B08_Attach_17_O_M_Requirements.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
ACAD 312255 - Rehabilitate Schoodic Water System
Solicitation number
140P2022R0043
Issued by

About this file

This document contains a template for closeout and operation and maintenance requirements for a National Park Service project. It lists various submittal requirements including project record drawings, demonstration and training documentation, spare parts lists, inspection reports, operations and maintenance manuals, warranties, and guarantees. Submittal dates are provided for items like mechanical equipment control system training, fire alarm system demonstration, telecommunications system training, and final project record drawings. The related federal contract opportunity is for solicitation number 140P2022R0043 to rehabilitate the Schoodic water and wastewater systems at Acadia National Park in Winter Harbor, Maine being conducted by the Department of the Interior National Park Service National Office.

View the file

Other files

File Type Posted
B09_Attach_31_General_Refs_0005.doc DOC document
Sol_140P2022R0043_Amd_0005.pdf PDF
B09_Attach_22_Request_for_Information_0005.pdf PDF
B09_Attach_29_O_M_0004.pdf PDF
B09_Attach_30_Photo_0004.pdf PDF
B09_Attach_22_Request_for_Information_0004.pdf PDF
Sol_140P2022R0043_Amd_0004.pdf PDF
B09_Amend_04_RFIs_updated_0004.pdf PDF
B09_Attach_28_Well_Pump_Calcs_0003.pdf PDF
Sol_140P2022R0043_Amd_0003.pdf PDF
B09_Attach_25_Plans_Update_0003.pdf PDF
B09_Attach_24_Spec_Updates_0003.pdf PDF
B09_Attach_23_Addendum_Summary_0003.pdf PDF
B09_Attach_22_Request_for_Information_0003.pdf PDF
B09_Amend_03_Updates_0003.pdf PDF
B09_Attach_26_Generator_Calculation_0003.pdf PDF
B09_Attach_27_Sewer_Tables_0003.pdf PDF
Sol_140P2022R0043_Amd_0002.pdf PDF
B09_Amend_02_Sign_in_Sheet_0002.pdf PDF
Sol_140P2022R0043_Amd_0001.pdf PDF
Amendment_01_Site_Visit_0001.pdf PDF
B08_Attach_12_Permit_Plan.pdf PDF
B08_Attach_05_Vaccination_Certification_Notification_.pdf PDF
B08_Attach_11_Radio_Path_Study.pdf PDF
B08_Attach_04_Certification_of_Vaccination_Form.pdf PDF
B08_Attach_14_PSP.pdf PDF
B08_Attach_03_Davis_Bacon.pdf PDF
B08_Attach_18_Product_Data_basis_of_estimate.pdf PDF
B08_Attach_15_JOFOC_SCADA_Software.pdf PDF
B08_Attach_08_Structural_Tests___Special_Inspections.pdf PDF
B08_Attach_01_Specs.pdf PDF
Sol_140P2022R0043.pdf PDF
B08_Attach_02_Drawings.pdf PDF
B08_RFP_140P2022R0043.pdf PDF
B08_Attach_10_HazMat_Report.pdf PDF
B08_Attach_09_Calculations.pdf PDF
B08_Attach_07__Sewer_Inspection.pdf PDF
B08_Attach_19_ConstructabilityChecklist.xlsx XLSX spreadsheet
B08_Attach_16_SubmittalList_Estimate.xlsx XLSX spreadsheet
B08_Attach_13_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_Attach_06_Geotechnical_Report.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template

Closeout and Operation & Maintenance (O&M) Requirements
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
TopicSpecification SectionRequirementSubmittal DateCompletedReceived

by Park

01 77 00Project Record Drawings
Project Record40 66 00Record Drawings
Drawings40 66 43Record Drawings
01 79 00Demonstration and Training
System01 80 00Equipment Startup and Testing
Demonstration
and Training
33 11 36Spare Parts
Tools
Spare Parts
Equipment

Extra Stock

01 32 16Critical Path Reports
Reports01 40 00Test Reports
01 40 00Off-Site Inspection Reports
01 57 19.11Inspection and Test Reports
01 77 00Functional Performance Testing Reports
26 05 73Power Systems Studies
26 08 12Power Distribution Acceptance Tests
33 05 46Accident Reports
40 61 00Test and Checkout Reports
40 66 00Test and Checkout Reports
01 77 00Keys and Keying Schedule
Keys & Keying
Schedule
01 77 00Warranties
01 77 00Guarantees
01 78 23Operations and Maintenance Data
O&M Data01 78 23Operations and Maintenance Manuals
Warranties32 31 13Manufacturer Satisfactory Guarantee
Guarantees40 66 43Operations and Maintenance Manuals
43 26 13Operations and Maintenance Manuals

&8&K01+024Closeout and Operation & Maintenance (O&M) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Sample

Closeout and Operation & Maintenance (O&M) Requirements Sample
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
TopicSpecification SectionRequirementSubmittal DateCompletedReceived

by Park

1770Final Project Record Drawings.
Project Record
Drawings
15900Mechanical equipment control system DDC (Direct Digital Control) training.
System16720Fire alarm system demonstration.
Demonstration17000Telecommunications system training.
and Training
2515Two curb stop wrenches with T-handles seven feet in length.
Tools2512One six inch gate valve (type used on water main).
Spare Parts2531One ten horsepower grinder pump (type and configuration as specified).
Equipment

9870 Two gallons of wall paint (forest green).

One gallon of trim paint (battleship grey).

Extra Stock 10800 Twelve each of wall and floor tiles used in the restrooms.

7540EIP and PVC (Ethylene-Interpolymer and Polyvinyl Chloride) Thermoplastic roofing manufacturer's inspection report.
7532Renovation of CSPE (Chlorosulfonated Polyethylene Polymer) membrane roofing, manufacturer's inspection report.
Reports15680HVAC (heating, ventilation & air conditioning) Test and balance report.
8710Instructions for cylindrical lock sets, door closers, and panic exit devices.
Keys & Keying8711Instructions for card key lock system and software.
Schedule8710Keying schedule.
2512Gate valves, O&M data for gate and post indicator valves.
O&M Data2515O&M data for water meter.
Warranties2517O&M data for fire hydrants.
Guarantees7511Built-up asphalt roofing with five year guarantee.
7620Flashing and sheet metal with five year guarantee.
7810Tubular skylights with ten year manufacturer's guarantee.
8211Flush wood doors with manufacturer's two year guarantee.
9680Kowski carpet with five year warranty.
15480O&M data for propane water heater.
15733Air cooled air condition units with manufacturer's five year guarantee on compressor and two year warranty on refrigerant loss.

&8&K01+024Closeout and Operation & Maintenance (O&M) Requirements Sample | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+023page &P of &N

File details come from the government source that posted it. Updated .