B09_Attach_24_Spec_Updates_0003.pdf

PDF 2 MB Posted

Attached to
ACAD 312255 - Rehabilitate Schoodic Water System
Solicitation number
140P2022R0043
Issued by

About this file

This technical specification covers the rehabilitation of water and wastewater systems at Acadia National Park in Winter Harbor, Maine. Key scope items include replacing water mains and service lines, installing new water meters, upgrading pump stations and controls, replacing wastewater force mains and laterals, and renovating bathhouses. Electrical work includes upgrading power to pumps and controls. The project is funded by the National Park Service and will be awarded on a best value basis considering technical merit, past performance, and price.

View the file

Other files

File Type Posted
B09_Attach_31_General_Refs_0005.doc DOC document
Sol_140P2022R0043_Amd_0005.pdf PDF
B09_Attach_22_Request_for_Information_0005.pdf PDF
B09_Attach_29_O_M_0004.pdf PDF
B09_Attach_30_Photo_0004.pdf PDF
B09_Attach_22_Request_for_Information_0004.pdf PDF
Sol_140P2022R0043_Amd_0004.pdf PDF
B09_Amend_04_RFIs_updated_0004.pdf PDF
B09_Attach_28_Well_Pump_Calcs_0003.pdf PDF
Sol_140P2022R0043_Amd_0003.pdf PDF
B09_Attach_25_Plans_Update_0003.pdf PDF
B09_Attach_23_Addendum_Summary_0003.pdf PDF
B09_Attach_22_Request_for_Information_0003.pdf PDF
B09_Amend_03_Updates_0003.pdf PDF
B09_Attach_26_Generator_Calculation_0003.pdf PDF
B09_Attach_27_Sewer_Tables_0003.pdf PDF
Sol_140P2022R0043_Amd_0002.pdf PDF
B09_Amend_02_Sign_in_Sheet_0002.pdf PDF
Sol_140P2022R0043_Amd_0001.pdf PDF
Amendment_01_Site_Visit_0001.pdf PDF
B08_Attach_12_Permit_Plan.pdf PDF
B08_Attach_05_Vaccination_Certification_Notification_.pdf PDF
B08_Attach_11_Radio_Path_Study.pdf PDF
B08_Attach_04_Certification_of_Vaccination_Form.pdf PDF
B08_Attach_14_PSP.pdf PDF
B08_Attach_03_Davis_Bacon.pdf PDF
B08_Attach_18_Product_Data_basis_of_estimate.pdf PDF
B08_Attach_15_JOFOC_SCADA_Software.pdf PDF
B08_Attach_08_Structural_Tests___Special_Inspections.pdf PDF
B08_Attach_01_Specs.pdf PDF
Sol_140P2022R0043.pdf PDF
B08_Attach_17_O_M_Requirements.xlsx XLSX spreadsheet
B08_Attach_02_Drawings.pdf PDF
B08_RFP_140P2022R0043.pdf PDF
B08_Attach_10_HazMat_Report.pdf PDF
B08_Attach_09_Calculations.pdf PDF
B08_Attach_07__Sewer_Inspection.pdf PDF
B08_Attach_19_ConstructabilityChecklist.xlsx XLSX spreadsheet
B08_Attach_16_SubmittalList_Estimate.xlsx XLSX spreadsheet
B08_Attach_13_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_Attach_06_Geotechnical_Report.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 01 50 00 - 1

ACAD - 312255 TEMPORARY FACILITIES AND CONTROLS

SECTION 01 50 00

TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

A.B. The Contractor’s use of existing utilities shall not result in the interruption or restriction of service for the park users or staff.

1.2 DEFINITIONS

A. Permanent Enclosure: As determined by Contracting Officer (CO), permanent or temporary roofing is complete, insulated, and weathertight; exterior walls are insulated and weathertight; and openings are closed with permanent construction or substantial temporary closures.

1.3 USE CHARGES

A. General: Cost or use charges for temporary facilities shall be included in Contract Sum as required.

B. Water Service: Potable and Nonpotable Water from existing water system is available for use in limited quantities without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional costs to the Government. Coordinating with Contracting Officer to determine quantity of water that is available for use. Contractor shall be prepared to furnish and deliver its own water to the site.

C. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional costs to the

Government.

1.4 QUALITY ASSURANCE

A. Electric Service: Comply with National Electrical Contractors Association (NECA), National Electrical Manufacturers Association (NEMA), and Underwriter Laboratories

(UL) standards and regulations for temporary electric service. Install service to comply with National Fire Protection Association (NFPA) 70.

B. Environmental Protection: Provide environmental protection as required by agency(ies) with jurisdiction and as indicated in Contract Documents. Coordinate with requirements of the following:

1. Regulatory Requirements anthony.pinnette Cloud

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 01 50 00 - 2

2. Indoor Air Quality (IAQ) Management

3. Noise and Acoustics Management

4. Environmental Management

5. Construction Waste Management

1.5 PROJECT CONDITIONS

A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before NPS acceptance, regardless of previously assigned responsibilities.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Temporary materials may be new or used, but must be adequate in capacity for required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.

B. Pavement: Comply with Division 32 Section 321216 Asphalt Paving.

C. Delete the first two paragraphs below if wood fence in third paragraph is used or covered walkway is used. For more security, increase fence height to 8 feet (2.4 meters) and revise size of posts. If appearance is important for highly visible projects, revise paragraphs to require new materials; otherwise, Contractor is likely to provide reused material. Delete all three paragraphs if fence material is Contractor's option or add custom information if site requires specific style.

D. Portable Chain-Link Fencing: Minimum 2 inch, 9-gage, galvanized steel, chain-link fabric fencing; minimum 6 feet high with galvanized steel pipe posts; minimum 2-3/8 inch OD line posts and 2-7/8 inch OD corner and pull posts, with 1-5/8 inch OD top and bottom rails. Provide concrete or galvanized steel bases for supporting posts.

E. Safety Barrier Fence: Orange plastic fence, minimum height, 4 feet.

F. Barrier Tape: Yellow tape Imprinted with "CAUTION: CONSTRUCTION AREA," manufactured by Reef Industries, Inc., Houston, Texas, or approved equal.

1. Material: Polyolefin Film

2. Width: 3 inches

3. Minimum Thickness: 4 MIL

4. Minimum Weight: 19.6 lbs/1,000 SF

2.2 TEMPORARY FACILITIES

A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature controls, and foundations adequate for normal loading.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 01 50 00 - 3

B. Contracting Officer’s Field Office: Field office shall be a separate structure from

Contractor's office.

1. Prefabricated, job built, or a mobile unit; excellent condition, structurally sound, non-flammable exterior construction, weather tight, minimum 360 square feet.

2. Operable windows and security screens, adjustable ventilation.

3. Air conditioner and heater.

4. Interior partition with lockable door to divide office

5. Paneling or freshly painted walls, acoustical tile or painted ceilings, and resilient flooring.

6. Two exterior doors with dead bolts keyed from outside,

7. Minimum 20-square-foot landing and steps at each exterior door.

8. Provide an entry ramp complying with ADA at one exterior door as directed by

Contracting Officer.

C. Storage and Fabrication Sheds: Temporary weather tight sheds or other covered facilities for storage of materials subject to weather damage. Number and size of structures shall be subject to Contracting Officer's approval.

D. Toilets: Sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible, sturdy enclosures with privacy locks.

1. Provide separate toilet facilities for men and women.

2. Provide toilet facilities throughout the duration of the project.

2.3 EQUIPMENT

A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

B. Heating, Ventilation, and Air Conditioning (HVAC) Equipment: Unless Contracting

Officer authorizes use of permanent HVAC system, provide vented, self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control.

1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited.

2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency acceptable to agency(ies) with jurisdiction, and marked for intended use.

3. Permanent HVAC System: If Contracting Officer authorizes use of permanent HVAC system for temporary use during construction, provide filter with Minimum

Efficiency Reporting Value (MERV) of 8 at each return air grille in system and remove at end of construction.

C. Direct Digital Control (DDC) Internet Connection: Furnish, install and maintain a high-speed connection (Digital Subscriber Line (DSL) or similar) between the project’s DDC system and the internet through a Contractor furnished internet service provider.

Contractor is responsible for maintenance of this connection and costs associated with internet service provider through warranty period of this contract. Upon completion of

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 01 50 00 - 4

warranty period, service shall be transferable to the Government at which time future costs for connection will no longer be the responsibility of Contractor.

D. Contracting Officers Field Office

1. Outlets: Minimum of two, quad outlets with surge protection.

2. Refrigerator: Under counter, 3.2-cubic-foot volume with 0.8-cubic-foot freezer with dedicated power receptacle.

3. Fire Extinguisher: UL listed and FM (Fire Pump Motors) approved, minimum rating of 2-A:10-B:C, dry chemical.

4. First-Aid Kit: General office/light industrial kit which includes antiseptic wipes, bandages, disposable gloves, tape, instant cold pack, dressing pads, eye pads, scissors, and Tylenol tablets. Provide small size, such as manufactured by Johnson

& Johnson, New Brunswick, New Jersey, or approved equal.

5. Two desks with five drawers each and two chairs with casters; two drafting tables

(minimum 40 inches wide by 5 feet long) and two stools; drawing rack; two

2-drawer and one 4-drawer legal size locking filing cabinets with keys; 8 feet of 12 inch deep shelving; coat rack; two additional guest chairs; two desk lamps; two drafting table lamps; and a maximum/minimum thermometer.

6. Manufactured computer work station, capable of containing CPU (central processing unit), monitor, keyboard, printer; work station chair.

7. Printer/Copier/Scanner color printer with 11 x 17 printing capacity and paper and ink supplies sufficient for printing 500 11x17 sheets and 1500 letter size sheets.

8. Additional tables necessary for printer/copier/scanner

9. Two 5-gallon trash cans and one 30-gallon trash can with lid.

10. Ceiling mounted general lighting fixtures.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

1. Locate facilities to limit site disturbance and as directed by the Contracting

Officer.

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

3.2 TEMPORARY UTILITY INSTALLATION

A. General: Install temporary service or connect to existing service.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 01 50 00 - 5

1. Arrange with utility company, NPS, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services. Acquire necessary permits.

B. Storm Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.

1. Connect temporary sewers as directed by the Contracting Officer.

C. Non-Potable Water

1. Non-potable water for construction may be available from the well and water treatment plant if coordinated and approved by the Contracting Officer. Install piping and connections as required.

2. When not available, Contractor shall furnish non-potable water from a source outside park boundary.

D. Potable Water

1. Potable water may be available on site if coordinated and approved by the

Contracting Officer. Make connections to existing facilities as needed. Facilities must be cleaned and maintained in a condition acceptable to NPS. At Substantial

Completion, restore these facilities to condition existing before initial use.

2. When not available I the quantities required, Contractor shall furnish cool, potable water for construction personnel in locations convenient to work stations.

E. Sanitary Facilities: Provide temporary toilets, and wash facilities for use by construction personnel.

1. Place in approved locations secluded from public observation and convenient to work stations. Relocate as work progress requires.

2. Maintain and clean toilet facilities at least weekly.

3. Completely remove sanitary facilities on completion of work.

F. Heating and Cooling: Provide temporary heating and cooling required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of low temperatures or high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed.

1. Use of permanent heating and cooling system will not be allowed without written authorization from Contracting Officer. When the permanent heating and cooling system is approved for use as temporary heating and cooling, pay costs until final acceptance. Permanent heating and cooling system shall be sufficiently complete, including controls, to permit safe operation

2. Provide and maintain adequate approved facilities, as required for safety and construction requirements, during the work. Provide ample clearance around stoves, heaters, chimney and vent connections to prevent ignition of combustible material

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 01 50 00 - 6

3. Install and maintain temporary filters when air handing equipment is used for temporary heating and cooling. Install new filters before final acceptance in addition to any extra sets of filters required. Clean coils as determined by

Contracting Officer.

4. Warranties for equipment used for temporary heating and cooling shall start on date of Final Acceptance.

G. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed.

Coordinate ventilation requirements to produce ambient condition required and minimize energy consumption.

H. Electric Power Service: Use of existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to NPS.

1. When temporary connections are removed, restore existing utility services to original condition.

I. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and traffic conditions.

1. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system.

J. Telephone Service: No telephone service is available on site for Contractor's use. Make arrangements with Telephone Company and pay costs.

1. Make arrangements with the telephone company to install 1 line for Contracting

Officer’s use and pay installation costs.

3.3 SUPPORT FACILITIES INSTALLATION

A. General: Comply with the following:

1. Provide incombustible construction for offices, shops, and sheds located within construction area or within 50 feet of building lines. Comply with NFPA 241.

2. Maintain support facilities until near Substantial Completion. Remove structures, equipment, and furnishings, and terminate services after punch list is 100 percent completed or when directed by Contracting Officer. Personnel remaining after

Substantial Completion will be permitted to use permanent facilities, under conditions acceptable to Contracting Officer.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 01 50 00 - 7

B. Contracting Officers Field Office:

1. Provide Heat, lights, power, air conditioning, temporary water pressure and sewage holding tanks.

2. Provide office, furnishings, and utility connections no later than 7 days after date of Notice to Proceed. Exact location will be determined by Contracting Officer.

3. Maintain equipment, furnishings, and structures. Provide equipment replacement elements as needed. Provide weekly cleaning services and trash disposal.

Maintain and service water and sewer holding tanks as required.

C. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas adequate for construction operations. Locate temporary roads and paved areas within construction limits indicated on Drawings.

1. Provide dust-control treatment that is nonpolluting and non-tracking. Reapply treatment as required to minimize dust.

2. Recondition base after temporary use, including removing contaminated material, regrading, proof-rolling, compacting, and testing.

3. Delay installation of final course of permanent hot-mix asphalt pavement until immediately before Substantial Completion. Repair hot-mix asphalt base-course pavement before installation of final course according to Division 32 Section

"Asphalt Paving."

D. Traffic Controls: Erect and maintain barricades, lights, danger signals, and warning signs in accordance with Manual on Uniform Traffic Control Devices (MUTCD), Part IV, latest edition.

1. Protect existing site improvements to remain including curbs, pavement, and utilities.

2. Maintain access for fire-fighting equipment and access to fire hydrants.

3. Illuminate barricades and obstructions at night; keep safety lights burning from sunset to sunrise.

4. Adequately barricade and post open cuts in or adjacent to thoroughfares.

5. Protect pedestrian traffic by guardrails or fences.

6. When pedestrian traffic is detoured onto a roadway, provide temporary walkways with protection as required at ends and overhead. For walkways, use lumber running parallel to direction of traffic movement and provide ramps at changes of elevation.

7. Cover pipes, hoses, and power lines crossing sidewalks and walkways with troughs using beveled edge boards.

8. Install Barrier Tape where directed by Contracting Officer. Keep a minimum of two rolls on site.

E. Parking: Provide temporary parking areas for construction personnel.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 01 50 00 - 8

F. Dewatering Facilities and Drains: Comply with requirements of the agency(ies) with jurisdiction. Maintain Project site, excavations, and construction free of water.

1. Dispose of rainwater in lawful manner that will not result in flooding Project or adjoining properties nor endanger permanent Work or temporary facilities.

2. Remove snow and ice as required to minimize accumulations.

G. Project Identification and Temporary Signs: Provide Project identification and other signs as required to maintain pedestrian and vehicular safety. Fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry.

1. Provide temporary, directional signs for construction personnel and visitors.

2. Maintain and touchup signs so they are legible at all times.

3. Erect and maintain sufficient detour signs at road closures and along detour routes.

H. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of agency(ies) with jurisdiction.

I. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.

1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities.

J. Excavation Supports: Contractor supplied in accordance with Section 315000.

3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

B. Cleaning of Equipment: Contractor shall ensure prior to moving on to Project Area, equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure equipment has been pressure washed and is free of exotic species. Equipment shall be considered free of soil, seeds, and other debris when visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

C. Temporary Erosion and Sedimentation Control: Refer to Section 01 57 23 "Temporary

Storm Water Pollution Prevention".

D. Tree and Plant Protection: Refer to Section 01 11 00 "Summary of Work".

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 01 50 00 - 9

E. Pest Control: Follow NPS requirements to minimize attraction and harboring of rodents, roaches, and other pests and perform extermination and control procedures at regular intervals so Project will be free of pests and residues at Substantial Completion.

Perform control operations lawfully, using environmentally safe materials.

F. Site Enclosure Fence: When excavation begins, furnish and install chain link fencing to prevent people and animals from easily entering site except by entrance gates.

1. Extent of Fence: As required to enclose portion determined sufficient to accommodate construction operations.

2. Locate vehicular gates to avoid interference with traffic on public thoroughfares.

3. Locate pedestrian entrance gates as required to provide controlled personnel entry.

4. Maintain security by limiting number of keys and restricting distribution to authorized personnel. Provide Contracting Officer with one set of keys.

G. Security Enclosure and Lockup: Install substantial temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security.

H. Barricades, Warning Signs, and Lights: Comply with requirements of Manual on

Uniform Traffic Control Devices (MUTCD), part IV, latest edition for erecting structurally adequate barricades, including warning signs and lighting.

I. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

1. Where heating or cooling is needed and permanent enclosure is not complete, insulate temporary enclosures.

J. Temporary Partitions: Provide floor-to-ceiling dustproof partitions to limit dust and dirt migration and to separate areas occupied by NPS and tenants from fumes and noise.

1. Construct dustproof partitions with 2 layers of 3-mil (0.07-millimeters) polyethylene sheet on each side. Cover floor with 2 layers of 3-mil (0.07-millimeters) polyethylene sheet, extending sheets 18-inches (460 millimeters) up the sidewalls. Overlap and tape full length of joints. Cover floor with fire-retardant plywood.

a. Construct vestibule and airlock at each entrance through temporary partition with not less than 48-inches (1219 millimeters) between doors.

Maintain water-dampened foot mats in vestibule.

2. Insulate partitions to provide noise protection to occupied areas.

3. Seal joints and perimeter. Equip partitions with dustproof doors and security locks.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 01 50 00 - 10

4. Protect air-handling equipment.

5. Weather strip openings.

6. Provide walk-off mats at each entrance through temporary partition.

K. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses.

Comply with NFPA 241.

1. Responsible Person: Capable and qualified person shall be placed in charge of fire protection. Responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures.

2. Tobacco Use, Smoking, and Vaping: Smoking within buildings or temporary storage sheds is prohibited.

3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition according to requirements of NPS and Agencies with Jurisdiction. Check with Park; many require "burn permits" for welding.

4. Develop and supervise overall fire-prevention and -protection program for personnel at Project Site. Review needs with local fire department and establish procedures to be followed. Instruct personnel in methods and procedures. Post warnings and information.

5. Provide temporary standpipes and hoses for fire protection. Hang hoses with warning sign stating hoses are for fire-protection purposes only and are not to be removed. Match hose size with outlet size and equip with suitable nozzles.

6. Hazard Control: Take necessary precautions to prevent fire during construction.

Do not store flammable or combustible liquids in existing buildings. Provide adequate ventilation during use of volatile or noxious substances.

7. Spark Arresters: Equip gasoline or diesel powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by United States Department of Agriculture (USDA) Forest

Service.

a. Written determinations of periods and areas of potential fire hazard will be issued by Contracting Officer.

8. Buildings: Furnish a minimum of one extinguisher for each 1,500 square feet of area or major fraction thereof.

a. Travel distance from any work station to nearest extinguisher shall not exceed 75 feet.

9. Vehicles and Equipment: Provide one extinguisher on each vehicle or piece of equipment.

10. Service and Refueling Areas: Locate areas a minimum of 50 feet from buildings.

Shut down equipment before refueling.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 01 50 00 - 11

3.5 OPERATION, TERMINATION, AND REMOVAL

A. Supervision: Enforce strict discipline in use of temporary facilities. Minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.

B. Maintenance: Maintain facilities in good operating condition until removal.

1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on 24-hour basis where required to achieve indicated results and avoid possibility of damage.

C. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Substantial Completion.

D. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.

1. Materials and facilities that constitute temporary facilities are property of

Contractor. NPS reserves right to take possession of Project identification signs.

2. At Substantial Completion, clean and renovate permanent facilities used during construction period.

END OF SECTION 01 50 00

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 23 1214 - 1

ACAD – 312255 LIQUID FUEL SYSTEMS

SECTION 23 1214

LIQUID FUEL SYSTEMS

GENERAL

1.1 DESCRIPTION

A. This Section includes equipment, piping, valves, tanks, pumps, and installation requirements for the installation of Liquid Propane systems to serve engine generators.

1.2 RELATED WORK

A. Section 26 3213 - Engine Generators

1.3 QUALITY ASSURANCE

A. Order piping with each length marked with manufacturer's name or trademark and type of pipe; with each shipping unit marked with purchase order number, metal or alloy designation, temper, size, and supplier's name.

B. Equipment and accessories shall be UL Listed and labeled where applicable.

C. Installed material not meeting specification requirements must be replaced with material that meets these specifications without additional cost to Owner.

D. Contractor qualifications: Contractor must hold special licenses and certifications to perform Liquid Propane systems work. Contractor shall submit copies of certifications and licenses as part of submittal process. Contractor must have successfully completed at least 20 Liquid Propane projects of similar size and facility. Statement of qualifications shall include name of job, dollar value, brief description of scope, name and phone number of end user customer. Statement of qualifications shall list qualified projects going back at least 5 yrs. Contractor shall have OSHA 30 certification.

1.4 REFERENCE STANDARDS

A. Installation shall conform to:

1. NFPA 30, Flammable and Combustible Liquids Code

2. NFPA 31, Standard for Installation of Oil-Burning Equipment

3. ASME B31.9 Building Services Piping

4. PEI/RP 100-11 Recommended Practices for Installation of Underground Liquid

Storage Systems.

5. International Fire Code (Chapters 6 and 34)

6. UL 971, Nonmetallic Underground Piping for Petroleum Products.

7.6. National Electric Code

8.7. United States Environmental Protection Agency Regulations

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 23 1214 - 2

9.8. Federal Register, CFR 40, Part 280.

10.9. Underground Storage Tank Compliance Act of 2005

11.10. Local Code Requirements

B. Aboveground steel tanks shall conform to:

1. UL 142 Standard for Steel Aboveground Tanks for Flammable and Combustible

Liquids.

2. UL 2085 Standard for Protected Aboveground Tanks for Flammable and Combustible

Liquids

1.5 DELIVERY, STORAGE, AND HANDLING

A. Promptly inspect shipments to ensure material is undamaged and complies with specifications.

B. Cover pipe to prevent corrosion or deterioration while allowing sufficient ventilation to avoid condensation. Do not store materials directly on grade. Protect pipe, tube, and fitting ends from damage. End caps shall remain in place. Protect fittings by storage inside or by durable, waterproof, above ground packaging.

C. Offsite storage agreements will not relieve Contractor from using proper storage techniques.

D. Storage and protection methods must allow inspection to verify products.

1.6 SUBMITTALS

A. Shop Drawings for each item including, but not limited to, the following:

1. Pipe, fittings, and joints

2. Valves

3. Liquid Propane tanks

4. Gauge assembly

5. Liquid Propane accessories

6. All other appropriate data

B. Liquid Propane System: Provide shop drawings for Liquid Propane system schematic, Liquid Propane system layout, pipe sizes, location of supports, elevations, and equipment mounting details. Schematic shall indicate entire Liquid Propane system from end to end with all devices, line sizes, tank sizes, leak detectors, control valves, bill of materials and sequence of operation.

C. Structural: Provide buoyancy calculations, excavation plan and backfill details as stamped by a Professional Structural or Civil Engineer. These shall be provided at the time of submittal. Tank deadman or pad is to be engineered to hold the tank down in 100% water with no overburden.

D. Permit Applications: Provide copies of all permit applications.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 23 1214 - 3

PRODUCTS

2.1 PIPING

A. Liquid Propane Aboveground

1. 2" and Smaller:

a. Pipe: ASTM A53, Grade B, Type E or S or ASTM A106, Grade B, standard weight, carbon steel

b. Fittings: ASME B16.3, Class 300 (300 psi), malleable iron, threaded or ASTM A105 Grade 2/ASME B16.11, 3000 lb psi forged steel, socket weld

c. Fittings ASTM-A-105 Grade 2/ASME B16.11, 3000 lb forged steel, socket weld.

d. Unions: Malleable iron, ASME B16.39 with ground joint, bronze or brass to iron.

Use unions of pressure class and joint type equal to that specified for fittings of respective piping service. Minimum pressure class of unions shall be Class 250 (250 psi).

e. Unions: Forged steel, ASTM A105 Grade 2, ASME B16,11, 3000 lb., socket weld

B. Liquid Propane Supply, Return and Fill (Underground)

1. Manufacturers: NUPI Smartflex or UPP by Franklin Fueling Systems

a. Pipe: Semi-Rigid HDPE Double Wall Pipe System. Pipe system shall be UL 971 listed and so labeled. Piping shall terminate in transition sump and shall have flanged or threaded connection to transition to aboveground piping. Fittings on end of each pipe shall have pressure/vacuum test ports for ease of future testing and regulatory compliance.

b. Primary piping system shall have minimum pressure rating of 90 450 psig at 75°F.

c. Secondary piping system shall have minimum pressure rating of 50 psig at 75°F.

d. Fittings: Electro fusion fittings shall be used with electro fusion welder. Pipe and fittings shall be approved for all petroleum products, E85 and Biodiesel.

e. Entry Boots: Penetrations into sumps and risers shall be through UL Listed, flexible entry boots. Entry boots shall be used with electrical as well as mechanical penetrations.

2. Manufacturers: Ameron - Dualoy 3000/L or Smith Fiberglass Red Thread IIA.

a. Primary piping system shall be UL 971 Listed double wall containment pipe system using filament-wound fiberglass reinforced epoxy pipe rated up to the following operating pressures at 150°F.

1). 450 psig250 psig for 2" 2). 150 psig for 3" 3).1). 125 psig for 4"

b. Secondary piping system shall be rated up to 50 psig operating pressure at 150°F.

anthony.pinnette Cloud anthony.pinnette Cloud anthony.pinnette Cloud

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 23 1214 - 4

c. Fittings for primary pipe shall be constructed of compression molded and filament-wound fiberglass reinforced epoxy. Primary fiberglass pipe and fittings shall be joined by means of deep socket, matching tapered bell and spigot adhesive joints.

d. Secondary containment system (double-wall) shall consist of totally encapsulating primary pipe and fittings with larger size pipe and fittings.

Secondary containment fittings shall be factory fabricated of 2-piece construction complete with nuts, bolts, and washers for field assembly.

Secondary containment pipe and fittings shall be joined by means of square cut non-tapered adhesive joints.

e. Adhesive for joining both primary and secondary fittings shall be two-part amine cured epoxy.

3. Manufacturers: OPW Flexworks or Franklin Fueling APT XP Flex Pipe System

a. Pipe: Flexible PVDF (polyvinylidene fluoride) or Nylon 12 double wall UL 971

Listed pipe system

b. Primary piping system shall have minimum pressure rating at 125°F, 1). 100 450 psig for 1-1/2" 2). 75 psig for 2" 3).1). 75 psig for 3"

c. Primary piping shall be able to withstand full vacuum without collapse.

d. Piping shall be flexible with minimum bend radius of 36” without kinking, breaking or cracking.

e. Secondary piping shall have minimum pressure rating of 8 psig and shall be able to withstand H-20 burial loads in accordance with AASHTO M294.

f. Piping shall be continuous below grade, all joints and fittings shall occur only at manholes, tanks or transition areas. Piping system shall include corrosion resistant brass fittings.

g. Piping shall be continuous below grade, all joints and fittings shall occur only at manholes, tanks or transition areas. Piping system shall include corrosion resistant forged steel fittings.

C. Liquid Propane Fill, Vent and Gauge (Aboveground)

1. 2" and Smaller:

a. Pipe: ASTM A53, Type F, standard weight, carbon steel

b. Fittings: ASME B16.3, Class 150 (150 psi), black malleable iron, threaded or

ASTM A234 Grade WPB/ASME B16.9, standard weight, seamless, carbon steel welds.

c. Fitting: ASTM A234 Grade WPB/ASME B16.9, standard weight, seamless, carbon steel welds.

d. Unions: Malleable iron, Class 250 (250 psi). Refer to Unions for Liquid Propane (Above Ground) in this Section

e. Unions: Forged steel, 3000 lb, socket weld.

anthony.pinnette Cloud

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 23 1214 - 5

2. 2-1/2" and Larger:

a. Pipe: ASTM A53, Grade B, Type E, standard weight, carbon steel

b. Fittings: ASTM A234 Grade WPB/ASME B16.9, standard weight, seamless, carbon steel weld

c. Flanges: Class 150 (150 psi). Refer to Flanges for Liquid Propane (Above

Ground) in this Section

D. Liquid Propane Vent and Tank Leak Detector Riser (Underground)

1. Single wall pipe and fitting materials used for primary pipe of underground Liquid

Propane supply/return piping.

2.2 LIQUID PROPANE SYSTEM VALVES

A. Manufacturers: Morrison Bros., Apollo, Milwaukee, Nibco, FNW, or Watts, equal to model listed

B. Ball Valves:

1. 3" and Smaller: ASTM B584 bronze body, threaded, chrome plated bronze or chrome plated brass ball, or stainless steel ball, full port, PTFE, or Teflon seat rings, blowout-proof stem, two-piece construction, UL 842 Listed, lockable with padlock, 600 psi WOG up to 2”, 450 psi WOG up to 3”, conforming to MSS SP-110, similar to Morrison Fig. 691B.

2. 3” and smaller: Stainless steel body, threaded, stainless steel ball, full port, PTFE or Teflon seat rings, blowout proof stem, two-piece construction, UL 842 Listed, lockable with padlock, 1000 psi SWP, similar to Morrison Fig. 691BSS.

C. Globe Valves:

1. 2" and Smaller: ASTM B62 bronze body, threaded, renewable TFE seat disc, union or screw-over bonnet, malleable iron hand wheel, Class 150 (300 psi WOG), conforming to MSS SP-80, Nibco Figure T-235

2. 2” and Smaller: ASTM stainless steel body, flanged, stainless steel disc, stellite seats, impregnated Teflon packing, union or screw over bonnet, stainless steel handwheel, Class 150, Williams Fig. 152F6-316.

3. 2-1/2" and Larger: iron body, bronze mounted, flanged, bolted bonnet, renewable bronze seat and disc, Class 125 (200 psi WOG), conforming to MSS SP-85, Nibco Figure F-718

4. 2-1/2” and Smaller: ASTM stainless steel body, flanged, stainless steel disc, stellite seats, impregnated Teflon packing, union or screw over bonnet, stainless steel handwheel, Class 150, Williams Fig. 152F6-316.

D. Swing Check Valves:

1. 2" and Smaller: ASTM B62 bronze body, threaded, regrinding, Y pattern, renewable

TFE seat disc, Class 150 (300 psi WOG), conforming to MSS SP-80, Nibco Figure T-

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 23 1214 - 6

2. 2” and Smaller: ASTM B62 stainless steel body, stainless steel disc, Class 150, Williams Fig. S152F6-316.

3. 2-1/2" and Larger: iron body, brass or bronze mounted, renewable seat and disc, Class 125 (200 psi WOG), conforming to MSS SP-71, Nibco Figure F-918

4. 2-1/2” and Larger ASTM B62 stainless steel body, stainless steel disc, Class 150, Williams Fig. S152F6-316.

E. Spring Loaded Check Valves:

1. 2" and Smaller: bronze or iron body, threaded, Class 125 (250 psi WOG), Nibco

Figure T-480

2. 2” and Smaller stainless steel body, threaded, stainless steel trim, TFE seats, similar to Mueller Fig. 303-HT.

3. 2-1/2" and Larger: iron body, wafer style, bronze trim, stainless steel spring, bronze or Buna-N seat, 200 psi WOG, Nibco Figure W-960

4. 2-1/2” and Larger: stainless steel body, wafer style, stainless steel trim, stainless steel spring, similar to Mueller Fig. 103MHT

F. Solenoid Valves:

1. 3" and Smaller: Brass or bronze body, Viton seat and disc, stainless steel spring, threaded, pilot operated, similar to ASCO RedHat.

2. 3” and Smaller: Stainless steel body, Viton seat and disc, stainless steel spring, threaded pilot operated, similar to ASCO RedHat.

3. Actuator shall be line voltage, Class H (high temperature), listed by UL or CSA.

G. Anti-Syphon Valves:

1. 3" and Smaller: bronze body, threaded, UL Listed, spring loaded poppet, composition seat and dashpot, similar to Preferred Utilities Mfg. Corp. Model A.

2. 3” and Smaller: stainless steel body, threaded, spring loaded poppet, similar to

Morrison Fig 912.

H. Back Pressure Regulating Valves:

1. Iron body, bronze trim, TFE diagram, threaded for 2" and smaller, flanged for 2-1/2" and larger, Class 125, similar to KM (Kaye MacDonald) Model DA5, Preferred Utilities Model BQ or V.

2. 316 SS body, 316L SS trim, TFE diagram, threaded for 2” and smaller, flanged for 2- 1/2” and larger, class 125, similar to KM (Kaye MacDonald) Model DA5.

I. Fire Valves (External Emergency Valves):

1. Ductile iron body, stainless steel trim, PTFE gasket, threaded for 2" and smaller and flanged for 2-1/2" and larger, Class 150, 200 psi WOG, similar to Morrison Bros. Co.

Fig. 346 Series.

2. 316 SS body, SS trim, PTFE gasket, threaded for 2” and smaller and flanged for 2- 1/2” and larger, 200 psi WOG, similar to Morrison Bros. Co. Fig 346SS and Fig 346FSS.

3. Fusible link shall be UL listed for 165°F.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 23 1214 - 7

J. Flow Limiting Valves:

1. 316 stainless steel wetted parts, PTFE O-ring, Class 150, threaded connection, similar to Kates FC Valve.

2. Accuracy: ±1.5% of set point, Turndown ratio: 25 to 1.

K. Overfill Prevention Valve:

1. Cast aluminum body, aluminum valve, Viton seal, SS hardware, vapor tight, similar to

EMCO A 1100 EVR or OPW 71 SO.

L. Seismic Shear Valves

2.3 THREADED JOINT SEALANTS

A. Use sealant, suitable for oil or petroleum products, similar to RectorSeal Tru Blu.

2.4 LIQUID PROPANE SYSTEM ACCESSORIES

A. Simplex Basket Strainers: Keckley, Kraissl, Hayward, or Viking similar to Viking Lid-Ease, cast iron body, 200 psi WOG threaded ends for 2”and smaller and 125lb flanged end for 2-1/2” and larger, Buna-N O-rings and 316 stainless steel screens with 1/32" diameter perforation.

B. Duplex Basket Strainers: Keckley, Kraissl, and Hayward, similar to Keckley Style WDPXS or WDPXF, cast iron body, 200 psi WOG, threaded ends for 2” and smaller, 125 lb flanged end for 2-1/2” and larger, iron diverter, Buna-N O-rings and 316 stainless steel screens with 1/32" diameter perforation.

C. Foot valves: Double Poppet type, Preferred Utilities Model 22, Morrison Model 335A or OPW Model 86 with matching foot valve extractor assemblies

D. Vent Caps: Aluminum construction in accordance with NFPA 30, equal to Morrison 354 or OPW Model 23

E. Spill Containment Manhole and Fill Assembly:

1. 5 gallon spill capacity, internal spring-loaded manual drain to tank, aluminum or FRP grade cover, high impact polymer or high-density polyethylene containment cell, threaded riser for overfill prevention valve connection, similar to OPW Model 1- 2100-DEVR or EMCO Wheaton A1004 EVR.

2. Fill cap shall be 4” with padlock, similar to OPW 634TT.

F. Drop Tube: OPW 61 FT

G. Flexible Connectors:

1. Flexible connectors shall be listed and labeled in accordance with UL 536.

2. 300 series stainless steel inner hose and 300 series stainless steel wire braided exterior sleeve, suitable for minimum 150 450 psig WOG at ambient temperature with minimum burst pressure of 600 psig.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 23 1214 - 8

3. Flexible connectors shall be full vacuum rated.

4. Flexible connectors shall be similar to Hose Master Fire-shield

H. Remote Fill Containment Port and Station:

1. Wall recessed mount, stainless steel, 28 litters (7 gallon) spill capacity, hinged and gasketed access door with locking handle, ¾” drain fitting, similar to Fairfield industries RFP series, All-Tech Controls ATC-RF-1200 series or approved equal.

2. Tank selection for multiple tank applications and remote alarm panel shall be provided as a complete package at the tank fill point. Tank selector shall be capable of control up to 6 tanks.

3. Provide 4” fuel fill line valve and cap in a hand hole for future underground storage tank connection. Refer to drawing for location. Control wire in a conduit shall be provided for future control provision.

I. Emergency Pressure Relief Vents

1. Morrison Bros. Co. 244 Series, OPW 201 or equal

2. Vents shall be aluminum or cast iron construction with Buna-N seats. Vents shall be self-closing after over pressure has been dissipated. Restraining cable shall connect head and flange and also serve as grounding cable. Vents shall be sized to meet codes and installed by tank manufacturer.

2.5 ABOVEGROUND LIQUID PROPANE STORAGE TANKS (STEEL)

A. Manufacturers: Highland Tank, Lannon Corp. or Envirosafe

B. Each tank shall be cylindrical UL labeled double-wall steel tank meeting UL 142 and STI- Flameshield requirements.

C. Each tank shall have nominal capacity of 250 gallons.

D. Tanks shall be suitable for above grade concrete pad mounting complete with factory installed steel support cradles. Tanks and support cradles shall be sandblasted and factory applied with 2 coats of suitable paint primer and 2 coats of white epoxy finish.

E. Each tank shall be furnished with the following reinforced bushings and openings.

1. One 4", top-mounted fill line with fill and cap internal fill pipe to 6" of bottom of tank and braced at tank bottom. Provide strike plate.

2. One 4", top-mounted vent with UL Listed internal ball check valve, 2 ft extension, and code approved vent and cap.

3. One 4", top-mounted Liquid Propane return bushed to 2" with internal pipe to 6"of bottom of tank.

4. One 4", top-mounted Liquid Propane suction bushed to 2" with internal pipe to 6"of bottom of tank with foot valve.

5. One 4", top-mounted outlet equipped with cap and lock for manual gauging of tank level.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 23 1214 - 9

6. Furnish sectionalized dip stick accurately marked in gallons.

7. One 4", top-mounted gauge with coupling bushed to required size.

8. One 24", top-mounted diameter UL Listed manhole with bolted gaskets and cover.

F. Furnish tank with required lifting lugs.

G. Provide code approved pressure relief device to prevent accumulation of explosive vapors in event of fire. Devices shall be sized as per Code requirements.

H. Provide 3/4" or 1" bottom-mounted code approved non-freeze drain valve with internal stop to drain water or sludge accumulation without spillage due to breakage.

2.6 OIL TANK GAUGE ASSEMBLY

A. Liquid Propane tank gauge system shall be hydraulically powered type with UL listed remote gauge similar to Pneumercator Model P-5 or P-14 with built-in hand pump and dial scale indicated in gallons. Gauge system shall be complete with tanktop fittings, airbell assembly and copper gauge tubing. Tank connection for gauge line shall be 2'-0" from any oil pipe connections.

2.7 OIL TANK GAUGES ASSEMBLY

A. Direct reading type as manufactured by Pneumercator, Petrometer or Hersey equal to Pneumercator 8" direct reader.

B. Provide 8" float actuated direct reading gauge. Gauge head to be mounted on top of tank in vertical position.

C. Instrument shall be calibrated in gallons. Unit shall be suitable for outdoor installation.

EXECUTION

3.1 PIPING

A. General

1. Remove foreign materials before erection. Ream ends of piping to remove burrs.

2. Install piping parallel to building walls and ceilings and at such heights not to obstruct any portion of window, doorway, stairway, or passageway. Install piping to allow adequate service space for equipment. Refer to drawings and/or manufacturer's recommendations. Install vertical piping plumb. Where interferences develop in field, offset or reroute piping as required to clear such interferences. In all cases, consult drawings for exact location of pipe spaces, ceiling heights, door and window openings or other architectural details before installing piping.

3. Provide anchors, expansion joints, swing joints and expansion loops so that piping may expand and contract without damage to itself, equipment or building.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 23 1214 - 10

4. Mitered ells, welded branch connections, notched tees and "orange peel" reducers are not allowed. Unless specifically indicated, reducing flanges and reducing bushings are not allowed. Reducing bushings may be used for air vents and instrumentation connections.

5. Do not install piping over electrical panelboards, switchgear, switchboards or motor control centers.

6. Install valves, control valves and piping specialties, including items furnished by others, as specified and/or detailed. Make connections to all equipment installed by others where that equipment requires piping services indicated in this Section.

7. For underground piping, install piping in accordance with PEI RP100-11 and in accordance with manufacturer’s written recommendations and instructions. Take specific care to comply with bedding, backfill, separation and slope requirements.

Install metallic detection tape above nonmetallic piping per Section 20 0553 and note exact routing (and depth) on as-built drawings.

B. Threaded Pipe Joints

1. Threads of pipe and fittings shall conform to ASME B1.20.1.

2. Cut threads so that no more than 3 threads remain exposed after joint is made. Ream pipe ends after cutting and clean before erection. Apply thread sealants to cleaned male threads. Assemble joint to appropriate depth and remove any excess pipe joint compound from tightened joint.

C. Flanged Joints

1. Clean flange surfaces and align flange surfaces parallel. Bolt holes of gaskets shall be cut slightly larger than bolt diameter and gasket ID shall be slightly larger than flange ID.

2. Position gasket concentrically so compression is equally distributed over entire gasket surface.

3. Lubricate bolts and run nuts down by hand.

4. By using torque wrench, tighten nuts in the proper sequence so gasket is compressed evenly, and to the appropriate torque specified by bolt manufacturer.

5. Re-torque bolts 12 to 24 h after start-up.

D. Liquid Propane (Fill, Vent, Gauge and Aboveground Supply and Return)

1. Install supply, return, fill, vent and gauge lines where indicated, including flexible connections and other piping specialties included with equipment furnished by others. Solder-joints and unions with gaskets or packing are not allowed. Pitch horizontal piping at minimum 1/8" per foot down to tank.

2. Provide double or triple swing joints in pipe lines connected to underground tanks, except straight fill lines and test wells, to permit tanks to settle without impairing tightness of pipe connections.

3. Install flexible piping connections in supply and return lines at each diesel engine.

Return line from each engine to main oil tank or day tank to contain no manual or automatic valves to restrict flow; pressure relief valves are acceptable.

REHABILITATE SCHOODIC WATER AND WASTEWATER SYSTEMS 23 1214 - 11

4. For supply or suction piping serving multiple fuel consuming devices, install shut-off valves to isolate each devise for maintenance.

5. Terminate oil tank fill piping at least 2 ft from any building wall. Install vent pipe to drain toward tank without sags or traps in which liquid may collect.

6. Terminate vent pipes outside of building, not less than 2 ft measured vertically or horizontally from any building opening, not less than 25 ft from any outside air intake, and with weather-proof and flame-proof vent cap or hood.

E. Liquid Propane (Underground Supply and Return)

1. All work in this section shall be in compliance with "Recommended Practices for

Installation of Underground Liquid Storage Systems", Petroleum Equipment Institute Publication PEI/RP100-11 and in accordance with manufacturer's installation instructions.

2. Installation to comply with regulations and codes governing petroleum storage systems of the following jurisdictions:

a. U.S. Environmental Protection Agency

b. NFPA 30

c. Article 79 of 1997 Uniform Fire Code with Seattle Amendments

3. Before starting installation, all pipe shall be visually inspected for damages. All damaged areas shall be located, repaired, or removed.

4. Pipe shall be handled carefully to avoid impact damage. Care shall be taken to keep tapered surfaces dry and free of dirt, grease, or oil. Do not drop or throw pipe, or allow objects to be thrown on top of pipe.

5. Horizontal primary fuel piping and secondary containment piping shall be pitched 1/8" per foot toward tank. Minimum depth below grade shall be 18".

6. Product piping shall be sloped uniformly free of sags, dips, low spots or vapor traps.

7. Pressure Testing…