CMP02 - Assist Visits training and plan and AARs- updated MAR 2024.pdf

PDF 240 KB Posted

Attached to
Military Sealift Command Logistics and Continuous Monitoring Program Services
Solicitation number
N3220524R4105-RFP
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) that outlines the data items required for the CMP Ships Assist Visits, Training Plan, and After Action Report (AAR) under a contract for the Military Sealift Command Logistics and Continuous Monitoring Program Services.

The key details are:

  • The CDRL specifies the requirements for CMP Ships Assist Visits, including providing technical and system training to shipboard personnel, communicating with the ship's Supply Officer and Logistics Support Officer, and submitting an AAR within 5 business days of each visit.
  • The Training Plan and AAR are required deliverables, with the AAR providing details on the ship's CMP readiness and the findings/recommendations from the assist visit.
  • The CDRL lists the distribution and frequency requirements for the deliverables, which include draft and final submissions to the Contracting Officer's Representative, N41 CMP Lead, and N46 CFMA Lead.
  • The CDRL references the Performance Work Statement (PWS) Section 5.3.1.5 and indicates attachments include AAR samples.

View the file

Other files

File Type Posted
24R4105 Amendment 0002.pdf PDF
SA 05 Questions with MSCs Answers.xlsx XLSX spreadsheet
FS01 - SMART AAR - updated.pdf PDF
24R4105 Amendment 0001.pdf PDF
Attachment 14N - CIVMAR Supply Dept Head Turnover Report - SMS C070304801 - JUL 2023.pdf PDF
Attachment 14Q - FY-20 N41 MARITIME E SCORE SHEET sample.xlsx XLSX spreadsheet
Attachment 14B - CMP dashboard screenshot sample.pdf PDF
FS02 - SMART Inspection Kits.pdf PDF
Attachment 7 - MSC Data Exploitation Plan 10 March 2020.pdf PDF
FS05 - Status of EOM Reports.pdf PDF
FS07 - Assist Visits_Training_ and Inspections.pdf PDF
CMP07 - Weekly and Monthly Progress Reports.pdf PDF
N3220524R4105.pdf PDF
A03 - Monthly Progress Reports.pdf PDF
CFMA 01 - CFMA analyses.pdf PDF
Attachment 11A - FS Food Service Assist Visits Travel 2019-2023.pdf PDF
Attachment 14F - CM Ships Drill Down and Analysis Report sample (1).pdf PDF
Attachment 12A - QMS FS 1 - Endurance and Food Order Calculator.pdf PDF
Attachment 14G - N41 summary drill down and analysis report sample.pdf PDF
Attachment 14D - CMP Notional Schedule (historical).pdf PDF
CMP09 - Ad Hoc - updated MAR 2024.pdf PDF
Attachment 12B - Reporting sample.pdf PDF
SA 01_LSCMP - Pricing Spreadsheet - Solicitation Attachment 1.xlsx XLSX spreadsheet
Attachment 6E - SMART Inspector Qualification Form N0734-100.11-F SMART JQR-1.pdf PDF
Attachment 10 - FS MSC 35-Day Cycle Menu Changes.xlsx XLSX spreadsheet
Attachment 14A - QMS_3Apr-pg.pdf PDF
Attachment 14C - CMP Readiness Indicators (RI) completion tracker - updated MAR 2024.pdf PDF
FS01 - SMART AAR.pdf PDF
Attachment 13B - Monthly Financial Status Report.pdf PDF
A05 - CAC processing.pdf PDF
CMP08 - CMP AARs - updated MAR 2024.pdf PDF
Attachment 14L - CMP RI GRID.xlsx XLSX spreadsheet
Attachment 5A - Cargo Fuels Measurement and Accountability SMS 6.8 002 ALL.pdf PDF
Attachment 6D - SMART Inspector Job and Qualification Requirements N0734-100.10-W-1.pdf PDF
Attachment 14I - CMP TSAs monthly correspondence to SUPPO sample.pdf PDF
Attachment 14M - CMP GRAPH sample.pdf PDF
Attachment 2- DD254 Contract Security Classification Specification.pdf PDF
FS06 - Endurance Loading and Food Order Calculator.pdf PDF
CMP06 - Monthly summary - updated MAR 2024.pdf PDF
Attachment 6A - SMART Inspection Test Kit and Travel 2016-2023.pdf PDF
A01 - Staffing Plan.pdf PDF
Attachment 5C - Cargo Fuels DD Form 1348-8.pdf PDF
CFMA 02 - CFMA training.pdf PDF
Attachment 14K- CMP Readiness Indicators (RIs) - updated MAR 2024.pdf PDF
Attachment 1 - Course synopsis - final.pdf PDF
CMP03 - Curriculum Change Requests (CCRs)- updated MAR 2024.pdf PDF
Attachment 11B - FS Food Service Assist Visits - After Action Report - AAR.pdf PDF
Attachment 11C - NRA support - N43 DEC 2023.pdf PDF
SA 02_ LSCMP - QA Spreadsheet.xlsx XLSX spreadsheet
Attachment 13C - Audit Report Example.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: CMP02
2_TITLE_OF_DATA_ITEM: CMP Ships Assist Visits, Training Plan, and AAR
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit:
5_CONTRACT_REFERENCE: See Block 16
6_REQUIRING_OFFICE: N4
7_DID_250_REQ: NO
8_APP_CODE: N/A
DIST_STATEMENT:
10_FREQUENCY: See Block 16
11_AS_OF_DATE:
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB:
addressee1: COR
draft1:
reg1: 1
repro1:
addressee2: N41 CMP Lead
draft2: 1
reg2: 1
repro2:
addressee3: N46 CFMA Lead
draft3: 1
reg3: 1
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 2
total_repro: 0
16_REMARKS: Background: CMP TSAs will be required to travel to locations CONUS, OCONUS, and within the local commuting areas of locations identified in Paragraphs 1.7.4 to conduct assessments, assist visits, technical and systems training to shipboard personnel, as directed. Additionally, they will attend meetings, conferences, training, and assessments in/around Hampton Roads’ area, VA/San Diego, CA/onboard world-wide.

Workload:

Training/Assist visit:

Provide technical and system training to shipboard personnel (distance support or onsite) when deficiencies are discovered. These visits, considered assist visits, are to rectify potential issues. This task also allows for the crews of each vessel to identify areas that are causing them concern and request technical assistance to identify the problem, provide the necessary corrective training, evaluate the source of the problem, and recommend corrective action, to include curriculum revisions and enhancement to ShipCLIP, CMLS, ERP, and CMP Program.

Communicate with ship's SUPPO/JSO via email or telephone with questions and corrective actions based on assessment and training results.

Training plan: CMP01 applies.

AAR: Provide AAR to N41 CMP lead within five (5) business days of completion of visit/training. AAR will include ship's current status on CMP readiness indicators and details of ship visit with findings/recommendations related to training and assistance provided.

PWS: 5.3.1.5

Attachments: AAR samples Attachments 5B/6C.

Microsoft Office product.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: Parrish Guerrero, MSC N41 CM Lead
H_DATE: 07JAN24
1_APPROVED_BY: Beth Travis, MSC COR
J_DATE: 07JAN24
Page: 1
reg38t: 3
A_CONTRACT_LINE_ITEM_NO: PWS
B_EXHIBIT: 4
TDP:
TM:
OTHER: Management
DSYSTEMITEM: MSC N4
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:

File details come from the government source that posted it. Updated .