B09_Attach_23_Addendum_Summary_0003.pdf
PDF 102 KB Posted
- Attached to
- ACAD 312255 - Rehabilitate Schoodic Water System
- Solicitation number
- 140P2022R0043
About this file
This document is an addendum summary for a federal solicitation to rehabilitate the water and wastewater systems at Acadia National Park in Winter Harbor, Maine. The solicitation is being conducted by the National Park Service National Office within the Department of the Interior. The addendum provides revisions to plans, specifications, and contract documents for the rehabilitation project. Key revisions include adding building attachment brackets and clarifying gravel thickness on plans, revising existing pipe labels and profiles, changing level controls from transducers to floats, revising conduit and enclosure types, clarifying fuel piping ratings and expansion fitting requirements, and adding corrosion resistance notes. It also revises pump voltages, adds gauges and valves, and provides a water treatment plant and clearwell level indicator narrative. The contract price schedule was revised to modify the description and quantity for a contract line item regarding cured-in-place pipe.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
312255-ACAD-Rehabilitate Schoodic Water and Wastewater Systems
Addendum Summary
8-1-2022
Plans
S1.0 Added building attachment bracket thickness
C2.1 Clarified gravel thickness for well access drive
C4.4 Revised existing pipe labels
C4.6 Add 2 laterals
C4.8 Added “A” to the short leg of 8-inch pipe from MH-A11 to the main line.
C5.7 Added the profile between MH-C1A to MH-C1.
P2.3 Clarified pipe materials, removed 1 valve under air release, changed 4-inch ball valve to a gate valve
I1.2 Added new clearwell transducer and changed the existing level control to floats in loop diagram. The existing level control was incorrectly shown as a transducer.
IE.1 Changed conduits from aluminum to RGS.
IE.2 Revised to reflect new level transducer in clearwell.
IE.3 Change panels to NEMA 4X. Added additional float for Gatehouse pump station.
IE.7 Added stainless steel notes on exterior equipment.
E0.1 Changed conduits from aluminum to RGS.
E1.11 Changed well house enclosure type to NEMA 12.
Specifications
01 50 00 Added noted to restrict interruption in services.
23 12 14 Removed reference to petroleum products. Revised fuel system piping and ratings.
26 05 13.16 Clarified use of existing MV cable.
26 05 33 Revised expansion fitting requirements. Revised conduit schedule.
26 05 93 Clarified responsibility for testing.
26 24 16.13 Pointed contractor to IE.1 for NEMA ratings.
26 27 26 Added corrosion resistance to receptacles.
26 28 16 Pointed contractor to IE.1 for NEMA ratings.
26 29 13 Pointed contractor to IE.1 for NEMA ratings.
26 32 14 Added corrosion resistance clarification.
33 11 36 Revised pump voltage from 3-phase 208 to 3 phase 200 volt.
33 11 37 Add section on gauges and stainless steel ball valve for gauge assembly.
40 67 00 Added corrosion resistance clarification. Removed indicator light color reference.
40 68 00 Added Water Treatment Plant Control Narrative
40 70 00 Added corrosion resistance clarification. Added clearwell level indicator and transducer.
Misc.
Generator Calculation
Added.
Pump Calculation Replaced
Sewer Tables Revised CIPP and replacement tables
RFI Responses Completed
Contract Price Schedule
Revised description and quantity for CLIN 9.