This is a Semi-Annual Inspection Report for fire protection systems at VA Grand Junction Building 35, completed on December 16, 2025. The inspection was conducted by James Trudeau of Platinum Fire Protection (PO Box 607, Mead, CO 80542) in accordance with NFPA 25 2011 standards for water-based fire protection systems.

The report identifies three deficiencies. Deficiency #1 addresses the absence of supervised control valves, including backflow preventer isolation valves with seals in correct position, noting that no control valves exist at the facility. Deficiency #2 concerns a wet sprinkler system where flow could not be observed due to the absence of a gauge for reading. Deficiency #3 pertains to the inspector's test connection at the east door, which consists of a single head fed from a domestic system with a washing machine hose serving as the test connection. This system lacks proper signage, does not terminate in a smooth orifice, has no control valve, and relies only on a flow switch connected to a single sidewall head. The inspector certified that all tested equipment was left in operational condition upon completion of the inspection, except as noted in the deficiency findings.

View the file

Other files

File Type Posted
36C25926Q0519 0003.docx DOCX document
Life Safety and Environment of Care Document List and Review Tool 10-2023.pdf PDF
VHA-Joint Commission Clarification Document effective 1-October-2023.pdf PDF
36C25926Q0519 0002.docx DOCX document
Attachment 2 - Revised Price Schedule.docx DOCX document
CLIN 03 Bldg 7- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 1- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 33- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 8- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 01 VA -Grnd Junc CLC Kitchen Hood 2121 N Ave FAIL.pdf PDF
CLIN 03 Bldg 6- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 22 Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 37- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 02 VA B37 Audible Deficiencies.pdf PDF
CLIN 03 Bldg 5- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 36- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 02 VA Hosp - Grand Junction Battery List 2025.pdf PDF
CLIN 03 Bldg 13- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 20- Quarterly Sprinkler 12-22-25 Fail.pdf PDF
CLIN 01 VA- NFS-Kitchen Hood 2121- N Ave-FAIL.pdf PDF
CLIN 03 Bldg 45- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 12- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 34- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
36C25926Q0519 0001.docx DOCX document
36C25926Q0519.docx DOCX document
Attachment 2 - Price Schedule.docx DOCX document
Attachment 1 - SOW.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Semi Annual Inspection Report

Completed on: 12-16-2025 for

VA Grand Junction Building 35 2121 North Ave

Grand Junction, CO

Conducted By:

James Trudeau

Platinum Fire Protection PO Box 607

Mead, CO 80542

This Joint Commission inspection was performed in accordance with the following codes and regulations:

• NFPA 25 2011 - Standard for the Inspection, Testing, and Maintenance of Water Based Fire Protection Systems

Deficiencies - General Questions

Deficiency #1

Are the control valves (including backflow preventer isolation valves) supervised with seals in correct (open or closed) position? - 13.3.2.2: No

Notes: There are no control valves.

Deficiency #1 - Photo #1

Date Taken: July 10, 2025

Deficiencies - General Wet System Questions

None

Deficiencies - Wet

Deficiency #2

Sprinkler Type: Wet Is flow observed? - 13.2.5: No

Notes: No gauge to read.

Deficiencies - Inspectors Test Connection

Report of Inspection / Test Semi-Annual NFPA 25

12-16-2025 Property VA Grand Junction Building 35 2121 North Ave Grand Junction CO

Print Date: 12-22-2025

Conducted by: James Trudeau

Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com

Copyright 2025 Inspect Point

Deficiency #3

Location: East door on bldg Description: Inspectors test Terminates in Smooth Orifice?: No Signs: No

Notes: This system consists of a single head fed from domestic system. The inspectors test is a washing machine hose with no sign. No control valve.

Just a flow switch to a single sidewall head.

Report of Inspection / Test Semi-Annual NFPA 25

12-16-2025 Property VA Grand Junction Building 35 2121 North Ave Grand Junction CO

Print Date: 12-22-2025

Conducted by: James Trudeau

Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com

Inspector Signature

I state that the information on this form is correct at the time and place of my inspection, and all equipment tested at this time was left in operational condition upon completion of this inspection except as noted.

Inspector Name Signature Date Completed

James Trudeau 2025-12-16

Report of Inspection / Test Semi-Annual NFPA 25

12-16-2025 Property VA Grand Junction Building 35 2121 North Ave Grand Junction CO

Print Date: 12-22-2025

Conducted by: James Trudeau

Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com

File details come from the government source that posted it. Updated .