.pdf PDF
Drawings - Structural - 2.pdf PDF
Specifications Volume II.pdf PDF
Biloxi VA Reno B1 - Set H.pdf PDF
Drawings - Structural - 1.pdf PDF
VA Biloxi Patient Room Footwall Typical Elevation.pdf PDF
Justification and Approval - Herman Miller Compass Patient Care Modular System.pdf PDF
Solicitation.pdf PDF
000000 Cover Page Appendix.pdf PDF
Justification and Approval - ESTIII Fire Alarm System.pdf PDF
Drawings - General.pdf PDF
A-dec Floor Plan - VA Biloxi - Preliminary.pdf PDF
Drawings - Mechanical - 2.pdf PDF
Drawings - Plumbing - 2.pdf PDF
Show 40 more

Latest 50 of 64 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

G

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

EXISTING 1/2"

NATURAL GAS UP

(TYPICAL).

EXISTING 1/2" NG UP

(TYPICAL)

EXISTING 3" CW,

2" HW, & 1" HWR UP.

EXISTING

3" CW, 2-1/2" HW,

& 3/4" HWR UP.

EXISTING 3" CW, 2-1/2" HW,

& 3/4" HWR UP.

EXISTING 1/2" CW UP.

(TYPICAL)

EXISTING 3" CW,

2-1/2" HW, & 1" HWR UP.

EXISTING

3/4" CW & HW UP.

EXISTING 8" DOMESTIC WATER

EXISTING SERVICES TO / FROM SOUTH WING.

EXISTING

EXISTING

SERVICES

TO / FROM

BUILDING 53.

NEW 4" CW, 2-1/2" HW

& 1-1/2" HWR.

NEW

SHUT-OFF

VALVES

SHUT-OFF

VALVE

EXISTING 2-1/2" CW,

1-1/4" HW, & 3/4" HWR UP.

PROVIDE FLOW METERS

FOR DOMESTIC WATER

PIPE WITH BYPASS AND

SHUT OFF VALVES FOR

REMOVAL/MAINTENANCE.

EXISTING

3/4" CW & HW UP.

EXISTING

3/4" CW & HW UP.

EXISTING

3/4" CW & HW UP.

EXISTING

3/4" CW & HW UP.

EXISTING

3/4" CW & HW UP.

REMOVE EXISTING CHECK

VALVE.

REFER TO PS101 FOR CONTINUATION

PROVIDE 4" CW COPPER MAIN

APPROXIMATELY 40 FEET TO

MECHANICAL SPACE UNDER BUILDING

53. TIE INTO VA PROVIDED 4" CW

COPPER MAIN. COORDINATE TIE-IN WITH

RESIDENT ENGINEER. REFER TO PS101

FOR MORE INFORMATION.

PROVIDE SHUT-OFF

VALVES AND CAP FOR

FUTURE USE.

APPROXIMATE LOCATION

OF ROOM BC 109

ALTERNATE PUMP LOCATION

IN ROOM BC 109

PRIMARY PUMP LOCATION

IN ROOM BC 109

PROVIDE DOMESTIC WATER

BOOSTER PUMP SYSTEM,1-BP1,

IN BASEMENT ROOM BC 109.

UNIT SHALL BE NO LARGER

THAN 72"W X 88" H X 60"D.

TO BUILDING 1 BASEMENT ROOM

BC 109 FOR CONNECTION TO

DOMESTIC WATER BOOSTER

SYSTEM. PROVIDE PIPING AND

VALVES TO ALLOW PUMP SKID TO

BE BYPASSED.

ROUTE TAPS TO WATER LINES

FOR MONITORING SYSTEM.

COORDINATE TAP LOCATIONS

AND ROUTING WITH VA. WATER MONITORING SYSTEM.

PROVIDE CONNECTIONS

FROM NEW MAIN TO

EXISTING CONNECTIONS

(TYP.)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL101

EXISTING CRAWL SPACE -

PLUMBING

RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 137 238

KEYED NOTES:

1. CONNECT TO EXISTING 4" AND 5" DOMESTIC WATER MAINS.

2. CONNECT TO EXISTING 3" HW & 1 1/2" HWR.

3. BOOSTER PUMP SHALL BE CAPABLE OF INTERFACING WITH

CAMPUS BAS. REFER TO MH402 AND SPECIFICATIONS FOR CONTROLS INFORMATION.

4. PROVIDE WATER MONITORING SYSTEM ON DOMESTIC COLD WATER MAIN WHICH

PROVIDES OXIDANT RESIDUAL, TEMPERATURE, PRESSURE, PH, AND DISSOLVED SOLIDS

(CONDUCTIVITY). PROVIDE ACCESSORIES AS NECESSARY TO MONITOR AND PROVIDE

THE REQUIRED INFORMATION ALONG WITH WATER HARDNESS. NEW SYSTEM SHALL BE

COMPATIBLE WITH AND CAPABLE OF SEAMLESS INTEGRATION INTO THE CAMPUS

EXISTING WATER MONITORING SYSTEM, CURRENTLY PHIGENICS, AND EXISTING CAMPUS

BAS SYSTEM, CURRENTLY SIEMENS, FOR DATA MONITORING AND LOGGING. WEB BASED

MONITORING AND DATA LOGGING SHALL BE PART OF THE SYSTEM PACKAGE. SYSTEM

SHALL BE PHIGENICS MODEL WME-1175 ADVANCED PWA WITH WME-9999 CALCIUM

HARDNESS ANALYZER – QUANTITATIVE. COORDINATE MONITORING SYSTEM

REQUIREMENTS, LOCATION, AND INSTALLATION WITH VA. REFER TO PLUMBING DETAILS

AND SPECIFICATION SECTION 22 11 00 FOR MORE INFORMATION.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. CONTRACTORS SHALL REVIEW ROUTING OF

PIPING PRIOR TO BID. ROUTING SHOWN IS ONE

POTENTIAL ROUTE WITH FINAL ROUTE UP TO

INSTALLING CONTRACTOR TO DETERMINE.

3. CONTRACTORS SHALL COORDINATE ROUTING OF

PIPING WITH EXISTING CONDITIONS.

4. EXISTING PIPING SHOWN ON PLANS SHALL

REMAIN FOR CONTINUED SERVICES TO THE 1ST

AND 2ND FLOORS.

Revisions: Date:

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

EXISTING 2-1/2" CW,

1-1/4" HW, & 3/4" HWR UP / DN.

EXISTING 3" CW,

2-1/2" HW, & 3/4" HWR DN..

EXISTING 3" CW,

2" HW, & 3/4" HWR DN.. EXISTING 3" CW,

2-1/2" HW, & 3/4" HWR DN..

EXISTING 3" CW,

2-1/2" HW, & 3/4" HWR UP.

EXISTING 3" CW,

2-1/2" HW, & 3/4" HWR UP.

EXISTING 3" CW,

2" HW, & 3/4" HWR UP.

EXISTING 3" CW,

2-1/2" HW,

& 3/4" HWR DN..

EXISTING 3" CW,

2-1/2" HW, & 3/4" HWR UP.

1 1/2" HWR, 1 1/2"

HW, 2 1/2" CW

CAPPED.

PROVIDE SHUT-OFF

VALVES AND CAP FOR

FUTURE USE.

1 1/2" HWR, 2 1/2" HW,

4" CW UP & DOWN, 3"

CW UP & DOWN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL102

EXISTING 1ST FLOOR - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 138 238

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. EXISTING PIPING SHOWN ON PLANS SHALL REMAIN

FOR CONTINUED SERVICES TO THE 1ST AND

2ND FLOORS.

1 2 3 4 5 6 7 8 9

11 12

14 15 16 17 18 19 20 21 22

G

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

EXISTING 2" CW,

1" HW, & 1/2" HWR DN..

EXISTING

3" CW, 2" HW, &

3/4" HWR DN

EXISTING 3" CW,

2" HW, & 3/4" HWR DN..

EXISTING 2-1/2" CW,

2" HW, & 3/4" HWR DN

EXISTING 3" CW,

2-1/2" HW, & 3/4" HWR DN..

PROVIDE SHUT-OFF

VALVES AND CAP

FOR FUTURE USE.

TURN UP/DN..

1 1/2" HWR, 1 1/2"

HW, 2 1/2" CW

CAPPED.

3" CW UP & DOWN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL103

EXISTING 2ND FLOOR - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 139 238

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. EXISTING PIPING SHOWN ON PLANS SHALL REMAIN

FOR CONTINUED SERVICES TO THE 1ST AND 2ND

FLOORS.

3. REFER TO DRAWING AE102 FOR INFORMATION

REGARDING PHASING OF WORK ON THE SECOND

FLOOR.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

FEC

FEC

FEC

1" CW,

3/4" HW,

1/2" HWR

UP

2" CW UP

1 1/2" CW UP

1 1/2" CW

UP

1/2" CW,

1/2" HW,

1/2" HWR

UP

3/4" CW,

3/4" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP 1" CW" UP

1 1/2" CW UP

3/4" CW,

3/4" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP

1 1/2" CW,

1/2" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP 1 1/2" CW,

1/2" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP

1 1/2" CW,

1/4" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP

1 1/2" CW,

1/2" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR

UP

1 1/2" CW,

1/2" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR

UP

1 1/2" CW,

1/2" HW,

1/2" HWR UP

3/4" CW,

3/4" HW,

1/2" HWR DN

1 1/2" CW,

1/2" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP

1 1/2" CW,

1/2" HW,

1/2" HWR UP

1 1/2" CW,

3/4" HW UP

1/2" CW,

1/2" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR

UP

1/2" CW,

1/2" HW

1/2" HWR UP

1" CW

UP

2 1/2" CW,

3/4" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP

3/4" CW,

3/4" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR

UP

1/2" CW,

1/2" HW,

1/2" HWR

UP

1" CW

UP

1/2" CW,

1/2" HW,

1/2" HWR

UP

3/4" CW,

3/4" HW,

1/2" HWR

DN

PROVIDE SHUT-OFF

VALVES AND CAP

FOR FUTURE USE.

TURN UP/DN..

1/2" CW,

1/2" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP 1/2" CW,

1/2" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP

PL401

PL401

PL402

PL4021

PL403

PL404

CS-2

CS-2

CS-2 CS-2

CS-2

CS-2

CS-2

1 1/2" HWR, 1 1/2"

HW, 2 1/2" CW

CAPPED.

3" CW UP, 4"

CW DN"

PROVIDE 1 1/2" BFP FOR DIALYSIS BOX

WATER LINE. ROUTE DRAIN FOR BFP

INTO MOP BASIN AND TERMINATE WITH

AIR GAP 6" ABOVE BASIN

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

3/4" CW,

3/4" HW,

1/2" HWR

UP

3/4" CW UP

PROVIDE 1 1/2" BFP FOR DIALYSIS BOX

WATER LINE. ROUTE DRAIN FOR BFP

INTO MOP BASIN AND TERMINATE WITH

AIR GAP 6" ABOVE BASIN

TP-2TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

3" CW UP & DOWN

1 1/2" CW UP

1/2" CW,

1/2" HW,

1/2" HWR

UP

1/2" CW,

1/2" HW,

1/2" HWR

UP

1/2" CW,

1/2" HW,

1/2" HWR UP

CS-2

1/2" CW,

1/2" HW,

1/2" HWR UP

CS-2 CS-2

1/2" CW,

1/2" HW,

1/2" HWR UP

CS-2 CS-2

1/2" CW,

1/2" HW,

1/2" HWR UP

CS-2 CS-2

1/2" CW,

1/2" HW,

1/2" HWR

DN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL104

3RD FLOOR - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 140 238

KEYED NOTES:

1. PROVIDE 3/4" DRAIN WITH SOLENOID VALVE THEN

MANUAL SHUT-OFF VALVE EXTENDED TO FLOOR

SINK (OR MOP SINK) TO "HEAT AND FLUSH"

DOMESTIC HOT WATER LINE. SOLENOID VALVE TO

BE WIRED TO BAS FOR REMOTE OPERATION AND

MONITORING. COORDINATE VALVE SELECTION AND

LOCATION WITH OWNER AND TEMPERATURE

CONTROL CONTRACTOR.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL401, PL402, PL403, AND PL404 SHEETS

FOR ENLARGED PLANS.

3. REFER TO PL501 AND PL502 FOR DETAILS.

4. REFER TO PL505, PL506, PL508, PL509, PL510, AND

PL511 SHEETS FOR RISER DIAGRAMS.

5. PROVIDE SHUT OFF VALVES FOR ALL BRANCHES.

REFER TO SPECIFICATIONS FOR TYPE.

6. PROVIDE CHECK VALVES FOR MOP BASIN SINKS

(P-502) IN HAC CLOSETS. REFER TO

SPECIFICATIONS FOR MORE INFORMATION.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS

SPECIFICATION SECTION 01 00 00.1.38

ALTERNATE NO.2 FOR REQUIREMENTS OF

DEDUCT ALTERNATE OF THE DIALYSIS

BOXES INDICATED ON THIS SHEET.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

SIM

TYP

FEC FEC FEC

1 1/2" CW UP 1" CW, 1" HW, 1/2" HWR UP

1/2" CW, 1/2" HW,

1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR

UP

2" CW,

1-1/2" HW,

1-1/2" HWR UP

TURN

DN

2" CW UP

1-1/2" HW UP

1- 1/2" HWR UP

1/2" CW,

1/2" HW,

1/2" HWR UP

1" CW UP,

3/4" CW DN,

1/2" HW UP,

3/4" HW DN

1/2" HWR

UP & DN

1" CW,

3/4" HW,

1/2" HWR DN

2" CW DN

1 1/2" CW UP,

2" CW DN

1/2" CW DN

1/2" CW,

1/2" HW,

1/2" HWR DN

2" CW,

1" DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

1 1/2" CW DN

1 1/2" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN 1 1/2" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

1 1/2" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

1 1/2" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR

DN

1 1/2" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

1 1/2" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

1 1/2" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

2" CW,

3/4" HW DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR

DN

2" CW,

1" CW DN

1 1/2" CW,

1/2" HW,

1/2" HWR DN

1/2" CW,

1/2" HW,

1/2" HWR

DN

2 1/2" CW,

1-1/2" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR

DN

1" CW

DN

1/2" CW,

1/2" HW,

1/2" HWR UP

3/4" CW,

3/4" HW,

1/2" HWR

DN

2-1/2" CW,

1-1/2" HW,

1- 1/2" HWR

UP

PROVIDE

SHUT-OFF

VALVES.

TURN UP/DN.

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

CS-2

CS-2

CS-2

CS-2

CS-2 CS-2 CS-2 CS-2 CS-2CS-2

CS-2

CS-2

2" CW,

1 1/2" HW,

1" HWR UP

3" CW DN,

3" CW DN,

2-1/2" CW UP,

1-1/2" HW UP,

2-1/2" HW DN

1 1/2" CW,

3/4" HW,

1/2" HWR

2" CW UP

PROVIDE 1 1/2" BFP FOR DIALYSIS

BOX WATER LINE. ROUTE DRAIN

FOR BFP INTO MOP BASIN AND

TERMINATE WITH AIR GAP 6"

ABOVE BASIN

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

3/4" CW,

3/4" HW,

1/2" HWR

DN

PROVIDE 1 1/2" BFP FOR DIALYSIS

BOX WATER LINE. ROUTE DRAIN FOR

BFP INTO MOP BASIN AND TERMINATE

WITH AIR GAP 6" ABOVE BASIN

TP-2

TP-2TP-2

TP-2

TP-2

TP-2

TP-2

PROVIDE PRESSURE

GAUGES ON ALL LINES

CW PIPING FOR TRAP

PRIMERS. REFER TO

PL106 FOR ROUTING.

1 1/2" CW DN

1/2" CW,

1/2" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR

DN

3/4" CW,

3/4" HW,

1/2" HWR

DN

CS-2

3/4" CW,

3/4" HW,

1/2" HWR

DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

3/4" CW,

3/4" HW,

1/2" HWR DN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL105

4TH FLOOR - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 141 238

KEYED NOTES:

1. PROVIDE ACCESS PANELS FOR BALL VALVES AND BALANCING

VALVES. COORDINATE SIZE AND LOCATION WITH ARCHITECT.

2. PROVIDE TEMPERATURE SENSORS AT THIS LOCATION FOR HOT,

COLD, AND HOT WATER RECIRCULATION PIPING. COORDINATE

EXACT INSTALLATION LOCATION WITH OWNER AND

TEMPERATURE CONTROLS CONTRACTOR.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL401, PL402, PL403, AND PL404 SHEETS FOR

ENLARGED PLANS.

3. REFER TO PL501 AND PL502 FOR DETAILS.

4. REFER TO PL505, PL506, PL508, PL509, PL510, AND PL511 SHEETS

FOR RISER DIAGRAMS.

5. CONTRACTOR SHALL SET ALL BALANCE VALVES TO 0.5GPM

UNLESS NOTED OTHERWISE.

6. PROVIDE SHUT OFF VALVES FOR ALL BRANCHES. REFER TO

SPECIFICATIONS FOR TYPE.

7. PROVIDE CHECK VALVES FOR MOP BASIN SINKS (P-502) IN HAC

CLOSETS. REFER TO SPECIFICATIONS FOR MORE INFORMATION.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS SPECIFICATION

SECTION 01 00 00.1.38 ALTERNATE NO.2 FOR REQUIREMENTS

OF DEDUCT ALTERNATE OF THE DIALYSIS BOXES INDICATED

ON THIS SHEET.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

2" CW,

1-1/2" HW,

1- 1/2" HWR DN

1/2" CW,

1/2" HW,

1/2" HWR DN

1/2" CW, 1/2"

HW, 1/2" HWR

DN

2" CW,

1-1/2" HW,

1-1/2" HWR DN

1" CW,

1/2" HW,

1/2" HWR

DN

1/2" CW,

1/2" HW,

1/2" HWR DN

1 1/2" CW DN

1" CW, 1" HW, 1/2" HWR DN

1" CW TURN

UP TO ATTIC.

2-1/2" CW,

1-1/2"HW,

1- 1/2" HWR DN

PROVIDE SHUT-OFF

VALVES AND CAP

FOR FUTURE USE.

PROVIDE

2" CW BFP.

1-1/2" HW,

AND 1" HWR DN.

PROVIDE SHUT-OFF

VALVES IN VERTICAL.

PROVIDE A DOMESTIC WATER FILTER WITH

BYPASS LINE, GAUGE, AND CW SUPPLY

ELECTRIC SOLENOID SHUT-OFF VALVE FOR

CONNECTION TO DENTAL EQUIPMENT.

COORDINATE EXACT LOCATION, ELEVATION, AND

PIPING CONNECTION WITH EQUIPMENT.

TURN CW DN.

& HW / HWR DN.

1" CW UP TO TRAP

PRIMERS AND HOSE BIBBS IN ATTIC.

PL401

PL401

PL401

PL401

PL402

PL404

PL404

PL404

1 1/2" HWR, 1 1/2"

HW, 2 1/2" CW

CAPPED.

TP-2

TP-2

CS-2 COORDINATE EXACT

CONNECTION REQUIREMENTS

WITH EQUIPMENT

2" CW DN.

PROVIDE

SHUT OFF IN

VERTICAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL106

5TH FLOOR - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 142 238

KEYED NOTES:

1. 1/2" CW BELOW SLAB TO TRAP.

2. PROVIDE 3/4" DRAIN WITH SOLENOID VALVE THEN MANUAL SHUT-

OFF VALVE EXTENDED TO FLOOR SINK (OR MOP SINK) TO "HEAT

AND FLUSH" DOMESTIC HOT WATER LINE. SOLENOID VALVE TO BE

WIRED TO BAS FOR REMOTE OPERATION AND MONITORING.

COORDINATE VALVE SELECTION AND LOCATION WITH OWNER AND

TEMPERATURE CONTROL CONTRACTOR.

3. COORDINATE PIPE ROUTING WITH LOW VOLTAGE SYSTEM PANEL

PLACEMENT TO PROVIDE 6'-0" CLEAR SPACE ABOVE PANELS.

4. PROVIDE 1/2" CW, 1/2" HW, AND 1 1/2" WASTE

CONNECTIONS INCLUDING ANGLE STOPS AND P-TRAP FOR SINK

LOCATED IN SIDE ACCESSORY CONSOLE. COORDINATE ROUGH-IN

REQUIREMENTS AND INCLUDED ACCESSORIES SUCH AS ANGLE

STOPS AND P-TRAPS WITH EQUIPMENT PROVIDER.

5. PROVIDE P-710 HANDHELD EYEWASH STATION WITH MIXING

VALVE MOUNTED BELOW COUNTER. COORDINATE PIPING,

MOUNTING BRACKET, UNIT LOCATION, AND MIXING VALVE

LOCATION WITH SINK AND EQUIPMENT.

6. PROVIDE TEMPERATURE SENSORS AT THIS LOCATION FOR HOT,

COLD, AND HOT WATER RECIRCULATION PIPING. PROVIDE FLOW

METERS AT THIS LOCATION FOR DOMESTIC HOT WATER

RECIRCULATION PIPING. COORDINATE EXACT INSTALLATION

LOCATION WITH OWNER AND TEMPERATURE CONTROLS

CONTRACTOR.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL401, PL402, PL403, AND PL404 SHEETS

FOR ENLARGED PLANS.

3. REFER TO PL501 AND PL502 FOR DETAILS.

4. REFER TO PL505, PL506, PL508, PL509, PL510, AND

PL511 SHEETS FOR RISER DIAGRAMS.

5. CONTRACTOR SHALL SET ALL BALANCE VALVES TO

0.5GPM UNLESS NOTED OTHERWISE.

6. PROVIDE SHUT OFF VALVES FOR ALL BRANCHES.

REFER TO SPECIFICATIONS FOR TYPE.

7. PROVIDE CHECK VALVES FOR MOP BASIN SINKS

(P-502) IN HAC CLOSETS. REFER TO

SPECIFICATIONS FOR MORE INFORMATION.

SPECIAL CONDITION NOTES:

1. DOMESTIC PIPING ASSOCIATED WITH WOMEN'S

TOILET 5A126, MEN'S TOILET 5A124, HALLWAY 5A125,

HAC 5A127, AND CORRIDOR 5A123 HAS BEEN

FABRICATED AND IS ON SITE. CONTRACTOR SHALL

INSTALL, TEST, AND INSULATE ALL PIPING AS PART

OF THIS CONTRACT.

2. REFER TO AS BUILT DRAWINGS IN APPENDIX FOR

MORE INFORMATION.

3. CONTRACTOR SHALL FIELD VERIFY ON SITE PIPING

PRIOR TO SUBMITTING BIDS.

4. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY

DISCREPANCIES WITH ITEMS ON SITE.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

1" CW

DN

EXISTING

FLOOR DRAIN

EXISTING

FLOOR DRAIN

EXISTING

FLOOR DRAIN

EXISTING

FLOOR DRAIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL107

ATTIC - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 143 238

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL401, PL402, PL403, AND PL404 SHEETS

FOR ENLARGED PLANS.

3. REFER TO PL501 AND PL502 FOR DETAILS.

4. REFER TO PL505, PL506, PL508, PL509, PL510, AND

PL511 SHEETS FOR RISER DIAGRAMS.

11 12

14 15 16 17 18 19 20 21 22

G

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

CO

CO

CO

CO

CO

CO

CO

CO CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

3" SS

2" SS

2" SS

EXISTING 6" SS

TO REMAIN

EXISTING 3" SS

TO REMAIN

PROVIDE 4" CONNECTION

WITH CAP FOR FUTURE

USE. (TYP.)

4" SS UP TO 2ND FLOOR

2" SS UP TO 1ST FLOOR

BATHROOM LAVATORIES

4" SS UP TO 1ST FLOOR

BATHROOM WATER CLOSETS

CO

CO

CO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL201

EXISTING CRAWL SPACE -

SANITARY

RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 144 238

KEYED NOTES

1. 8" SANITARY SEWER TO EXISTING LIFT STATION.

SEE SHEET PS101 FOR CONTINUATION.

2. CONNECT TO EXISTING 4" SANITARY SEWER PIPING.

3. EXISTING 3" SANITARY SEWER FROM SOUTH WING.

4. CONNECT TO EXISTING 3" SANITARY SEWER PIPING.

5. CONNECT TO EXISTING 6" SANITARY SEWER PIPING.

6. CONNECT TO EXISTING 2" SANITARY SEWER PIPING.

GENERAL SHEET NOTES:

1. CONTRACTORS SHALL REVIEW ROUTING OF

PIPING PRIOR TO BID. ROUTING SHOWN IS

ONE POTENTIAL ROUTE WITH FINAL ROUTE

UP TO INSTALLING CONTRACTOR TO

DETERMINE.

2. CONTRACTORS SHALL COORDINATE ROUTING

OF PIPING WITH EXISTING CONDITIONS.

3. ALL EXISTING SANITARY SEWER STACKS

SHALL BE CONNECTED TO THE NEW

SANITARY SEWER MAINS. THIS INCLUDES ANY

BRANCH PIPING SERVING 1ST FLOOR

FIXTURES.

4. REFER TO PL601 FOR SYMBOLS AND NOTES.

5. REFER TO PL401, PL402, PL403, AND PL404

SHEETS FOR ENLARGED PLANS.

6. REFER TO PL501 AND PL502 FOR DETAILS.

7. REFER TO PL505, PL506, PL508, PL509, PL510,

AND PL511 SHEETS FOR RISER DIAGRAMS.

11 12

14 15 16 17 18 19 20 21 22

G

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

CO

UP. UP.UP.

UP.

UP

UP

UP.

UP

UP.

UP.

UP

UP

UP.

UP

UP.

UP.

UP.

UP

UP.

UP. UP

UP.

UP.

UP.

UP

UP

UP

UP. UP

UP

UP

UP

UP.

UP.

UP

UP.

UP.

UP.

UP

UP

UP

UP.

UP

UP.

UP

UP

UP

UP.

UP

UP

UP

UP

UP

UP

UP

UP

UP.

UP.

UP. 2" SS UP

4" SV UP

UP

UP.

UP

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL202

EXISTING PLAN 2ND FLOOR -

SANITARY

RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 145 238

KEYED NOTES:

1. CONNECT TO EXISTING 4" SS STACK.

2. CONNECT TO EXISTING 4" SV STACK.

3. CONNECT TO EXISTING 2" SS STACK.

4. CONNECT TO EXISTING 2" SV STACK.

5. CONNECT TO EXISTING 3" SV STACK.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL401, PL402, PL403, AND PL404 SHEETS

FOR ENLARGED PLANS.

3. REFER TO PL501 AND PL502 FOR DETAILS.

4. REFER TO PL505, PL506, PL508, PL509, PL510, AND

PL511 SHEETS FOR RISER DIAGRAMS.

5. COORDINATE SHOWER FLOOR DRAIN LOCATIONS

WITH ARCHITECTURAL PLANS.

6. REFER TO DRAWING AE102 FOR INFORMATION

REGARDING PHASING OF WORK ON THE SECOND

FLOOR.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

FEC

FEC

FEC

EXISTING 4"DN..

4" SV UP

4" SS

UP &

DN

4" SS

UP &

DN 4" SV UP

4" SS

UP & DN

4" SV UP

4" SS

UP &

DN

4" SV UP

4" SS

UP &

DN

4" SV UP

4" SS

UP &

DN

4" SV UP

4" SS UP & DN

4" SV UP

4" SS

UP &

DN

4" SV UP

4" SS

UP & DN

4" SV UP

4" SS

UP &

DN

4" SV UP

4" SS

DN

4" SS UP

& DN

3" SV UP

2" SS UP

& DN

1 1/2" SS

UP & DN

1 1/2" SS

UP & DN

1 1/2" SS

UP & DN

2" SV UP

UP

UPEXISTING 4" SS DN

2 1/2" SV

UP

2" SS

DN

1 1/2" SV

UP

1 1/2" SS

UP & DN

4" SS UP & DN

4" SV UP. UP

UP

UP

UP/DN

UP

UP

DN

UP

4" VENT UP

UP

FD-M

UP

UP & DN

UP

DN

UP

DN

UP

DN UP

CS-2 CS-2

CS-2 CS-2 CS-2 CS-2

CS-2

CS-2 CS-2 CS-2 CS-2

CS-2

4" SS

2" SV

4" SV

TP-2TP-2

TP-2

TP-2

TP-2

TP-2 TP-2

TP-2TP-2TP-2

TP-2

1 1/2"SS UP & DN

TP-2TP-2

2" SS UP & DN

2" SS UP & DN 2" SS UP & DN 2" SS UP

& DN 2" SS UP & DN

2" SS UP & DN

2" SS UP & DN

2" SS UP & DN 2" SS UP & DN

2" SS UP

& DN2" SS UP

& DN

4" SS DN,

4" SV UP

4" SS

UP &

DN

WCO

UP & DN

2" SS UP & DN

2" SS UP & DN

CS-2

UP & DN UP & DN UP & DN UP & DN

2" SS DN

& 1 1/2" SV DN

4" SS

UP & DN

2" SV UP

2" SS

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL203

3RD FLOOR - SANITARY RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 146 238

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL401, PL402, PL403, AND PL404 SHEETS

FOR ENLARGED PLANS.

3. REFER TO PL501 AND PL502 FOR DETAILS.

4. REFER TO PL505, PL506, PL508, PL509, PL510, AND

PL511 SHEETS FOR RISER DIAGRAMS.

5. COORDINATE SHOWER FLOOR DRAIN LOCATIONS

WITH ARCHITECTURAL PLANS.

SPECIAL CONDITION NOTES:

1. CONTRACTOR TO COORDINATE WITH THE OWNER

FOR SANITARY AND VENT PIPING WORK.

2. REMOVE EXISTING SANITARY AND VENT PIPING

WHICH SERVES THE LOWER LEVELS OF THE

HOSPITAL WITH MINIMAL DOWN TIME.

3. CONTRACTOR SHALL FIELD VERIFY ALL PIPING

WHICH WILL NEED REMOVAL AND TIE-IN PRIOR TO

BID.

4. CONTRACTOR SHALL REVIEW EACH WATER CLOSET

LOCATION AND COORDINATE CARRIER TYPE,

LOCATION, AND PENETRATION REQUIRED WITH

EXISTING STRUCTURE PRIOR TO ORDERING.

NOTIFY ARCHITECT OF ANY DISCREPANCIES WITH

NEW WALLS.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS SPECIFICATION

SECTION 01 00 00.1.38 ALTERNATE NO.2 FOR

REQUIREMENTS OF DEDUCT ALTERNATE OF THE

DIALYSIS BOXES INDICATED ON THIS SHEET.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

FEC FEC FEC

UP

4" SS

DN

4" SV UP

4" SS

DN

4" SV UP

4" SS

UP

4" SS DN

3" SV UP

2" SS DN1 1/2" SS

DN

1 1/2" SS

DN

1 1/2" SS

DN

2" SV UP

UP

UP

UP

UP

UP

4" SS

UP

4" SV

UP & DN

UPUP

1 1/2" SS

DN

1 1/2" SV

UP

3" SS

UP

UP

DN

UPUP

DN

UP

UP

UP/DN

DN

DN

UP/DN UP/DN

DN

UP

UP/DN

UP

UP DN

UP

UP

UP UPUP

UP

UP

UP

UP

UP/DN

UP/DN

DN

UP UP

DN

UP

UP

DN

UP/DN

DN

UP

DN

UP/DN

2" SS UP

FD-M

CS-2

CS-2

CS-2

CS-2

CS-2

CS-2 CS-2 CS-2 CS-2

UP

UP

UP

1 1/2" SS DN

2" SV UP

TP-2

TP-2

TP-2

TP-2

TP-2TP-2TP-2TP-2TP-2TP-2 TP-2

TP-2

TP-2

2" SV, 2"

SS DN

2" SV, 2"

SS DN

2" SV, 2"

SS DN

2" SV, 2" SS DN 2" SV, 2"

SS DN

2" SV, 2" SS DN

2" SV, 2" SS DN

2" SV, 2" SS DN 2" SV, 2" SS DN

2" SV, 2" SS DN

2" SV, 2" SS DN

UP

UP

UP

1 1/2" SS UP

BFP

3" SS UP

CONNECT 4" SV TO

EXISTING 4" VENT STACK.

4" SV

DN

UP

UP

WCO

1 1/2" SS DN,

2 1/2" SV UP

1 1/2" SV,

2" SS DN

CS-2

CS-2

CS-2 CS-2

SEPARATOR

TANK

4" SV UP

WCO

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL204

4TH FLOOR - SANITARY RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 147 238

KEYED NOTES:

1. PROVIDE 1-1/2" DRAIN FROM SEPARATOR TANK

TO FLOOR DRAIN.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL401, PL402, PL403, AND PL404 SHEETS

FOR ENLARGED PLANS.

3. REFER TO PL501 AND PL502 FOR DETAILS.

4. REFER TO PL505, PL506, PL508, PL509, PL510, AND

PL511 SHEETS FOR RISER DIAGRAMS.

5. COORDINATE SHOWER FLOOR DRAIN LOCATIONS

WITH ARCHITECTURAL PLANS.

SPECIAL CONDITION NOTES:

1. CONTRACTOR TO COORDINATE WITH THE OWNER

FOR SANITARY AND VENT PIPING WORK.

2. REMOVE EXISTING SANITARY AND VENT PIPING

WHICH SERVES THE LOWER LEVELS OF THE

HOSPITAL WITH MINIMAL DOWN TIME.

3. CONTRACTOR SHALL FIELD VERIFY ALL PIPING

WHICH WILL NEED REMOVAL AND TIE-IN PRIOR TO

BID.

4. CONTRACTOR SHALL REVIEW EACH WATER CLOSET

LOCATION AND COORDINATE CARRIER TYPE,

LOCATION, AND PENETRATION REQUIRED WITH

EXISTING STRUCTURE PRIOR TO ORDERING.

NOTIFY ARCHITECT OF ANY DISCREPANCIES WITH

NEW WALLS.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS

SPECIFICATION SECTION 01 00 00.1.38

ALTERNATE NO.2 FOR REQUIREMENTS

OF DEDUCT ALTERNATE OF THE

DIALYSIS BOXES INDICATED ON THIS

SHEET.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

DN

DN

DN

DNDN

UP

DN DN

DN

DN

DN

DN

DN

DN

DN

UP TO EXISTING

FLOOR DRAIN

UP TO EXISTING

FLOOR DRAIN

DN

UP

DN

DN

DNDN

DN

DN

FROM BELOW

WCO

WCO

DN

UP

WCO

3"

FD-C 3"

FD-C

3"

FD-C

TP-2 FD-M

TP-2 FD-M

CS-2 COORDINATE EXACT

CONNECTION REQUIREMENTS

WITH EQUIPMENT

DN

4" SV UP

4" SV UP

4" SV UP

4" SV UP

CONNECT NEW PIPING

TO EXISTING 4" VTR

CONNECT TO EXISTING 4" VENT STACK.

REMOVE REMAINING VENT FROM THIS

POINT INTO ATTIC.

WCO

WCO

UP TO

EXISTING

FLOOR DRAIN.

ROUTE PIPING BELOW

COUNTER TO

SANITARY/VENT LOCATION.

CONNECT TO EXISTING FLOOR

DRAIN. PROVIDE TRANSITIONS

AS NECESSARY.

DN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL205

5TH FLOOR - SANITARY RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 148 238

KEYED NOTES:

1. CONNECT TO EXISTING 4" VTR.

2. PROVIDE 1/2" CW, 1/2" HW, AND 1 1/2" WASTE

CONNECTIONS FOR SINK LOCATED IN SIDE

ACESSORY CONSOLE. COORDINATE ROUGH-IN

REQUIREMENTS WITH EQUIPMENT PROVIDER.

3. CONNECT 1 1/2" SS PIPING FROM FLOOR

BELOW TO DENTAL CHAIR DRAIN.

COORDINATE EXACT LOCATION AND

CONNECTION REQUIREMENT WITH EQUIPMENT

PROVIDER (ADEC).

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL401, PL402, PL403, AND PL404 SHEETS

FOR ENLARGED PLANS.

3. REFER TO PL501 AND PL502 FOR DETAILS.

4. REFER TO PL505, PL506, PL508, PL509, PL510, AND

PL511 SHEETS FOR RISER DIAGRAMS.

5. COORDINATE SHOWER FLOOR DRAIN LOCATIONS

WITH ARCHITECTURAL PLANS.

SPECIAL CONDITION NOTES:

1. SANITARY/VENT PIPING NOT ASSOCIATED WITH

DIALYSIS BOXES OR ATTIC FLOOR DRAINS HAS

BEEN FABRICATED AND IS ON SITE. CONTRACTOR

SHALL INSTALL, TEST, AND INSULATE ALL PIPING AS

PART OF THIS CONTRACT.

2. REFER TO AS BUILT DRAWINGS IN APPENDIX FOR

MORE INFORMATION.

3. CONTRACTOR SHALL FIELD VERIFY ON SITE PIPING

PRIOR TO SUBMITTING BIDS.

4. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY

DISCREPANCIES WITH ITEMS ON SITE.

5. CONTRACTOR TO COORDINATE WITH THE OWNER

FOR SANITARY AND VENT PIPING WORK.

6. REMOVE EXISTING SANITARY AND VENT PIPING

WHICH SERVES THE LOWER LEVELS OF THE

HOSPITAL WITH MINIMAL DOWN TIME.

7. CONTRACTOR SHALL FIELD VERIFY ALL PIPING

WHICH WILL NEED REMOVAL AND TIE-IN PRIOR TO

BID.

8. CONTRACTOR SHALL REVIEW EACH WATER CLOSET

LOCATION AND COORDINATE CARRIER TYPE,

LOCATION, AND PENETRATION REQUIRED WITH

EXISTING STRUCTURE PRIOR TO ORDERING.

NOTIFY ARCHITECT OF ANY DISCREPANCIES WITH

NEW WALLS.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

REMOVE EXISTING

4" VTR

REMOVE EXISTING

4" VTR

EXISTING

4" VTR

EXISTING

4" VTR

4" VTR

REMOVE EXISTING 4" VTR, FIELD VERIFY FOR ANY

UNRENOVATED OR CURRENT CONNECTIONS.

SEAL AND CAP AS REQUIRED IF NONE EXIST.

EXISTING

FLOOR DRAIN

EXISTING FLOOR DRAIN.

EXISTING

FLOOR DRAIN

EXISTING

4" VTR

REMOVE EXISTING

4" VTR

REMOVE EXISTING

4" VTR

REMOVE EXISTING VENT

PIPING NO LONGER BEING

USED BACK TO MAIN AND CAP

ONCE NEW VENT PIPING IS IN

OPERATION. (TYPICAL ALL

VENT PIPING IN ATTIC)

PROVIDE NEW 4" VTR

PROVIDE NEW 4" VTR

CONNECT TO

EXISTING 4" VTR

PROVIDE NEW 4" VTR

NEW 4" SV DN

NEW 4" SV DN

NEW 4" SV DN

NEW 4" SV DN

NEW 4" SV

CONNECT NEW PIPING

TO EXISTING 4" VTR

REMOVE EXISTING VENT PIPING

ONCE NEW VENT IS INSTALLED.

REMOVE EXISTING VENT PIPING

ONCE NEW VENT IS INSTALLED.

EXISTING

FLOOR DRAIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL206

ATTIC - SANITARY RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 149 238

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL401, PL402, PL403, AND PL404 SHEETS

FOR ENLARGED PLANS.

3. REFER TO PL501 AND PL502 FOR DETAILS.

4. REFER TO PL505, PL506, PL508, PL509, PL510, AND

PL511 SHEETS FOR RISER DIAGRAMS.

SPECIAL CONDITION NOTES:

1. CONTRACTOR TO COORDINATE WITH THE OWNER

FOR SANITARY AND VENT PIPING WORK.

2. COORDINATE EXISTING VENT PIPING ADJUSTMENTS

WITH MECHANICAL CONTRACTOR FOR NEW HVAC

INSTALLATION.

File details come from the government source that posted it. Updated .