This document contains a submittal list and review estimate template for a federal construction project to rehabilitate water and wastewater systems at Acadia National Park in Maine. The template provides instructions for completing submittal requirements for over 100 construction submittals across various specification sections. It also includes an estimate of the review time required from multiple engineering disciplines to evaluate action submittals. The related solicitation is for design and construction services for Project ACAD 312255 with the goal of rehabilitating the Schoodic water system. Engineering firms would use this template to estimate the level of effort needed to review submittals and negotiate the scope of work and pricing for providing construction administration and submittal review services during the project.

View the file

Other files

File Type Posted
B09_Attach_31_General_Refs_0005.doc DOC document
Sol_140P2022R0043_Amd_0005.pdf PDF
B09_Attach_22_Request_for_Information_0005.pdf PDF
B09_Attach_29_O_M_0004.pdf PDF
B09_Attach_30_Photo_0004.pdf PDF
B09_Attach_22_Request_for_Information_0004.pdf PDF
Sol_140P2022R0043_Amd_0004.pdf PDF
B09_Amend_04_RFIs_updated_0004.pdf PDF
B09_Attach_28_Well_Pump_Calcs_0003.pdf PDF
Sol_140P2022R0043_Amd_0003.pdf PDF
B09_Attach_25_Plans_Update_0003.pdf PDF
B09_Attach_24_Spec_Updates_0003.pdf PDF
B09_Attach_23_Addendum_Summary_0003.pdf PDF
B09_Attach_22_Request_for_Information_0003.pdf PDF
B09_Amend_03_Updates_0003.pdf PDF
B09_Attach_26_Generator_Calculation_0003.pdf PDF
B09_Attach_27_Sewer_Tables_0003.pdf PDF
Sol_140P2022R0043_Amd_0002.pdf PDF
B09_Amend_02_Sign_in_Sheet_0002.pdf PDF
Sol_140P2022R0043_Amd_0001.pdf PDF
Amendment_01_Site_Visit_0001.pdf PDF
B08_Attach_12_Permit_Plan.pdf PDF
B08_Attach_05_Vaccination_Certification_Notification_.pdf PDF
B08_Attach_11_Radio_Path_Study.pdf PDF
B08_Attach_04_Certification_of_Vaccination_Form.pdf PDF
B08_Attach_14_PSP.pdf PDF
B08_Attach_03_Davis_Bacon.pdf PDF
B08_Attach_18_Product_Data_basis_of_estimate.pdf PDF
B08_Attach_15_JOFOC_SCADA_Software.pdf PDF
B08_Attach_08_Structural_Tests___Special_Inspections.pdf PDF
B08_Attach_01_Specs.pdf PDF
Sol_140P2022R0043.pdf PDF
B08_Attach_17_O_M_Requirements.xlsx XLSX spreadsheet
B08_Attach_02_Drawings.pdf PDF
B08_RFP_140P2022R0043.pdf PDF
B08_Attach_10_HazMat_Report.pdf PDF
B08_Attach_09_Calculations.pdf PDF
B08_Attach_07__Sewer_Inspection.pdf PDF
B08_Attach_19_ConstructabilityChecklist.xlsx XLSX spreadsheet
B08_Attach_13_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_Attach_06_Geotechnical_Report.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

TOC

Submittal List with Review Estimate Template
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LISTACTION SUBMITTAL
REVIEW ESTIMATE
ACAD 312255(Complete this portion for Architect / Engineer (A/E)
Project Title:REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMSconstruction service task order negotiation.)
SUBMITTALREQUIREMENTSARCHITECT / ENGINEER REVIEW TIME
(Indicate with X)(Indicate in whole or partial hours.)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS OR CALCULATIONS
OR PLANMANUFACTURER DATA
AND INSTRUCTIONSCOPYSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSAS-BUILT DRAWIGNSARCHITECTCIVIL ENGINEERPROCESS ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERINSTRUMENTATION ENGINEERPROJECT MANAGER COORDINATIONLANDSCAPE ARCHITECT
01 11 00Summary of Work

01 26 01 Contract Modification Procedures

01 27 00 Definition of Contract Line Items

01 31 00Project Management and Coordination
1.4.A-BCoordination DrawingsX
1.4.CCoordintation Digital Data FilesX
1.4.DDivision 1 DocumentsX
1.6.CList of employees needing access to NPS Sharepoint SiteX
1.8.CEnvironmental Training ProgramX
01 32 16Construction Schedule
1.3.BSchedule of ValuesX22
1.3.CConstruction Baseline ScheduleX22
1.3.DCritical Path Method (CPM) ReportsX22
1.3.EConstruction Schedule UpdatesX22
1.3.FConstruction Schedule Revisions and Time Impact AnalysusX22
01 32 33Photographic Documentation
1.2.AConstruction ImagesX
1.2.BCloseout ImagesX

01 33 23 Submittal Procedures

01 35 13.22Archeological Protection
1.3.ADaily Work ScheduleX1
01 35 23Safety Requirements
1.3.AAccident Prevention PlanX1
01 40 00Quality Requirements
1.4.AQuality Control PlanX1
1.4.BQualification DataX2
1.4.CContractor Quality Control Daily ReportsX2
1.4.DTest ReportsX8
1.4.EAccessibility Inspection ReportX1
1.4.FOff-Site Inspection ReportsX1
1.4.HPermits, Licenses, and CertificatesX1

01 42 00 Reference Standards

01 42 13 Abbreviations and Acronyms

01 50 00 Temporary Facilities and Controls

01 57 19.11Indoor Air Quality Management
1.4.AIndoor Air Quality (IAQ) Management PlanX1
1.4.BProduct Data
1.4.CInspection and Test Reports

01 57 19.12 Noise and Acoustics Management

01 57 23Temporary Storm Water Pollution Prevention
1.3.A.1Storm Water Pollution Prevention Plan (SWPPP)X8
1.3.A.2Under-An-Acre Pollution Prevention Plan (UPPP)X
1.3.BInspection Schedule - Pollution PreventionX
1.3.CInspection Schedule - Storm Water Pollution PreventionX
1.3.DErosion Control ProductsX

01 57 26 Dust Control

01 58 13Safety Signage
1.2.AProduct DataX2
1.2.BManufacturer's Catalogs and Data SheetsX
1.2.CManufacturer's Standard Color ChipsX
1.2.DSign Schedule w/ Locations and GraphicsX
01 67 00Product Requirements
1.3.A.1Affirmative Procurement Reporting FormX
1.3.A.2Environmental DataX
1.3.A.3Material Safety Data SheetsX
1.3.A.4Chain of Custody DocumentationX
01 73 29Cutting and Patching
1.2.ACutting and Patching PlanX2
01 73 40Execution
1.2.ACertificatesX1
1.2.BLandfill ReceiptsX1
1.2.CCertified SurveysX1
1.2.DQuantity SurveysX1
01 74 19Construction Waste Management and Disposal
1.4.AWaste Management PlanX4
1.4.BProgress DocumentationX
1.4.CWaste Reduction CalculationsX
1.4.DRecords of DonationsX
1.4.ERecords of SalesX
1.4.FRecycling and Processing Facility RecordsX
1.4.GLandfill and Incinerator Disposal RecordsX
1.4.HQualification DataX
1.4.IProgress Payment RequirementsX
1.4.JCloseout SubmittalsX
01 77 00Closeout ProceduresX16164416168
1.2.CProject Record DrawingsX
1.3Equipment, piping and valve tagsXX
1.4.A.1Specific Warranties, Guarantees, Worksmanship Bonds, Final
Certifications, and Similar DocumentsX
14.A.2NPS required forms for occupancy, fire sprinkler/alarm acceptance, and other similar forms or certificatesX
1.4.A.4Environmental Record DocumentsX
1.4.A.5Posted Operating InstructionsX
1.4.A.6Keys and Keying ScheduleX
1.4.A.9Pre-functional Checklists and Functional Performance Testing
ReportsX
1.4.A.10Test and Balance ReportX
01 78 23Operation and Maintenance Data
1.2.AOperations and Maintenance ManualsX24416248
01 79 00Demonstration and Training
1.3.AInstruction ProgramX14442
1.3.BDemonstration and Training VideoX14442
01 80 00Equipment Startup and Testing
1.1.GSystem-Specific Startup, Testing, and Training PlansX8328242424
3.1.JEquipment Start-Up Certification FormsX221222
02 41 00Demolition
1.4.ADemolition ScheduleX1
1.4.BRecordsX
02 83 33.13Lead Paint Disturbing and Encapsulation Activites
1.5 BWork Schedule and SequenceXX
1.5 BLead Paint Disturbance PlanXX
1.5 BHazardous Waste Management PlanXX
1.5 BQualificationsXX
1.5 BManufacturer's Literature and DataXX
1.5 BSite-Specific Health and Safety PlanXX
3.6 APost Work Submittals - Test ReportsXX
3.6 ACertificate of Final Visual InspectionsXX
3.6 ARecord DocumentsXX

03 33 00 Product data: Supports for reinforcement X 1

03 33 00 Product data: Admixtures X 1

03 33 00 Product data: Curing compounds X 1

03 33 00 Reinforcement shop drawiings X 2

03 33 00 Formwork shop drawings X 4

03 33 00 Construction joint layout X 1

03 33 00 Laboratory test reports for concrete materials and mix design test X 1

03 33 00 Materials certificates X 1

03 33 00 Cold weather and hot weather concreting procedures X 2

03 33 00 Concrete design mix X 1

09 91 00Special Coatings
1.3.BList of ProductsX3

09 99 05 Shop Coatings

13 34 23.13 Portable and Mobile Buildings 8 8

22 05 29 Prefabricated Pipe Hangers, Supports, and Bracing X

23 09 03 Control Instrumentation 2

23 09 93 Control Sequences 2

23 34 00 Fans X 2 1

23 82 14 Heating and Cooling Terminal X 2 1

26 00 00 General Electrical Requirements

26 05 19 Low-Voltage Electrical Power Conductors and Cables X 1

26 05 26 Grounding and Bonding for Electrical Systems X 1

26 05 29 Hangers and Supports for Electrical Systems X 1

26 05 33 Raceway and Boxes for Electrical Systems X 1

26 05 43 Underground Ducts and Raceways for Electrical Systems X 2

26 05 73 Power System Studies X 2

26 24 16.13 Lighting and Appliance Panelboards X 2

26 27 26 Wiring Devices X 4

26 28 16 Enclosed Switches and Circuit Breakers

26 29 13 Enclosed Controllers X 2

26 32 13 Engine Generators X 8

26 36 23 Automatic Transfer Switches 4

26 43 00 Surge Protective Devices X 2

26 50 00 Lighting X 2

31 00 00Earthwork
1.3.BTest ResultsXX4
1.3.CBorrow Material Test ResultsXX4
1.3.DMoisture Density CurvesXX4
31 23 19Dewatering
1.4.BTemporary Construction Dewatering System PlanX84
1.4.CQualifications of the Temporary Construction Dewatering
System Design EngineerX
1.4.CQualifications of the Contractor or specialty subcontractor installing and operating the systemX
1.4.C.1Signed and Sealed Design CalculationsX
1.4.C.2Signed and Sealed Dimensioned Layout DrawingsX
1.4.C.3Detailed Written Description of Dewatering MethodsX
1.4.C.4Pumping RatesX
1.4.C.5Capacity and Number of standby Pumping EquipmentX
1.4.C.6Capacity and Number of Standby Power EquipmentX
1.4.C.7Treatment Tankage and Discharge LocationsX
1.4.C.8Technical Data on the Well Screens, Filter Materials, and GradationsX
1.4.C.9Structure Monitoring PlanX
1.4.C.10Pre-Construction and Post-Construction SurveyX
1.4.C.11Effluent Monitoring Provisions and Laboratory Testing MethodsX
1.4.C.12System Removal RequirementsX
1.4.EWater Monitoring ResultsXX
31 23 23.33Excavatable Flowable Fill
1.2.AMix DesignX1
31 25 00Erosion and Sedimentation Controls
1.2.AWork Plan & Schedule of WorkX2
31 37 00Riprap
1.2.BTest ResultsXX1
31 50 00Excavation Support and Protection
1.4.BQualifications of temporary excavation support system design engineerX42
1.4.CCertificate of Design and Complete Scaled and Dimensioned Layout DrawingsX1
1.4.DExcavation Support System Monitoring PlanX21
32 12 16Asphalt Paving
1.3.AJob MiX FormulaX1
1.3.BDelivery SlipsX4
32 16 13.33Asphalt CurbingX1
1.3.ACertificatesX
32 16 13.43Granite Curbing
1.2.AShop DrawingsX1
1.2.BDimensional Information, Layout Diagrams, and Sources of MaterialsX2
1.2.CMortar Mix DesignX0.25
1.2.DMasonry Contractor's QualificationsX
32 16 23Concrete SidewalksX2
1.3.BCertificate of ComplianceX
32 17 23Pavement Markings
1.2.BProduct DataX1
32 31 13Chain Link Fence and GatesX42
1.7.AManufacturer Satisfactory GuaranteeX
32 92 20Seeding
1.2.ASeed CertificationX1
1.2.BTop Soil Test ResultsX1
1.2.CLime & Fertilizer InvoicesX1
33 00 00Pipe and Pipe Fittings - General
3.3.B.3.dBacteriological Test ResultsXX1

33 01 12 Inspection and Testing of Water Utilities

33 01 30.01 Final Sewer Testing

33 01 30.02 Sewer Line Joint Testing

33 01 30.16Television Inspection of Sewers
1.3.BNASSCO PACP CertificationsXX1
3.1.D.4Video and PhotographsX244
33 01 30.51Sewer Flow Control
1.2.A.1Proposed Schedule, Sequence of Construction, Duration of Activities, and Description of Sewer Control MethodsX4
1.2.A.2Temporary Pumping Equipment Technical DataX2
1.2.A.3Sewer Flow Control Supplemental InformationX2

33 01 30.53 Sewer Line Cleaning

33 01 30.72Sewer Pipe Lining
2.3.ADesign CalculationsX2
2.3.BMaterials and Installation ProceduresX1
2.3.CPre-Installation CCTV Inspection and Post- Lining CCTV InspectionX24
2.3.DOutreach PlanX1
2.3.EQualifications, Training, and Experience of InstallersXX1
2.3.FEquipment ListX1
2.3.GPlan for providing and disposing of water if curing the liner by waterX2
2.3.HOdor Mitigation PlanX1
2.3.IProposed or Potential Repair and/or Rehabilitation MethodsX4
2.3.JWet-Out Logs, Saturation Charts, and Curing SchedulesX4
2.3.KTemperature Measurements and Samples for TestingX4
33 01 30.81Manhole Rehabilitation
1.5.AShop DrawingsX8
1.5.BMaterials and Installation ProceduresX2
1.5.CField-Testing Processes and ProceduresX2
1.5.DFive Verifiable ReferencesX2
1.5.EInstallation HistoryX1
33 05 05Watermains and Appurtenances
1.3.AShop Drawings and Product DataX62

33 05 09.13 Couplings and Connectors for Buried Applications X 1

33 05 17 Sewer Force Main Copper Tubing Size HDPE X 4

33 05 19 Ductil Iron Pipe and Fittings Buried Application X 1

33 05 31.11Polyvinyl Chloride Gravity Sewer Pipe
1.3.AShop DrawingsX2
1.3.BCertificate of ConformanceXX1
33 05 33High Density Polyethylene Pipe and Fittings
1.3.AShop DrawingsX1
1.3.BCertification of ConformanceXX1
1.3.CExperience StatementX0
1.3.DJoint Fusion DataX1
1.3.EManufacturer Installation Instructions and SpecificationsX1
33 05 46Asbestos-Containing Materials Abatement
1.2.AAbatement PlanXX1
1.5.B.1Certification of ComplianceXXX0
1.5.B.2Respiratory Protection ProgramXX0
1.5.B.3Project ScheduleXX1
1.5.B.4Emergency Action PlanXX1
1.5.B.5Proposed Waste Disposal Site and Waste TransporterXX1
1.5.B.6Safety Data SheetsXX0
1.5.B.7Work PlanXX1
1.5.CResults of Personnel Exposure MonitoringX
1.5.DDisposal ReceiptsX
1.5.D.2Copies of On-Site Job Logs, Notifications, Permits, Accident Reports, Waivers of LienX
1.5.D.3Copies of Any Notices of Non-ComplianceX
33 05 61Concrete Manholes
1.3.AShop Drawings and Manufactuer's LiteratureXX84
1.3.BTest ResultsXX

33 05 97 Identification and Signage for Utilities X 1

33 11 36Submersible Well Pump
1.3.AShop Drawings, Manufacturers' Literature, Maintenance Data, Operating Instructions, and List of Spare Parts and Maintenance MaterialsXX82
1.3.B.1Factory Certified TestingX2
1.3.B.2Field Acceptance TestingX2
1.3.CComplete Dimensions of Pump and Motor Unit, Series and Types of Shafts, Type of Bowl Lining, and DrawingsX2
33 14 19Gate Valves
1.3.AShop DrawingsXX31
1.3.BManufacturer's Certificate of ConformanceXX
1.3.CManufacturer's Installation Instructions and SpecificationsXX
33 14 23Piping Insulation
1.3.AShop DrawingsXX41

33 14 23.02 Valve Boxes X 1

33 15 01Rigid Board Insulation for Pipe in Trenches
1.3.AShop Drawings, Product Data, and Manufacturer's Installation InstructionsX1
33 15 02Tracer Wire
1.2.AManufacturer's Material SpecificationsX1

40 05 06 Couplings, Adaptors, and Specials for Process Piping X 3

40 05 09 Wall Pipes, Floor Pipes, and Pipe Sleeves X 2

40 05 19 Ductile Iron Process Pipe X 2

40 05 24 Steel Process Pipe X 2

40 05 31.14 Polyvinyl Chloride PVC Pipe (Pressure) X 1

40 05 53 Valves and Specialties General

40 05 61 Gate Valves (INTERIOR) X 1

40 05 63 Process Systems Ball Valves Bronze Body X 0.5

40 05 65 Check Valves X 3

40 05 78 Air Release Valves X 2

40 61 00Instrumentation and Control General
1.3.A.1Shop Drawings and Operation and Maintenane ManualsX16
1.3.A.5Samples of Programs and GraphicsX1
1.3.BTest and Checkout ReportsX4
40 62 00SCADA (HMI) System
1.2.AShop DrawingsXX12
40 63 00Programmable Logic Controllers
1.3.AShop DrawingsX4
1.3.BLadder LogicX2
1.3.C.1PLC I/O ConfigurationsX4
1.3.C.2PLC Communication ConfigurationsX4
1.3.C.3PLC Cross Reference ListX4
1.3.C.4PLC Tag Data Base and Memory UsageX2
1.3.C.5OIT Communication ConfigurationsX1
1.3.C.6OIT Screen ListX1
1.3.C.7OIT Screen PrintoutsX1
40 66 00Communication Network
1.3.AShop Drawings and SamplesX4
1.3.BTest and Checkout ReportsX2
1.3.CDirectionsX2
1.3.DList of Local Service DepartmentsX0.5
1.3.ERecord DrawingsX4
40 66 33Fiber Optic Cabling
1.4.AWorking Drawings, Shop Drawings, and Material SpecificationsXX2
1.4.BFiber DiagramsX2
40 66 43Wireless Network System
1.3.AShop DrawingsXX2
1.3.BOperations and Maintenance ManualsX4
1.3.CRecord DrawingsX8
40 67 00Control Panels
1.3.AShop DrawingsXX2
1.3.A.2Bill of MaterialsX1
1.3.A.3Factory Acceptance Testing Report ResultsX1
40 70 00Field Instruments
1.3.AShop Drawings and SamplesXX4
41 22 13Portable Davit Crane and Cable Winch
1.3.AShop DrawingsXX2
1.3.BDetailed Layout DrawingsX1

43 05 20 Pumps General

43 26 13Grinder Pump Station (WastewaterPSs)
1.3.AShop Drawings, Manufactuer's Literature, Short-Term and Long-Term Storage Requirements, and Operations and Maintenance ManualsXX8168
1.3.B.2Precast Concrete Structure Design CalculationsX2

Total: 8 292.25 117.5 27 25 100 168.5 87 0