B08_Attach_12_Permit_Plan.pdf

PDF 192 KB Posted

Attached to
ACAD 312255 - Rehabilitate Schoodic Water System
Solicitation number
140P2022R0043
Issued by

About this file

This document outlines permitting requirements and associated federal contract opportunity for rehabilitation of water and wastewater systems at Acadia National Park in Maine. The contractor will be required to obtain a Construction General Permit from the EPA which mandates preparation and implementation of a Stormwater Pollution Prevention Plan. Additional permits that have already been obtained or for which the application process has commenced include a General Permit Authorization from the U.S. Army Corps of Engineers under Clean Water Act Section 404, as well as a Natural Resource Protection Act Permit by Rule from the Maine Department of Environmental Protection. Given that the project involves forested wetlands, no individual permit will be required under the Natural Resource Protection Act. Similarly, a Water Quality Certification under Clean Water Act Section 401 is not needed as it is automatically conferred through the Permit by Rule process. The related federal contract opportunity is solicitation number 140P2022R0043 for rehabilitation of the Schoodic water system at Acadia National Park in Winter Harbor, Maine and is being conducted by the National Park Service.

View the file

Other files

File Type Posted
B09_Attach_31_General_Refs_0005.doc DOC document
Sol_140P2022R0043_Amd_0005.pdf PDF
B09_Attach_22_Request_for_Information_0005.pdf PDF
B09_Attach_29_O_M_0004.pdf PDF
B09_Attach_30_Photo_0004.pdf PDF
B09_Attach_22_Request_for_Information_0004.pdf PDF
Sol_140P2022R0043_Amd_0004.pdf PDF
B09_Amend_04_RFIs_updated_0004.pdf PDF
B09_Attach_28_Well_Pump_Calcs_0003.pdf PDF
Sol_140P2022R0043_Amd_0003.pdf PDF
B09_Attach_25_Plans_Update_0003.pdf PDF
B09_Attach_24_Spec_Updates_0003.pdf PDF
B09_Attach_23_Addendum_Summary_0003.pdf PDF
B09_Attach_22_Request_for_Information_0003.pdf PDF
B09_Amend_03_Updates_0003.pdf PDF
B09_Attach_26_Generator_Calculation_0003.pdf PDF
B09_Attach_27_Sewer_Tables_0003.pdf PDF
Sol_140P2022R0043_Amd_0002.pdf PDF
B09_Amend_02_Sign_in_Sheet_0002.pdf PDF
Sol_140P2022R0043_Amd_0001.pdf PDF
Amendment_01_Site_Visit_0001.pdf PDF
B08_Attach_05_Vaccination_Certification_Notification_.pdf PDF
B08_Attach_11_Radio_Path_Study.pdf PDF
B08_Attach_04_Certification_of_Vaccination_Form.pdf PDF
B08_Attach_14_PSP.pdf PDF
B08_Attach_03_Davis_Bacon.pdf PDF
B08_Attach_18_Product_Data_basis_of_estimate.pdf PDF
B08_Attach_15_JOFOC_SCADA_Software.pdf PDF
B08_Attach_08_Structural_Tests___Special_Inspections.pdf PDF
B08_Attach_01_Specs.pdf PDF
Sol_140P2022R0043.pdf PDF
B08_Attach_17_O_M_Requirements.xlsx XLSX spreadsheet
B08_Attach_02_Drawings.pdf PDF
B08_RFP_140P2022R0043.pdf PDF
B08_Attach_10_HazMat_Report.pdf PDF
B08_Attach_09_Calculations.pdf PDF
B08_Attach_07__Sewer_Inspection.pdf PDF
B08_Attach_19_ConstructabilityChecklist.xlsx XLSX spreadsheet
B08_Attach_16_SubmittalList_Estimate.xlsx XLSX spreadsheet
B08_Attach_13_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_Attach_06_Geotechnical_Report.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Furnished Permit List

PROJECT TITLE: Acadia National Park PMIS # 312225 Rehabilitate Schoodic Water Wastewater Systems

21-May-22

Permit Provider Jurisdiction Regulatory Agency Law/Regulation Requirements, Actions Comments

Construction General Permit Contractor State/Federal EPA EPA SWPPP Rules

Stormwater Polution Prevention Plan, Notice of Intent filing and Notice of Termination filing.

Government Furnished Permit List

PROJECT TITLE: Acadia National Park PMIS # 312225 Rehabilitate Schoodic Water Wastewater Systems

21-May-22

Permit Provider Jurisdiction Regulatory Agency Law/Regulation Requirements, Actions Comments

U.S. Army Corps of Engineers Maine

General Permit Authorization NPS Federal

U.S. Army Corps of

Engineers

Section 404 of the Clean Water Act

(see 33 CFR 323)

Delineation and jurisdictional determination of waters of the U.S.; preparation of Self-

Verification Notification Form (SVNF) application for permit; and USACE processing of application. SVNF requires Maine Historic

Preservation Commission Notification, Tribal

Historic Preservation Officer Notification, IPaC review Official Species List and NLEB 4(d)

Consultation, locus map, and project plans.

The Self-Verification Notification Form has been submitted.

Maine Natural Resource Protection Act

Permit By Rule (PBR) NPS State

Maine Department of Environmental

Protection

Natural Resources Protection Act

(Title 38, Chapter 3, §§ 480-A to

480-Z)

Delineation of NRPA jurisdictional resources;

preparation of NRPA PBR application including application form, photo attachment, USGS locus map, project plans, project narrative (brief description including project impacts, erosion and sediment control plan if necessary, fee).

Since the wetlands are forested wetlands, no permit is required.

401 Water Quality Certification NPS State

Maine Department of Environmental

Protection

CWA Section 401

Issuance of a NRPA permit constitutes Clean

Water Act Section 401 Water Quality

Certification (state-delegated).

Since no NRPA PBR application is required, no 401 Water

Quality Certification is needed.

31225-Contractor-Furnished-Permits
31225-Government-Furnished-Permits