B09_Amendment_05_GRCA257282_FinalCD_Addendum_02_SCADA_wSeal_0005.pdf
PDF 6 MB Posted
- Solicitation number
- 140P2026R0101
About this file
This is Amendment 05 Addendum 02 to the 100% Complete Construction Documents for the Replace Wastewater Plant South Rim Village project (GRCA-257282), prepared by Jacobs Engineering Group for the National Park Service.
The addendum addresses minor updates resulting from a SCADA (Supervisory Control and Data Acquisition) system review completed by HDR in June 2025. Revisions are presented in markup format showing additions in red, deletions in green, and notes in blue. The document includes updates to 11 instrumentation and control network diagram drawings (sheets 7, 133-138, 140-144) and modifications to multiple specifications across divisions, including: Section 01 11 00 (Summary of Work with new paragraph 1.15 on System Integration Roles); Section 01 81 33 (Cyber Security Requirements with new requirements for NPS-provided laptops for programming); Section 40 90 00B (Instrument and Control for Process Systems, removing application software section and adding cyber security submittal requirements); Section 40 91 00B (Instrumentation and Control Components, revising server hardware and adding programming laptop section); and updated cyber security compliance requirements in Sections 40 99 90I, 43 32 56I, 44 42 31S, 44 42 41B, 44 44 73I, and 44 45 13I for various package control systems and equipment. No revisions to standard details are included. These updates will be incorporated into conformed contract documents following project award. The construction documents are dated September 8, 2026, under Contract No. 140P2023D0006, Task Order No. 140P2023F0235.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Park Service
Replace Wastewater Plant South Rim Village
GRCA-257282
100% Complete Construction Documents Addendum 2
September 8, 2026
Prepared by:
Jacobs Government Services Company
Greenwood Village, CO
Contract No. 140P2023D0006
Task Order No. 140P2023F0235
GRCA 257282 – 100% Complete CD: Addendum 02
Jacobs Engineering Group Inc. 2
1. Addendum Contents
This addendum addresses comments from the SCADA review of the 100% Final Construction Documents for the Replace Wastewater Plant South Rim Village project, dated June 2025, which was completed by
HDR. The comments form and responses to comments have been transmitted to NPS separately. The comments resulted in minor updates to drawings, specifications and standard details. Revised documents are listed below and attached. Revisions are captured in markup format showing additions in red, deletions in green and notes in blue. Revised documents are listed below and attached. Revised documents will ultimately be incorporated into conformed contract documents after project award.
1.1 Revisions to Drawings
New or
Updated
Sheet No. DWG No. Sheet Name Description
Updated 7 01N0001 Instrument and Control Legend Sheet
Updated 133 09N0002 Instrument and Control Facility 10 Network Diagram
Updated 134 09N0003 Instrument and Control Facility 20 Network Diagram
Updated 135 09N0004 Instrument and Control Facility 80 Network Diagram
Updated 136 09N0005 Instrument and Control Facility 32 Network Diagram
Updated 137 09N0006 Instrument and Control Facility 32 MCC Network Diagram
Updated 138 09N0007 Instrument and Control Facility 12 Network Diagram
Updated 140 09N0100 Instrument and Control Facility 10 Server Rack Layout
Updated 141 09N0101 Instrument and Control Facility 20 PLC Panel Layout
Updated 142 09N0102 Instrument and Control Facility 32 PLC Panel Layout
Updated 143 09N0103 Instrument and Control Facility 80 PLC Panel Layout
Updated 144 09N0104 Instrument and Control Facility 12 Network Interface Panel
1.2 Revisions to Standard Details
New or
Updated
Standard
Detail No.
Name Description
None
GRCA 257282 – 100% Complete CD: Addendum 02
Jacobs Engineering Group Inc. 3
1.3 Revisions to Specifications
New or
Updated
Specification
No.
Name Description
Updated 01 11 00I Summary of Work Addes paragraph 1.15 System Integration Roles
Updated 01 81 33 Cyber Security
Requirements
Added paragraph 2.01 A requiring NPS provided laptops to be used for programming
Updated 40 90 00B Instrument and Control for
Process Systems
Revised Section 1.01 B Major Work Items – removed application software section
Added cyber security submittal requirements
Updated 40 91 00B Instrument and Control
Components
Revised Section 2.06 B Server Hardware Added
Section 2.06 I Programming Laptop
Updated 40 99 90I Package Control Systems Added requirements to comply with Section 01 81
33 Cyber Security Requirements
Updated 43 32 56I Membrane Equipment
System
Added requirements to comply with Section 01 81
33 Cyber Security Requirements
Updated 44 42 31S Septage Receiving System Added requirements to comply with Section 01 81
33 Cyber Security Requirements
Updated 44 42 41B Grit Washing and
Dewatering
Added requirements to comply with Section 01 81
33 Cyber Security Requirements
Updated 44 44 73I Ultraviolet Disinfection
Equipment for Wastewater
Added requirements to comply with Section 01 81
33 Cyber Security Requirements
Updated 44 45 13I Package Biofilter System Added requirements to comply with Section 01 81
33 Cyber Security Requirements
P L
O T D
A T
E
P L
O T T
IM
E
/1
/2
:1
:4
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V i
06/2025 401
VILLAGE, CO
GREENWOOD
COMPANY
SERVICES
GOVERNMENT
JACOBS
PMIS/PKG NO.
257282
D S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \G
E N \0
N
D .d g n
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
LINE LEGEND
INTERFACE SYMBOLS
SELF CONTAINED VALVE &
EQUIPMENT TAG NUMBERS
INSTRUMENT IDENTIFICATION
EXAMPLE SYMBOLS
SPECIAL CASES
ANALYZERS
FIELD MOUNTED INSTRUMENT
PANEL MOUNTED INSTRUMENT
ON AND OFF EVENT LIGHTS
UVT
TURB
TSS
PH
ORP
NO3
LEL
INT
DO
CL
= AIR RELEASE VALVE
= AIR AND VACUUM RELEASE VALVEAVRV
= GATE
= EJECTOR
= LEVEL CONTROL VALVE
= FLOW CONTROL VALVE
E
FCV
G
LCV
= MECHANICAL EQUIPMENT
= PUMP
= PRESSURE CONTROL VALVE
= RUPTURE DISK
= PRESSURE RELIEF VALVE
= TANK
M
P
PCV
PSE
PSV
T
= TEMPERATURE CONTROL VALVE
= UNIT PROCESS NUMBER
= LOOP NUMBER
= UNIT NUMBER
TCV
W
X
Y
ARVD:
N N
CONTINUATION N=1,2,3,ETC
PROCESS OR SIGNAL LINE
EXTERNAL PROCESS
INTERFACE TO OR FROM
WAS
WA D
W
A
D
S
= DESTINATION DRAWING NO.
= SOURCE DRAWING NO.
= SOURCE UNIT PROCESS NO. (1 OR 2 DIGITS)
= INTERFACE NO. (2 DIGITS)
= PROCESS INTERFACE
= SIGNAL INTERFACE
CONNECTING LINES
PROCESS (OPEN CHANNEL)
PULSE FREQUENCY SIGNAL
PNEUMATIC SIGNAL
FILLED SYSTEM SIGNAL
HYDRAULIC SYSTEM SIGNAL
PULSE DURATION SIGNAL
NETWORK
LINES
NON-CONNECTING
REPRESENTED)
SIGNALS
THE NUMBER OF
NUMBER INDICATES
(PARENTHETICAL
PARALLELING LINES
FACILITY BOUNDARY
BUILDING OR
(4 TO 20 mAdc, ETC.)
ANALOG SIGNAL
(ON/OFF, ETC.)
DISCRETE SIGNAL
PF
PD
(3)
(3)
(8)
ALTERNATE FLOW STREAM)
DASHED LINE INDICATES
PROCESS (CLOSED CONDUIT,
DESIGNATIONS)
SETS OF UNITS WITH THE SAME W-X
SET NUMBER (USED WHEN THERE ARE MULTIPLE
CLARIFYING ABBREVIATIONS
UNITS WITH THE SAME W DESIGNATIONS)
UNIT NUMBER (USED WHEN THERE ARE MULTIPLE
LOOP NUMBER
ET
DISCRETE POINT
ANALOG POINT
ABBREVIATIONS
FIBER OPTICFO MB
E ETHERNET
MODBUS
? 9# - POSITION
? 8# - ANALYTICAL
? 7# - FLOW
? 6# - PRESSURE
? 5# - LEVEL
• 5-9 - INTRUMENTATION
• 2-4 - AUXILIARY ELEMENTS
• 1 - MAIN PROCESS ELEMENT
• 0 - OVERVIEW- NO INSTRUMENTATION
? T - TYPE
• NUMBER DESIGNATION BASED ON PROCESS COMPLEXITY
• 100 TO 999, 10-99, 1-9
? PPP - PROCESS NUMBERING SCHEME
? A - AREA NUMBER
• TYPICALLY, 2-TO-6-DIGIT NUMBER BASED ON PROCESS COMPLEXITY.
2. APPPT#-LOOP NUMBERING
1. XXX - PREFIX PER ISA 5.1 IS A STANDARD FOR INSTRUMENT PREFIXES THAT INDICATE A CODE OF EQUIPMENT.
? ZZZ- SUFFIX
? APPPT#-- LOOP NUMBER
? XXX- PREFIX
• XXX-APPPT#-ZZZ
P&ID TAG NUMBER CONSISTS OF 3 MAIN PARTS.
LIGHTS
OPENED AND CLOSED POSITION
SWITCHES
OPENED AND CLOSED POSITION
POWER AFTER POWER FAILURE).
DEVICE WILL RESTART ON RETURN OF
CONTACT SWITCH (CONTROLLED
ON-OFF HAND SWITCH. MAINTAINED
OF POWER AFTER POWER FAILURE)
DEVICE WILL NOT RESTART ON RETURN
CONTACT SWITCHES (CONTROLLED
STOP-START HAND SWITCH MOMENTARY
MOUNTED ANNUNCIATOR
ANNUNCIATOR WINDOW IN PANEL
MOUNTED ANNUNCIATOR
COMMON ALARM OUTPUT OF PANEL
MOMENTARY CONTACT SWITCHES.
OPEN-CLOSE HAND SWITCH.
MAINTAINED CONTACT SWITCHES.
OPEN-STOP-CLOSE HAND SWITCH.
MAINTAINED CONTACT SWITCHES.
LOCAL-REMOTE HAND SWITCH.
NOTE 5
ETHERNET POINT
GENERAL SHEET NOTES
ETHERNET/IP, OR DO-MORE ETHERNET RIO.
COVERS BUT NOT LIMITED TO MODBUS TCP/IP, 5.
STARTER BUCKETS WILL HAVE ON/OFF LIGHTS.
ALTHOUGH NOT SHOWN ON P&ID/S, ALL MCC 4.
PROJECT.
ALL OF THIS INFORMATION MAY BE USED ON THIS
THIS IS A STANDARD LEGEND. THEREFORE, NOT 3.
UNDER DIVISION 26, ELECTRICAL.
DOUBLE ASTERISK ( ) ARE TO BE PROVIDED
COMPONENTS AND PANELS SHOWN WITH A 2.
PACKAGE SYSTEM.
ASTERISK ( ) ARE TO BE PROVIDED AS PART OF A
COMPONENTS AND PANELS SHOWN WITH A SINGLE 1.
ULTRAVIOLET TRANSMITTANCE
TURBIDITY
TOTAL SUSPENDED SOLIDS
POTENTIAL OF HYDROGEN
OXYDATION REDUCTION POTENTIAL
NITRATE
LOWER EXPLOSIVE LIMIT
ULTRAVIOLET INTENSITY
DISSOLVED OXYGEN
FREE CHLORINE RESIDUAL
D THOMAS
D ATURALIYE
AND CONTROL
LEGEND
J BOSS INSTRUMENTATION
GENERAL
01N0001
ZS
ZI
ZCS
ZCO
ZCC
YL
XC
WST
WIT
WI
VT
VI
VFD
V
UV
UA
TSL
TSH
TK
TIT
TI
TE
TAH
SW
SV
STR
SP
SMP
SLG
SI
SG
SCN
SCL
SC
SC
RW
RDT
PW
PSL
PSH
PRV
PMP
PMP
PIT
PT
PI
PE
PB
PAH
PAL
NI
NE
NC
MX
MSH
MEM
MAH
M
LT
LSLL
LSL
LSHH
LSH
LIT
LI
LE
LCP
LAL
LAHH
LAH
KGV
JL
INT
HYPO
HSR
HSA
HS
HCL
FV
FT
FSH
FS
FQI
FL
FIT
FI
FE
FCV
FBD
FAH
ETM
ESEW
ES
EEW
DRY
CTR
CMP
CKV
CIT
CA
B
AVRV
ARV
AIT
AI
AE
ACP
PREFIX
NO
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
NO
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
NO
PROCESS
YES
YES
YES
YES
NO
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
NO
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
NO
INSTRUMENTATION
DI
AI
DO
DO
DO
NO
DO
N/A
AI
AI
N/A
AI
N/A
N/A
N/A
N/A
DI
DI
N/A
AI
AI
N/A
DI
N/A
N/A
N/A
N/A
N/A
N/A
AI
N/A
N/A
N/A
N/A
AO
N/A
N/A
N/A
DI
DI
N/A
N/A
N/A
AI
AI
N/A
N/A
N/A
N/A
N/A
DI
DO
DI
N/A
DI
N/A
N/A
N/A
AI
DI
DI
DI
DI
AI
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
DI
DI
N/A
N/A
N/A
AI
DI
N/A
DI
N/A
AI
N/A
N/A
N/A
N/A
N/A
N/A
N/A
DI
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
AI
N/A
N/A
N/A
I/O
POSITION SWITCH
POSITION INDICATOR
POSITION COMMAND STOP
POSITION COMMAND OPEN
POSITION COMMAND CLOSE
RUNNING
START/STOP COMMAND
WASTE
WEIGHT INDICATING TRANSMITTER
WEIGHT INDICATOR
VIBRATION TRANSMITTER
VIBRATION INDICATOR
VARIABLE FREQUENCY DRIVE
VALVE
ULTRAVIOLET
MULTIVARIABLE ALARM
TEMPERATURE SWITCH LOW
TEMPERATURE SWITCH HIGH
TANK
TEMPERATURE INDICATING TRANSMITTER
TEMPERATURE INDICATOR
TEMPERATURE EMITTER
TEMPERATURE ALARM HIGH
SOFTENED WATER
SOLENOID VALVE
STRAINER (MANUAL)
SUMP PUMP
SUMP
SLUDGE
SPEED INDICATION
SLIDE GATE
SCREEN
WEIGHT SCALE
SLUDGE COLLECTOR
SPEED COMMAND
RAW WATER
ROTARY DRUM THICKENER
PERMEATE WATER
PRESSURE SWITCH LOW
PRESSURE SWITCH HIGH
PRESSURE REGULATING/RELIEF VALVE
PUMP
AUX. PUMP (i.e. CHEM INJECTION)
PRESSURE INDICATING TRANSMITTER
PRESSURE TRANSMITTER
PRESSURE INDICATION
PRESSURE ELEMENT
PUSHBUTTON
PRESSURE ALARM HIGH
PRESSURE ALARM LOW
RUN STATUS
RUN ENABLE
GENERATOR CALLED TO RUN
MIXER
MOISTURE INDICATION HIGH
MEMBRANE
MOISTURE ALARM HIGH
MOTOR
LEVEL TRANSMITTER
LEVEL SWITCH LOW LOW
LEVEL SWITCH LOW
LEVEL SWITCH HIGH HIGH
LEVEL SWITCH HIGH
LEVEL INDICATING TRANSMITTER
LEVEL INDICATION
LEVEL ELEMENT
MASTER CONTROL PANEL
LEVEL ALARM LOW
LEVEL ALARM HIGH HIGH
LEVEL ALARM HIGH
KNIFEGATE VALVE
POWER TRANSMITTER
UV INTENSITY
SODIUM HYPOCHLORITE
HAND SWITCH REMOTE
HAND SWITCH AUTO
HAND SWITCH
HYDROCHLORIC ACID
AUTOMATED OPEN/CLOSE VALVE
FLOW TRANSMITER
FLOW SWITCH HIGH
FLOW SWITCH
FLOW TOTALIZE INDICTOR
FLOCCULATORS
FLOW INDICATING TRANSMITTER
FLOW INDICATOR
FLOW ELEMENT
AUTOMATED MODULATING FLOW CONTROL VALVE
FINE BUBBLE DIFFUSION SYSTEM
FLOW ALARM HIGH
ELAPSE TIMER METER
EYE WASH SHOWER-EYE WASH
ELECTRICAL SWITCH
EMERGENCY EYE WASH
DRYER
MOTOR CYCLE COUNTER
COMPRESSOR
CHECK VALVE
CITRIC ACID SYSTEM
COMPRESSED AIR
BLOWER
AIR/VACUUM COMBO RELEASE VALVE
AIR RELEASE VALVE
ANALYTICAL INDICATING TRANSMITTER
ANALYTICAL INDICATOR
ANALYTICAL ELEMENT
ACCESS CONTROL PANEL
DESCRIPTION
D-W-X-Y
XXX
AIT
OC
ZS
HS
OO
HS
SS
YA
ANN
ANN
YA
ZL
OC
YL
OO
YL
TT
FIT
WWW-XY
LR
HS
HS
HS
OC
OSC
NO SCALE
-0
4-
AW032405
Snapshot
O T D
A T
E
P L
O T T
IM
E
/1
/2
:1
:1
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \I
C \0
N
D .d g n
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
FOFO FO FO FO FO FOFO
E
E
E
E
E
E E
E
E E
E
E
E
EE
E
EE
E E
E
E
E
E
E
E
E
EE
120V
GENERAL SHEET NOTES
STRATIX
E E
E E
E
EE
F O
F O
F O
F O
F O
F O
FACILITY 10 ADMIN BUILDING
NIP-1002
SWITCH
BUSINESS
SWITCH
SCADA
CNSW-1001
PROCESS LAB
0109N0007
FROM FACILITY 12
SHEET NOTES
02 09N0003
TO FACILITY 20
F O
F O
BNSW-1001
STRATIX
24 STRAND SMFO
FPP-1001A FPP-1001B
F O
FO FO FO
CPP-1001
NIP-1001
POE POE POE POE
24 STRAND SMFO
SCADA WORKSTATION
I&C SHOP
101081010810107 10109 10110 10107
FPP-1002
E
OFFICE
SUPERVISOR'S
ROOM
MULTI PURPOSETYP
NOTE 1,
E E E E
E E
SCADA WORKSTATION
SUPERVISOR'S
OFFICE
SUPERVISOR'S
LAB
PROCESS
SCADA MONITOR
LARGE TV
SHOP
I&C
SCADA WORKSTATION
PROCESS LAB
SCADA MONITOR
LARGE TV
FIBER-OPTIC LOOP
SOUTH RIM
POWER METER
PANELBOARD
10-LP-01
10-DPM-01
24 STRAND SMFO
FOFO
A WILLIAMS
A ELLIS
NETWORK DIAGRAM
J BOSS COMMUNICATION
I&C
09N0002
NO SCALE
REFERENCE 01E0002 FOR DETAILS.1.
POWER OVER ETHERNET- POE
NETWORK INTERFACE PANEL-NIP
FIBER PATCH PANEL- FPP
MODBUS TCP-MB
FIBER PATCH CABLE SINGLE MODE- FPC SM
CAT6E ETHERNET CABLE-E
CABLE
24 STRAND SINGLE MODE FIBER OPTIC - 24 SMFO
(BY NPS)
WIFI
(9)
(9)
(9)
(9)
TYP
FPC SM
TYP
FPC SM
S(1)
B(1)
S(1)
B(1)
S(1)
B(1)
S(1)
B(1)
S(1)
B(1)
S(1)
B(1)
SCADA MONITOR
MULTIPURPOSE ROOM
E E
SCADA WORKSTATION
I&C SHOP
10110
E E
SHOP
I&C
S(1)
B(1)
E E
10111
E E
S(1)
B(1)
ROOM
SCADA
SCADA WORKSTATION
SCADA ROOM
FO
E
E E E
POE POE POE
F O
FO
F O
F O
F O
F O
FO
FO
F O
F O
F O
E
E
E E E E E E
E
POE
F O
F O
-0
4-
AW032405
Rectangle
AW032405
Rectangle
AW032405
PolyLine
AW032405
PolyLine
AW032405
PolyLine
AW032405
Line
AW032405
Line
AW032405
Text Box
NOTE 2
AW032405
Rectangle
AW032405
Line
AW032405
Snapshot
AW032405
Line
AW032405
Snapshot
AW032405
Snapshot
AW032405
Snapshot
AW032405
Snapshot
AW032405
Snapshot
AW032405
Snapshot
AW032405
Line
AW032405
Line
AW032405
Snapshot
AW032405
Text Box
2. NPS BUSINES NETWORK: SWITCHES,
ROUTERS, FIREWALLS, WIFI ACCESS
POINTS, AND FIBER PATCH PANEL(S) TO BE
SUPPLIED, INSTALLED, AND PROGRAMMED BY NPS IT.
AW032405
Snapshot
AW032405
Snapshot
AW032405
Text Box 3.
AW032405
Text Box 4.
AW032405
Rectangle
AW032405
Rectangle
AW032405
Text Box
NOTE 2
O T D
A T
E
P L
O T T
IM
E
/1
/2
:1
:4
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \I
C \0
N
D .d g n
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
FOFO FO
F O
F O
FO FO FO FO FO
F O
F O
F O
F O
F O
F O
E E E
FACILITY 20 HEADWORKS
120V
LCP-2001
SWITCH
BUSINESS
BNSW-2001
SWITCH
SCADA
CNSW-2001
0209N0002
FROM FACILITY 10
03 09N0004
TO FACILITY 80
DIGESTION
FO FO FO
FO FO
FPP-2001A FPP-2001B
RIO-2001BRIO-2001APLC-2001
SWITCH
LOCAL IO
IOSW-2001
HMI-2001
20-IOSW-01
POWER METER
MCC DIGITAL
20-DPM-01
HEADWORK MCC
20-MCC-01
SWITCH
MCC IO
VFD-2215 VFD-2216
FAN 2
CONTROL
ODOR
FAN 1
CONTROL
ODOR
24 STRAND SMFO
24 STRAND SMFO
F O
F O
480V
FINE SCREEN #1
LCP-2112
NETWORK DIAGRAM
J BOSS COMMUNICATION
I&C
09N0003
NO SCALE
TYP
FPC SM
TYP
FPC SM
(5)
(BY NPS)
WIFI
CNSW-2112IOSW-2112
OIT-2112
CNSW-2212IOSW-2212
OIT-2212
480V
FINE SCREEN #2
LCP-2212
PLC-2112
PLC-2212
VENDOR
CNSW-2111 IOSW-2111
OIT-2111
PLC-2111
480V
INFLUENT SCREEN 1
LCP-2111
VENDOR
CNSW-2211 IOSW-2211
OIT-2211
PLC-2211
480V
INFLUENT SCREEN 2
LCP-2211
VENDOR
CNSW-1801 IOSW-1801
OIT-1801
PLC-1801
480V
SEPTAGE RECEIVING
LCP-1801
VENDOR
VENDOR
GENERAL SHEET NOTES
POWER OVER ETHERNET- POE
NETWORK INTERFACE PANEL-NIP
FIBER PATCH PANEL- FPP
MODBUS TCP-MB
FIBER PATCH CABLE SINGLE MODE- FPC SM
CAT6E ETHERNET CABLE-E
CABLE
24 STRAND SINGLE MODE FIBER OPTIC - 24 SMFO
FO
E
E
EE
E
E
E E
E E
EE
E
EE E
E E
E
E
E
E
EEE EEE
E
EE
E
EEE EEE
E
EE E
EE E
E
E
E
EE
EE
E E
E E
E E
EE
EE
EE
EE
EE
EE
EE
EE
-0
4-
AW032405
Rectangle
AW032405
Rectangle
AW032405
Line
AW032405
Rectangle
AW032405
Snapshot
AW032405
Rectangle
AW032405
Text Box
NOTE 1
AW032405
Line
AW032405
Snapshot
AW032405
Snapshot
AW032405
Snapshot
AW032405
Line
AW032405
Line
AW032405
Line
AW032405
Line
AW032405
Text Box
1. NPS BUSINES NETWORK: SWITCHES,
ROUTERS, FIREWALLS, AND WIFI ACCESS
POINTS TO BE SUPPLIED, INSTALLED, AND
PROGRAMMED BY NPS IT.
AW032405
Snapshot
AW032405
Snapshot
AW032405
Text Box 2.
AW032405
3.
O T D
A T
E
P L
O T T
IM
E
\1
\2
:4
:2
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
FACILITY 80 DIGESTION
0309N0003
FROM FACILITY 20
HEADWORKS
PROCESS
09N0005
TO FACILITY 32
F O
F O
F O
F O
F O
F O
F O
F O
120V
LCP-8001
SWITCH
BUSINESS
BNSW-8001
SWITCH
SCADA
CNSW-8001
FO
FO
FPP-8001A FPP-8001B
RIO-8001BRIO-8001APLC-8001
SWITCH
LOCAL IO
IOSW-8001
HMI-8001
24 STRAND SMFO
24 STRAND SMFO
VFD-8011
BLOWER 1
DIGESTER
VFD-8012
BLOWER 2
DIGESTER
VFD-8013
BLOWER 3
DIGESTER
VFD-8014
BLOWER 4
DIGESTER
(4)
80-IOSW-01
POWER METER
MCC DIGITAL
80-DPM-01
HEADWORK MCC
80-MCC-01
SWITCH
MCC IO
VFD-8111 VFD-8112 VFD-8211 VFD-8212
MIXER 1
DIGESTER 1
MIXER 2
DIGESTER 1
MIXER 1
DIGESTER 2
MIXER 2
DIGESTER 2
F O
F O
F O
F
RIO-8001C
NETWORK DIAGRAM
J BOSS COMMUNICATION
I&C
09N0004
NO SCALE
TYP
FPC SM
TYP
FPC SM
GENERAL SHEET NOTES
POWER OVER ETHERNET- POE
NETWORK INTERFACE PANEL-NIP
FIBER PATCH PANEL- FPP
MODBUS TCP-MB
FIBER PATCH CABLE SINGLE MODE- FPC SM
CAT6E ETHERNET CABLE-E
CABLE
24 STRAND SINGLE MODE FIBER OPTIC - 24 SMFO
FO
E
EE
E
EE
E
EEE
E
E
E
E E
E E
E E
FO FO FO
FOFOFOFOFOFOFO
E
E
E
E
E
E
E
E
E E E
E E E
E E E
D S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \I
C \0
N
D .d g n
-0
4-
AW032405
Snapshot
AW032405
Rectangle
AW032405
Rectangle
AW032405
Text Box
NOTE 1
AW032405
Line
AW032405
Snapshot
AW032405
Snapshot
AW032405
Snapshot
AW032405
Line
AW032405
Line
AW032405
Line
AW032405
Line
AW032405
Text Box
1. NPS BUSINES NETWORK: SWITCHES,
ROUTERS, FIREWALLS, AND WIFI ACCESS
POINTS TO BE SUPPLIED, INSTALLED, AND
PROGRAMMED BY NPS IT.
AW032405
Rectangle
AW032405
Snapshot
AW032405
Snapshot
AW032405
Text Box 2.
AW032405
O T D
A T
E
P L
O T T
IM
E
/1
/2
:1
:3
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \I
C \0
N
D .d g n
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T
FACILITY 32 PROCESS BUILDING
05 09N0006
TO FACILITY 12
F O
F O
F O
F O
F O
F O
F O
120V
LCP-3201
SWITCH
BUSINESS
BNSW-3201
SWITCH
SCADA
CNSW-3201
FO
FPP-3201A FPP-3201B
RIO-3201BRIO-3201APLC-3201
IOSW-3201A
HMI-3201
24 STRAND SMFO
24 STRAND SMFO
LCP-3217
LCP-3218
LCP-3225
LCP-3226
0409N0004
FROM DIGESTION
FACILITY 80
RIO-3201DRIO-3201C
LCP-3221
LCP-3222
LCP-3223
LCP-3224
VFD-3312
VFD-3412
BLOWER 2
AERATION
VFD-3512
BLOWER 3
AERATION
VFD-3612
BLOWER 4
AERATION
LCP-3215 LCP-3216 LCP-3219 LCP-3220
PUMP 3
SHC
PUMP 4
SHC
PUMP 1
MgOH
PUMP 2
MgOH
PUMP 1
SC
PUMP 2
SC
PUMP 3
SC
PUMP 4
SC
BLOWER 1
AERATION
09N0006
TO 32-MCC-01
PUMP 1
SHC
PUMP 2
SHC
PUMP 1
CA
PUMP 2
CA
F O
F O
IOSW-3201B
SWITCH #2
LOCAL IO
SWITCH #1
LOCAL IO
RIO-3201E RIO-3201F
RIO-3201G
VFD-3314
BLOWER 1
AIR SCOUR
MEMBRANE
BLOWER 2
AIR SCOUR
MEMBRANE
BLOWER 3
AIR SCOUR
MEMBRANE
VFD-3414 VFD-3514 VFD-3315 VFD-3415 VFD-3515
PUMP 1
PERMEATE
PUMP 2
PERMEATE
PUMP 3
PERMEATE
GENERATOR
08-GEN-01
NETWORK DIAGRAM
J BOSS COMMUNICATION
I&C
09N0005
NO SCALE
GENERAL SHEET NOTES
POWER OVER ETHERNET- POE
NETWORK INTERFACE PANEL-NIP
FIBER PATCH PANEL- FPP
MODBUS TCP-MB
FIBER PATCH CABLE SINGLE MODE- FPC SM
CAT6E ETHERNET CABLE-E
CABLE
24 STRAND SINGLE MODE FIBER OPTIC - 24 SMFO
TYP
FPC SM
TYP
FPC SM
(4)
CNSW-3202IOSW-3202
OIT-3202
PLC-3202
VENDOR
120V
MEMBRANE CONTROL PANEL
LCP-3202
(10)
(8)
(4)
FO
E
E E
EE
E
E
E
FO
E
E
E
E
E E
E
E
E
E
E
E
E E
E EE
FO FOFOFOFOFOFOFOFO
E
E
FO
E
E
EEEE
E E
E E
E
E E
E
E
E
FO FO FO
E
E E
E E E E E
E E E E E E
E E
EEEE
EEE
EE E
E E E
MB
M B
M B
M B
E E E
E
E E
E E
E E
E
E
E E E
E E
EE
E
E
E E
-0
4-
AW032405
Snapshot
AW032405
Snapshot
AW032405
Rectangle
AW032405
Rectangle
AW032405
Text Box
NOTE 1
AW032405
Line
AW032405
Snapshot
AW032405
Snapshot
AW032405
Snapshot
AW032405
Line
AW032405
Line
AW032405
Line
AW032405
Line
AW032405
Text Box
1. NPS BUSINES NETWORK: SWITCHES,
ROUTERS, FIREWALLS, AND WIFI ACCESS
POINTS TO BE SUPPLIED, INSTALLED, AND
PROGRAMMED BY NPS IT.
AW032405
Rectangle
AW032405
Snapshot
AW032405
Snapshot
AW032405
Text Box 2.
AW032405
O T D
A T
E
P L
O T T
IM
E
/1
/2
:1
:2
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \I
C \0
N
D .d g n
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T
0609N0005
VFD-3420 VFD-3520 VFD-2511 VFD-2512
FROM LCP-3201
POWER METER
MCC DIGITAL
32-DPM-01
VFD-3213 VFD-3214 VFD-8611VFD-3320VFD-3511
PUMP 3
RAS
VFD-3411
PUMP 2
RAS
VFD-3311
PUMP 1
RAS
32-MCC-01
PUMP 1
WATER
RECLAIMED
PUMP 2
WATER
RECLAIMED
PUMP 3
WATER
RECLAIMED
VFD-8612
PUMP 1
TANK DRAIN
PUMP 2
TANK DRAIN
PUMP 1
BOOSTER
UV EFFLUENT
PUMP 2
BOOSTER
UV EFFLUENT
PUMP 1
PLANT DRAIN
PUMP 2
PLANT DRAIN
NETWORK DIAGRAM
J BOSS COMMUNICATION
I&C
09N0006
NO SCALE
(12)
GENERAL SHEET NOTES
POWER OVER ETHERNET- POE
NETWORK INTERFACE PANEL-NIP
FIBER PATCH PANEL- FPP
MODBUS TCP-MB
FIBER PATCH CABLE SINGLE MODE- FPC SM
CAT6E ETHERNET CABLE-E
CABLE
24 STRAND SINGLE MODE FIBER OPTIC - 24 SMFO
E
E
E E E E E E E
E E
E E E E E E E EEEE
E E E E E E E E E E
E
E
-0
4-
AW032405
Snapshot
AW032405
Rectangle
AW032405
Snapshot
AW032405
Snapshot
AW032405
Text Box 1.
AW032405
2.
O T D
A T
E
P L
O T T
IM
E
/1
/2
:1
:3
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \I
C \0
N
D .d g n
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T
05 09N0006
TO FACILITY 12
F O
F O
F O
F O
F O
F O
F O
NIP-1201
SWITCH
BUSINESS
BNSW-1201
SWITCH
SCADA
CNSW-1201
FO
FPP-1201A FPP-1201B
0409N0004
FROM DIGESTION
FACILITY 80
SHEET NOTES
12101
SHOP
FACILITY 12 MAINTENANCE BUILDING
SCADA WORKSTATION
MAINTENANCE
POWER METER
PANELBOARD
12-LP-01
12-DPM-01
NETWORK DIAGRAM
J BOSS COMMUNICATION
I&C
09N0007
NO SCALE
S(1)
B(1)
NOTE 1
TYP
FPC SM
TYP
FPC SM
GENERAL SHEET NOTES
POWER OVER ETHERNET- POE
NETWORK INTERFACE PANEL-NIP
FIBER PATCH PANEL- FPP
MODBUS TCP-MB
FIBER PATCH CABLE SINGLE MODE- FPC SM
CAT6E ETHERNET CABLE-E
CABLE
24 STRAND SINGLE MODE FIBER OPTIC - 24 SMFO
REFERENCE 01E0002 FOR DETAILS.1.
FO
FO FO FOFOFOFOFOFOFO
E
E
E
E
E E
E E
E E
F O
F O
F O
FO
EE
-0
4-
AW032405
Rectangle
AW032405
Rectangle
AW032405
Text Box
NOTE 2
AW032405
Line
AW032405
Snapshot
AW032405
Snapshot
AW032405
Snapshot
AW032405
Line
AW032405
Line
AW032405
Line
AW032405
Line
AW032405
Text Box
2. NPS BUSINES NETWORK: SWITCHES,
ROUTERS, FIREWALLS, AND WIFI ACCESS
POINTS TO BE SUPPLIED, INSTALLED, AND
PROGRAMMED BY NPS IT.
AW032405
PolyLine
AW032405
Snapshot
AW032405
PolyLine
AW032405
Snapshot
AW032405
Snapshot
AW032405
Text Box 3.
AW032405
Text Box 4.
Rectangle
O T D
A T
E
P L
O T T
IM
E
/1
/2
:1
:4
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \I
C \0
N
D .d g n
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
BILL OF MATERIALS
NAMEPLATE SCHEDULE
3"=1'-0" 3"=1'-0"
FRONT PANEL ELEVATION - NIP-1001 FRONT PANEL ELEVATION - NIP-1002
11 12
A
C
E
F
G
H
B
D
K
BUILDING NETWORK
INTERFACE PANELS
J BOSS
I&C
09N0100 0 6"
3"=1'-0"
10 6"
3"=1'-0"
ADMINISTRATION
-0
4-
AW032405
Line
AW032405
Cloud+
AW032405
Cloud+
MANAGED SWITCH
AW032405
Line
AW032405
Rectangle
AW032405
Rectangle
AW032405
Line
AW032405
Line
AW032405
Line
AW032405
Cloud+
AW032405
Cloud+
HYPERVISOR (VM HOST SERVER)
AW032405
Text Box
AREA RESERVED FOR
NPS IT (NOTE 1)
AW032405
Snapshot
AW032405
Rectangle
AW032405
Line
AW032405
Line
AW032405
Rectangle
AW032405
Text Box
AREA RESERVED FOR
NPS IT
AW032405
Text Box
1. NPS BUSINES NETWORK: SWITCHES,
ROUTERS, FIREWALLS, AND WIFI ACCESS
POINTS TO BE SUPPLIED, INSTALLED, AND
PROGRAMMED BY NPS IT.
O T D
A T
E
P L
O T T
IM
E
/1
/2
:1
:2
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \I
C \0
N
D .d g n
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
V
C
W E
R
S U
P P
L Y
PWR
ROM
RUN
ERR
TX
USB
RX
ETH
USB
PORT
PGM
RS-232
SERIAL
RUN STOP
TERM
E
H T
E
R
N
E T
H2-ERM100
PWR1
PWR2
FAULT
MASTER
COUPLER
100M
1 2
10M
PWR1
PWR2
FAULT
MASTER
COUPLER
100M
1 2
10M
PWR1
PWR2
FAULT
MASTER
COUPLER
100M
1 2
10M
R3 S9
R3 S8
R3 S7
R3 S6
R3 S5
R3 S4
R3 S3
R3 S2
R2 S5
R2 S2
R2 S3
R2 S4
CB16
CB15
CB14
CB13
CB12
CB11
CB16
CB15
CB14
CB13
CB12
CB11
V
W E
R
S U
P P
L Y
POWER SUPPLY
REDUNDANCY MODULE
BILL OF MATERIALS
NAMEPLATE SCHEDULE
15 1612
2221 2623
22 23 26
172524
262524
131211
4 PLCS
TYP
4 PLCS
TYP
2 PLCS
TYP
2 PLCS
TYP
2 PLCS
TYP
S
A
K
L
M N
H
G
E
J
DC
FRQO P B
FRONT PANEL ELEVATION
1 1/2"=1'-0"
BACK PANEL ELEVATION
1 1/2"=1'-0"
Esc F1
F13
Caps Lock
F2
F14
F3
F15
Q W E
A
Z
Ctrl Alt
S
X
D
C
F4
F16
R
F5
F17
T
Y
F G H
V B
F6
F18
U
J
F7
F19
I
K
N M <, Alt
F8
F20
F9
Ins
O P
L
Ctrl
F10
Home
F11
Del
F12
End
Num
Scroll
Caps
Scroll
Lock
PrtSc
SysRq
Pause
Break
Num
Lock
Home
PgUp End
PgDn Ins
PgUp
PgDn
Enter
Del
LCP-2001 CONTROL
PANEL LAYOUT
J BOSS
I&C
09N0101
0 1
1 1/2"=1'-0"
PS0 1
1 1/2"=1'-0"
PS
NOTE 1
GENERAL SHEET NOTES
THE KEYBOARD TO REACH.
SITUATED FOR THE HMI TO DVI-D CABLE FROM
THE ENCLOSURE. COMPUTER SHOULD BE
MOUNT OR STRAP COMPUTER TO THE INSIDE OF NOTE 1:
HEADWORKS
72" H X 48" W X 18" D
-0
4-
AW032405
Line
AW032405
Rectangle
AW032405
Rectangle
AW032405
Line
AW032405
Cloud+
AW032405
Cloud+
AW032405
Snapshot
AW032405
Line
AW032405
Cloud+
AW032405
Cloud+
O T D
A T
E
P L
O T T
IM
E
/1
/2
:1
:2
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \I
C \0
N
D .d g n
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
CB11
CB12
CB13
CB14
CB15
CB16
CB11
CB12
R4 S2
R4 S3
R6 S2
R6 S3
R6 S4
R6 S5
PWR1
PWR2
FAULT
MASTER
COUPLER
100M
1 2
10M
PWR1
PWR2
FAULT
MASTER
COUPLER
100M
1 2
10M
PWR1
PWR2
FAULT
MASTER
COUPLER
100M
1 2
10M
R8 S2
R8 S3
R8 S4
R8 S5
R6 S6
R6 S7
R6 S8
R4 S4
R4 S5
R4 S6
R4 S7
R2 S4
R2 S3
R2 S2
R2 S6
R2 S5
R2 S8
R2 S7
R2 S9
PWR
ROM
RUN
ERR
TX
USB
RX
ETH
USB
PORT
PGM
RS-232
SERIAL
RUN STOP
TERM
E
H T
E
R
N
E T
PWR1
PWR2
FAULT
MASTER
COUPLER
100M
1 2
10M
R6 S9
R3 S4
R3 S2
R3 S7
R3 S8
R3 S9
R4 S8
R4 S9
R5 S2
R5 S3
R5 S4
R5 S5
R5 S6
R5 S7
R5 S8
R5 S9
R7 S2
R7 S3
R7 S5
R8 S6
R8 S7
H2-ERM100
Esc F1
F13
Caps
Lock
F2
F14
F3
F15
Q W E
A
Z
Ctrl Alt
S
X
D
C
F4
F16
R
F5
F17
T
6̂
Y
F G H
V B
F6
F18
U
J
F7
F19
I
K
N M <, Alt
F8
F20
F9
Ins
O P
L
Ctrl
F10
Home
F11
Del
F12
End
Num
Scroll
Caps
Scroll
Lock
PrtSc
SysRq
Pause
Break
Num
Lock
Home
PgUp 1 End
PgDn 0 Ins
PgUp
PgDn
Enter
Del
R3 S3
H2-ERM100
H2-ERM100
R7 S4
R8 S8
V
W E
R
S U
P P
L Y
V
W E
R
S U
P P
L Y
POWER SUPPLY
REDUNDANCY MODULE
BILL OF MATERIALS
NAMEPLATE SCHEDULE
31 1
4 3
12 14
3 PLCS
TYP
2 PLCS
TYP
2 PLCS
TYP
2 PLCS
TYP
A
L
VT U
FRONT PANEL ELEVATION
1 1/2"=1'-0"
BACK PANEL ELEVATION
1 1/2"=1'-0"
2 PLCS
TYP
W X Y B G
E HC
JFD
11 12
8 PLCS
TYP
3 PLCS
TYP
30 26
8 PLCS
TYP
4 PLCS
TYP
7 PLCS
TYP
16 PLCS
TYP
21 22
23 26
19 21
22 26
11 12
11 12
P P
Q
Q R R S M
K
N
LCP-3201 CONTROL
PANEL LAYOUT
J BOSS
I&C
09N0102
0 1
1 1/2"=1'-0"
20 1
1 1/2"=1'-0"
GENERAL SHEET NOTES
THE KEYBOARD TO REACH.
SITUATED FOR THE HMI TO DVI-D CABLE FROM
THE ENCLOSURE. COMPUTER SHOULD BE
MOUNT OR STRAP COMPUTER TO THE INSIDE OF NOTE 1:
PROCESS BUILDING
90" H X 72" W X 20" D
NOTE 1
-0
4-
AW032405
Line
AW032405
Rectangle
AW032405
Rectangle
AW032405
Rectangle
AW032405
Line
AW032405
Cloud+
AW032405
Cloud+
AW032405
Cloud+
AW032405
Cloud+
Line
O T D
A T
E
P L
O T T
IM
E
/1
/2
:1
:2
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \I
C \0
N
D .d g n
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
CB11
CB12
CB12
PWR
ROM
RUN
ERR
TX
USB
RX
ETH
USB
PORT
PGM
RS-232
SERIAL
RUN STOP
TERM
E
H T
E
R
N
E T
H2-ERM100
R3 S6
R2 S3
R2 S2
R3 S7
R4 S2
R4 S3
R4 S4
R4 S5
PWR1
PWR2
FAULT
MASTER
COUPLER
100M
1 2
10M
PWR1
PWR2
FAULT
MASTER
COUPLER
100M
1 2
10M
PWR1
PWR2
FAULT
MASTER
COUPLER
100M
1 2
10M
R4 S6
R4 S7
R4 S8
R4 S9
R2 S4
R2 S5
R3 S9
R3 S8
R2 S6
R3 S2
R3 S3
R3 S5
R3 S4
V
W E
R
S U
P P
L Y
V
W E
R
S U
P P
L Y
POWER SUPPLY
REDUNDANCY MODULE
BILL OF MATERIALS
NAMEPLATE SCHEDULE
31 1
262524
12 15
21 22 23
22 23 26
4 PLCS
TYP
5 PLCS
TYP
4 PLCS
TYP
4 PLCS
TYP
2 PLCS
TYP
A
F
K
L
PO
Q R
B
C S
M
N
E
G
H
J
FRONT PANEL ELEVATION
1 1/2"=1'-0"
BACK PANEL ELEVATION
1 1/2"=1'-0"
T
Esc F1
F13
Caps Lock
F2
F14
F3
F15
Q W E
A
Z
Ctrl Alt
S
X
D
C
F4
F16
R
F5
F17
T
Y
F G H
V B
F6
F18
U
J
F7
F19
I
K
N M <, Alt
F8
F20
F9
Ins
O P
L
Ctrl
F10
Home
F11
Del
F12
End
Num
Scroll
Caps
Scroll
Lock
PrtSc
SysRq
Pause
Break
Num
Lock
Home
PgUp End
PgDn Ins
PgUp
PgDn
Enter
Del
262524
4 PLCS
TYP
L
LCP-8001 CONTROL
PANEL LAYOUT
J BOSS
I&C
09N0103
0 1
1 1/2"=1'-0"
20 1
1 1/2"=1'-0"
GENERAL SHEET NOTES
THE KEYBOARD TO REACH.
SITUATED FOR THE HMI TO DVI-D CABLE FROM
THE ENCLOSURE. COMPUTER SHOULD BE
MOUNT OR STRAP COMPUTER TO THE INSIDE OF NOTE 1:
DIGESTER FACILITY
NOTE 1
72" H X 48" W X 18" D
-0
4-
AW032405
Line
AW032405
Rectangle
AW032405
Rectangle
AW032405
Snapshot
AW032405
Line
AW032405
Cloud+
AW032405
Cloud+
AW032405
Line
AW032405
Cloud+
AW032405
Cloud+
O T D
A T
E
P L
O T T
IM
E
/1
/2
:1
:3
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
S o u th R im \4 D e li v e ry \4
C
A D D e s ig n \G
R C
A \2
\M ic ro s ta ti o n V i
D ra w in g s \I
C \0
N
D .d g n
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
PW
R1
PW
R2
FAU
LT
M
ASTER
CO
U
PLER
864100M
210M
SUPPLY
POWER
24 VDC
CB2
PW
R1
PW
R2
FAU
LT
M
ASTER
CO
U
PLER
864100M
210M
BILL OF MATERIALS
NAMEPLATE SCHEDULE
11 13
A
F
B
C
D
E
G
H
J
FRONT PANEL ELEVATION BACK PANEL ELEVATION
3"=1'-0" 3"=1'-0"
1210 13
NIP-1201 NETWORK
INTERFACE PANEL
J BOSS MAINTENANCE BUILDING
09N0104
0 6"
3"=1'-0"
10 6"
3"=1'-0"
I&C
36" H X 24" W X 12" D
-0
4-
AW032405
Line
AW032405
Line
AW032405
Cloud+
AW032405
Cloud+
AW032405
Line
AW032405
Cloud+
AW032405
Cloud+
AW032405
Rectangle
AW032405
Rectangle
Line
NATIONAL PARKS SERVICE
GRAND CANYON NATIONAL PARK
GRAND CANYON, ARIZONA
CONTRACT DOCUMENTS
for the construction of the
REPLACE WASTEWATER PLANT SOUTH RIM VILLAGE
GRCA 257282
ADDENDUM NO. 2
JACOBS
Grand Canyon, Arizona
September 15, 2026
© National Parks Service 2026. All rights reserved.
Any reuse, modification, or alteration of this document and the ideas and designs incorporated herein is at the sole risk of the party(ies) reusing, modifying, or altering it. All references to Jacobs and its employees and all professional seals shall be removed prior to any reuse, modification, or alteration of this document.
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 [JUNE 10, 2026][SEPTEMBER 15, 2026] 00 01 10 [REV. 12][ADD12] - 1
GRCA 257282 ADDENDUM NO. 12
TABLE OF CONTENTS
VOLUME 1
Person Section Responsible Title Pages
SPECIFICATIONS
DIVISION 01—GENERAL REQUIREMENTS
01 11 00 KR Rev. 1/Summary of Work ........................................................ 1-145[ADD2]
01 26 01 KR Contract Modification Procedures ........................................... 1- 7 01 27 00 KR Definition of Contract Line Items ............................................ 1- 2 01 31 00 KR Project Management and Coordination ................................... 1- 14 01 32 16 KR Construction Schedule ............................................................. 1- 12 01 32 33 KR Photo Documentation............................................................... 1- 3 01 33 23 KR Submittal Procedures ............................................................... 1- 11
Supplement:
KR Submittal List ........................................................................... 1- 34
01 35 00 KR Environmental Protection and Special Controls ...................... 1- 8 01 35 13.22 KR Archeological Protection ......................................................... 1- 3 01 35 23 KR Safety Requirements ................................................................ 1- 5 01 40 00 KR Quality Requirements .............................................................. 1- 11
Supplements:
KR Statement of Structural Tests and Special Inspections ............ 1- 21 KR Accessibility Inspection Report – Buildings & Facilities ........ 1- 12
01 42 00 KR Reference Standards................................................................. 1- 16 01 43 33 KR Manufacturers’ Field Services ................................................. 1- 4
Supplement:
KR Manufacturer’s Certificate of Proper Installation .................... 1- 1
01 45 33 WWK Special Inspection, Observation, and Testing .......................... 1- 6 Supplements:
WWK Contractor’s Statement of Responsibility ................................ 1- 1 WWK Fabricator’s Certificate of Compliance .................................... 1- 1
01 50 00 KR Temporary Facilities and Controls........................................... 1- 12 01 57 13 KDA Temporary Erosion and Sediment Control .............................. 1- 17 01 57 19.11 KR Indoor Air Quality Management .............................................. 1- 7 01 57 19.12 KR Noise and Acoustics Management ........................................... 1- 3 01 57 23 KR Temporary Storm Water Pollution Prevention ........................ 1- 8 01 57 28 DE Temporary Flow Control ......................................................... 1- 9 01 61 03 DE Equipment – Basic Requirements ............................................ 1- 12
Supplement:
DE Exhibit A, Manufacturer Field Service Report ........................ 1- 5
Person Section Responsible Title Pages
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 [REV. 12][ADD12] - 2 JUNE 2025 [JUNE 10, 2026][SEPTEMBER 15, 2026]
ADDENDUM NO. 12 GRCA 257282
01 67 00 MS Product Requirements .............................................................. 1- 12 Supplement:
MS Affirmative Procurement Reporting Form............................... 1- 2 MS Manufacturer’s Certificate of Proper Installation Form .......... 1- 1 MS Manufacturer’s Certificate of Compliance Form ..................... 1- 1
01 73 20 WWK Openings and Penetrations in Construction ............................. 1- 8 Supplements:
WWK Schedule A – Openings and Penetrations Schedule for New Construction ............................................................ 1- 1
WWK Schedule B – Openings and Penetrations Schedule for Existing Construction ...................................................... 1- 1
01 73 29 MS Cutting and Patching ................................................................ 1- 4 01 73 40 KR Execution ................................................................................. 1- 11 01 74 19 KR Construction Waste Management and Disposal ...................... 1- 9 01 77 00 KR Closeout Procedures................................................................. 1- 6 01 78 23 KR Operation and Maintenance Data............................................. 1- 10
Supplements:
KR Equipment Data Sheet.............................................................. 1- 1 KR Closeout and Operation & Maintenance (O&M)
Requirements Template + Sample ........................................ 1- 8 01 78 25 KR Operations and Maintenance Support Services ....................... 1- 9
Supplements:
KR Minimum Qualifications O&M Supervisor ............................. 1- 2 KR Qualification Schedule for Operation and
Maintenance Services / Positions.......................................... 1- 2 01 79 00 KR Demonstration and Training .................................................... 1- 6 01 81 13 KR Sustainable Design Requirements for Non-LEED™
Projects .................................................................................. 1- 4 01 81 33 AW Rev. 1/Cyber Security Requirements ....................................... 1-6[ADD2]
01 88 15 WWK Anchorage and Bracing............................................................ 1- 7 01 91 14 CL Equipment Testing and Facility Startup .................................. 1- 26
Supplement:
CL Supplement A........................................................................... 1- 13
01 91 15 SH Rev. 1/Total Building Commissioning .................................... 1-13[ADD1]
DIVISION 02—EXISTING CONDITIONS
02 41 00 KR Demolition ............................................................................... 1- 11 Supplement:
KR Hazardous Materials Investigation Report............................... 1-114 02 61 00 KR Removal and Disposal of Contaminated Soil .......................... 1- 8
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 [JUNE 10, 2026][SEPTEMBER 15, 2026] 00 01 10 [REV. 12][ADD12] - 3
GRCA 257282 ADDENDUM NO. 12
02 81 00 KR Transportation and Disposal of Hazardous Materials .............. 1- 11 Supplement:
KR Attachment A: Sample Offsite Policy Certification Memo ..... 1- 1 02 82 00 KR Asbestos Remediation .............................................................. 1- 32 02 83 00 KR Lead Remediation .................................................................... 1- 18 02 84 16 KR Handling of Lighting Ballasts and Lamps Containing
PCBs and Mercury .............................................................................1- 7 02 84 33 KR Removal and Disposal of Polychlorinated Biphenyls
(PCBs) ................................................................................... 1- 11
DIVISION 03—CONCRETE
03 01 32 WWK Repair of Vertical and Overhead Concrete Surfaces ............... 1- 14 03 01 33 WWK Repair of Horizontal Concrete Surfaces .................................. 1- 13 03 10 00 WWK Concrete Forming and Accessories ......................................... 1- 8 03 15 00 WWK Concrete Joints and Accessories .............................................. 1- 9 03 21 00 WWK Steel Reinforcement ................................................................. 1- 5 03 24 00 WWK Fibrous Reinforcing ................................................................. 1- 3 03 30 00 WWK Cast-in-Place Concrete............................................................. 1- 26
Supplements:
WWK Concrete Mix Design, Class A (5000F3S1P2C2).................... 1- 3 WWK Concrete Mix Design, Class B (4500F2S1P1C1) .................... 1- 2 WWK Concrete Mix Design, Class C (SM00F2S1P2C1) .................. 1- 2 WWK Concrete Mix Design, Class D (4500F1S1P0C1).................... 1- 2 WWK Concrete Mix Design, Class E (CF00F1S1P0C1) ................... 1- 2 WWK Concrete Mix Design, Class F (4500F3S1P1C2) .................... 1- 2
03 39 00 WWK Concrete Curing ....................................................................... 1- 4 03 62 00 WWK Grouting ................................................................................... 1- 11
Supplement:
WWK 24-hour Evaluation of Nonshrink Grout Test Form and Grout Testing Procedures ............................................... 1- 3 03 63 00 WWK Concrete Doweling .................................................................. 1- 5 03 64 23 WWK Epoxy Resin Injection Grouting .............................................. 1- 11 03 64 24 WWK Polyurethane Injection Grouting .............................................. 1- 9
DIVISION 04—MASONRY
04 22 00 WWK Concrete Unit Masonry ............................................................ 1- 16
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 [REV. 12][ADD12] - 4 JUNE 2025 [JUNE 10, 2026][SEPTEMBER 15, 2026]
ADDENDUM NO. 12 GRCA 257282
DIVISION 05—METALS
05 05 19 WWK Post-Installed Anchors ............................................................. 1- 9 05 05 23 WWK Welding .................................................................................... 1- 6
Supplement:
WWK Welding and Nondestructive Testing Table ............................ 1- 1
05 12 00 WWK Structural Steel Framing .......................................................... 1- 14 05 31 00 WWK Steel Decking ........................................................................... 1- 6 05 50 00 WWK Metal Fabrications ................................................................... 1- 17 05 52 16 WWK Aluminum Railings .................................................................. 1- 9 05 53 00 WWK Metal Gratings ......................................................................... 1- 6
DIVISION 06—WOOD, PLASTICS, AND COMPOSITES
06 10 00 MS Rough Carpentry ...................................................................... 1- 9 06 17 53 WWK Shop-Fabricated Wood Trusses ............................................... 1- 9 06 41 00 MS Architectural Wood Casework ................................................. 1- 8 06 82 00 WWK Glass-Fiber-Reinforced Plastic ................................................ 1- 7
DIVISION 07—THERMAL AND MOISTURE PROTECTION
07 14 00 MS Fluid-Applied Waterproofing .................................................. 1- 5 07 21 00 MS Thermal Insulation ................................................................... 1- 7 07 26 16 MS Belowgrade Vapor Retarders ................................................... 1- 3 07 41 13 MS Metal Roof and Soffit Panels ................................................... 1- 19 07 54 23 MS Thermoplastic Membrane (TPO) Roofing ............................... 1- 10 07 62 00 MS Sheet Metal Flashing and Trim ................................................ 1- 9 07 70 01 MS Roof Specialties and Accessories ............................................ 1- 4 07 84 00 MS Firestopping ............................................................................. 1- 5 07 92 00 MS Joint Sealants ........................................................................... 1- 9
DIVISION 08—OPENINGS
08 11 00 MS Metal Doors and Frames .......................................................... 1- 9 08 30 00 MS Specialty Doors ........................................................................ 1- 7 08 51 13 MS Aluminum Windows ................................................................ 1- 7 08 71 00 MS Door Hardware......................................................................... 1- 20 08 80 00 MS Glazing ..................................................................................... 1- 13 08 90 00 MS Louvers .................................................................................... 1- 4
DIVISION 09—FINISHES
09 22 16 MS Nonstructural Metal Framing ................................................... 1- 3 09 29 00 MS Gypsum Board ......................................................................... 1- 13
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 [JUNE 10, 2026][SEPTEMBER 15, 2026] 00 01 10 [REV. 12][ADD12] - 5
GRCA 257282 ADDENDUM NO. 12
09 30 00 MS Tiling ........................................................................................ 1- 8 09 51 23 MS Acoustical Tile Ceilings ........................................................... 1- 4 09 65 00 MS Resilient Flooring..................................................................... 1- 5 09 77 01 MS Fiberglass-Reinforced Plastic (FRP) Panel Walls ................... 1- 3 09 90 00 DE Painting and Coating ................................................................ 1- 27
Supplements:
DE Paint System Data Sheet (PSDS) ............................................. 1- 1 DE Paint Product Data Sheet (PPDS) ............................................ 1- 1 DE Volatile Organic Compound (VOC) Limit List ....................... 1- 2
09 96 35 DE Chemical-Resistant Coatings ................................................... 1- 13 Supplements:
DE Chemical-Resistant Coating System Data Sheet (CRCSDS) .. 1- 1 DE Chemical-Resistant Coating Product Data Sheet (CRCPDS) .. 1- 1
09 97 13 DE Steel Tank Linings and Coatings ............................................. 1- 16 Supplements:
DE Paint System Data Sheet (PSDS) ............................................. 1- 1 DE Paint Product Data Sheet (PPDS) ............................................ 1- 1
DIVISION 10—SPECIALTIES
10 14 00 MS Rev. 1/Signage ......................................................................... 1-7[ADD1]
Supplement:
MS Rev. 1/Sign Schedule ............................................................... 1-2[ADD1]
10 28 00 MS Toilet and Bath Accessories..................................................... 1- 7 10 44 00 MS Fire Protection Specialties and Safety Equipment ................... 1- 4 10 51 00 MS Lockers ..................................................................................... 1- 3 10 80 00 MS Miscellaneous Specialties ........................................................ 1- 6
DIVISION 11—EQUIPMENT
11 31 00 MS Appliances................................................................................ 1- 2
DIVISION 12—FURNISHINGS
12 24 13 MS Roller Shades ........................................................................... 1- 9 12 35 53 MS Laboratory Casework ............................................................... 1- 23
DIVISION 13—SPECIAL CONSTRUCTION
13 34 19 WWK Metal Building Systems ........................................................... 1- 9
DIVISION 14 THROUGH DIVISION 20 (NOT USED)
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 [REV. 12][ADD12] - 6 JUNE 2025 [JUNE 10, 2026][SEPTEMBER 15, 2026]
ADDENDUM NO. 12 GRCA 257282
DIVISION 21—FIRE SUPPRESSION
21 13 13 CKS Wet-Pipe Sprinkler Systems .................................................... 1- 16
DIVISION 22—PLUMBING
22 05 48 SH Vibration Isolation for Plumbing Piping and Equipment ........ 1- 7 22 07 00 SH Plumbing Piping Insulation...................................................... 1- 7 22 10 01 SH Plumbing Piping and Accessories ............................................ 1- 20
Supplements:
22 10 01.02 SH Polyvinyl Chloride Drain Waste and Vent (PVC-DWV)
Pipe and Fittings Data Sheet ................................................. 1- 1 22 10 01.06 SH Acid-Resistant Polypropylene Waste and Vent Pipe and
Fittings Data Sheet ................................................................ 1- 1 22 30 00 SH Plumbing Equipment ............................................................... 1- 11
Supplements:
SH Electric Water Heater (Commercial) Data Sheet ..................... 1- 1 SH Domestic Water Expansion Tank Data Sheet .......................... 1- 1 SH Domestic Hot Water Circulating Pump Data Sheet ................. 1- 1 SH Acid Neutralization Tank Data Sheet ...................................... 1- 1 SH Backflow Preventers Data Sheet .............................................. 1- 1 SH Reverse Osmosis System Data Sheet ....................................... 1- 1 SH Sanitary Sewer Lift Station, Sump Data Sheet ........................ 1- 1 SH Sanitary Sewer Lift Station, Duplex Submersible Grinder
Pump Data Sheet ................................................................... 1- 1 22 40 00 SH Plumbing Fixtures .................................................................... 1- 13
DIVISION 23—HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 05 48 SH Vibration Isolation and Seismic Control for HVAC Piping and Equipment ...................................................................... 1- 12 Supplement:
SH Vibration Isolation Schedule for HVAC Piping and Equipment ...................................................................... 1- 2
23 05 93 SH Testing, Adjusting, and Balancing for HVAC ......................... 1- 6 23 07 00 SH HVAC Insulation ..................................................................... 1- 12 23 09 00 SH Instrumentation and Control Devices for HVAC .................... 1- 16
Supplement:
SH HVAC Controls Sequence of Operation, General Control
Types ..................................................................................... 1- 3 23 09 13 SH HVAC Controls, Field Components, and Instruments ............ 1- 13 23 09 23 SH Direct-Digital Control System for HVAC ............................... 1- 26 23 23 00 SH Refrigerant Piping .................................................................... 1- 8
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 [JUNE 10, 2026][SEPTEMBER 15, 2026] 00 01 10 [REV. 12][ADD12] - 7
GRCA 257282 ADDENDUM NO. 12
23 31 13 SH Metal Ducts and Accessories ................................................... 1- 30 Supplement:
SH Ductwork Schedule .................................................................. 1- 2 23 31 16.16 KG Thermoset Fiberglass-Reinforced Plastic Ducts and
Accessories ........................................................................... 1- 16 23 34 00 SH HVAC Fans .............................................................................. 1- 19
Supplement:
SH Fans Schedule ......................................................................................... 1- 2
23 37 00 SH Air Outlets and Inlets ............................................................... 1- 3 Supplement:
SH Air Outlets and Inlets Schedule ............................................... 1- 1 23 77 00 SH Air Handling Units ................................................................... 1- 32
Supplements:
SH Air Handling Units Schedule ................................................... 1- 2 SH Make-Up Air Handling Units Schedule ................................... 1- 4
23 81 00 SH Unitary Air-Conditioning Equipment ...................................... 1- 25 Supplements:
SH Split System DX Indoor Units Data Sheet ............................... 1- 1 SH Split System DX Outdoor Units Data Sheet ............................ 1- 1 SH VRF Indoor Unit Schedule Data Sheet .................................... 1- 1 SH VRF Outdoor Unit Schedule .................................................... 1- 1 SH VRF Heat Recovery Branch Circuit Controller ....................... 1- 1 SH Packaged DX Air Conditioning Units Data Sheet ................... 1- 2
23 82 00 SH Terminal Heating and Cooling Units ....................................... 1- 7 Supplements:
SH Unit Heaters ............................................................................. 1- 1 SH Baseboard Unit Heaters ........................................................... 1- 1 SH Duct Heaters............................................................................. 1- 1
DIVISION 24 AND DIVISION 25 (NOT USED)
DIVISION 26—ELECTRICAL
26 05 02 DB Basic Electrical Requirements ................................................. 1- 7 26 05 04 DB Basic Electrical Materials and Methods .................................. 1- 14 26 05 05 DB Conductors ............................................................................... 1- 14 26 05 10 DB Network Communication System ............................................ 1- 27 26 05 26 DB Grounding and Bonding for Electrical Systems ...................... 1- 6 26 05 33 DB Raceway and Boxes ................................................................. 1- 27 26 05 70 DB Electrical Systems Analysis ..................................................... 1- 8
Supplement:
DB Figure 1: Example Arc Flash Label ......................................... 1- 1
26 08 00 DB Commissioning of Electrical Systems ..................................... 1- 24
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 [REV. 12][ADD12] - 8 JUNE 2025 [JUNE 10, 2026][SEPTEMBER 15, 2026]
ADDENDUM NO. 12 GRCA 257282
26 09 13 DB Power Measurement and Control............................................. 1- 5 26 14 13 DB Switchboards ............................................................................ 1- 9 26 20 00 DB Low-Voltage AC Induction Motors ......................................... 1- 9 26 22 00 DB Low-Voltage Transformers ...................................................... 1- 5 26 24 16 DB Panelboards .............................................................................. 1- 7 26 24 19 DB Low-Voltage Motor Control .................................................... 1- 14 26 27 26 DB Wiring Devices ........................................................................ 1- 10 26 29 23 DB Low-Voltage Adjustable Frequency Drive System .................