This document is a Task Assignment Change Order Form (Change Order No. 1) dated November 25, 2024, executed between the Florida Department of Environmental Protection (FDEP) and Mott MacDonald Florida, LLC under FDEP Contract No. BS135. The change order modifies Task Assignment Number 22, which involves field survey and hydrologic modeling services for high hazard potential dams in Hillsborough County, Florida. The project focuses on control structures S-161 along the Harney Canal and S-159 along the Tampa Bypass Canal, owned by the Southwest Florida Water Management District (SWFWMD). Key personnel include Tracy Woods (FDEP Project Manager), Avery Lehmann (FDEP Contract Manager), and David Skipper (Mott MacDonald Project Principal).

The change order extends the project completion deadline by 17 days, moving the original completion date of February 28, 2025 to March 17, 2025, with no change to the total contract amount of $70,853.36. The fixed-price compensation structure covers four tasks: Task 1 (Field Reconnaissance and Site Coordination) at $4,608.40 with deliverables due by December 16, 2024; Task 2 (Field Survey Data Acquisition) at $37,844.16 (including subcontractor Southeastern Survey and Mapping Corp costs) due by January 24, 2025; Task 3 (LiDAR Data Compilation and Analysis) at $13,463.80 due by February 17, 2025; and Task 4 (Hydrologic Modeling Inputs) at $14,937.00 due by March 17, 2025. Payment is contingent upon FDEP acceptance of each deliverable, with no compensation provided for incomplete or unaccepted work. The scope revision reflects updates to key personnel and extended deliverable dates to accommodate project requirements.

Text of this file

ATTACHMENT D – TASK ASSIGNMENT CHANGE ORDER FORM

Task Assignment Number: ____________ Date: ______________ Change Order No.________

Contractor Name: ______________________________________________

Contractor Representative: ________________________________ Phone: ____________________

DEP Contract Manager: _____________________________________ Phone: ____________________

Description of Change (Use Additional Sheets if necessary):

CHANGE IN TASK AMOUNT

Item Fee Schedule Cost Reimbursement Total

Original Task Amount:

Task Amount Prior to this Change Order:

Net Increase/Decrease in Task Amount:

Task Amount with all Change Orders:

CHANGE IN TASK TIME

Original Task Completion Date:

Completion Date Prior to This Change:

Net Increase/Decrease in Task Period:

Completion Date with all Change Orders:

CONTRACTOR FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Project Principal Date Project Manager

Contract Manager

Cost Administrator

Approval

Division Director

Date

Date

Date

Date cc: DEP Procurement Section (MS93), Bureau of Finance and Accounting (MS78) – 2 copies

22 11/25/2024 1

Mott MacDonald Florida, LLC

Amber Kirk 850-490-1209

Deneka Smith 850-245-8021

A scope revision is requested to extend the deliverable dates for the Project (Tasks 1, 2, 3, and 4). Key Personnel table has also been revised to reflect current Mott MacDonald staff. A revised scope with an updated deliverables schedule is attached.

DEP CONTRACT NO. BS135-A1

$70,853.36 $70,853.36

$70,853.36 $70,853.36

$70,853.36 $70,853.36 $0.00 $0.00

02/28/2025 02/28/2025

+17 days 03/17/2025 j t Principal 11/25/2024 Tracy Woods Digitally signed by Tracy Woods

Date: 2024.12.02 16:27:41 -05'00'

Deneka Smith Digitally signed by Deneka Smith Date: 2024.12.12 17:30:37 -05'00'

Digitally signed by Avery Lehmann Date: 2024.12.13 15:58:25 -05'00'

Digitally signed by John Coates Date: 2024.12.17 14:40:34 -05'00'

FDEP Contract BS135, Task Assignment No. 22, Project 1 - Field Survey and Hydrologic Model Inputs for the High Hazard Potential Dams System, at the Harney Canal Structure S-161 and the Tampa Bypass Canal Structure S-159 Upper, Middle and Lower Dams, in Hillsborough County, Owned by the Southwest Florida Water Management District, FL

SCOPE OF SERVICES Original: October 2024 Change Order 1: 11/25/2024

Background and Project Description:

Mott MacDonald (MM) is pleased to submit this proposal to the Florida Department of Environmental Protection (FDEP) to conduct required professional engineering services for Task Assignment Number 22 under FDEP Contract No. BS135. The engineering services involves the compilation of existing pertinent data provided by Southwest Florida Water Management District (SWFWMD),and conducting Field Surveying and limited topographic mapping at the dam structures, as well as developing hydrologic modeling input for the High Hazard Potential (HHP) Dams system, owned by SWFWMD, for control structure S-161 along the Harney Canal, and the Tampa Bypass Canal control structures at S-159 Upper, Middle and Lower dams in Hillsborough County.

PROJECT INFORMATION

The requested services include:

1. Conducting an on-site field reconnaissance survey, and initial site meeting with MM, the surveying crew and SWFWMD representatives to:

a. Discuss pertinent issues of concern and confirm using control structures and related watershed data included in the External Hard drive provided by SWFWMD.

2. Conducting field cross- section, plan and profile surveying and site specific topographic mapping of the control structures at the S-161 Harney Canal and S-159 Tampa Bypass structures S-159 Upper, Middle, and Lower.

3. Developing Hydrologic Modeling Inputs for the watershed subareas within the project domain areas for future inundation modeling and mapping required to support the development of an Emergency Action Plan for the HHP dams’ system associated with structures S-161 and S-159 Upper, Middle, and Lower.

SCOPE OF SERVICES

Task 1: Field Reconnaissance Site Visit and Coordination with FDEP, and SWFWMD representatives.

The following work tasks will be performed to verify the available pertinent data for the below listed HHP dams’ system in Hillsborough County, FL.

1. S-161 structure, National Inventory of Dams (NID) ID # FL00640, Hillsborough County

2. S-159 structures Upper, Middle, and Lower and NID ID # FL12001, Hillsborough County

A. Conduct on site field reconnaissance and attend an initial meeting, with the representatives of the FDEP, SWFWMD and the surveying crew to discuss pertinent project issues of concern and verify the available data items regarding the control structures at the impoundments, as follows:

1) S-161 control structure along Harney Canal, and S-159 Upper, Middle and Lower Control structures along the Tampa Bypass Canal -

As-built drawings - plan, elevation, details, and cross-sections Latest Inspection Reports Project Hydrologic design criteria/ data

2) Watershed Master Control Plan and related reports Watershed Master Control Plan Report - electronic file.

Lidar and topographic data - electronic file Hydrologic Modeling data - electronic file

3) Existing Field Survey data Existing field survey data of the control structures and benchmarks datum -electronic files

B. Compilation of pertinent available data identified above.

DELIVERABLES:

1) Prepare and submit electronic files for:

Draft Site Reconnaissance Summary Report including Appendices with Figures and Excel Tables - summarizing pertinent available data used and recommendations regarding downstream consequence areas during extreme storm events.

Final Site Reconnaissance Summary Report

Performance Measure: Deliverables will be reviewed by the Department to confirm that they are complete, accurate, and timely.

Task 2: Field Survey Data Acquisition

Refer to Figures SD1 , SD2 and SD3 for the S-161 and S-159 structures aerial view locations and layout of field surveying cross-section work. Conduct field surveying data acquisition at the structures and:

1) Establish the top of embankment profiles and cross-sections at the control structures and verify structures outlet works dimensions data necessary to support future hydrologic analyses.

2) Confirm (ground truth) site topographic mapping of the adjacent embankments at the control structures.

Note: Field cross-section and topographic surveying work to be conducted by Southeastern Survey and Mapping Corp (SSMC).

1) Provide e-mail notification to the FDSP at least one week prior to the scheduled field site visit to conduct the required field surveying work. The notification should include the date, time, team meeting location, and the vendor contact name and phone numbers (office and cell).

The e-mail notification should be sent to Tracy.Woods@FloridaFDEP.gov

2) Provide an electronic version of the original field surveying data obtained for the dam structures, along with photographs taken at the selected field survey locations.

Task 3: LiDAR Data Compilation and Analysis

Conduct LiDAR Data compilation and Analysis for the HHP dam systems study area, Refer to Figure

H/TBC.

1) Download the available 2017 LiDAR data and produce a DEM for the HHP dam systems associated with the control structures S-161` and S-159 on Harney Canal and the Tampa Bypass canal, respectively, in the Hillsborough County, project study domain areas using GIS methods.

2) Integrate the 2017 LiDAR bare earth Digital Elevation Models (DEMs) with the cross-section and topographic survey data developed in Task 2 for the control structures S-161 and S- 159 Upper, Middle, and Lower.

1) DEM from 2017 LiDAR in both ASCII and GDB format (GIS readable geodatabase data); and cross-section and topographic data developed in Task 2 in XML and DWG formats for the control structures S-161 and S-159 Upper, Middle, and Lower and the downstream flooding impact area.

Task 4: Project domain watershed Hydrologic modeling inputs for the S-161 and S-159 HHP dam system.

Develop project domain watershed characteristics for S-161 and S-159 HHP dam systems to include:

1) The delineation of watershed subareas contributing flow to selected Point of interest (POI)for S-161 and S-159 HHP dam system impoundments and downstream flooding impact area.

2) Utilize base watershed and subareas data, and pertinent hydrologic data provided by SWFWMD in conjunction with watershed DEM to define selected Point of Interest (POI) locations.

1) Provide Draft watershed and subareas map contributing flow to the selected POIs for the S- 161 and S-159 HHP dam system impoundments and downstream flooding impact area, along the TBC.

2) Provide Final watershed and subareas map contributing flow to the selected POIs for the S- 161 and S-159 HHP dam system impoundments and downstream flooding impact area, along the TBC.

Key Personnel

FDEP

Role Name Entity

Project Manager Tracy Woods FDEP Contract Manager Avery Lehmann FDEP

Mott MacDonald Role Name Entity

Project Principal David Skipper Mott MacDonald Principal Project Manager Amber Kirk Mott MacDonald

Principal Engineer Michael Cox Comak Group

Project Schedule: CONSULTANT is available to begin work on this project immediately following receipt of the executed Task Assignment Number 22 from FDEP.

Compensation and Method of Payment

Compensation to be paid to the Consultant for providing the services described herein shall be on a fixed-price basis for each Task Deliverable. No compensation will be paid for services and/ or tasks that are not performed. The fixed-price compensation for the Deliverable shall be as listed in the detailed Payment and Deliverables Schedule Table. See Appendix A for Payment and Deliverables Schedule Table.

The Consultant will submit invoices to the FDEP for work performed at the completion and acceptance by FDEP of the final deliverable. The invoicing will be accompanied by a brief description of the work effort completed, including deliverables achieved, in accordance with the attached Fee Schedule. Compensation will not be paid for a deliverable until the deliverable has been completed and accepted by the FDEP.

AUTHORIZATION

The following individual is a representative for the CONSULTANT with the authority to enter.

into a binding Contract with the FDEP:

Signature Date

11-25-2024

Name and Title

David Skipper, PE – Senior Vice President

Company Name

Mott MacDonald Florida, LLC

Appendix A

PAYMENT AND DELIVERABLES SCHEDULE

For all tasks, payment shall be made on a fixed price basis in the fixed amounts specified below for each deliverable following receipt and acceptance by the FDSP in accordance with Contract Terms.

Deliverable Deliverable Description Due Date

Total Payment Amount

Task 1

Field Reconnaissance Site Visit and Coordination with FDEP, and SWFWMD representatives.

1) Draft & Final Site Reconnaissance Summary Reports, including Appendices with Figures and Excel Tables summarizing pertinent available data

11/15/2024

12/16/2024

$4,608.40

Task 2

Field Survey Data Acquisition

1)Provide e-mail notification to the FDSP at least one week prior to the scheduled field site visit to conduct the required field surveying work.

2) Provide electronic file of field surveying and topographic data for control structures S-161 and S-159 Upper, Middle, and Lower HHP dam system

12/20/2024

01/24/2025

SSMC =

$29,508.56

MM =

$8,335.60

Task 3

LiDAR Data Compilation and topographic data integration

1) Compile DEM from 2017 LiDAR and topographic data developed in Task 2 for the control structures S-161, and S-159 Upper, Middle, and Lower and the downstream flooding impact area along the TBC.

01/31/2025

02/17/2025 $13,463.80

Deliverable Deliverable Description Due Date Total

Payment Amount

Task 4

Project domain watershed Hydrologic modeling inputs for control structures S-161 and S-159 HHP dam system.

1)Provide watershed subareas map contributing flow to the selected points of interest for the S-161 and S-159 HHP dam system impoundments and downstream flooding impact area, along the TBC.

02/28/2025

03/17/2025 $14,937.00

TOTAL $70,853.36

Other files

File Type Posted
CN-370000-BS135-CMC2.pdf PDF
CN-370000-BS135-CMC3.pdf PDF
CN-370000-BS135-CMC4.pdf PDF
CN-370000-BS135-T10.pdf PDF
CN-370000-BS135-T10CO1.pdf PDF
CN-370000-BS135-T10CO3.pdf PDF
CN-370000-BS135-T10CO4.pdf PDF
CN-370000-BS135-T12.pdf PDF
CN-370000-BS135-T13CO2.pdf PDF
CN-370000-BS135-T13CO4.pdf PDF
CN-370000-BS135-T19.pdf PDF
CN-370000-BS135-T1CO1.pdf PDF
CN-370000-BS135-T1CO2.pdf PDF
CN-370000-BS135-T1CO5.pdf PDF
CN-370000-BS135-T2.pdf PDF
CN-370000-BS135-T20.pdf PDF
CN-370000-BS135-T21CO2.pdf PDF
CN-370000-BS135-T22.pdf PDF
CN-370000-BS135-T23C04.pdf PDF
CN-370000-BS135-T23CO2.pdf PDF
CN-370000-BS135-T4CO1.pdf PDF
CN-370000-BS135-T6.pdf PDF
CN-370000-BS135-T7CO1.pdf PDF
CN-370000-BS135-T8CO2.pdf PDF
CN-370000-BS135-T8CO3.pdf PDF
CN-370000-BS135-A1.pdf PDF
CN-370000-BS135-T10CO5.pdf PDF
CN-370000-BS135-T10CO7.pdf PDF
CN-370000-BS135-T11.pdf PDF
CN-370000-BS135-T13CO1.pdf PDF
CN-370000-BS135-T15.pdf PDF
CN-370000-BS135-T16CO1.pdf PDF
CN-370000-BS135-T23C05.pdf PDF
CN-370000-BS135-T23CO1.pdf PDF
CN-370000-BS135-T3.pdf PDF
CN-370000-BS135-T4CO2.pdf PDF
CN-370000-BS135-T6CO1.pdf PDF
CN-370000-BS135-T6CO2.pdf PDF
PC-370000-BS135.pdf PDF
CN-370000-BS135-T1.pdf PDF
CN-370000-BS135-T12CO1.pdf PDF
CN-370000-BS135-T13.pdf PDF
CN-370000-BS135-T14.pdf PDF
CN-370000-BS135-T15CO1.pdf PDF
CN-370000-BS135-T17.pdf PDF
CN-370000-BS135-T21.pdf PDF
CN-370000-BS135-T21CO1.pdf PDF
CN-370000-BS135-T22CO1.pdf PDF
CN-370000-BS135-T23.pdf PDF
CN-370000-BS135-T23CO3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .