This is a Questions and Answers document containing responses to industry questions regarding a solicitation for logistics services at Fort Huachuca, AZ. The document addresses questions about the Collective Bargaining Agreement (CBA), wage rates, labor categories, workload data, facility locations, safety plans, and evaluation criteria.
Key clarifications include: the current CBA is effective from May 2021 through April 2025; submission deadline has been extended to January 24, 2025; no mission essential services have been identified; no Subsistence Supply Management Office workload is currently projected; and the government intends to award without discussions to the lowest-priced technically acceptable offeror with substantial confidence in past performance. The Q&A also addresses concerns about electronics technician requirements, fuel delivery services, and various facility operating hours.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| # in Attach 00XX | Question Reference (RFP #, PWS #, etc.) | RFP Text | Question Reference | Question | Response |
| L.5.1.9 | Previous EAGLE solicitation with limited ASP operations, like this EAGLE Fort Huachuca requirement which is essentially handling residue (TD-02 staffing - 2 FTE), have not required the inclusion of a Pre-Award Safety Plan. Would the Government please reserve the L.5.1.9 requirement in this solicitation? | The USG requires offerors to follow L.5.1.9 as specified in the solicitation for this requirement. | |||
| ATT0008 CBA | We noticed that the CBA was signed May 2021, and Appendix A - Wage Rates/H&W Rate table only reflects rates effective 4/24/21. Is there an Memorandum of Agreement in place that updates the employee rates on the contract for 2022 - 2024? If so, will the Government provide updated MOA's or other documents associated with CBA rate changes for the contract? | CBA Negotiation May 2021, Article 2-Duration of Agreement, 2.0 This Agreement shall become affective as of 16 May 2021 and shall remain in effect through 30 Apr 2025. |
The government has provided the most current CBA.
ATT0016 CBA Crosswalk We noticed the CBA rates used on the CBA-SCA Crosswalk are from 2021. Will the Government update CBA hourly rates to 2024 rates? CBA Negotiation May 2021, Article 2-Duration of Agreement, 2.0 This Agreement shall become affective as of 16 May 2021 and shall remain in effect through 30 Apr 2025.
The government has provided the most current CBA.
ATT0008 CBA With an outdated CBA, what productive hours are bidders expected to use? CBA Negotiation May 2021, Article 2-Duration of Agreement, 2.0 This Agreement shall become affective as of 16 May 2021 and shall remain in effect through 30 Apr 2025.
The government has provided the most current CBA.
ATT0008 CBA & ATT0016 CBA Crosswalk Pg 21 of CBA The effective rates provided within the CBA are as of 4/24/2021. Given that the CBA is over 3 years old and no wage table was provided beyond 2021, will the Government provide any MOUs/ updated CBA to allow industry to appropriately determine the productive hours for CBA members? CBA Negotiation May 2021, Article 2-Duration of Agreement, 2.0 This Agreement shall become affective as of 16 May 2021 and shall remain in effect through 30 Apr 2025.
The government has provided the most current CBA.
ATT0008 CBA pg 12-13 The 2021 CBA only reflects ten (10) paid holidays. Currently there are eleven (11) recognized federal holidays. Will the Government provide any MOUs/ updated CBA to allow industry to appropriately determine the productive hours for CBA members? CBA Negotiation May 2021, Article 2-Duration of Agreement, 2.0 This Agreement shall become affective as of 16 May 2021 and shall remain in effect through 30 Apr 2025.
The government has provided the most current CBA.
| ATT0001 PWS | Given that ammunition supply services consists of the handling of residue (not live ammunition), the low workload hours for both ASP support services, will the Government consider reserving the Safety Plan? | The USG requires PM-13 Safety, Enviromental, and Emergency Response Plan shall be submitted based on solicitation instructions. | |
| ATT0001 PWS | pg 15 | Government Continuity of Operations Plan is based on personnel designated as "mission essential personnel." Historically mission essential contract support attachment (Attachment 0013 - Mission Essential Contractor Services) would enable the contractor do identify which positions would be considered mission essential. Additionally a requirement to address such services in the contractor response would be required. Currently attachment 13 is listed as not applicable. Can the Government confirm that there are no Mission Essential Contractor Services for the EAGLE FHAZ effort? | The USG has not identified any mission esential services. |
| ATT0001 PWS | pg 15 | If there are no MECS, will the Government remove the requirement for the COOP from the PWS as there is no way to identify mission essential personnel authorized on the contract without the MECS? | USG has determind PWS para 1.4.2 will remain in the PWS. |
| ATT0001 PWS | pg 15 | If there are MECS for the effort will the Government provide the list of MECS prior to the RFP response submission deadline? | Currently there is no MECS requirement. |
| ATT0007 WGD, ATT0008 CBA, ATT0016 CBA Crosswalk | L.5.4.2.12(a)(2), page 47 | Request for Proposal (RFP) Paragraph L.5.4.2.12(a)(2) directs offerors to not escalate Collective Bargaining Agreement (CBA) wages past those in the CBA which last effective wage date is over four (4) years prior to the Notice to Proceed (NTP). CBA Article 13 requires wages and Health & Welfare be paid at the higher of the CBA or current Wage Determination. There are seven (7) labor categories that have higher wages in the current WD than the CBA. Will the Government please confirm that the CBA wages, Health & Welfare, and other financial benefits are the most current agreement between the incumbent and the Union? | The USG has provided additional CBA documents and revised applicable documents. |
| ATT0007 WGD, ATT0008 CBA, ATT0016 CBA Crosswalk | L.5.4.2.12(a)(2), page 47 | RFP Paragraph L.5.4.2.12(a)(2) directs offerors to not escalate CBA wages past those in the CBA which last effective wage date is over four (4) years prior to the NTP. CBA Article 13 requires wages and Health & Welfare be paid at the higher of the CBA or current WD. There are seven (7) labor categories that have higher wages in the current WD than the CBA. Will the Government please confirm that offerors are required to propose the higher wage and Health & Welfare between the provided Attachment 0008 and Attachment 0007? | The USG has provided additional CBA documents and revised applicable documents. |
| ATT0008 CBA | The CBA is dated 2021 and effective through April 2025. Article 2 outlines that any modifications or addendums must be reduced to writing and executed to be effective. Will the Government please provide offerors all executed modifications and addendums to this CBA, along with corresponding updated Attachment 0016? | The USG has provided additional CBA documents and revised applicable documents. | |
| Attachment 0008 CBA |
Attachment 0012 DD254 Attachment 0016 CBA Crosswalk
| Attachment 0026 TD-02 | Attachment 0012 states: "Electronic Technicians are required to hold SECRET clearances;" however, Attachments 0008 and 0016 list no Electronics labor categories. Further, there is no COMSEC equipment workload lists in Attachment 0026. Will the Government please both clarify and reconcile the Electronics workload requirement in Attachment 0026 with the CBA, Crosswalk, and DD-254? | No workload currently projected, but is a capability at this location. | |
| Attachment 0008 CBA |
Attachment 0012 DD254 Attachment 0016 CBA Crosswalk
| Attachment 0026 TD-02 | No Electronics labor categories are listed in Attachments 0008 and 0016; however, Attachment 0026 has Maintenance workload equipment that does require Electronics-type (non-COMSEC) labor categories, but none are listed in Attachments 0008 or 0016. Will the Government please both clarify and reconcile the Electronics workload in Attachment 0026 with the CBA and Crosswalk? | No workload currently projected, but is a capability at this location. | |||
| Attachment 001 PWS Attachment 0026 TD-02 | PWS Page 42: Paragraph 5.2.8 | Does the incumbent contractor currently have any certified Emergency Vehicle Technicians (EVTs) in their workforce? | USG has provided the current CBA identifying the current contractor staffing. The USG requires the offeror to propose to the requirement and documents provided in the solicitation. | ||
| Attachment 0001 PWS |
Attachment 0008 CBA Attachment 0016 CBA Crosswalk
| Attachment 0026 TD-02 | There appears to be several tasks and/or density equipment that require labor categories not present in Attachments 0008, 0016, or 0026. Is it acceptable for offerors to select an appropriate Service Contract Act (SCA) labor category that is not in the CBA if/as needed to perform required tasks? | Yes, offerors should identify those DOL SCA labor codes they deem applicable to perform the requirement based on the solicitation documents. | |||
| Attachment 0026 TD-02 | On the Indirect Maintenance Tab under CLIN 3AA, BASOPS, there are several line item tasks toward the bottom rows that area Material Maintenance, Allied Trades, and/or Technical Inspections, and not Production Control or Shop Supply-related. Will the Government please review these Indirect Maintenance tasks and clarify the requirement? | Transactional data is provided based on the tasks identifed and estimated productive hours for those transactions. | |||
| Attachment 0008 CBA | |||||
| Attachment 0016 CBA Crosswalk | Both the CBA Supply Technician and CBA Supply Technician II are cross-walked to the SCA Supply Technician; however, the Supply Technician II in the CBA has a higher wage. Will the Government please explain the difference between these two (2) labor categories' duty descriptions? | The USG didn’t establish or negotiate the CBA skill description determinations and do not have the description to provide. | |||
| Attachment 0001 PWS Attachment 0032 TD-11 | PWS Page 54; Paragraph 5.21.2 | Is PWS Paragraph 5.21.2, with associated Attachment 0032 locations, a year-round task or cyclical? | These are based on the emergency use of the equipment to refueled/defueled. Offeror should untilize TD-02 Workload Data and Density Listing for the projected requirement. | ||
| Attachment 0001 PWS Attachment 0032 TD-11 | PWS Page 54; Paragraph 5.21.2 | Will the Government please clarify the frequency of PWS Paragraph 5.21.2 in detail? | These are based on the emergency use of the equipment to refueled/defueled. Offeror should untilize TD-02 Workload Data and Density Listing for the projected requirement. | ||
| Attachment 0029 | Attachment 0029 lists a Guard Shack. Is the Contractor responsible for any guard duties? | That structure is part of the facilitys at the location. The offeror should follow the requirements in the PWS and TD-02 Workload Data and Density Listing. | |||
| Attachment 0029 | If the Contractor is responsible for guard duties, will the Government please provide the specific facilities at which these duties will be performed and the detailed task responsibilities? | The offeror should follow the requirements in the PWS and TD-02 Workload Data and Density Listing. | |||
| Attachment 0008 CBA | What are current wages for the CBA employees? The CBA provided as of 2021. | CBA Negotiation May 2021, Article 2-Duration of Agreement, 2.0 This Agreement shall become affective as of 16 May 2021 and shall remain in effect through 30 Apr 2025. |
The government has provided the most current CBA.
| Attachment 0008 CBA | Reference the CBA document under Appendix A and Article 13 regarding wages. What is the current wage rate for a Freight Specialist? According to Appendix A, the 2021 wage rate was listed as $27.16. Article 13 of the CBA states that wages will be reviewed annually to determine if they exceed the Wage Determination (WD) rate. Should the contractor assume that the Freight Specialist wage rate has not changed since 2021, or are there updated wage rates for positions that now exceed the current WD rate?" | The USG has provided additional CBA documents and revised applicable documents. |
| Attachment 0008 CBA | Per Article 13, certain rates will be reviewed annually. The Quality Inspector is not in the WD provided nor is it referred to in the CBA to SCA crosswalk (attachment 16). Could the Government provide the current pay rate for the Quality Inspector? | The USG has provided additional CBA documents and revised applicable documents. |
| Attachment 0008 CBA | Can you confirm if this is the most current CBA-SCA Crosswalk document? The attached file indicates it is effective as of April 24, 2021. If there have been any updates or revisions since this date, please provide the latest version | CBA Negotiation May 2021, Article 2-Duration of Agreement, 2.0 This Agreement shall become affective as of 16 May 2021 and shall remain in effect through 30 Apr 2025. |
The government has provided the most current CBA.
| Attachment 0001 PWS | paragraph 5.17 | The SSMO section is required by the PWS, but there is no workload to support the task in TD-02. Nor does Att0005 provide a CLIN to support the SSMO. | No workload currently projected, but is a capability at this location. | ||
| ATT0016 - Ft. Huachuca CBA to SCA Crosswalk | Can the government confirm that the Supply Technician II is an exempt type supervisory postion? | No, the USG provides the SCA related Labor codes. The USG did not participate in the CBA agreeded between the Union and the current Contract Company for the specifics of Supply Technician I and Supply Technician II. | |||
| ATT0016 - Ft. Huachuca CBA to SCA Crosswalk | Can the government provide the difference between the SCA Supply Technician I and II? | The USG provides the SCA related Labor codes. The USG did not participate in the CBA agreed between the Union and the current Contract Company for the specifics of Supply Technician I and Supply Technician II. | |||
| ATT0012 - DD 254 makes no mention of Supply positions needing to handle sensitive equipment. | Can the government clarify if there are functions within supply handling sensitive items? | The PWS is written to the level of all and any type of transportation movement or pasenger support according to regulation, policy or other mission guidance. The TD-02 Workload is the USG best projected identification of the Workload Data and Density List for this requirement. | |||
| ATT0016 - Ft. Huachuca CBA to SCA Crosswalk | Can the government update the crosswalk to reflect the addition of an electronic technician? | The USG has provided additional CBA documents and revised applicable documents. | |||
| B08 Attachment 0008 - Collective Bargaining Agreement (CBA) | Page 3 | Article 2 of the CBA says in part: This Agreement shall become effective as of 16 May 2021 and shall remain in effect through 30 April 2025. Appendix A "Wage Rates / H&W Rate" of the CBA has an effective date of 4/24/2021 and provides rates for CBA Job Descriptions that were effective 4/24/2021, are there updated or current rates associated with the CBA for offerors to use? | The USG has provided additional CBA documents and revised applicable documents. | ||
| B08 Attachment 0001 - Performance Work Statement (PWS) | Page 49-50, Paragraph 5.17 | The PWS 5.17 contains text for Subsistance Supply Management Office, however B08 Attachment 0026 - TD Workload Data and Density List and B08 Attachment 0005 do not provide workload or a CLIN for this function, please address. | No workload currently projected, but is a capability at this location. | ||
| The RFP does not include DFARS 252.237-7024 NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES in the RFP. Since Offerors are not required to submit an MECS file, will the Government please confirm there are no mission essential services for this task order? | The USG has not identified any mission essential services. | ||||
| Attachment 0001, PWS, page 32, 3.1.1; | |||||
| Exhibit B, CDRL List PM-07 | PWS page 32, para 3.1.1, states PM-07 is due 30 days after NTP. The CDRL list (Exhibit B) for PM-07 states due 15 days after NTP. Would the Government please clarify? | The Contract Data Requirements List Listing has been revised. | |||
| Attachment 0026, TD-02 Workload Data and Density List | MAINT-Indirect Tab, Lines 40-47 | The TD-02 gives workload for Non-ASC ISEC (CLIN3CA); however, the PWS does not reference the requirements for this CLIN and there is no Appendix outlining the requirements. Would the Government please provide the Appendix detailing the work requirements associated with CLIN3CA? | The PWS specifics for the inspections, services, repair, and load testing for CLIN3CA is the same as other like items listed under other CLIN(s) on the TD-02 Workload Data and Density listing. | ||
| Attachment 0026, TD-02 Workload Data and Density List, | |||||
| Attachment 0001, PWS, page 3 | MAINT-Indirect Tab, Line 2; PWS page 3 | Line 2 of the TD-02 references PWS paragraph 5.7; however, this paragraph is noted as Reserved in the PWS. Would the Government please correct the appropriate document regarding PWS paragraph 5.7? | TD-02 Workload Data and Density Listing has been revised. | ||
| Attachment 0026, TD-02 Workload Data and Density List, | |||||
| Attachment 0001, PWS | TD-02 Supply Tab PWS pages 49-50 | Attachment 0001, PWS, pages 49-50, outline work requirements for Subsistence Supply Management Office (SSMO); however, the TD-02 does not stipulate any productive hours for this work. Would the Government please clarify the productive hours on the TD-02? | No workload currently projected, but is a capability at this location. | ||
| Attachment 0026, TD-02 Workload Data and Density List, Supply Tab; |
Attachment 0001, PWS, pages 49-50;
Attachment 0002;
Attachment 0005 TD-02 Supply Tab;
PWS, pages 49-50;
| Attachment 0001, PWS, pages 49-50, outline work requirements for Subsistence Supply Management Office (SSMO); however, the TD-02 does not give the CLIN associated with this work. Would the Government please clarify the SSMO CLIN on the TD-02, and update Attachments 0002 and 0005? | No workload currently projected, but is a capability at this location. | ||||
| Attachment 0016, CBA-SCA Crosswalk, Disclaimer; | |||||
| RFP | PWS - page 37, L.5.2.1.1(b) | The Attachment 0016 DISCLAIMER states, in part, "This information has been provided for proposal purposes only. Offerors are not obligated to utilize the CBA positions identified on this SCA/CBA Crosswalk document. It is strictly the offerors’ decision on how to bid and what positions to bid in order to meet the requirements of the subject solicitation." This statement is in conflict with the RFP, L.5.2.1.1(b). Is it the Government's intent to allow Offerors to ignore the CBA, when it is to their advantage, and propose SCA positions and still be Technically compliant? | The offeror should propose as directed by the RFP and L.5.2.1.1(b) "The Offeror's Staffing and Management Plan must detail the Offerors approach to deliver services required in the RFP and PWS. The Offeror's SMP must detail the overarching methodology used to determine the proposed skill sets / skill level; the SMP must also contain any rationale used to support staffing decisions with any explanations needed to clarify staffing decisions (e.g., cross utilization of specific labor categories, dual hatted positions, etc.), to include a detailed narrative of innovations and efficiencies. Rationale for innovations and efficiencies must be clearly identified, by placing under a separate header, in the SMP and confirmed within the Attachment 0026 - TD-02 Workload Data and Density List. The Government will NOT accept methodologies previously utilized under a different EAGLE Task Order or any other similar service contract, Government or otherwise, as supporting rationale for this requirement. The methodology shall be independent to this RFP only. As the Government will utilize any applicable Collective Bargaining Agreement (CBA), the Service Contract Act (SCA) Directory of Occupations (5th Edition) and Attachment 0026 - TD-02 Workload Data and Density List for technical evaluation purposes, the Offeror shall utilize those sources whenever possible to determine which labor categories/position titles to propose as part of its proposed staffing." | ||
| TD-04, Hours of Operation; | |||||
| Attachment 0001, PWS | The TD-04 lists Hours of Operation for the LRC Maintenance Division, the ASP, and several Transportation sections; however, several PWS work section hours of operation appear to be missing. Would the Government please update the TD-04 and provide the hours of operation for CIF Storefront Operations (PWS 5.15; CLIN4AA)? | TD-04 Hours of Operation has been revised. | |||
| TD-04, Hours of Operation; | |||||
| Attachment 0001, PWS | The TD-04 lists Hours of Operation for the LRC Maintenance Division, the ASP, and several Transportation sections; however, several PWS work section hours of operation appear to be missing. Would the Government please update the TD-04 and provide the hours of operation for CIPBO (PWS 5.18; CLIN4BA)? | TD-04 Hours of Operation has been revised. | |||
| TD-04, Hours of Operation; | |||||
| Attachment 0001, PWS | The TD-04 lists Hours of Operation for the LRC Maintenance Division, the ASP, and several Transportation sections; however, several PWS work section hours of operation appear to be missing. Would the Government please update the TD-04 and provide the hours of operation for the Hazardous Material Control Point (PWS 5.20; CLIN4BA)? | TD-04 Hours of Operation has been revised. | |||
| TD-04, Hours of Operation; | |||||
| Attachment 0001, PWS | The TD-04 lists Hours of Operation for the LRC Maintenance Division, the ASP, and several Transportation sections; however, several PWS work section hours of operation appear to be missing. Would the Government please update the TD-04 and provide the hours of operation for the SSMO (PWS 5.17; CLIN TBD)? | No workload currently projected, but is a capability at this location. | |||
| TD-04, Hours of Operation; | |||||
| Attachment 0001, PWS | The TD-04 lists Hours of Operation for the LRC Maintenance Division, the ASP, and several Transportation sections; however, several PWS work section hours of operation appear to be missing. Would the Government please update the TD-04 and provide the hours of operation for Retail Supply (PWS 5.19; CLIN 4EA)? | TD-04 Hours of Operation has been revised. | |||
| TD-04, Hours of Operation; | |||||
| Attachment 0001, PWS | The TD-04 lists Hours of Operation for the LRC Maintenance Division, the ASP, and several Transportation sections; however, several PWS work section hours of operation appear to be missing. Would the Government please update the TD-04 and provide the hours of operation for ASC Personnel Movements and Travel Services (PWS 5.28; CLIN 5CA)? | TD-04 Hours of Operation has been revised. | |||
| TD-04, Hours of Operation; | |||||
| Attachment 0001, PWS | The TD-04 lists Hours of Operation for the LRC Maintenance Division, the ASP, and several Transportation sections. Are the hours listed for IMCOM POL - Retail Fuel Operations (Duty Hours) applicable to ASC Wholesale Fuel Supply (CLIN 4FA) and Non-ASC IMCOM POL Fuel Labor (CLIN 4GA)? | TD-04 Hours of Operation has been revised. | |||
| TD-04, Hours of Operation; | |||||
| Attachment 0001, PWS | The TD-04 lists Hours of Operation for the LRC Maintenance Division, the ASP, and several Transportation sections. Are the hours listed for the LRC-TMP applicable to Non-ASC 111th MI Bde (Appendix B; CLIN 5EA)? | TMP follows TD-04 Hours of operations to support customers. | |||
| TD-07, Government Furnished Facilities | The TD-07 does not list the location for the PMO. Would the Government please update the TD-07 and provide the building number for the PMO? | TD-07 Government Furnished Facilities has been revised. | |||
| TD-07, Government Furnished Facilities | The TD-07 lists Building 52065 for Personnel Property Operations; however, there is no building annotated for Personnel Movements and Travel Services (PWS 5.28; CLIN 5CA). Are PPSO (PWS 5.27; CLIN 5DA) and Passenger Movements (PWS 5.28) co-located in Building 52065, or would the Government provide the building number for Passenger Movements? | All Persennel Property, Movement and Travel requirements are colocated. | |||
| TD-07, Government Furnished Facilities | |||||
| Attachment 0001, PWS | PWS - Pages 49-50 | Attachment 0001, PWS, pages 49-50, outline work requirements for Subsistence Supply Management Office (SSMO); however, the TD-07 does not give a building location for these services. Would the Government please provide the building number for SSMO services? | No workload currently projected, but is a capability at this location. | ||
| Attachment 0008, CBA | |||||
| Attachment 0016, CBA-SCA Crosswalk | The CBA lists a Supply Technician and a Supply Technician II, with no clarity provided in the CBA in the way of job descriptions to justify the difference in wages, and both are mapped to an SCA Supply Technician IAW Attachment 0016, CBA-SCA Crosswalk. As it would be disadvantageous for Offerors to propose unwarranted higher wages, would the Government please provide further clarity in Attachment 0016, CBA-SCA Crosswalk, as to the difference in these positions? | The USG provides the SCA related Labor codes. The USG did not participate in the CBA agreeded between the Union and the current Contract Company for the specifics of Supply Technician I and Supply Technician II. | |||
| Attachment 0026, TD-02 Workload Data and Density List, Supply Tab; | |||||
| Attachment 0001, PWS, page 55, para 5.22.5 | TD-02 Supply Tab; | ||||
| PWS, page 55, para 5.22.5 | PWS paragraphs 5.22.5 - 5.22.5.2 outline requirements for Ammunition Inspectors; however, the TD-02, Supply Tab, lines 41-46, ASP CLIN 4CA, do not convey requirements for any type of inspection services. Would the Government please provide clarification in the appropriate document? | The PWS is written to the level of all and any type of transportation movement or pasenger support according to regulation, policey or other mission guidance. The TD-02 Workload is the USG best projected identification of the Workload Data and Density List for this requirement. | |||
| TD-07, Government Furnished Facilities | The TD-07 lists 75901, 75902, and 75903 as Building Numbers for Maintenance Facilities; however, the TD-02, MAINT CLIN3SS-BASEOPS, lists 74915 as the Building Number for operations, which is not listed on the TD-07. Would the Government please provide clarification on the location for BASEOPS Maintenance? | TD-02 Workload Data and Density Listing has been revised. | |||
| Attachment 0026, TD-02 Workload Data and Density List, Transportation Tab, Line 6; |
Attachment 0019, Transportation PRS, 5.29.4;
Attachment 0001, PWS, page 60, para 5.29.4 TD-02 Transportation Tab, Line 6;
Transportation PRS, 5.29.4;
| PWS, page 60, para 5.29.4 | PWS paragraph 5.29.4 states, "The contractor shall provide bus/truck and driver support. The driver could transport personnel, cargo, and/or correspondence and will use the minimum size vehicle suitable for a particular mission IAW AR 58-1". Attachment 0019, Transportation PRS, 5.29.4, states, "Operate buses and other non-tactical vehicles." However, the TD-02, Transportation Tab, Line 6, simply annotates "Troop Lift Support" with Estimated Annual Hours of 40,604, without distinguishing historical workload for Bus Driver versus Driver-Light (other non-tactical vehicles) support, data only the incumbent would know. Would the Government please provide further historical workload details for the types and quantities of troop lift support required? | The PWS is written to the level of all and any type of transportation movement or pasenger support according to regulation, policey or other mission guidance. The TD-02 Workload is the USG best projected identification of the Workload Data and Density List for this requirement. | |
| Attachment 0026, TD-02 Workload Data and Density List, Transportation Tab, Line 25; |
Attachment 0024, Appendix B;
Attachment 0001, PWS, page 59, para 5.28 TD-02 Transportation Tab, Line 25;
Attachment 0024, Appendix B;
| PWS, page 59, para 5.28 | The TD-02, Transportation Tab, Line 25, annotates workload data for 111th Troop Movement. Attachment 0024, Appendix B, outlines a requirement for passenger movement IAW PWS 5.28. For clarity, would the Government please confirm that the workload refers to arranging passenger movement and not providing actual movement by way of bus or non-tactical vehicle? | Appendix B has been revised to reflect PWS para 5.29. | |||
| TD-07, Government Furnished Facilities | The TD-07 does not list a building for Non-ASC 111th MI Bde operations (Appendix B; CLIN 5EA). Would the Government provide the appropriate building number for Non-ASC 111th MI Bde support operations? | Locations are based on mission requests submitted by the customer. | |||
| RFP L.5.1.9; M1.1.3 | Previous EAGLE solicitation with limited ASP operations, like the EAGLE Jackson requirement and this FHAZ requirement, which is essentially handling residue, have not required the inclusion of a Pre-Award Safety Plan. Would the Government please reserve L.5.1.9 and M.1.1.3, as it did in the EAGLE Jackson solicitation? | The USG requires offerors to follow L.5.1.9 as specified in the solicitation for this requirement. | |||
| Attachment 0016, CBA to SCA Crosswalk |
RFP L.5.4.2.12(a)(2)
Attachment 0018, Collective Bargaining Agreement RFP L.5.4.2.12(a)(2) Attachment 0016 includes the following statement as a part of the Disclaimer:
"All of the job descriptions listed can be used for any CBA labor categories. This information has been provided for proposal purposes only. Offerors are not obligated to utilize the CBA positions identified on this SCA/CBA Crosswalk document. It is strictly the offerors’ decision on how to bid and what positions to bid in order to meet the requirements of the subject solicitation."
L.5.4.2.12(a)(2) states "When proposing Direct Labor Rates, compliance with the Service Contract Act (SCA) (Attachment 0007, Wage Determination) and the CBA (Attachment 0008) is required."
And "Offerors (including Subcontractors shall use the CBA rates included with the solicitation (Attachment 0008) through the final year of the CBA and shall not include escalation through the remainder of the period of performance. As the CBA expires on 30 April 2025, Offerors (including Subcontractors) will continue to use the last applicable rate(s)in force (without escalating) for the remainder of the period of performance."
Article 1 - Recognition identifies the Union as the sole exclusive collective bargaining agency for all full time and part-time employees employed by the Company on the current Contract Number W52P1j-17-G-0096 for the purpose of work and other conditions of employment at Fort Huachuca, Arizona and whose job classifications are listed in Appendix “A”.
| The disclaimer in Attachment 0016 appears to be in direct conflict with L.5.4.12(a)(2) of the RFP and Article 1 of the CBA. Will the Government remove the language from Attachment 0016, which essentially removes the obligation to utilize the CBA and makes it strictly the offerors decision to chose between using the CBA or SCA when proposing positions? | The USG has provided additional CBA documents and revised applicable documents. |
| RFP L.5.4.2.12(a)(2) |
| Attachment 0008, Collective Bargaining Agreement | RFP L.5.4.2.12(a)(2) | L.5.4.12(a)(2) states, "As the CBA expires on 30 April 2025, Offerors (including Subcontractors) will continue to use the last applicable rate(s)in force (without escalating) for the remainder of the period of performance." The CBA only provides rates that are effective 5/15/2021. Is there a more current version of this CBA or an MOU that provides more current rates for 2024/2025? | The USG has provided additional CBA documents and revised applicable documents. |
| Attachment 0008, Collective Bargaining Agreement |
RFP M.5.3.6 RFP M.5.3.6 Article 13 of the CBA states, "The Company agrees to pay the Bargaining Unit Employees in accordance with the current negotiated pay rates as specified in Appendix A. Effective May 15, 2022, a position’s Wage Rate will be reviewed annually for wage limits that exceed Wage Determination (WD) amounts on the anniversary date of the CBA. The payroll period following May 15, 2021 and for each subsequent annual period the Wage Rate will be the greater of:
• The negotiated Wage Rate for the position as stated in Appendix A, or,
• The Wage Rate for the position as stated in the U.S. Department of Labor’s Service Contract Act WD for Cochise County, AZ where wages or health and welfare fringe benefits exceeds the current CBA rate."
| As the CBA provided with the solicitation documents only contains wages through May 2022, and no MOU or other document has been provided with more current rates, several labor categories in the CBA have wages lower than those in SCA WD. Will the Government confirm that proposal evaluations will ensure compliance with Article 13 of the CBA as stated in M.5.3.6, and that all offerors have complied with the language in the CBA? | The USG has provided additional CBA documents and revised applicable documents. | |
| Attachment 0008, Collective Bargaining Agreement | Article 13 states, "Effective May 15, 2022, a position’s Wage Rate will be reviewed annually for wage limits that exceed Wage Determination (WD) amounts on the anniversary date of the CBA." |
| As a more current version of the CBA, amendment, or MOU has not been provided to date, and there are several wages in the CBA that have been exceeded by the SCA WD, will the Government confirm that no amendment, MOU, or other more current document is in the possession of the incumbent contractor or the Union that should be included as part of this solicitation? | The USG has provided additional CBA documents and revised applicable documents. | |||
| Attachment 0016 CBA/SCA Crosswalk | L.5.4.2.12(a)(2), page 47-57 | There seems to be a discrepancy between RFP W519TC-24-R-0027,page 47-57, L.5.4.2.12(a)(2) and B08 Attachment 0016 - CBA-SCA Crosswalk, "Disclaimer" which states that "Offerors are not obligated to utilize the CBA positions identified on this SCA/CBA Crosswalk document. It is strictly the offerors’ decision on how to bid and what positions to bid in order to meet the requirements of the subject solicitation." Please provide clarification if the offeror is to use the CBA or SCA for those positions. If an offeror chooses SCA positions based on the Service Contract Act (SCA) Directory of Occupations (5th Edition) , but the SCA position is included in the CBA/SCA crosswalk, is the offeror required to use the CBA rate for the direct rate of that position or can the offeror use the WD as the direct rate for the SCA position? | The USG recommends the offeror follow the instruction as defined in the solicitation L.5.4.2.12(a) (2). | |
| Attachment 0026 - TD-02 Workload and Density List | Is it the Government’s intention that the Estimated Productive Hours provided on Attachment 0026 – TD02 Workload Data and Density List is what bidders should use as the Minimum hours to bid in each functional area to level the playing field? | The USG provided estimated functional hours not minimum hours. The offeror should proposed based on L.5.2.1.1(c) (6) (v) and M.5.1.2(c) (1). | ||
| ATT0021 | We noticed that there was no Attachment 0021 is not included in the solicitation documents. Will the Government confirm that PWS Annex E is part of this solicitation? If it does apply, will the Government please provide Attachment 0021. | Document was uploaded to SAM.gov on 12/10/24 and ALL BOA Holders were informed of this on 12/10/24 via email. | ||
| ATT0027 TD-03 | We noticed that TD-03 Supported Organization document is password protected and bidders cannot open it. Will the Government provide an unprotected TD-03. | Document was NOT password protected, there was a "sensitivity" setting that needed to be changed. This was changed and the updated attachment was provided with Amendment 0001. | ||
| ATT0032 TD-11 | We noticed that TD-11 Fuel Delivery to Emergency Back-up Generators and Vehicles is not included in the solicitation documents. Will the Government confirm that PWS TD-11 is part of this solicitation? If it does apply, will the Government please provide TD-11. | Attachment 0032, TD-11 Fuel Delivery to Emergency Back-up Generators and Vehicles was provided via DoD SAFE to all BOA holders. | ||
| ATT0005 Cost Price Matrix | We noticed the Cost Price Workbook was unable to refresh and could not update values from a linked workbook that is not accessable by bidders. When clinking on Tab 1a, it appears that the workbook is password protected. Please correct Attachment 0005. | Attachment 0005 Cost Price Matrix is, and will remain, password protected. The ONLY cells offerors need to input information into are those cells highlighted in blue, all others are inaccessible to offerors. Refer to RFP L.5.4.2.3, L.5.4.2.3.1(d) | ||
| RFP | L.5.3.5.1 | Will the Government conider allowing past incumbents to use their Past Performance from EAGLE FT Huchuca. Under the current instructions and evaluation criteria, we can not use it. Our logic is the contract period is 5 years in duration, no prior incumbent's past performance would be deemed 'recent' under the current instructions. We believe this is extremely restrictive since we were the prior incumbent and our experience/past performance is relevant and recent. We are asking the Government to allow previous incumbent's to use their past performance or defining recent as 'within the past 5 years.' | The Government does not intend to modify the EAGLE Evaluation Criteria in this manner, at this time. | |
| RFP | M1.1 | The Government expects to award a single combination Cost Plus Fixed Fee/Firm-Fixed Price (Transition-In CLIN and PMO CLINs only) task order with 1, 12-month base period, to include a 30-day transition, 4, 1-year evaluated option periods, and 1, 6-month evaluated | ||
| option period with this RFP. The Government will make an award to the responsible Offeror (IAW FAR 9.1) whose proposal complies with the RFP requirements and is determined to be the lowest total evaluated (fair and reasonable) priced proposal that is determined to be Technically Acceptable with Substantial Confidence in Past Performance. If a company elects to not submit Past Performance and receives a 'Neutral' rating, can they still be awarded the contract since M1.1 states with 'Substantial Confidence in Past Performance.' | An Offeror not providing any past performance references does not necessarily dictate a "Neutral Confidence" rating. Per M.5.2.1 of the RFP the Government will asses "...other information available from sources other than those identified by the Offeror..." | |||
| RFP, SF33, Block 9 | Given the possibility of additional information as it pertains to the CBA and when industry may receive responses to submitted questions, will the Government consider extending the submission deadline by one week? | Submission deadline is extended until 24 January 2025, per amendment 0003. | ||
| Attachment 0001 PWS |
Attachment 0005 Cost/Price Matrix
| Attanchment 0026 TD-02 | Attachment 0026 has two (2) Maintenance "Non-ASC" tabs: CLIN 3BA - Non-ASC ATEC-EPG and CLIN 3CA - Non-ASC ISEC. The Maintenance Indirect Tab repeats and confirms these CLINs; however, Attachment 0005 lists CLIN 3BA as "ASC FSE Equipment" and CLIN 3CA as "Non-ASC-EPG." Further, FSE does not appear to be in the PWS. Will the Government please clarify the requirement and corresponding attachments? | Attachment 0005 was updated | ||
| RFP, page 1, block 9 | Upon receiving answers to questions and any other revised solicitation documents, would the Government please allow offerors to have at least three (3) weeks to review and incorporate all Amendment changes by way of an extension to the proposal submission date? | Submission deadline is extended until 24 January 2025, per amendment 0003. | ||
| RFP L.5.3.1.1(c); L.5.3.1.2 | IAW L.5.3.1.1(c) the definition of a Subcontractor for the Past Performance Factor states, "Subcontractor(s), as used in the Past Performance factor, means those who are expected to perform 20% or more of the Offeror's total estimated dollar value as found in column F of the Offerors Cost Price Matrix (Attachment 0005, Tab 2-Teaming Matrix) or who are expected to perform a critical performance task." Using this definition, to ensure compliance with L.5.3.1.2 and L.5.3.1.2 (d), should offerors only provide a Letter of Consent, Attachment 0004, for those subcontractors performing 20% or more of the Offeror's total estimated dollar value or a critical task, or should offerors provide a Letter of Consent for all subcontractors, regardless of their work percentage and tasks? | All offerors shall provide a letter of consent for all subcontractors performing 20% or more. | ||
| RFP L.5.3.1.1(c); L.5.3.5; L.5.3.5(c)(4) | IAW L.5.3.1.1(c) the definition of a Subcontractor for the Past Performance Factor states, "Subcontractor(s), as used in the Past Performance factor, means those who are expected to perform 20% or more of the Offeror's total estimated dollar value as found in column F of the Offerors Cost Price Matrix (Attachment 0005, Tab 2-Teaming Matrix) or who are expected to perform a critical performance task." Using this definition, to ensure compliance with L.5.3.5 and L.5.3.5(c)(4), should offerors only provide a Performance Questionnaire, Attachment 0003, for those subcontractors performing 20% or more of the Offeror's total estimated dollar value or a critical task, or should offerors provide a Performance Questionnaire for all subcontractors, regardless of their work percentage and tasks? | Offerors should provide a Performance Questionnaire for all subcontractors regardless. As stated in Section M.5.2.6 Past performance for parent/sister companies or other corporate entities may be evaluated only if these companies or entities are listed as subcontractors on |
the Offerors Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix and are expected to perform 20% or more of the total value of column F in the Offerors Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix.
| RFP, L.1.2 | L.1.2 states, "In accordance with (IAW) FAR 52.215-1, Instructions to Offerors - Competitive Acquisition (Jan 2017), the Government intends to award a contract without discussions. Offerors are cautioned to examine this RFP in its entirety and to ensure that proposals contain all necessary information, provide all required documentation, and are complete in all respect. The Government is not obligated to make another request for the required information nor does the Government assume the duty to search for data to cure problems it finds in proposals." As the Government has opened discussions with offerors on all recent EAGLE solicitations, changing its intent to award without discussions, would the Government update Section L and M language to appropriately reflect its intent to conduct discussions? | The intention is to award without discussions; however, if opening discussions is determined to be in the best interest of the Government, the Government reserves the right to open them. The Government will not update Section L language regarding discussions at this time. | ||
| RFP, L.1.2 | L.1.2 states, "In accordance with FAR 15.306(c)(2), if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Any Offeror eliminated from further consideration will be notified in writing." The Government appears to have moved toward a trend of opening discussion on all EAGLE RFPs regardless of the size of the effort. Will the Government consider revising this language to state its true intentions? | Each Solicitation is unique, and discussions are opened at the discretion of the Government. Section L Language will not be updated at this time. | ||
| RFP, L.1.2 | If technical evaluations are pass/fail, can the Government clarify how it determines the "most highly rated proposals"? | IAW M.4.1, Technical Evaluations are conducted on an Acceptable/Unacceptable basis. See M.5 on Evaluation Criteria. | ||
| RFP, L.1.2 | Will the competitive range be established after reviewing all proposals to determine technical acceptability and then identifying the "highly rated" proposals, or will a down-select process occur before this analysis? | |||
| Competitive Range is established if and when the Government determines opening discussions is in the Governments best interest. See M.3.2, M.4.4.1 and M.4.4.2 regarding Evaluation factors. | ||||
| RFP, L.1.2 | If a down-select process is conducted, how will the Government ensure that only the most highly rated proposals are included in the competitive range? | |||
| See M.3.2, M.4.4.1 and M.4.4.2 regarding Evaluation factors. | ||||
| RFP, L.1.2 | What measures are in place to prevent Offerors from understaffing to be included in the down-select numbers despite not being among the most highly rated after a full review of all proposals? | See M.3.2, M.4.4.1 and M.4.4.2 regarding Evaluation factors. | ||
| RFP, L.1.2 | FAR 15.306 - Competitive range. (1) Agencies shall evaluate all proposals in accordance with 15.305(a), and, if discussions are to be conducted, establish the competitive range. Based on the ratings of each proposal against all evaluation criteria, the contracting officer shall establish a competitive range comprised of all of the most highly rated proposals, unless the range is further reduced for purposes of efficiency pursuant to paragraph (c)(2) of this section. | |||
| While the RFP language and FAR provide the Government the ability to reduce the number of proposals in the competitive range, recent EAGLE discussions suggest that the competitive range may be expanding. Could the Government clarify how many offerors it intends to include in the competitive range and how this approach aligns with the goal of promoting efficient competition? | Each Solicitation is unique, which means the establishment of a competitive range is unique to each specific situation. | |||
| M.4.4.1 and M.4.4.2 | M.4.4.1 and M.4.4.2 state that discussions will be conducted "IF AND ONLY IF" specific conditions are met. Can the Government clarify under what circumstances discussions are most likely to occur and whether there are any scenarios where discussions might be conducted at the Contracting Officer's discretion? | If discussions are to occur, a competitive range will be established based on ratings of each proposal against the evaluation criteria. | ||
| M.4.4.1 and M.4.4.2 | As the FAR requires that only the most "highly rated" proposals be included in the competitive range, could the Government provide clarification on how the Step process will proceed if discussions are conducted? | Discussions, as needed, can be conducted while in Step 1, Step 2 or both during the evaluation process. | ||
| M.4.4.1 and M.4.4.2 | Will the Government revisit the compliance check, evaluate all Offerors for compliance, and review all technical proposals before establishing the competitive range? | Competitive Range is established before revisiting strict compliance check to any revision to an offeror's proposal. Subsequently followed by another round of Step 1 evaluations. | ||
| M.4.4.1 and M.4.4.2 | Given that "Cost/Price proposals will not be assigned an adjectival rating," can the Government explain how the process outlined in M.3.1 aligns with FAR requirements? | When proposals are received, USG lists Offerors lowest to highest total proposed price. Followed by a Strict Compliance Review. IAW M.3.2 five or 20% (whichever is greater) will move forward to Step 1. | ||
| M.4.4.1 | M.4.4.1 indicates that only Offerors deemed Technically Acceptable will proceed to Step 2 evaluations. With this pass/fail methodology, will the Government clarify how a technically unacceptable offer can be included in the competitive range and be authorized to receive discussion questions? | IAW M.4.1 the lowest three total proposed offerors move onto Step 2. If, there is not sufficient competition due to Offerors being found Technically Unacceptable, all Offerors who have passed the Strict Compliance Review and moved onto Step 1 will receive discussion letters. Offerors with identified deficiencies will receive Evaluation Notices to address deficiencies in order to maximize competition. | ||
| M.4.4.2 | M.4.4.2 explains that the competitive range determination after Step 2 evaluations will be based on qualitative confidence ratings for Past Performance and price reasonableness for Cost/Price factors. Can the Government clarify what level of Past Performance confidence rating (e.g., "Satisfactory" or above) will generally be considered "highly rated" for inclusion in the competitive range? | |||
| Per the RFP a Substantial Confidence rating. | ||||
| M.4.4.2 | As an award will be made "to the Offeror determined to be responsible IAW FAR subpart 9.1 whose proposal conforms to the RFP requirements and is determined to be the lowest evaluated (fair and reasonable) priced proposal that is determined Technically Acceptable with Substantial Confidence in Past Performance" will past performance be included in the "highly rated" proposals for the competitive range? | |||
| Competitive Range is established if and only if discussions are conducted. Confidence Ratings are assigned for Past Performance during Step 2 evaluations for lowest three technically acceptable offerors that were moved on from Step 1. | ||||
| M.4.4.2 | M.4.4.2 mentions that proposals not requiring a major rewrite will remain in the competitive range. Could the Government provide examples or criteria for what constitutes a "major rewrite" versus acceptable minor revisions? | The Government cannot provide examples. Decision if something is a major or minor rewrite is made on a case by case basis. | ||
| M.4.4.3 | M.4.4.3 defines deficiencies, significant weaknesses, and uncertainties. If a proposal has minor uncertainties or weaknesses that do not rise to the level of a deficiency, will the Government provide Offerors the opportunity to address these issues during discussions, should discussions occur? | Depends on the weakness/uncertainty, falls into a case-by-case basis. IAW FAR 15.306(d)(3) the Contracting Officer is not required to discuss every area where the proposal could be improved. | ||
| RFP Section M | How will the Government ensure consistency in the application of qualitative ratings for Past Performance and the evaluation of Cost/Price factors, given the absence of adjectival ratings for the latter? | The Government will only award to an Offeror that recieves a substantial confidence in Past Performance with the lowest Total Evaluated Price. |