This is a Specifications document (Amendment 01) for the construction of a replacement wastewater treatment plant (WWTP) at South Rim Village in Grand Canyon National Park, Arizona, under contract GRCA 257282. The project is a comprehensive replacement of existing treatment facilities with a new 0.65 million gallons per day (mgd) treatment system, including site preparation, new process buildings, administration and maintenance facilities, emergency generator installation, instrumentation and control systems, site utilities, and landscaping. The work is organized into three construction phases: access road improvements and Phase 1 construction of new treatment facilities (headworks building, septage receiving station, process building, process tanks, equalization tank, reclaimed water tank, digester facility, and plant drain pump station); Phase 2 demolition and decommissioning of existing facilities; and Phase 3 construction of maintenance building, compost facility, odor control facility, and stormwater pond conversion. The contractor is also responsible for 12 months of operation and maintenance support services following facility startup and commissioning.
The specifications detail extensive requirements across 49 divisions covering general construction requirements, existing conditions management (hazardous materials remediation, asbestos, lead), concrete and structural work, mechanical systems (HVAC, plumbing, fire suppression), electrical systems, process equipment (membrane bioreactor, pumps, chemical metering systems, ultraviolet disinfection), controls and instrumentation, and site improvements. Key administrative requirements include preparation of a construction schedule, coordination drawings, requests for information procedures, project website management, and adherence to National Park Service operational constraints including restricted work hours (6:00 a.m. to 6:00 p.m., Monday through Friday), protection of existing utilities and operations, public access considerations, and environmental/cultural protections. The contractor must coordinate with concurrent projects including the Shuttle Bus Maintenance Facility and North Rim Utilities construction, as well as a separate PLC/SCADA integration contract and Arizona Public Service (APS) for primary power connection. Contract modifications follow a detailed pricing structure with specified overhead and profit limitations (8% overhead, 8.4% profit for contractor self-performed work, with aggregate markup not exceeding 25%).
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL PARKS SERVICE
GRAND CANYON NATIONAL PARK
GRAND CANYON, ARIZONA
CONTRACT DOCUMENTS
for the construction of the
REPLACE WASTEWATER PLANT SOUTH RIM VILLAGE
GRCA 257282
100% COMPLETE CONSTRUCTION DOCUMENTS
JACOBS
Grand Canyon, Arizona
June 2025
© National Parks Service 2025. All rights reserved.
Any reuse, modification, or alteration of this document and the ideas and designs incorporated herein is at the sole risk of the party(ies) reusing, modifying, or altering it. All references to Jacobs and its employees and all professional seals shall be removed prior to any reuse, modification, or alteration of this document.
PW\JA\D3167666\4\42 SEALS PAGE
JUNE 2025 00 01 07 - 1
GRAC 257282 (NO55)
SECTION 00 01 07
SEALS PAGES
See Table of Contents for author of each specification section, identified by author’s initials as follows:
AUTHOR’S NAME = INITIALS
WAYNE W. KOHLER = WWK CORY LANCASTER = CL
KATARZYNA ROSINSKI = KR SCOTT HINTE = SH
DARREN EDWARDS = DE KENNETH GALARDI = KG
KAYLA D. ARCHER = KDA CHRISTOPHER KYLE SMITH = CKS
MORGAN SHOEMAKER = MS DAVID BURGER = DB
ANDY WILLIAMS = AW CHAD LEE ST. JOHN = CLS
RYUJIRO TSUCHIHASHI = RT
SPECIFICATIONS
Digitally Signed
Wayne W. Kohler
81476
WAYNE W. KOHLER
SEALS PAGE PW\JA\D3167666\4\42
00 01 07 - 2 JUNE 2025
GRAC 257282 (NO55)
SPECIFICATIONS
Digitally Signed
Katarzyna Rosinski
12-31-2025
JUNE 2025 00 01 07 - 3
GRAC 257282 (NO55)
SPECIFICATIONS
Digitally Signed
Darren Edwards
JUNE 19, 2025
00 01 07 - 4 JUNE 2025
GRAC 257282 (NO55)
SPECIFICATIONS
Digitally Signed
Kayla D. Archer
JUNE 2025 00 01 07 - 5
GRAC 257282 (NO55)
SPECIFICATIONS
Morgan Shoemaker
00 01 07 - 6 JUNE 2025
GRAC 257282 (NO55)
SPECIFICATIONS
Andy Williams
JUNE 2025 00 01 07 - 7
GRAC 257282 (NO55)
SPECIFICATIONS
Cory Lancaster
00 01 07 - 8 JUNE 2025
GRAC 257282 (NO55)
SPECIFICATIONS
Scott Hinte
JUNE 2025 00 01 07 - 9
GRAC 257282 (NO55)
SPECIFICATIONS
Kenneth Galardi
00 01 07 - 10 JUNE 2025
GRAC 257282 (NO55)
SPECIFICATIONS
Christopher Kyle Smith
JUNE 2025 00 01 07 - 11
GRAC 257282 (NO55)
SPECIFICATIONS
David Burger
00 01 07 - 12 JUNE 2025
GRAC 257282 (NO55)
SPECIFICATIONS
Chad Lee St. John
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 00 01 10 - 1
GRCA 257282
TABLE OF CONTENTS
VOLUME 1
Person Section Responsible Title Pages
SPECIFICATIONS
DIVISION 01—GENERAL REQUIREMENTS
01 11 00 KR Summary of Work.................................................................... 1- 14 01 26 01 KR Contract Modification Procedures ........................................... 1- 7 01 27 00 KR Definition of Contract Line Items ............................................ 1- 2 01 31 00 KR Project Management and Coordination ................................... 1- 14 01 32 16 KR Construction Schedule ............................................................. 1- 12 01 32 33 KR Photo Documentation............................................................... 1- 3 01 33 23 KR Submittal Procedures ............................................................... 1- 11
Supplement:
KR Submittal List ........................................................................... 1- 34
01 35 00 KR Environmental Protection and Special Controls ...................... 1- 8 01 35 13.22 KR Archeological Protection ......................................................... 1- 3 01 35 23 KR Safety Requirements ................................................................ 1- 5 01 40 00 KR Quality Requirements .............................................................. 1- 11
Supplements:
KR Statement of Structural Tests and Special Inspections ............ 1- 21 KR Accessibility Inspection Report – Buildings & Facilities ........ 1- 12
01 42 00 KR Reference Standards................................................................. 1- 16 01 43 33 KR Manufacturers’ Field Services ................................................. 1- 4
Supplement:
KR Manufacturer’s Certificate of Proper Installation .................... 1- 1
01 45 33 WWK Special Inspection, Observation, and Testing .......................... 1- 6 Supplements:
WWK Contractor’s Statement of Responsibility ................................ 1- 1 WWK Fabricator’s Certificate of Compliance .................................... 1- 1
01 50 00 KR Temporary Facilities and Controls........................................... 1- 12 01 57 13 KDA Temporary Erosion and Sediment Control .............................. 1- 17 01 57 19.11 KR Indoor Air Quality Management .............................................. 1- 7 01 57 19.12 KR Noise and Acoustics Management ........................................... 1- 3 01 57 23 KR Temporary Storm Water Pollution Prevention ........................ 1- 8 01 57 28 DE Temporary Flow Control ......................................................... 1- 9 01 61 03 DE Equipment – Basic Requirements ............................................ 1- 12
Supplement:
DE Exhibit A, Manufacturer Field Service Report ........................ 1- 5
Person Section Responsible Title Pages
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 - 2 JUNE 2025
GRCA 257282
01 67 00 MS Product Requirements .............................................................. 1- 12 Supplement:
MS Affirmative Procurement Reporting Form............................... 1- 2 MS Manufacturer’s Certificate of Proper Installation Form .......... 1- 1 MS Manufacturer’s Certificate of Compliance Form ..................... 1- 1
01 73 20 WWK Openings and Penetrations in Construction ............................. 1- 8 Supplements:
WWK Schedule A – Openings and Penetrations Schedule for New Construction ............................................................ 1- 1
WWK Schedule B – Openings and Penetrations Schedule for Existing Construction ...................................................... 1- 1
01 73 29 MS Cutting and Patching ................................................................ 1- 4 01 73 40 KR Execution ................................................................................. 1- 11 01 74 19 KR Construction Waste Management and Disposal ...................... 1- 9 01 77 00 KR Closeout Procedures................................................................. 1- 6 01 78 23 KR Operation and Maintenance Data............................................. 1- 10
Supplements:
KR Equipment Data Sheet.............................................................. 1- 1 KR Closeout and Operation & Maintenance (O&M)
Requirements Template + Sample ........................................ 1- 8 01 78 25 KR Operations and Maintenance Support Services ....................... 1- 9
Supplements:
KR Minimum Qualifications O&M Supervisor ............................. 1- 2 KR Qualification Schedule for Operation and
Maintenance Services / Positions.......................................... 1- 2 01 79 00 KR Demonstration and Training .................................................... 1- 6 01 81 13 KR Sustainable Design Requirements for Non-LEED™
Projects .................................................................................. 1- 4 01 81 33 AW Cyber Security Requirements .................................................. 1- 6 01 88 15 WWK Anchorage and Bracing............................................................ 1- 7 01 91 14 CL Equipment Testing and Facility Startup .................................. 1- 26
Supplement:
CL Supplement A........................................................................... 1- 13
01 91 15 SH Total Building Commissioning ................................................ 1- 13
DIVISION 02—EXISTING CONDITIONS
02 41 00 KR Demolition ............................................................................... 1- 11 Supplement:
KR Hazardous Materials Investigation Report............................... 1-114 02 61 00 KR Removal and Disposal of Contaminated Soil .......................... 1- 8
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 00 01 10 - 3
GRCA 257282
02 81 00 KR Transportation and Disposal of Hazardous Materials .............. 1- 11 Supplement:
KR Attachment A: Sample Offsite Policy Certification Memo ..... 1- 1 02 82 00 KR Asbestos Remediation .............................................................. 1- 32 02 83 00 KR Lead Remediation .................................................................... 1- 18 02 84 16 KR Handling of Lighting Ballasts and Lamps Containing
PCBs and Mercury .............................................................................1- 7 02 84 33 KR Removal and Disposal of Polychlorinated Biphenyls
(PCBs) ................................................................................... 1- 11
DIVISION 03—CONCRETE
03 01 32 WWK Repair of Vertical and Overhead Concrete Surfaces ............... 1- 14 03 01 33 WWK Repair of Horizontal Concrete Surfaces .................................. 1- 13 03 10 00 WWK Concrete Forming and Accessories ......................................... 1- 8 03 15 00 WWK Concrete Joints and Accessories .............................................. 1- 9 03 21 00 WWK Steel Reinforcement ................................................................. 1- 5 03 24 00 WWK Fibrous Reinforcing ................................................................. 1- 3 03 30 00 WWK Cast-in-Place Concrete............................................................. 1- 26
Supplements:
WWK Concrete Mix Design, Class A (5000F3S1P2C2).................... 1- 3 WWK Concrete Mix Design, Class B (4500F2S1P1C1) .................... 1- 2 WWK Concrete Mix Design, Class C (SM00F2S1P2C1) .................. 1- 2 WWK Concrete Mix Design, Class D (4500F1S1P0C1).................... 1- 2 WWK Concrete Mix Design, Class E (CF00F1S1P0C1) ................... 1- 2 WWK Concrete Mix Design, Class F (4500F3S1P1C2) .................... 1- 2
03 39 00 WWK Concrete Curing ....................................................................... 1- 4 03 62 00 WWK Grouting ................................................................................... 1- 11
Supplement:
WWK 24-hour Evaluation of Nonshrink Grout Test Form and Grout Testing Procedures ............................................... 1- 3 03 63 00 WWK Concrete Doweling .................................................................. 1- 5 03 64 23 WWK Epoxy Resin Injection Grouting .............................................. 1- 11 03 64 24 WWK Polyurethane Injection Grouting .............................................. 1- 9
DIVISION 04—MASONRY
04 22 00 WWK Concrete Unit Masonry ............................................................ 1- 16
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 - 4 JUNE 2025
GRCA 257282
DIVISION 05—METALS
05 05 19 WWK Post-Installed Anchors ............................................................. 1- 9 05 05 23 WWK Welding .................................................................................... 1- 6
Supplement:
WWK Welding and Nondestructive Testing Table ............................ 1- 1
05 12 00 WWK Structural Steel Framing .......................................................... 1- 14 05 31 00 WWK Steel Decking ........................................................................... 1- 6 05 50 00 WWK Metal Fabrications ................................................................... 1- 17 05 52 16 WWK Aluminum Railings .................................................................. 1- 9 05 53 00 WWK Metal Gratings ......................................................................... 1- 6
DIVISION 06—WOOD, PLASTICS, AND COMPOSITES
06 10 00 MS Rough Carpentry ...................................................................... 1- 9 06 17 53 WWK Shop-Fabricated Wood Trusses ............................................... 1- 9 06 41 00 MS Architectural Wood Casework ................................................. 1- 8 06 82 00 WWK Glass-Fiber-Reinforced Plastic ................................................ 1- 7
DIVISION 07—THERMAL AND MOISTURE PROTECTION
07 14 00 MS Fluid-Applied Waterproofing .................................................. 1- 5 07 21 00 MS Thermal Insulation ................................................................... 1- 7 07 26 16 MS Belowgrade Vapor Retarders ................................................... 1- 3 07 41 13 MS Metal Roof and Soffit Panels ................................................... 1- 19 07 54 23 MS Thermoplastic Membrane (TPO) Roofing ............................... 1- 10 07 62 00 MS Sheet Metal Flashing and Trim ................................................ 1- 9 07 70 01 MS Roof Specialties and Accessories ............................................ 1- 4 07 84 00 MS Firestopping ............................................................................. 1- 5 07 92 00 MS Joint Sealants ........................................................................... 1- 9
DIVISION 08—OPENINGS
08 11 00 MS Metal Doors and Frames .......................................................... 1- 9 08 30 00 MS Specialty Doors ........................................................................ 1- 7 08 51 13 MS Aluminum Windows ................................................................ 1- 7 08 71 00 MS Door Hardware......................................................................... 1- 20 08 80 00 MS Glazing ..................................................................................... 1- 13 08 90 00 MS Louvers .................................................................................... 1- 4
DIVISION 09—FINISHES
09 22 16 MS Nonstructural Metal Framing ................................................... 1- 3 09 29 00 MS Gypsum Board ......................................................................... 1- 13
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 00 01 10 - 5
GRCA 257282
09 30 00 MS Tiling ........................................................................................ 1- 8 09 51 23 MS Acoustical Tile Ceilings ........................................................... 1- 4 09 65 00 MS Resilient Flooring..................................................................... 1- 5 09 77 01 MS Fiberglass-Reinforced Plastic (FRP) Panel Walls ................... 1- 3 09 90 00 DE Painting and Coating ................................................................ 1- 27
Supplements:
DE Paint System Data Sheet (PSDS) ............................................. 1- 1 DE Paint Product Data Sheet (PPDS) ............................................ 1- 1 DE Volatile Organic Compound (VOC) Limit List ....................... 1- 2
09 96 35 DE Chemical-Resistant Coatings ................................................... 1- 13 Supplements:
DE Chemical-Resistant Coating System Data Sheet (CRCSDS) .. 1- 1 DE Chemical-Resistant Coating Product Data Sheet (CRCPDS) .. 1- 1
09 97 13 DE Steel Tank Linings and Coatings ............................................. 1- 16 Supplements:
DE Paint System Data Sheet (PSDS) ............................................. 1- 1 DE Paint Product Data Sheet (PPDS) ............................................ 1- 1
DIVISION 10—SPECIALTIES
10 14 00 MS Signage ..................................................................................... 1- 7 Supplements:
MS Sign Schedule........................................................................... 1- 2 10 28 00 MS Toilet and Bath Accessories..................................................... 1- 7 10 44 00 MS Fire Protection Specialties and Safety Equipment ................... 1- 4 10 51 00 MS Lockers ..................................................................................... 1- 3 10 80 00 MS Miscellaneous Specialties ........................................................ 1- 6
DIVISION 11—EQUIPMENT
11 31 00 MS Appliances................................................................................ 1- 2
DIVISION 12—FURNISHINGS
12 24 13 MS Roller Shades ........................................................................... 1- 9 12 35 53 MS Laboratory Casework ............................................................... 1- 23
DIVISION 13—SPECIAL CONSTRUCTION
13 34 19 WWK Metal Building Systems ........................................................... 1- 9
DIVISION 14 THROUGH DIVISION 20 (NOT USED)
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 - 6 JUNE 2025
GRCA 257282
DIVISION 21—FIRE SUPPRESSION
21 13 13 CKS Wet-Pipe Sprinkler Systems .................................................... 1- 16
DIVISION 22—PLUMBING
22 05 48 SH Vibration Isolation for Plumbing Piping and Equipment ........ 1- 7 22 07 00 SH Plumbing Piping Insulation...................................................... 1- 7 22 10 01 SH Plumbing Piping and Accessories ............................................ 1- 20
Supplements:
22 10 01.02 SH Polyvinyl Chloride Drain Waste and Vent (PVC-DWV)
Pipe and Fittings Data Sheet ................................................. 1- 1 22 10 01.06 SH Acid-Resistant Polypropylene Waste and Vent Pipe and
Fittings Data Sheet ................................................................ 1- 1 22 30 00 SH Plumbing Equipment ............................................................... 1- 11
Supplements:
SH Electric Water Heater (Commercial) Data Sheet ..................... 1- 1 SH Domestic Water Expansion Tank Data Sheet .......................... 1- 1 SH Domestic Hot Water Circulating Pump Data Sheet ................. 1- 1 SH Acid Neutralization Tank Data Sheet ...................................... 1- 1 SH Backflow Preventers Data Sheet .............................................. 1- 1 SH Reverse Osmosis System Data Sheet ....................................... 1- 1 SH Sanitary Sewer Lift Station, Sump Data Sheet ........................ 1- 1 SH Sanitary Sewer Lift Station, Duplex Submersible Grinder
Pump Data Sheet ................................................................... 1- 1 22 40 00 SH Plumbing Fixtures .................................................................... 1- 13
DIVISION 23—HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 05 48 SH Vibration Isolation and Seismic Control for HVAC Piping and Equipment ...................................................................... 1- 12 Supplement:
SH Vibration Isolation Schedule for HVAC Piping and Equipment ...................................................................... 1- 2
23 05 93 SH Testing, Adjusting, and Balancing for HVAC ......................... 1- 6 23 07 00 SH HVAC Insulation ..................................................................... 1- 12 23 09 00 SH Instrumentation and Control Devices for HVAC .................... 1- 16
Supplement:
SH HVAC Controls Sequence of Operation, General Control
Types ..................................................................................... 1- 3 23 09 13 SH HVAC Controls, Field Components, and Instruments ............ 1- 13 23 09 23 SH Direct-Digital Control System for HVAC ............................... 1- 26 23 23 00 SH Refrigerant Piping .................................................................... 1- 8
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 00 01 10 - 7
GRCA 257282
23 31 13 SH Metal Ducts and Accessories ................................................... 1- 30 Supplement:
SH Ductwork Schedule .................................................................. 1- 2 23 31 16.16 KG Thermoset Fiberglass-Reinforced Plastic Ducts and
Accessories ........................................................................... 1- 16 23 34 00 SH HVAC Fans .............................................................................. 1- 19
Supplement:
SH Fans Schedule ......................................................................................... 1- 2
23 37 00 SH Air Outlets and Inlets ............................................................... 1- 3 Supplement:
SH Air Outlets and Inlets Schedule ............................................... 1- 1 23 77 00 SH Air Handling Units ................................................................... 1- 32
Supplements:
SH Air Handling Units Schedule ................................................... 1- 2 SH Make-Up Air Handling Units Schedule ................................... 1- 4
23 81 00 SH Unitary Air-Conditioning Equipment ...................................... 1- 25 Supplements:
SH Split System DX Indoor Units Data Sheet ............................... 1- 1 SH Split System DX Outdoor Units Data Sheet ............................ 1- 1 SH VRF Indoor Unit Schedule Data Sheet .................................... 1- 1 SH VRF Outdoor Unit Schedule .................................................... 1- 1 SH VRF Heat Recovery Branch Circuit Controller ....................... 1- 1 SH Packaged DX Air Conditioning Units Data Sheet ................... 1- 2
23 82 00 SH Terminal Heating and Cooling Units ....................................... 1- 7 Supplements:
SH Unit Heaters ............................................................................. 1- 1 SH Baseboard Unit Heaters ........................................................... 1- 1 SH Duct Heaters............................................................................. 1- 1
DIVISION 24 AND DIVISION 25 (NOT USED)
DIVISION 26—ELECTRICAL
26 05 02 DB Basic Electrical Requirements ................................................. 1- 7 26 05 04 DB Basic Electrical Materials and Methods .................................. 1- 14 26 05 05 DB Conductors ............................................................................... 1- 14 26 05 10 DB Network Communication System ............................................ 1- 27 26 05 26 DB Grounding and Bonding for Electrical Systems ...................... 1- 6 26 05 33 DB Raceway and Boxes ................................................................. 1- 27 26 05 70 DB Electrical Systems Analysis ..................................................... 1- 8
Supplement:
DB Figure 1: Example Arc Flash Label ......................................... 1- 1
26 08 00 DB Commissioning of Electrical Systems ..................................... 1- 24
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 - 8 JUNE 2025
GRCA 257282
26 09 13 DB Power Measurement and Control............................................. 1- 5 26 14 13 DB Switchboards ............................................................................ 1- 9 26 20 00 DB Low-Voltage AC Induction Motors ......................................... 1- 9 26 22 00 DB Low-Voltage Transformers ...................................................... 1- 5 26 24 16 DB Panelboards .............................................................................. 1- 7 26 24 19 DB Low-Voltage Motor Control .................................................... 1- 14 26 27 26 DB Wiring Devices ........................................................................ 1- 10 26 29 23 DB Low-Voltage Adjustable Frequency Drive System ................. 1- 13 26 32 13.13 DB Deisel Engine Generator Set .................................................... 1- 14 26 36 23 DB Automatic Transfer Controller ................................................. 1- 4 26 41 00 DB Facility Lightning Protection ................................................... 1- 7 26 42 01 DE Pipe Bonding ............................................................................ 1- 10
Supplement:
DE Joint Bond Continuity Test Schematic .................................... 1- 1
26 43 00 DB Surge Protective Devices ......................................................... 1- 6 26 50 00 DB Lighting .................................................................................... 1- 13
DIVISION 27 (NOT USED)
DIVISION 28—ELECTRONIC SAFETY AND SECURITY
28 31 00 CKS Fire Alarm And Detection ....................................................... 1- 12
DIVISION 29 AND DIVISION 30 (NOT USED)
DIVISION 31—EARTHWORK
31 10 00 KDA Site Clearing............................................................................. 1- 5 31 21 13 SH Radon Mitigation ..................................................................... 1- 11 31 23 13 KDA Subgrade Preparation .............................................................. 1- 4 31 23 16 KDA Excavation................................................................................ 1- 5 31 23 23 KDA Fill and Backfill ....................................................................... 1- 8 31 23 23.15 KDA Trench Backfill ........................................................................ 1- 11 31 32 19.16 KDA Geotextile ................................................................................. 1- 6 31 37 00 KDA Riprap ....................................................................................... 1- 5
DIVISION 32—EXTERIOR IMPROVEMENTS
32 01 90 CLS Tree and Shrub Preservation .................................................... 1- 6 32 11 23 KDA Aggregate Base and Subbase Course(s) .................................. 1- 7 32 12 16 KDA Asphalt Paving ......................................................................... 1- 13 32 13 13 KDA Concrete Paving ....................................................................... 1- 21 32 16 00 KDA Sidewalks, Curbs, and Gutters ................................................. 1- 5 32 17 23 KDA Pavement Markings ................................................................. 1- 3
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 00 01 10 - 9
GRCA 257282
32 31 13 KDA Chain Link Fences and Gates .................................................. 1- 9 32 32 17 KDA Precast Modular Block Gravity Retaining Wall ...................... 1- 22 32 84 00 CLS Planting Irrigation .................................................................... 1- 16 32 91 13 CLS Soil Preparation ........................................................................ 1- 6 32 92 00 CLS Turf and Grasses ...................................................................... 1- 4 32 93 00 CLS Plants ........................................................................................ 1- 12
DIVISION 33—UTILITIES
33 05 13 KDA Manholes .................................................................................. 1- 14 33 12 17.01 DE Surge Tank ............................................................................... 1- 6 33 12 19 KDA Water Utility Distribution Fire Hydrants ................................. 1- 5 33 16 13.13 WWK Welded Steel Tank ................................................................... 1- 15
Supplements:
WWK Welded Steel Tank Data Sheet ................................................ 1- 1
33 41 01 KDA Storm Drain Piping .................................................................. 1- 5 33 41 01.03 KDA Polyvinyl Chloride (PVC) Data Sheet ..................................... 1- 1 33 44 13.13 KDA Catch Basins............................................................................. 1- 5
DIVISION 34 (NOT USED)
DIVISION 35—WATERWAY AND MARINE CONSTRUCTION
35 20 16.25 DE Fabricated Slide Gates and Stop Gates .................................... 1- 14 Supplement:
DE Slide Gate and Stop Gate Schedule ......................................... 1- 2
DIVISION 36 THROUGH DIVISION 39 (NOT USED)
DIVISION 40—PROCESS INTERCONNECTIONS
40 05 15 DE Piping Support Systems ........................................................... 1- 17 40 05 33 DE Pipe Heat Tracing .................................................................... 1- 6 40 27 00 DE Process Piping—General ......................................................... 1- 27 40 27 00.01 DE Cement-Mortar, Ceramic-Epoxy, and Glass-Lined
Ductile Iron Pipe and Fittings Data Sheet............................. 1- 6 40 27 00.03 DE Carbon Steel Pipe and Fittings—General Service
Data Sheet ............................................................................. 1- 5 40 27 00.08 DE Stainless Steel Pipe and Fittings—General Service
Data Sheet ............................................................................. 1- 4 40 27 00.10 DE Polyvinyl Chloride (PVC) Pipe and Fittings Data Sheet ......... 1- 3 40 27 00.11 DE Chlorinated Polyvinyl Chloride (CPVC) Pipe and Fittings
Data Sheet ............................................................................. 1- 3
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 - 10 JUNE 2025
GRCA 257282
40 27 00.13 DE Copper and Copper Alloy Pipe, Tubing, and Fittings Data Sheet ............................................................................. 1- 2
40 27 00.14 DE Perforated Polyvinyl Chloride (PVC) Pipe and Fittings Data Sheet ............................................................................. 1- 1
40 27 00.19 DE Chemical Piping, Tubing, and Fittings Data Sheet .................. 1- 3 40 27 00.21 DE High Density Polyethylene (HDPE) Pressure Pipe and
Fittings Data Sheet ................................................................ 1- 4 40 27 00.23 DE Polyvinyl Chloride (PVC – AWWA C900) Pipe and and Fittings Data Sheet ......................................................... 1- 3 40 27 01 DE Process Piping Specialties........................................................ 1- 18 40 27 02 DE Process Valves and Operators .................................................. 1- 41 40 42 13 DE Process Piping Insulation ......................................................... 1- 8
Supplement:
DE Service and Insulation Thickness Table .................................. 1- 1
40 80 01 DE Process Piping Leakage Testing .............................................. 1- 4 40 90 00 AW Instrumentation and Control for Process Systems ................... 1- 39
Supplements:
AW Instrument List ......................................................................... 1- 3 AW Input/Output List ...................................................................... 1- 12 AW Process Control Narrative – Overview .................................... 1-129 AW Preparation for Testing and Functional Test Forms ................ 1- 3 AW Performance Test Sheet - Example .......................................... 1- 1
40 91 00 AW Instrumentation and Control Components ............................... 1- 52 40 92 01 AW Control Panels .......................................................................... 1- 10
Supplement:
AW Control Panel Schedule ............................................................ 1- 1
40 96 00 AW Applications Software .............................................................. 1- 22 40 99 90 AW Package Control Systems ......................................................... 1- 36
DIVISION 41—MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 23.19 DE Monorail Hoists ....................................................................... 1- 9 Supplements:
DE Headworks Monorail Hoist Data Sheet ................................... 1- 1 DE Headworks Monorail Hoist Dimension Sheet ......................... 1- 1 DE Membrane Tank Monorail Hoist Data Sheet ........................... 1- 1 DE Membrane Tank Monorail Hoist Dimension Sheet ................. 1- 1 DE Digester Facility Monorail Hoist Data Sheet ........................... 1- 1 DE Digester Facility Monorail Hoist Dimension Sheet ................. 1- 1 DE Reclaimed Water Pump Monorail Hoist Data Sheet .................1 1 DE Reclaimed Water Pump Monorail Hoist Dimension Sheet ..... 1- 1
DIVISION 42 (NOT USED)
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 00 01 10 - 11
GRCA 257282
DIVISION 43—PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND
STORAGE EQUIPMENT
43 22 56.01 CL Submersible Mixers ................................................................. 1- 6 43 22 56.02 CL Vertical Mixers ........................................................................ 1- 10
Supplements:
CL Digester Mixers 1, 2, 3, and 4 Data Sheet ............................... 1- 1 CL Digester Mixers 1, 2, 3, and 4 Induction Motor Data Sheet .... 1- 1
43 32 56 RT Membrane Equipment System (Membrane Bioreactor) .......... 1- 41 43 40 01 RT Polyethylene Storage Tank ...................................................... 1- 10
DIVISION 44—POLLUTION AND WASTE CONTROL EQUIPMENT
44 42 19.04 RT Rotary Positive Displacement Blower ..................................... 1- 16 44 42 28 RT Weir and Baffle Plates ............................................................. 1- 6 44 42 30 DE Inclined Rotating Drum Screens .............................................. 1- 21 44 42 31 DE Septage Receiving System ....................................................... 1- 14 44 42 35 CL Floating Decanters ................................................................... 1- 5 44 42 40 DE Grit Concentrator ..................................................................... 1- 6 44 42 41 DE Grit Washing and Dewatering Unit ......................................... 1- 7 44 42 48.04 DE Automatic Composite Sampler (Refrigerated, Peristaltic Type) .................................................................... 1- 10 44 42 56.04 DE Submersible Pumps .................................................................. 1- 9
Supplements:
DE WAS Pump 1 and WAS Pump 2 Data Sheet ........................... 1- 2 DE Tank Drain Pump 1 and Tank Drain Pump 2 Data Sheet ........ 1- 2 DE Plant Drain Pump 1 and Plant Drain Pump 2 Data Sheet ........ 1- 2
44 42 56.09 DE Non-Clog Dry-Pit Centrifugal Pumps ..................................... 1- 10 Supplement:
DE RAS Pumps 1, 2, 3, and a Spare Data Sheet ............................ 1- 3 44 42 56.11 DE Vertical Inline Multistage Centrifugal Pumps ......................... 1- 7
Supplements:
DE RW Pumps Data Sheet ............................................................. 1- 3 DE RW Pumps Motor Data Sheet .................................................. 1- 1
44 42 56.13 DE Progressing Cavity Pumps ....................................................... 1- 6 Supplement:
DE Digester 1 Sample Pump and Digester 2 Sample Pump DE Data Sheet ............................................................................. 1- 2
44 42 56.14 RT Lobe Pumps ............................................................................. 1- 10 Supplements:
RT Permeate Pump Data Sheet ...................................................... 1- 2 RT Pump Drive Induction Motor Data Sheet ................................ 1- 1
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 - 12 JUNE 2025
GRCA 257282
44 42 56.18 DE Horizontal Self-Priming Centrifugal Pumps ............................ 1- 8 Supplement:
DE Grit Pump and Grit Pump Spare Data Sheet ............................ 1- 2 44 44 13.01 RT Chemical Metering Pumps ....................................................... 1- 10
Supplements:
RT Magnesium Hydroxide Pumps 1 and 2 Data Sheet ................. 1- 2 RT Supplemental Carbon Pumps 1, 2, 3, and 4 Data Sheet ........... 1- 2 RT Citric Acid Pumps 1 and 2 Data Sheet..................................... 1- 2 RT Sodium Hypochlorite Pumps 1 and 2 Data Sheet .................... 1- 2 RT Sodium Hypochlorite Pumps 3 and 4 Data Sheet .................... 1- 2
44 44 73 RT Ultraviolet Disinfection Equipment for Wastewater ............... 1- 35 44 45 13.11 KG Package Biofilter System ......................................................... 1- 15 44 45 16.02 CL Fine Bubble Air Diffuser System ............................................ 1- 17 44 46 30 DE Miscellaneous Mechanical Equipment .................................... 1- 12
DIVISION 45 THROUGH DIVISION 49 (NOT USED)
VOLUME 2
DRAWINGS
VOLUME 3
STANDARD DETAILS
END OF SECTION
SPECIFICATIONS
PW\JA\D3167666\4\42 SUMMARY OF WORK
JUNE 2025 01 11 00 - 1
GRCA 257282 REV. 05/11/2021
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Work Covered by Contract Documents.
2. Work Phases.
3. Materials and Work by Others.
4. Work Under Other Contracts.
5. Government-Furnished Materials.
6. Contractor Use of Site.
7. Public Use of Site.
8. Occupancy Requirements for Buildings.
9. Conduct of Operations.
10. Work Restrictions.
11. Special Construction Requirements.
12. Soils Investigation Report.
13. Additional Reports.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: Grand Canyon National Park, Arizona, in South Rim Village at South Rim Wastewater Treatment Plant (WWTP).
B. The Work required in the base scope as described in Section 01 27 00, Definition of Contract Line Items, include the following scope as described herein but not limited to:
1. South Rim WWTP replacement to include the following:
a. Site preparation, including tree protection, tree removal and grubbing of previously undisturbed areas outside of existing WWTP fence line.
b. Relocation of existing on-site metal storage containers and existing storage sheds contents into temporary off-site storage containers.
c. Temporary process facilities and relocations.
d. New 0.65 million gallons per day (mgd) treatment processes constructed at the existing plant site including: headworks building, septage receiving station, process building, process tanks, equalization tank, reclaimed water tank, digester facility, drying beds, compost facility, odor control facility, plant drain pump station.
e. New administration building, maintenance building, and covered storage.
f. New emergency generator with integral fuel tank.
SUMMARY OF WORK PW\JA\D3167666\4\42
01 11 00 - 2 JUNE 2025
REV. 05/11/2021 GRCA 257282
g. Modifications to existing backwash holding pond to convert it to stormwater pond.
h. New site yard piping and site utilities.
i. Utility connections and tie-ins to existing influent sewer, effluent discharge pipeline, reclaimed water piping and potable water.
j. New site power and electrical.
k. New instrumentation and process control systems.
l. New site grading, landscaping and paving.
m. Site fencing.
n. Chemicals and consumables required for WWTP equipment testing, facility start-up and demonstration.
2. South Rim WWTP demolition of existing facilities, disposal of demo materials and site restoration to include the following:
a. Existing on-site temporary storage sheds.
b. Existing control building, pretreatment / digester building, aeration tanks and pipe gallery, secondary clarifiers, flow equalization tanks, drying beds, reclamation plant, backwash holding pond.
c. Yard piping, utilities and site electrical.
3. South Rim WWTP new treatment facilities operation and maintenance for a 12-month period as described in Section 01 78 25, Operations and Maintenance Support Services.
4. Improvement of existing two track access road from APS Substation located at the west terminus of Clinic Road to South Rim WWTP and construction of a road extension to new SR WWTP west access gate, to include the following:
a. Site preparation, including tree removal and grubbing of previously undisturbed areas along proposed road alignment.
b. Erosion control.
c. Environmental, cultural and archeological mitigation.
d. Installation of culvers.
e. Manhole adjustments.
f. Grading, installation of aggregate base and asphalt concrete pavement.
g. Site restoration, seeding/mulching.
C. The optional work items as described in Section 01 27 00, Contract Line Items, include the following work:
1. Field services for testing passive radon gas mitigation systems in new buildings according to Section 31 21 13, Radon Mitigation – Option A.
2. Install active radon gas mitigation system in new buildings, if based on testing it is determined necessary to reduce and maintain radon concentration, as specified in Section 31 21 13, Radon Mitigation, and shown on Drawings – Option B.
JUNE 2025 01 11 00 - 3
GRCA 257282 REV. 05/11/2021
D. Project will be constructed under a single prime Contract. Government will take Beneficial Occupancy of certain Project elements as they are completed, prior to Substantial Completion of the Work as a whole.
E. Warranties on Contractor workmanship and materials, and Manufacturer/Supplier warranties on equipment and performance for period not less than 1 year from the date of Substantial Completion.
1.3 WORK PHASES
A. The Work shall be conducted in three phases in the following order, with each phase substantially complete before beginning next phase, unless otherwise approved by the Contracting Officer. Refer to the Drawings for a visual representation of the construction areas, temporary facilities, demolition and phasing. Refer to Section 01 91 14, Equipment Testing and Facility Startup, for additional information on treatment facility startup sequence and requirements. Refer to Section 01 91 15, Total Building Commissioning, for additional information on building and building systems startup requirements. Additional steps and phasing will be required and it is the responsibility of the Contractor to develop a complete work sequencing approach which must be approved by the Contracting Officer.
B. Access Road Improvements
1. Construct minimum improvements to existing two track road needed to facilitate access for Contractor staff, and materials and equipment deliveries to the project site on a year-round basis during South Rim WWTP construction.
2. Maintain access road for Contractor use during construction.
3. Work should be substantially complete and ready for occupancy at time of
Substantial Completion.
C. South Rim WWTP Phase 1:
1. Complete process relocations and install temporary facilities.
2. Complete relocation of contents of temporary storage sheds to off-site temporary storage and demolition.
3. Relocate existing metal storage containers.
4. Remove trees, clear and grub site for new treatment facilities.
5. Construct new liquid and solids wastewater treatment facilities in areas not currently occupied by existing treatment facilities, including headworks building, septage receiving station, process building, process tanks, reclaimed water tank, digester facility, drying beds, plant drain pump station.
6. Construct administration building.
7. Construct exterior covered storage adjacent to administration building.
8. Install new primary power connection and install emergency generator.
9. Complete site grading, paving, and fencing.
10. Complete startup testing and commissioning of constructed buildings and wastewater treatment facilities, complete tie-ins, demonstrate performance.
01 11 00 - 4 JUNE 2025
REV. 05/11/2021 GRCA 257282
11. Obtain acceptance of Phase 1 work by the Government.
12. Assume 12-month operation and maintenance of new treatment facilities. Refer to Section 01 78 25 Operation and Maintenance Support Services.
13. Transition operation from existing wastewater treatment facilities to new treatment facilities.
14. Work within the South Rim WWTP Site shall be performed to minimize impacts to the operation and maintenance of the existing treatment facilities.
Completion of this phase is required before proceeding with Phase 2.
D. South Rim WWTP Phase 2:
1. Cleanout wastewater, sludges, and any remaining process fluids and residues from existing treatment facilities and basins.
2. Decommission and demolish existing buildings and treatment facilities, install structural backfill and restore area to grade.
E. South Rim WWTP Phase 3:
1. Construct maintenance building, adjacent covered storage, and parking area in location of previously demolished drying beds.
2. Construct compost facility in location of previously demolished clarifiers and control building.
3. Construct odor control facility.
4. Complete stormwater pond conversion.
5. Complete remaining site restoration, paving and landscaping.
6. Complete startup testing, commissioning and integration of facilities constructed in this phase. Demonstrate performance.
7. Obtain acceptance of Phase 3 work by the Government.
8. The remaining Work shall be substantially complete and ready for occupancy at time of Substantial Completion.
1.4 MATERIALS AND WORK BY OTHERS
A. Work depicted in the Contract Documents will be procured by Government and performed by others. The work will be conducted simultaneously with work under this Contract and require Contractor coordination to ensure efficient and timely completion of Work.
1. South Rim WWTP PLC and SCADA Integration: A separate contract will be awarded to Process Control System Integrator (SI) to perform the following work as part of and in support of South Rim WWTP Replacement project:
a. Programming and configuration of the main Plant PLCs and SCADA system.
b. Acquiring and providing the necessary PLC and SCADA software licenses for the South Rim WWTP.
JUNE 2025 01 11 00 - 5
GRCA 257282 REV. 05/11/2021
c. Conducting software integration workshops to finalize the control narratives for programming the main Plant PLCs and SCADA system.
d. Participating and contributing to the software integration workshops with the packaged system vendors to finalize the programming requirements for the vendor systems and the main Plant PLCs.
e. Developing submittals for the draft and final control narratives prior to programming the main Plant PLCs and SCADA system.
f. Testing (Factory Acceptance, Field testing and commissioning) of the main plant PLCs and SCADA software.
g. Coordinating the software integration workshops and submittals with the Park Service and the General Contractor for this Project.
h. Provide training for the main plant PLCs and SCADA programs.
i. Provide warranty and support for the main plant PLCs and SCADA software and hardware.
j. Develop O&Ms and loop (interconnect) drawings for the plant control system.
2. Arizona Public Service (APS). Power utility connection
a. APS will provide new primary feeder to the SR WWTP CT Cabinet in a trench and conduit provided by Contractor.
b. APS will install Current Transformer (CT) meter in the allocated section of the switchboard.
c. Contractor Coordination: Contractor shall submit product information to Contracting Officer for the CT Cabinet enclosure for review by APS prior to ordering materials and coordinate in a timely fashion with APS to allow for design and installation of primary feeder.
1.5 WORK UNDER OTHER CONTRACTS
A. General: Cooperate with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract.
Coordinate Work of this Contract with work performed under separate contracts.
B. Existing NPS Operations: Contractors work area is adjacent to and within existing wastewater treatment facility. Contractor shall coordinate construction activities with NPS Operations as to not interfere with plant operations. NPS Operations will have final authority to stop construction work during operational emergencies.
01 11 00 - 6 JUNE 2025
REV. 05/11/2021 GRCA 257282
C. Preceding Work: Government has awarded separate contract(s) for the following construction operations at or near the Project Site. Those operations are scheduled to be substantially complete before work under this Contract begins.
1. GRCA 190083 Replace Transcanyon Waterline and Improve Potable Water Systems:
a. A separate contract has been awarded to improve various potable water treatment and conveyance facilities throughout the Park. The improvements are outside of South Rim WWTP Project Site and include:
1) Construct new South Rim Water Treatment Plant (WTP) with a production capacity of 1.8 million gallons per day (mgd) on South Rim.
2) Construct new Phantom Ranch WTP with production capacity of
1.0 mgd.
3) Rehabilitate existing Transcanyon Waterline (TCWL).
4) Rehabilitate existing Bright Angel Water Supply Pipeline.
5) Replace existing Havasupai Gardens potable water supply.
6) Construct Indian Garden Pump Station.
D. Concurrent Work: Government has awarded separate contract(s) for the following construction operations at or near Project Site. Those operations will be conducted simultaneously with work under this Contract.
1. GRCA 250440 Shuttle Bus Maintenance Facility:
a. A separate contract has been awarded to construct a new bus maintenance facility in the general vicinity of the Contract Support Facilities Area 2.b as described below. Expect common use of the access road to Area 2.b.
2. GRCA 318719 North Rim Utilities:
a. Construction of new wastewater and water treatment plants, water and sewer and water pipelines on the North Rim of Grand Canyon. Contract will require helicopter activity from the South Rim helicopter base located to southeast of project site and access via the Contractor Support Facility Area 2.b as described below.
E. Future Work: Government will award separate contract(s) for the following additional work to be performed at Site after Substantial Completion. Completion of that work will depend on successful completion of preparatory work under this Contract.
1. None.
JUNE 2025 01 11 00 - 7
GRCA 257282 REV. 05/11/2021
1.6 GOVERNMENT-FURNISHED MATERIALS
A. In case of Government-furnished materials:
1. Government will arrange and pay for delivery of Government-furnished items according to Contractor’s Construction Schedule.
2. Contractor is responsible for initial inspection, receiving, unloading, and handling Government-furnished items at Project Site.
3. Government will inspect delivered items for damage after delivery. Contractor shall be present for and assist in Government’s inspection.
4. Government will arrange for replacement if Government-furnished items are damaged, defective, or missing.
5. Contractor is responsible for protecting Government-furnished items from damage during storage and handling, including damage from exposure to the elements.
6. If Government-furnished items are damaged as a result of Contractor’s operations, Contractor shall repair or replace them.
7. Contractor shall install and otherwise incorporate Government-furnished items into Work.
B. Government-Furnished Materials:
1. Hydroseed, as shown on the Landscape Drawings.
2. Landscape vegetation, as shown on the Landscape Drawings.
1.7 CONTRACTOR USE OF SITE
A. General: Contractor shall have limited use of site for construction operations. Limit use of premises to work in areas indicated on the Drawings. Do not disturb portions of Project Site beyond areas in which the Work is indicated.
1. Limits: Confine constructions operations to areas of existing South Rim WWTP and within Limits of Construction noted on the Drawings.
This is the start of the file's text. The full file is on GovTribe.