B08_Attach_19_ConstructabilityChecklist.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
ACAD 312255 - Rehabilitate Schoodic Water System
Solicitation number
140P2022R0043
Issued by

About this file

This document contains a constructability checklist for the ACAD 312255 project to rehabilitate the Schoodic water and wastewater systems at Acadia National Park in Winter Harbor, Maine. The checklist identifies various project issues to be addressed during design development, construction documents, and contracting. Key issues discussed include long lead times for materials, seasonal limitations for construction from January to March, safety requirements, staging areas, permitting needs from the USACE and Maine DEP, potential hazardous materials, and operational training. The related federal contract opportunity is for solicitation number 140P2022R0043 for the rehabilitation of the Schoodic water system, to be awarded by the National Park Service with an anticipated award date in 2022.

View the file

Other files

File Type Posted
B09_Attach_31_General_Refs_0005.doc DOC document
Sol_140P2022R0043_Amd_0005.pdf PDF
B09_Attach_22_Request_for_Information_0005.pdf PDF
B09_Attach_29_O_M_0004.pdf PDF
B09_Attach_30_Photo_0004.pdf PDF
B09_Attach_22_Request_for_Information_0004.pdf PDF
Sol_140P2022R0043_Amd_0004.pdf PDF
B09_Amend_04_RFIs_updated_0004.pdf PDF
B09_Attach_28_Well_Pump_Calcs_0003.pdf PDF
Sol_140P2022R0043_Amd_0003.pdf PDF
B09_Attach_25_Plans_Update_0003.pdf PDF
B09_Attach_24_Spec_Updates_0003.pdf PDF
B09_Attach_23_Addendum_Summary_0003.pdf PDF
B09_Attach_22_Request_for_Information_0003.pdf PDF
B09_Amend_03_Updates_0003.pdf PDF
B09_Attach_26_Generator_Calculation_0003.pdf PDF
B09_Attach_27_Sewer_Tables_0003.pdf PDF
Sol_140P2022R0043_Amd_0002.pdf PDF
B09_Amend_02_Sign_in_Sheet_0002.pdf PDF
Sol_140P2022R0043_Amd_0001.pdf PDF
Amendment_01_Site_Visit_0001.pdf PDF
B08_Attach_12_Permit_Plan.pdf PDF
B08_Attach_05_Vaccination_Certification_Notification_.pdf PDF
B08_Attach_11_Radio_Path_Study.pdf PDF
B08_Attach_04_Certification_of_Vaccination_Form.pdf PDF
B08_Attach_14_PSP.pdf PDF
B08_Attach_03_Davis_Bacon.pdf PDF
B08_Attach_18_Product_Data_basis_of_estimate.pdf PDF
B08_Attach_15_JOFOC_SCADA_Software.pdf PDF
B08_Attach_08_Structural_Tests___Special_Inspections.pdf PDF
B08_Attach_01_Specs.pdf PDF
Sol_140P2022R0043.pdf PDF
B08_Attach_17_O_M_Requirements.xlsx XLSX spreadsheet
B08_Attach_02_Drawings.pdf PDF
B08_RFP_140P2022R0043.pdf PDF
B08_Attach_10_HazMat_Report.pdf PDF
B08_Attach_09_Calculations.pdf PDF
B08_Attach_07__Sewer_Inspection.pdf PDF
B08_Attach_16_SubmittalList_Estimate.xlsx XLSX spreadsheet
B08_Attach_13_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_Attach_06_Geotechnical_Report.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template

NPS Constructability Checklist
National Park Service (NPS) - Denver Service Center (DSC) | 3-20-18
For instructions, see Instructions tab below.
Date:3/24/22Project Title:Rehabilitate Schoodic Water and Wastewater Systems
Park:ACADCompleted By:Ed Whatley
PMIS:

(Project Management Information System) 312255 DBB or DB:

(Design-Bid-Build

OR Design-Build)DBB
Item NumberProject IssuesSD Comments
Schematic DesignDD or RFP Comments

Design Development (DBB) OR Request for Proposal (DB) CD or RFP Resolution Construction Documents (DBB) OR Request for Proposal (RFP)

PROJECT INTRODUCTION
1ANY NON-TYPICAL CONTRACT LINE ITEMS OR MISCELLANEOUS CONTRACT CONCERNSMaterials, equipment and labor availability is a concern and early contractor procurement of materials, equipment and subcotractors will be critical.Materials, equipment and labor availability is a concern and early contractor procurement of materials, equipment and subcotractors will be critical. This has been highlighted in
2RECOMMENDED CONTRACT LENGTH; SEASONAL BREAKS IN CONTRACT; IDENTIFY CONTRACT TIMING ISSUES THAT NEED TO BE ADDRESSED; IDENTIFY SPECIFIC PHASING REQUIREMENTSRecommended contract length: 18 months

Seasonal issues:

Winter (mid January to mid March) will require suspension of site activities depending on the severity of weather.

Summer work will require more effort to accommodate park group activities through sewer bypassing and limiting impacts to users. Recommended contract length: 18 months Seasonal issues:

Winter (mid January to mid March) will require suspension of site activities depending on the severity of weather.

Summer work will require more effort to accommodate park group activities through sewer bypassing and limiting impacts to users.

PERMITTING & COMPLIANCE
3

External Permit

or ApprovalLIST REQUIRED GOVERNMENT FURNISHED PERMITS AND APPROVALS: List by Agency-Type: Example: USACE-CWA404 NWP18. Include contact, and phone number.USACE – SVNF
Maine DEP – NRPA PBRUSACE – SVNF
4

External Permit

or ApprovalLIST REQUIREMENTS FOR GOVERNMENT FURNISHED PERMITS: Include inspections, meetings, close out requirements, and drawings.Permit drawingsPermit drawings
5

External Permit

or ApprovalLIST REQUIRED CONSTRUCTION CONTRACTOR FURNISHED PERMITS AND APPROVALSWell Building local building permit
6

External Permit

or ApprovalDESCRIBE WHERE AND HOW PERMIT REQUIREMENTS ARE INCLUDED IN DESIGN PACKAGE: For each permit, describe requirement, specification (section and paragraph) and/or drawing number.Permits will be described in SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION.Permits will be described in SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION.
7
Internal ComplianceIDENTIFY COMPLIANCE REQUIREMENTS:
SHPO, NEPA, EA: List requirement, status, and date or expected date.SHPO, THPO, USFWS ESA consultationsSHPO, THPO, USFWS ESA consultations
8
Internal ComplianceCOMPLETE ALL APPROVALS: Director's, DAB, Congressional Funding issues, estimate within available funds? Adequate time to complete work within project and funding constraints?Estimate exceeds funding and Add Alternates will used as needed to bring project within funding amount.Estimate exceeds funding and Add Alternates will used as needed to bring project within funding amount.
9
GeneralIDENTIFY REQUIRED SPECIAL INSPECTIONS: List inspecting or approving organization and reason required.None identified.None identified.
STAGING AND MOBILIZATION
10IDENTIFY AREAS FOR STAGING INCLUDING AREAS FOR PRIME, SUBS, MATERIAL, AND PARKING; IDENTIFY AREAS FOR CONSTRUCTION CAMP IF APPLICABLE:
List drawing number(s) showing staging area(s).For discussion, we suggest:

1. Salt shed/public works yard

2. Parking are on south side of the Administration Building.

3. Transportation Building Parking Area

Staging areas will be added to G1.5.Staging areas are now identified.
11IDENTIFY TEMPORARY UTILITIES AVAILABLE FOR CONSTRUCTION: List drawing number or specification section that indentifies available utilities-electrical, phone, non-potable and potable water, sanitary-provider, meter needed, and responsible cost party.Temporary utilities will be idendified in SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS.Temporary utilities are idendified in SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS.
12IDENTIFY CONSTRUCTION LOGISTICS: List drawing numbers that show traffic control, access restrictions, work hour restrictions, bridges, features, other.Sheet G1.2, Note 1.
SECTION 01 11 00 - SUMMARY OF WORKSheet G1.2, Note 1.

SECTION 01 11 00 - SUMMARY OF WORK

13IDENTIFY IMPACTS TO PARK AND VISITOR OPERATIONS: List drawing number(s) or specification section(s) that identifies impacts (e.g. Visitor Impacts, Neighborhood-Urban Impacts, Detours, Closures).Impacts to park and visitor operations and restrictions will be descibed in SECTION 01 11 00 SUMMARY OF WORK, Contractor Use of Site.Impacts to park and visitor operations and restrictions are be descibed in SECTION 01 11 00 SUMMARY OF WORK, Contractor Use of Site.
14IDENTIFY SITE ACCESS ISSUES: List drawing number(s) or specification section(s) that identify issues (e.g. remote and road type constrained sites, weather closure restrictions, road and bridge load limits, road and tunnel height restrictions, crane and helicopter requirements).One way traffic is identified on G1.4, G1.5 AND C2.1. A note regarding snow removal on Mountain Road will be shown on Sheet G1.4.One way traffic is identified on G1.4, G1.5 AND C2.1. Snow removal is addressed in Section 011100 Summary of Work, 1.9.
SUBMITTALS
15LIST MATERIAL SUBMITTALS ON CRITICAL PATH;
FOR DESIGN-BUILD (DB), LIST MATERIAL SUBMITTALS REQUIRING GOVERNMENT APPROVALNA.NA.
16LIST LONG LEAD ITEMS; MATERIAL AND EQUIPMENT AVAILABILITY CONCERNS, SPECIAL DELIVERY REQUIREMENTSLong Lead Items:
Pipe, lining materials, valves, pumps, electrical components, generator.Long Lead Items:

Pipe, lining materials, valves, pumps, electrical components, generator.

17LIST OF SOLE SOURCE MATERIALS AND GOVERNMENT FURNISHED MATERIALS OR EQUIPMENTNone.None.
SITE LAYOUT / RESOURCE PROTECTION
18TYPES OF RESOURCE PROTECTION REQUIRED: List where and how requirements are included in design package.Wetlands: erosion control barriers are shown on C2.1 through C2.5.Wetlands: erosion control barriers are shown on C2.1 through C2.5.
19ACCURATE SURVEY DATA ON PLANS: BMs, TBMs, TOPOSurvey and existing record utility data have compiled. Surveyor will return to set benchmarks.Survey and existing record utility data have compiled. Control point tables have been added to Sheets G1.4 and G1.5 for the Contractors use in establishing control and setting bench marks.
20PRELIMINARY SITE INVESTIGATION COMPLETE, EXISTING CONDITIONS VERIFIED AND INCLUDED IN PACKAGEAddition site investigation will include: CCTV of 4-inch laterals, test probes, utility locating services.Preliminary site investigation has been completed.Due the inability for 4-inch laterals to be lined with CIPP, they will be replaced.
21CONSTRUCTION LIMITS CLEARLY SHOWN AND DEFINED FOR BOTH ACCESS AND CONSTRUCTION: List where and how requirements are included in design package.Construciton limits are shown on water main plans. Construction limits will be added to the sanitary sewer site plans in the next submission.Construciton limits are shown on water main plans. Construction limits were added to the sanitary sewer site plans.
22SPECIAL SIGNAGE REQUIREMENTS: Describe and list where requirements are included in design package.There are no special signage requirements.There are no special signage requirements.
23LIST WORK SAFETY CONCERNS, LOCATION, AND NEEDS: Include Height, Weather, Animal, Aerial, Public Accessibility, Security, Confined Space, Pathologic, Atmospheric, and others.Safety concerns will be identified in SECTION 01 35 23 - SAFETY REQUIREMENTS, including confined space, pathogens, weather and pathogens.Safety concerns are be identified in SECTION 01 35 23 - SAFETY REQUIREMENTS, including confined space, pathogens, weather and pathogens.
DEMOLITION
24ALL EXISTING UTILITIES LOCATED AND ACCURATELY SHOWN: Describe where shown.Utilities have been compiled from record drawings and survey and NPS provided plans. Instructions for the contractor are shown on G1.2 under Existing Conditions.Utilities have been compiled from record drawings and survey and NPS provided plans. Instructions for the contractor are shown on G1.2 under Existing Conditions.
25TEMPORARY SYSTEMS REQUIRED: Identify for Park or Public: Access, power, water, sanitary, covered access, exhibit relocation, movement assistance, accessibility.Temporary systems provided will be found in SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS.

Suggested:

Park to Provide: potable and non potable water, incidental electrical power only as available pump station control panels Contractor to Provide: sanitary facilities, heating Temporary systems provided will be found in SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS.

Suggested:

Park to Provide: potable and non potable water, incidental electrical power only as available pump station control panels Contractor to Provide: sanitary facilities, heating and communications.

26SALVAGE, RECYCLING, STORAGE, AND DISPOSAL REQUIREMENTS: Who is removing salvageable equipment and where requirements are included in design package?Requirements will be defined in SECTION 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. The contractor will be reponsible for removing and disposing of equipment at no cots to the Gov't.
The park will have rights to retain ownership of individual pieces of equipment and will provide a location on Schoodic to deliver items.Requirements are defined in SECTION 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. The contractor is reponsible for removing and disposing of equipment at no cots to the Gov't.

The park will have rights to retain ownership of individual pieces of equipment and will provide a location on Schoodic to deliver items.

27 NOISE / DUST / SAFETY CONCERNS FOR PUBLIC OR ENVIRONMENT: Describe where included in design package.

To be included in D/CD submittals:

Dust: SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS, SECTION 01 57 23 – UNDER-AN-ACRE POLLUTION PREVENTION, notes on G1.2.

Noise: SECTION 01 57 19.12 – NOISE AND ACCOUSTICS MANAGEMENT.

Included in D/CD submittals:

Dust: SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS, SECTION 01 57 23 – POLLUTION PREVENTION, notes on G1.2.

Noise: SECTION 01 57 19.12 – NOISE AND ACCOUSTICS MANAGEMENT.

28CONSTRAINTS ON MEANS AND METHODS: Blasting, Burning, Tidal, Weather, Public Accessibility, Existing structures/features, Holidays and Seasonal, Permitting, other.To be included:
Blasting (not allowed): SECTION 200520 EXCAVATION AND BACKFILLIncluded:

Blasting (not allowed): SECTION 200520 EXCAVATION AND BACKFILL

29HAZARDOUS MATERIAL CONSIDERATIONS DEMO METHODS AND DISPOSAL STATE AND LOCAL REQUIREMENTS: Describe hazardous materials being addressed, how, and where in design package.Hazardous Materials Survey was performed and the report will be submitted. Findings will be incorporated in: SECTION 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSALSeparate Spec sections addressing lead-containing and asbestos-containing materaisl have been added to the package.
30ARCHEOLOGICAL MONITORING REQUIREMENTS: Describe what is needed and where in design package. Identify who provides monitor.To be included in:
SECTION 01 35 13.22 – ARCHEOLOGICAL PROTECTIONSee included section:

SECTION 01 35 13.22 – ARCHEOLOGICAL PROTECTION

CONSTRUCTION
31MATERIAL, EQUIPMENT, LABOR AVAILABILITY FOR REMOTE SITES: Describe issues and where included in design package.Long Lead Items:

Pip+C45:C54e, lining materials, valves, pumps, electrical components, generator.

Concerns should be identified in contract advertisement.

Suggest deadline for contractor to obtain approval of all submittals and ordering of materials. Long Lead Items:

Pipe, lining materials, valves, pumps, electrical components, generator.

Concerns should be identified in contract advertisement.

Suggest deadline for contractor to obtain approval of all submittals and ordering of materials.

32SITE ACCESS RESTRICTIONS TO CONSTRUCTION OPERATIONS IF DIFFERENT OR MORE SUBSTANTIAL THAN ITEMS 12 AND 14NANA
33ANTICIPATED WEATHER CONSIDERATIONS, CONSTRUCTION SEASON, OPTIMUM TIME TO ADVERTISE, RECOMMENDED CONTRACT LENGTHWeather:

Winter conditions for excavation and backfill.

April to October: accomodation of fully occupied facility Time to advertise: ASAP Recommended contract length: 24 months Weather:

Winter conditions for excavation and backfill.

April to October: accomodation of fully occupied facility Time to advertise: ASAP Recommended contract length: 24 months

34PARK / CONCESSION IMPOSED RESTRICTIONS INCLUDED IN DESIGN PACKAGE AND IMPACTS ON SCHEDULE & COSTWork restrictions to prevent disruption to educational activities. Stage activities to reduce impacts.Work restrictions to prevent disruption to educational activities. Stage activities to reduce impacts.
35DESCRIBE FULL SCOPE OF WORK FOR LOCAL UTILITY COMPANIES AND CONSTRUCTION CONTRACTOR FOR EACH UTILITYNone.None.
36DESCRIBE DISRUPTION REQUIREMENTS FOR UTILITY CONNECTIONS, CLOSURES, AND MAXIMUM ALLOWABLE INTERRUPTIONS: Describe where addressed in design package.Contractor will be required to maintain all services or provide temporary services at all times. To be described in SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLSContractor will be required to maintain all services or provide temporary services at all times as described in SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS.
37SPECIFIC PHASING REQUIREMENTS: Detail what and where where provided in design package.Suggested pahsing will be developed for review.Suggested sequencing has been added to Section 011100 Summary of Work, 1.10.
38DESCRIBE SPECIALIZED MATERIALS/INSTALLATION METHODS CERTIFICATIONS/TRAINING REQUIREMENTS; DETAIL GOVERNMENT REQUIRED SPECIALTY SERVICES OR INSPECTIONS: List requirements.NANA
39COORDINATION WITH PARK OR CONCESSIONAIRE ON BENEFICIAL OCCUPANCY: Grand opening, fixed completion dates, etc.NANA
40ADJACENT or CONCURRENT CONTRACTS COORDINATION / OVERLAPS ON CONCURRENT OR FUTURE CONTRACTSFuture septic system conversion project.

Water treatment plant O&M update Water tank rehabilitation project Future septic system conversion project.

Water treatment plant O&M update Water tank rehabilitation project

41VALUE ENGINEERING POTENTIALNot anything of significance.Not anything of significance.
PROJECT CLOSEOUT
42TRAINING REQUIREMENTS, CERTIFICATIONS SPECIFIEDOperator training will be required for the sewer pump staitons, well pump system, controls, SCADA system and generator.Operator training will be required for the sewer pump staitons, well pump system, controls, SCADA system and generator.
43OPERATION & MAINTENANCE (O&M) REQUIREMENTSO&M Manuals will be required for the sewer pump staitons, well pump system, controls, SCADA system and generator.O&M Manuals will be required for the sewer pump staitons, well pump system, controls, SCADA system and generator.
44LIST PERMITS NEEDING CLOSURE AND POINTS OF CONTACT: Describe requirement; include specification and/or drawing location for each.USACE – SVNF

Maine DEP – NRPA PBR

Winter Harbor Building Department - Final Inspections for Well BuildingUSACE – SVNF
45POST CONSTRUCTION REQUIREMENTSContractor's 1-year Warranty / Correction Period.Contractor's 1-year Warranty / Correction Period.
46LIST LONG TERM MAINTENANCE NEEDS AND LOCATION IN THE DESIGN PACKAGE.Incorporation of maintenance requirements in to existing O&M manuals, Section 2.3.17 Project Close-Out.Incorporation of maintenance requirements in to existing O&M manuals, Section 2.3.17 Project Close-Out.

&8&K01+015NPS Constructability Checklist, 3-20-18 | page &P of &N

Instructions

INSTRUCTIONS FOR NPS CONSTRUCTABILITY CHECKLIST
Introduction - Use the NPS Constructability Checklist as a tool to inspire, document, track, and record project issues as discussed and resolved throughout preparation of Design Development (DD), Construction Documents (CD), and Request for Proposal (RFP) documents. The end result is a completed checklist that identifies project issues and provides the background to complete contract documents (primarily Division 01 Specifications).
Title Block - Enter Date, Park, PMIS Number (Project Management Information System), Project Title, Completed By, and if DBB or DB (Design-Bid-Build (DBB) or Design (DB)) in appropriate row.
Project Issues Column - Typical constructability issues are listed under Project Issues. Insert additional issues as needed to cover project issues not listed. If issues are listed that do not apply, insert N/A.

Project issues are organized to coincide with award and construction phasing of a project. They are organized under headings typically used as summary headings in a project schedule. If these project issues have significant impact on time, impacts should be shown in a projected construction schedule developed during design. This is an effective way to accomplish construction planning, develop realistic expectations, and account for time and cost implications of project issues.

Schematic Design (SD) Column - Complete necessary research to gain full understanding of project issues that will need to be considered. Explain specific issue in general for each project issue.
Design Development (DD) or Request for Proposal (RFP) Comments Column - Develop necessary in-depth research to gain full understanding of project issues that will need to be considered. Explain specific issue in general for each project issue.
Construction Documents (CD) or Request for Proposal (RFP) Resolution Column - Develop strategy on how each project issue will be resolved contractually. Indicate how it will be resolved. Refer to specification or drawing where information is contained. Be as complete as possible. Be specific with language needed to describe a constraint, requirements for specific phasing, potential impacts to cost and schedule, etc.
General - After completing this checklist, make sure resolution to project issues have been incorporated into CDs / RFPs. The Park, Project Manager (PM), and others may be responsible for some items and this should be so noted.

File details come from the government source that posted it. Updated .