About this file
This document is a Consultant's Task Assignment Notification issued by the Florida Department of Environmental Protection (FDEP) for work at Delnor Wiggins Pass State Park in Recreation and Parks. The contract is designated CN204 and is being executed with AMEC Foster Wheeler Environment & Infrastructure, Inc. (AMEC), with project management oversight provided by the FDEP's Bureau of Design and Construction. The task assignment was signed and executed on July 16, 2015, with a completion date of November 21, 2015.
The scope of work encompasses architectural and engineering design services for a new administration building at Delnor Wiggins Pass State Park, including five distinct tasks: Task I (Verify Existing Conditions - $20,306.46), Task II (Provide 30% Schematic Design - $10,498.56), Task III (Provide 60% Design Development - $11,098.55), Task IV (Provide 100% Bid Documents - $15,248.49), and Task V (Provide Permitting Services - $13,453.56). The total project cost is $70,605.62, with a fixed price cost of $61,381.62 and cost reimbursement not to exceed $9,224.00. Services include demolition of existing structures, design of mechanical, electrical, and plumbing systems, hazardous materials surveying, topographic surveying, and permit acquisition. The project assumes an anticipated construction budget of $250,000. Work is funded through Fund 131001, Module U3100, Object Code 131500, with all deliverables to be submitted in PDF format on established schedules.
View the file
Other files
Show 40 more
Latest 50 of 116 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CN204 TA5 CRF
CN204 TA5 backup
File details come from the government source that posted it. Updated .