Attachment 11C - NRA support - N43 DEC 2023.pdf

PDF 404 KB Posted

Attached to
Military Sealift Command Logistics and Continuous Monitoring Program Services
Solicitation number
N3220524R4105-RFP
Issued by

About this file

The document is an attachment titled "Attachment 11C - NRA support - N43 DEC 2023.pdf" that outlines the transportation and event support requirements for the National Restaurant Association Education Foundation (NRAEF) Training Support Analyst (TSA) Planning Event and Contract Consumables and Material Requirements.

The key details include providing transportation for incoming and departing winners of the Captain Cook Food Service (FS) Award Presentation/Training event in Chicago, assisting with staging and securing trophies and plaques for the NRA Award Presentation, and providing transportation for the students to/from the two-day training event. The contractor is required to identify drivers for the transportation two days before each event and provide confirmation that winners have been dropped off at the airport. The document also requires the contractor to set up a meeting to discuss improvements for the following year's event.

View the file

Other files

File Type Posted
24R4105 Amendment 0002.pdf PDF
SA 05 Questions with MSCs Answers.xlsx XLSX spreadsheet
FS01 - SMART AAR - updated.pdf PDF
24R4105 Amendment 0001.pdf PDF
Attachment 14N - CIVMAR Supply Dept Head Turnover Report - SMS C070304801 - JUL 2023.pdf PDF
Attachment 14Q - FY-20 N41 MARITIME E SCORE SHEET sample.xlsx XLSX spreadsheet
Attachment 14B - CMP dashboard screenshot sample.pdf PDF
FS02 - SMART Inspection Kits.pdf PDF
Attachment 7 - MSC Data Exploitation Plan 10 March 2020.pdf PDF
FS05 - Status of EOM Reports.pdf PDF
FS07 - Assist Visits_Training_ and Inspections.pdf PDF
CMP07 - Weekly and Monthly Progress Reports.pdf PDF
N3220524R4105.pdf PDF
A03 - Monthly Progress Reports.pdf PDF
CFMA 01 - CFMA analyses.pdf PDF
Attachment 11A - FS Food Service Assist Visits Travel 2019-2023.pdf PDF
Attachment 14F - CM Ships Drill Down and Analysis Report sample (1).pdf PDF
Attachment 12A - QMS FS 1 - Endurance and Food Order Calculator.pdf PDF
Attachment 14G - N41 summary drill down and analysis report sample.pdf PDF
Attachment 14D - CMP Notional Schedule (historical).pdf PDF
CMP09 - Ad Hoc - updated MAR 2024.pdf PDF
Attachment 12B - Reporting sample.pdf PDF
SA 01_LSCMP - Pricing Spreadsheet - Solicitation Attachment 1.xlsx XLSX spreadsheet
Attachment 6E - SMART Inspector Qualification Form N0734-100.11-F SMART JQR-1.pdf PDF
Attachment 10 - FS MSC 35-Day Cycle Menu Changes.xlsx XLSX spreadsheet
Attachment 14A - QMS_3Apr-pg.pdf PDF
Attachment 14C - CMP Readiness Indicators (RI) completion tracker - updated MAR 2024.pdf PDF
FS01 - SMART AAR.pdf PDF
Attachment 13B - Monthly Financial Status Report.pdf PDF
A05 - CAC processing.pdf PDF
CMP08 - CMP AARs - updated MAR 2024.pdf PDF
Attachment 14L - CMP RI GRID.xlsx XLSX spreadsheet
Attachment 5A - Cargo Fuels Measurement and Accountability SMS 6.8 002 ALL.pdf PDF
Attachment 6D - SMART Inspector Job and Qualification Requirements N0734-100.10-W-1.pdf PDF
Attachment 14I - CMP TSAs monthly correspondence to SUPPO sample.pdf PDF
Attachment 14M - CMP GRAPH sample.pdf PDF
Attachment 2- DD254 Contract Security Classification Specification.pdf PDF
FS06 - Endurance Loading and Food Order Calculator.pdf PDF
CMP06 - Monthly summary - updated MAR 2024.pdf PDF
Attachment 6A - SMART Inspection Test Kit and Travel 2016-2023.pdf PDF
A01 - Staffing Plan.pdf PDF
Attachment 5C - Cargo Fuels DD Form 1348-8.pdf PDF
CFMA 02 - CFMA training.pdf PDF
CMP02 - Assist Visits training and plan and AARs- updated MAR 2024.pdf PDF
Attachment 14K- CMP Readiness Indicators (RIs) - updated MAR 2024.pdf PDF
Attachment 1 - Course synopsis - final.pdf PDF
CMP03 - Curriculum Change Requests (CCRs)- updated MAR 2024.pdf PDF
Attachment 11B - FS Food Service Assist Visits - After Action Report - AAR.pdf PDF
SA 02_ LSCMP - QA Spreadsheet.xlsx XLSX spreadsheet
Attachment 13C - Audit Report Example.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MSC National Restaurant Association Education Foundation (NRAEF), Training Support Analyst (TSA)

Planning Event Support and Contract Consumables and Material Requirements.

1. Provide transportation for all incoming and departing winners of the Captain Cook Food Service

(FS) Award Presentation/Training in Chicago or another location, if required.

2. Airport Pickup/drop off schedule:

a. Food Service SME will provide procedures and timelines for picking up guests at airport and check-in to the assigned hotel(s).

b. Contractor will identify drivers for transportation two (2) days before the event.

Note: TSA will text SME to confirm pickup and check-in of each guest arriving and departing.

3. NRA Award Presentation:

a. One (1) TSA will pick up and escort the winners to the reception room. Contractor will identify the driver two (2) days before the event.

b. All TSAs will assist with staging trophies and plaques from storage to the ballroom and securing trophies and plaques from the ballroom to storage room after the award presentation. Assist with any other food service support related tasks as assigned by the

MSC SME.

c. Assist the MSC winners in finding their seats in the ballroom if required.

d. Be on hand to answer questions throughout the presentation.

e. TSA will drive the winners back to their hotel after the presentation, if required.

4. Training [two (2) days]:

a. One (1) TSA will be on hand to drive the students to/from training if transportation is not provided by the NRA Training Coordinator. Contractor will identify the driver two (2) days before the event.

5. Transportation from the hotel to the airport:

a. TSAs will assist the winners with checkout and provide the winners transportation back to the airport for their departing flights.

b. MSC SME will provide the TSAs with the flight/transportation timelines.

c. TSAs will text confirmation that the winners have been dropped off at the airport.

6. The Contractor will set up a meeting NLT three (3) days after the event to discuss the follow year improvements.

Attachment 11C

File details come from the government source that posted it. Updated .