A01 - Staffing Plan.pdf
PDF 96 KB Posted
- Solicitation number
- N3220524R4105-RFP
About this file
This document is a Contract Data Requirements List (CDRL) for a Staffing Plan. The Staffing Plan must address the contractor's integrated staffing, training of staff, and action plan to perform all elements of the Performance Work Statement (PWS), associated publications, and the resulting contract. The plan must identify any unusual impacts to the Military Sealift Command (MSC). The Staffing Plan must describe the processes and procedures for hiring and maintaining a competent workforce, ensuring staff skills align with the PWS technical criteria, and preventing interruptions or late deliverables. It must address coverage for specific tasks such as the Continuous Monitoring Program, SMART inspections, and Assist Visits. The Staffing Plan is an initial deliverable, with subsequent submissions required when significant changes occur. The PWS provides additional details on the staffing plan requirements.
View the file
Other files
Show 40 more
Latest 50 of 75 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| 1_DATA_ITEM_NO: A01 |
| 2_TITLE_OF_DATA_ITEM: Staffing Plan |
| 3_SUBTITLE: |
| 4_AUTHORITY_Data_Acquisit: |
| 5_CONTRACT_REFERENCE: See Block 16 |
| 6_REQUIRING_OFFICE: N4 |
| 7_DID_250_REQ: NO |
| 8_APP_CODE: N/A |
| DIST_STATEMENT: |
| 10_FREQUENCY: See Block 16 |
| 11_AS_OF_DATE: |
| 12_DATE_OF_FIRST_SUBMISSI: See Block 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: |
| addressee1: COR |
| draft1: 1 |
| reg1: 1 |
| repro1: |
| addressee2: KO |
| draft2: |
| reg2: 1 |
| repro2: |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 1 |
| total_repro: 0 |
| 16_REMARKS: Staffing Plan shall address the Contractor’s integrated staffing, training of staff, and action plan that clearly demonstrates its ability to perform all elements of this PWS, associated publications, and the resulting contract. The plan shall identify any unusual impacts to MSC (delays, reduction in service, etc.). |
The Contractor shall submit a staffing plan that describes its processes and procedures for hiring and maintaining a competent workforce.
* Describe how the proposed staffing plan ensures that staff with skill sets that align with technical criteria of PWS to provide quality products, with little/no government intervention, to achieve the quality and level of performance required by the PWS, for all programs.
* Describe how the proposed staffing plan ensures that deliverables submitted and tasks performed will be of high quality and executed in a timely manner.
* Describe the processes and procedures used to backfill positions with qualified personnel within 30 days to prevent interruption in task execution or the late submission of deliverables.
* Describe the processes and procedures for cross-training personnel to support/conduct multiple events, some simultaneously in different locations.
* Describe how the proposed staffing plan enables a quick, global response to multiple activities and/or surge requirements. In addition, specifically address coverage for CMP, SMART inspections, and Assist Visits.
* Demonstrate how skillset will be maintained or improved on a continuous basis and current with industry standards/requirements.
* Describe the processes and procedures for how Contractor personnel will be certified in SERVSAFE Manager and Proctor certification for food service Training Support Analysts (TSAs). Contractor is responsible to ensure required certifications are obtained prior to performance start date. Delays that may result from inadequate planning are the Contractor’s responsibility.
Workload/Frequency: Initial/during Phase-In and when significant changes occur.
PWS: 1.5/Section 5 Microsoft Office product.
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: Beth Travis, MSC COR |
| H_DATE: 07JAN24 |
| 1_APPROVED_BY: Beth Travis, MSC COR |
| J_DATE: 07JAN24 |
| Page: 1 |
| reg38t: 2 |
| A_CONTRACT_LINE_ITEM_NO: PWS |
| B_EXHIBIT: 4 |
| TDP: |
| TM: |
| OTHER: Management |
| DSYSTEMITEM: MSC N4 |
| E_CONTRACTPR_NO: |
| FCONTRACTOR: |
| of_pages: 1 |
| Reset: |
File details come from the government source that posted it. Updated .