B08_Att_08_Solit_PSP_Vol_I_Exp_REQD.pdf

PDF 122 KB Posted

Attached to
GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation number
140P2026R0101
Issued by

About this file

This is a Project Experience Questionnaire template associated with federal solicitation 140P2025R0087. The document serves as an evaluation tool for assessing contractor experience on past projects relevant to the proposed contract work.

The questionnaire requires offerors to submit information about referenced projects that demonstrate experience aligned with Project Experience evaluation criteria specified in solicitation section L. Submissions must be limited to the quantity of projects and timeframes mandated in the solicitation. The template includes sections for offeror company name, referenced project information (title, location, brief description, and project owner contact details), and a contractor list identifying all prime and subcontractors whose experience is being submitted. For each contractor, offerors must provide their role (prime or subcontractor), trade classification, original and final price for their specific work, and original and final performance period in calendar days. Seven questions require narrative responses addressing: project work performed by all listed contractors, alignment with Project Experience elements in section L, reasons for price and schedule changes, problems encountered and resolutions implemented, successful means and methods with rationale for implementation on the proposed project, and any additional relevant project information. The questionnaire may be expanded across multiple pages as needed to adequately address all questions.

View the file

Other files

File Type Posted
Sol_140P2026R0101_Amd_0006.pdf PDF
B09_Amendment_06_B08_Att_13_Solit_PSP_Vol_II_SubKPlan_0006.docx DOCX document
B09_Amendment_06_GRCA_25782_Site_Visit_Sign_in_Sheet_0006.jpeg JPEG file
B09_Amendment_06_Answers_to_Questions_0006.pdf PDF
B09_Amendment_06_GRCA257282_FinalCD_Addendum_06_0006.pdf PDF
B09_Amendment_06_SF_30_0006.pdf PDF
B09_Amendment_05_SF_30_0005.pdf PDF
B09_Amendment_05_Answers_to_Questions_0005.pdf PDF
B09_Amendment_05_GRCA257282_FinalCD_Addendum_05_0005.pdf PDF
B09_Amendment_05_GRCA257282_FinalCD_Addendum_02_SCADA_wSeal_0005.pdf PDF
B09_Amendment_05_GRCA257282_FinalCD_Addendum_04_0005.pdf PDF
B09_Amendment_05_GRCA_Final_Individual_Specs_0005.zip ZIP file
Sol_140P2026R0101_Amd_0005.pdf PDF
B09_Amendment_04_SF30_0004.pdf PDF
Sol_140P2026R0101_Amd_0004.pdf PDF
Sol_140P2026R0101_Amd_0003.pdf PDF
B09_Amendment_03_SF30_0003.pdf PDF
B09_Amendment_03_GRCA257282_FinalCD_Addendum_03_Compiled_wSeal_0003.pdf PDF
B09_Amendment_03_Answers_to_Questions_0003.pdf PDF
B09_Amendment_02_What_Evaluators_Will_Ask_for_Each_Factor_2_0002.pdf PDF
B09_Amendment_02_SF30_0002.pdf PDF
B09_Amendment_02_GRCA_257282_SR_WWTP_PreBid_Mtg_presentation_(8-11-26)_FINAL_0002.pdf PDF
B09_Amendment_02_GRCA_257282_Precon_SignIn_0002.pdf PDF
Sol_140P2026R0101_Amd_0002.pdf PDF
B09_Amendment_01_SF30_01.pdf PDF
Sol_140P2026R0101_Amd_01.pdf PDF
B09_Amendment_01_GRCA257282_Access_Road_100P_Final_CD_DRAWINGS_01.pdf PDF
B09_Amendment_01_GRCA257282_CD_Specifications_June2025_01.pdf PDF
B09_Amendment_01_RCA257282_Access_Road_100P_Final_CD_Specifications_01.pdf PDF
B08_Att_01c_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part3.pdf PDF
B08_Att_09_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Att_01b_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part2.pdf PDF
B08_Att_07_GRCA_257282_Price_Schedule.xlsx XLSX spreadsheet
Sol_140P2026R0101.pdf PDF
B08_Att_11_Solit_PSP_Vol_II_Equals.pdf PDF
B08_Att_06_Wage_Determination_(1).pdf PDF
B08_Att_01a_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part1.pdf PDF
B08_Att_13_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v2_Mar25.pdf PDF
B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf PDF
B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5.pdf PDF
B08_Att_05_Hazardous_Materials_Investigation_Report_South_Rim_WWTP.pdf PDF
B08_Att_03_GRCA257282_100P_FinalCD_Addendum_1.pdf PDF
B08_Att_04_GRCA257282_Geotechnical_Recommendation_TM_May2025.pdf PDF
B08_Att_10_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Att_01d_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part4.pdf PDF
B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5_1.pdf PDF
B08_Att_12_Solit_PSP_Vol_II_GenRefs.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Experience Questionnaire Solicitation: 140P2025R0087

Submit responses to the questions below that address experience relative to the elements noted under the Project Experience evaluation subfactor in solicitation section L. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).

Offeror Company Name

REFERENCED PROJECT INFORMATION

Project Title Title Project Location City, State Brief Project Description Description

Project Owner Company Name POC: First & Last Name Phone: (XXX) XXX-XXXX

CONTRACTOR LIST

List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor.

Contractor Name

Role on Referenced

Project (Prime or Sub)

Trade

Price (list for each contractor’s specific work)

Performance Period

(calendar days) (list for each contractor’s specific work) Original Final Original Final

Sparky’s Electrical Company Prime Prime $XXX,XXX $X,XXX,XXX XX XX

ABC Plumbing & Heating, Co Subcontractor Plumbing & Mechanical $X,XXX,XXX $X,XXX,XXX XXX XXX

Subcontractor

PROJECT EXPERIENCE QUESTIONS

1. Describe the project work performed by all contractors listed above.

Response

2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.

Response

3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.

Response

4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.

Response

5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.

Response

6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?

Response

7. Provide any other additional project information you believe should be presented.

Response

File details come from the government source that posted it. Updated .