CN-370000-CN204-T14.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|CN204|f9e64019cbdbf459a877c458887c5485
Contract number
CN204
Issued by
Florida

About this file

This document is a Consultant's Task Assignment Notification issued by the Florida Department of Environmental Protection (FDEP) for a task under Contract CN204. The assignment involves Amec Foster Wheeler Environment & Infrastructure, Inc., a consulting firm based in Miami Lakes, Florida, serving as the consultant with Daniela De Rossi as the consultant's representative. The project is located at Delnor-Wiggins State Park in Florida, and FDEP Project Manager Gretchen Miller oversees the engagement.

The scope of services requires Amec Foster Wheeler to develop three preliminary design alternatives and cost estimates for a new administrative building at Delnor-Wiggins State Park, with deliverables including architectural plans formatted to FDEP standards (24"x36"), cost opinions for each alternative, and coordination with Collier County Building Department regarding permitting feasibility. The contract specifies a fixed price cost of $9,946.78 with reimbursable expenses not to exceed $606.80, bringing the total task amount to $10,553.58. The assignment has a start date upon execution and a completion date of July 1, 2016, with preliminary design documents to be submitted within four weeks of execution. The cost is encumbered under Project 60919C, Org Code 37-50-40-00-091, with funding from Module U3100, Object Code 131500. Payment will be made upon completion and approval of each deliverable, with no payment issued for unsatisfactory work; the Department reserves the right to terminate the contract if satisfactory deliverables are not submitted within the specified timeframe.

View the file

Other files

File Type Posted
CN-370000-CN204-T16CO3.pdf PDF
CN-370000-CN204-T14CO1.pdf PDF
CN-370000-CN204-T14CO4.pdf PDF
CN-370000-CN204-T24.pdf PDF
CN-370000-CN204-CMC3.pdf PDF
CN-370000-CN204-T14CO3.pdf PDF
CN-370000-CN204-T15CO5.pdf PDF
CN-370000-CN204-T39.pdf PDF
CN-370000-CN204-T27CO2.pdf PDF
CN-370000-CN204-T49.pdf PDF
CN-370000-CN204-T15CO1.pdf PDF
CN-370000-CN204-T40.pdf PDF
CN-370000-CN204-T32.pdf PDF
CN-370000-CN204-T14CO6.pdf PDF
CN-370000-CN204-T18.pdf PDF
CN-370000-CN204-T22.pdf PDF
CN-370000-CN204-T43.pdf PDF
CN-370000-CN204-T41.pdf PDF
CN-370000-CN204-T27CO3.pdf PDF
CN-370000-CN204-T21.pdf PDF
CN-370000-CN204-T37CO2.pdf PDF
CN-370000-CN204-T12.pdf PDF
CN-370000-CN204-T15.pdf PDF
CN-370000-CN204-T33.pdf PDF
CN-370000-CN204-T6CO2.pdf PDF
CN-370000-CN204-T48.pdf PDF
CN-370000-CN204-CO1.pdf PDF
CN-370000-CN204-TA2.pdf PDF
CN-370000-CN204-CMC4.pdf PDF
CN-370000-CN204-T16CO2.pdf PDF
CN-370000-CN204-CMC5.pdf PDF
CN-370000-CN204-T37.pdf PDF
CN-370000-CN300-TA5CO1.pdf PDF
CN-370000-CN204-T15CO6.pdf PDF
CN-370000-CN204-T11CO1.pdf PDF
CN-370000-CN204-T11CO2.pdf PDF
CN-370000-CN204-A2.pdf PDF
CN-370000-CN204-T47.pdf PDF
CN-370000-CN204-T33CO1.pdf PDF
CN-370000-CN204-T44.pdf PDF
CN-370000-CN204-TA5.pdf PDF
CN-370000-CN204-T9CO1.pdf PDF
CN-370000-CN204.pdf PDF
CN-370000-CN204-T19CO2.pdf PDF
CN-370000-CN204-TA3.pdf PDF
CN-370000-CN204-T18CO1.pdf PDF
CN-370000-CN204-T11.pdf PDF
CN-370000-CN204-T43CO4.pdf PDF
CN-370000-CN204-T18CO3.pdf PDF
CN-370000-CN204-T27.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

February 22nd, 2016

Mrs. Gretchen Z. Miller

BUREAU OF DESIGN AND CONSTRUCTION

Office of Operations 3800 Commonwealth Blvd.

Tallahassee, FL 32399 amec foster wheeler

Phone: 850-245-2661 email: Gretchen.Z.Miller@dep.state.fl.us

Subject: Proposal to Povide A&E Professional Design Services Administration Building, FDEP Project #60919C Delnor-Wiggins State Park, Florida CONTRACT No. CN204 -TA14 Proposal No. 16PROP-MIAM-6788-12

Dear Mrs. Miller:

Amee Foster Wheeler Environment & Infrastructure, Inc., (Amee Foster Wheeler) is pleased to present this proposal to the Bureau of Design and Construction (BOC) to provide architectural and engineering services for the above referenced project. This proposal includes project information, our proposed scope of services, associated fees and authorization procedures.

BACKGROUND INFORMATION AND SCOPE

Project information that was utilized for this proposal was obtained from previous email and phone conversations between Gretchen Z. Miller of BOC and Daniela De Rossi of Amee

Foster Wheeler. BOC has requested that Amee Foster Wheeler submit a proposal to provide professional services to assist BOC in providing preliminary design services which include three schematic design alternatives, and probable cost estimates for each alternative, for the new administrative office building at the Delnor-Wiggins State Park. In addition, Amee

Foster Wheeler will meet with Collier County Building Department to discuss each of the three alternatives feasibility.

The design alternatives for the new administration building will consist of the following:

• One-story building on grade, with dry flood-proofing to meet Florida Building Code

2014 and ASCE 24 standards.

• Administrative offices and CSO meeting room on a raised open ground floor structure. Ramp to be provided at southeast corner of building for accessibility.

• Administrative offices and CSO meeting room on a raised enclosed ground floor structure with masonry walls to be utilized as storage area. Ramp to be provided at southeast corner of building for accessibility.

Amee Foster Wheeler E&I, Inc.

5845 N.W. 158th Street Miami Lakes, Florida 33014 Tel (305) 826-5588 Fax (305) 826-1799 www.amecfw.com

CN204 TA14 signed
CN204 TA14 proposal

File details come from the government source that posted it. Updated .