This is a Task Assignment Notification Form for a state contract between the Florida Department of Environmental Protection (FDEP) and Wood Environment & Infrastructure Solutions, Inc. (Wood) under FDEP Contract No. CN204. The assignment authorizes Task Assignment No. 31 for a Feasibility Study on the Downs Dam Water Control Structure located at Myakka River State Park. The project is managed by Theresa Carron at FDEP's Bureau of Design and Construction, with Kristen Nowak serving as the Wood consultant representative. The contract is structured as a 50% matching grant with the Southwest Florida Water Management District (SWFWMD) and commenced upon execution with a completion date of July 1, 2020.
The scope of work encompasses five major task categories: (1) Data Collection Plan development; (2) Field Data Collection including surveying and sediment sampling; (3) Data Compilation and Analysis consisting of hydrologic/hydraulic modeling and alternatives/cost-benefit analyses; (4) Draft and Final Report preparation; and (5) Project Management and Meetings. The contract utilizes a fixed-price structure with reimbursable costs for travel, lodging, and meals. The total fixed price cost is $120,079.72, with total reimbursable costs of $5,586.89, bringing the overall task assignment total to $125,666.61. Payment is made upon FDEP approval of deliverables for each subtask. The project schedule extends from February 2020 through June 2020, with specific milestone dates established for each subtask completion.
View the file
Other files
Show 40 more
Latest 50 of 116 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .