B09_Attach_23_Addendum_Summary_0003.pdf

PDF 102 KB Posted

Attached to
ACAD 312255 - Rehabilitate Schoodic Water System
Solicitation number
140P2022R0043
Issued by

About this file

This document is an addendum summary for a federal solicitation to rehabilitate the water and wastewater systems at Acadia National Park in Winter Harbor, Maine. The solicitation is being conducted by the National Park Service National Office within the Department of the Interior. The addendum provides revisions to plans, specifications, and contract documents for the rehabilitation project. Key revisions include adding building attachment brackets and clarifying gravel thickness on plans, revising existing pipe labels and profiles, changing level controls from transducers to floats, revising conduit and enclosure types, clarifying fuel piping ratings and expansion fitting requirements, and adding corrosion resistance notes. It also revises pump voltages, adds gauges and valves, and provides a water treatment plant and clearwell level indicator narrative. The contract price schedule was revised to modify the description and quantity for a contract line item regarding cured-in-place pipe.

View the file

Other files

File Type Posted
B09_Attach_31_General_Refs_0005.doc DOC document
Sol_140P2022R0043_Amd_0005.pdf PDF
B09_Attach_22_Request_for_Information_0005.pdf PDF
B09_Attach_29_O_M_0004.pdf PDF
B09_Attach_30_Photo_0004.pdf PDF
B09_Attach_22_Request_for_Information_0004.pdf PDF
Sol_140P2022R0043_Amd_0004.pdf PDF
B09_Amend_04_RFIs_updated_0004.pdf PDF
B09_Attach_28_Well_Pump_Calcs_0003.pdf PDF
Sol_140P2022R0043_Amd_0003.pdf PDF
B09_Attach_25_Plans_Update_0003.pdf PDF
B09_Attach_24_Spec_Updates_0003.pdf PDF
B09_Attach_22_Request_for_Information_0003.pdf PDF
B09_Amend_03_Updates_0003.pdf PDF
B09_Attach_26_Generator_Calculation_0003.pdf PDF
B09_Attach_27_Sewer_Tables_0003.pdf PDF
Sol_140P2022R0043_Amd_0002.pdf PDF
B09_Amend_02_Sign_in_Sheet_0002.pdf PDF
Sol_140P2022R0043_Amd_0001.pdf PDF
Amendment_01_Site_Visit_0001.pdf PDF
B08_Attach_12_Permit_Plan.pdf PDF
B08_Attach_05_Vaccination_Certification_Notification_.pdf PDF
B08_Attach_11_Radio_Path_Study.pdf PDF
B08_Attach_04_Certification_of_Vaccination_Form.pdf PDF
B08_Attach_14_PSP.pdf PDF
B08_Attach_03_Davis_Bacon.pdf PDF
B08_Attach_18_Product_Data_basis_of_estimate.pdf PDF
B08_Attach_15_JOFOC_SCADA_Software.pdf PDF
B08_Attach_08_Structural_Tests___Special_Inspections.pdf PDF
B08_Attach_01_Specs.pdf PDF
Sol_140P2022R0043.pdf PDF
B08_Attach_17_O_M_Requirements.xlsx XLSX spreadsheet
B08_Attach_02_Drawings.pdf PDF
B08_RFP_140P2022R0043.pdf PDF
B08_Attach_10_HazMat_Report.pdf PDF
B08_Attach_09_Calculations.pdf PDF
B08_Attach_07__Sewer_Inspection.pdf PDF
B08_Attach_19_ConstructabilityChecklist.xlsx XLSX spreadsheet
B08_Attach_16_SubmittalList_Estimate.xlsx XLSX spreadsheet
B08_Attach_13_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_Attach_06_Geotechnical_Report.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

312255-ACAD-Rehabilitate Schoodic Water and Wastewater Systems

Addendum Summary

8-1-2022

Plans

S1.0 Added building attachment bracket thickness

C2.1 Clarified gravel thickness for well access drive

C4.4 Revised existing pipe labels

C4.6 Add 2 laterals

C4.8 Added “A” to the short leg of 8-inch pipe from MH-A11 to the main line.

C5.7 Added the profile between MH-C1A to MH-C1.

P2.3 Clarified pipe materials, removed 1 valve under air release, changed 4-inch ball valve to a gate valve

I1.2 Added new clearwell transducer and changed the existing level control to floats in loop diagram. The existing level control was incorrectly shown as a transducer.

IE.1 Changed conduits from aluminum to RGS.

IE.2 Revised to reflect new level transducer in clearwell.

IE.3 Change panels to NEMA 4X. Added additional float for Gatehouse pump station.

IE.7 Added stainless steel notes on exterior equipment.

E0.1 Changed conduits from aluminum to RGS.

E1.11 Changed well house enclosure type to NEMA 12.

Specifications

01 50 00 Added noted to restrict interruption in services.

23 12 14 Removed reference to petroleum products. Revised fuel system piping and ratings.

26 05 13.16 Clarified use of existing MV cable.

26 05 33 Revised expansion fitting requirements. Revised conduit schedule.

26 05 93 Clarified responsibility for testing.

26 24 16.13 Pointed contractor to IE.1 for NEMA ratings.

26 27 26 Added corrosion resistance to receptacles.

26 28 16 Pointed contractor to IE.1 for NEMA ratings.

26 29 13 Pointed contractor to IE.1 for NEMA ratings.

26 32 14 Added corrosion resistance clarification.

33 11 36 Revised pump voltage from 3-phase 208 to 3 phase 200 volt.

33 11 37 Add section on gauges and stainless steel ball valve for gauge assembly.

40 67 00 Added corrosion resistance clarification. Removed indicator light color reference.

40 68 00 Added Water Treatment Plant Control Narrative

40 70 00 Added corrosion resistance clarification. Added clearwell level indicator and transducer.

Misc.

Generator Calculation

Added.

Pump Calculation Replaced

Sewer Tables Revised CIPP and replacement tables

RFI Responses Completed

Contract Price Schedule

Revised description and quantity for CLIN 9.