This document is Addendum 1 to the 100% Complete Construction Documents for the Replace Wastewater Plant South Rim Village project (GRCA-257282) at Grand Canyon National Park, issued June 10, 2026, by Jacobs Government Services Company under Contract No. 140P2023D0006, Task Order No. 140P2023F0235.
The addendum addresses comments from the National Park Service Design and Construction Standards review and implements minor updates across drawings, specifications, and standard details. Key revisions include: updating IBC code references from 2024 to 2021 edition across five architectural life safety plan sheets; standardizing paint color specifications from "Dover Gray" to "Classic French Gray SW0077" across six architectural schedule sheets; correcting plumbing isometric callouts on the Administration Building drawing; adding non-potable water signage details and specifications; updating the Hub Drain standard detail to remove trap primer references; adding cross-connection testing requirements to Total Building Commissioning specifications; adding NICET Level 2 certification requirements for fire alarm installers; and creating new caution sign details for non-potable water utilization. The revised documents maintain the 100% completion status of construction documents and incorporate all changes approved during the design review process. Supporting materials include updated sign schedules, detailed specifications for signage and fire alarm systems, and comprehensive commissioning requirements with equipment testing protocols and operator training provisions.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Park Service
Replace Wastewater Plant South Rim Village
GRCA-257282
100% Complete Construction Documents Addendum 1
June 10, 2026
Prepared by:
Jacobs Government Services Company
Greenwood Village, CO
Contract No. 140P2023D0006
Task Order No. 140P2023F0235
GRCA 257282 – 100% Complete CD: Addendum 01
Jacobs Engineering Group Inc. 2
1. Addendum Contents
This addendum address comments from NPS DCS review of 100% Final Construction Documents, dated
June 2025, prepared for the Replace Wastewater Plant South Rim Village project. The comments resulted in minor updates to drawings, specifications and standard details. Revised documents are listed below and attached.
1.1 Revisions to Drawings
New or
Updated
Sheet
No.
DWG No. Sheet Name Description
Updated 1A 01G0001 WWTP Replacement Revision Block
Updated 2A 01G0002 General Index of Drawings Updated sheet numbers for drawing revisions
Updated 3A 01G0003 General Index of Drawings Updated sheet numbers for drawing revisions
Updated 16A 01A0010 Architectural Code Data and
Life Safety Plan
Administration Building
Updated IBC reference from 2024 IBC to 2021 IBC.
Updated 17A 01A0012 Architectural Code Data and
Life Safety Plan Maintenance
Building
Updated IBC reference from 2024 IBC to 2021 IBC.
Updated 18A 01A0020 Architectural Code Data and
Life Safety Plan Headworks
Updated 19A 01A0032 Architectural Code Data and
Life Safety Plan Process
Building
Updated 20A 01A0080 Architectural Code Data and
Life Safety Plan Digester
Facility
Updated 190A 10A6001 Administration Building
Architectural Schedules
Updated Sherwin Williams “Dover
Gray” to “Classic French Gray SW0077”
Updated 200A 10P9003 Administration Building
Plumbing Isometric
Corrected RW and W1 callouts.
Updated 220A 12A6001 Maintenance Building
Architectural Schedules
Updated Sherwin Williams “Dover
Gray” to “Classic French Gray SW0077”
Updated 253A 20A6001 Headworks Architectural
Schedules
Updated Sherwin Williams “Dover
Gray” to “Classic French Gray SW0077”
GRCA 257282 – 100% Complete CD: Addendum 01
Jacobs Engineering Group Inc. 3
Updated 311A 32A6001 Process Building Architectural
Schedules
Updated Sherwin Williams “Dover
Gray” to “Classic French Gray SW0077”
Updated 342A 70D3001 Reclaimed Water Tank
Mechanical Sections
Addition of non-potable water signage
Updated 357A 80A6001 Digester Facility Architectural
Schedules
Updated Sherwin Williams “Dover
Gray” to “Classic French Gray SW0077”
1.2 Revisions to Standard Details
New of
Updated
Standard
Detail No.
Name Description
Updated Index Index Added detail 1014-002
Updated 1014-002
Detail 1 of 2
Caution Sign Made Detail 1 of 2
New 1014-002
Detail 2 of 2
Caution Sign Detail 2 of 2; New detail for non-potable water utilization
Updated 2240-100A Hub Drain Deleted reference to trap primers
1.3 Revisions to Specifications
New of
Updated
Specification
No.
Name Description
Updated 01 91 15 Total Building
Commissioning
Added requirement for cross connection test
Updated 10 14 00 Signage Added signage regarding non-potable water
Updated 28 31 00 Fire Alarm and Detection Updated spec to include NICET Level 2 for fire alarm installer
FLAGSTAFF
BULLHEAD
CITY
KINGMAN
LAKE
HAVASU
CITY
PRESCOTT
WINSLOW
JACOB
LAKE
N E
V A
D A
U T
A H
UTAH
ARIZONA
GLEN
CANYON
N.R.A.
LAKE
MEAD
N.R.A
GRAND
CANYON
NATIONAL
PARK
PAGE
JACOB LAKE
VULCANS
THRONE
TUWEEP
HUALAPAI
HILLTOP
G R
A N
D W
A S H C
LI
FF
S
D R
Y C
A N
Y O
N
C A N
Y O
N S E P A R
A
TI
O N
MOLLIES
NIPPLE
TUCKUP
POINT
KANAB
POINT
GREAT
THUMB
MESA
POINT
IMPERIAL
CAPE
SOLITUDE
LAKE MEAD
NATIONAL
RECREATION AREA
HAVASUPAI
INDIAN
RESERVATION
NAVAJO
INDIAN
RESERVATION
KAIBAB
NATIONAL
FOREST
V.C. CAPE
ROYAL
GRAND
CANYON
VILLAGE
POINT
SUBLIME GRAND
CANYON
LODGE
T U
C K
U P
C A
N Y
O N
T O
R O
W E
A P
V A
L L E
Y
KAIBAB PLATEAU
CO
LO
RADO
R
IV
ER
R
IV
E R
L
IT
T L E
C O
L O
R A
D O
NORTH RIM
ENTRANCE
STATION
POW
ELL
P
LATE
AU
H A
V A S
U C
R E
E K
C A
T A
R A
C T
TAPEATS
CREEK
W H
ITM
O R E C
A N
Y O
N
U
IN
K A
R E
T M
T N
S
GLEN
CANYON
N.R.A.
CANYON RIM
ALT
D
IA
M O
N D
CREEK
TO WILLIAMS
AND
CANYON
RIM
KAIBAB
NATIONAL
FOREST
BOUNDARY ON SOUTH
BANK OF COLORADO RIVER
(SUBJECT TO CONCURRENCE
OF HUALAPAI TRIBE)
S H
IV
W
ITS
P
LA
TE
A U
K A
N A
B C
R E
E K
BRIGHT
ANGEL
POINT
M A
R B
L E
C A
N Y
O N
HUALAPAI
INDIAN
RESERVATION
C O
L O
R A
D O
R
IV
E R
DESERT
VIEW
HERMITS
REST
TOROWEAP
POINT
TO
PEACH SPRINGS,
SELIGMAN &
NORTH
RIM
SOUTH
RIM
LEE'S
FERRY
HQ.
C R
E E
K
TRIBE
OF NAVAJO
CONCURRENCE
SUBJECT TO
CANYON RIM
BOUNDARY ON
GRAND CANYON NATIONAL PARK
WORLD HERITAGE SITE
UNESCO
PARK BOUNDARY
UNPAVED ROAD
VISITOR CENTER
RANGER STATION
PARK HEADQUARTERSHQ.
PICNIC AREA
V.C.
TRAIL
RIVER
PAVED ROAD
SCALE OF KILOMETERS
SCALE OF MILES
5 0
15105
5 10
SCALE OF MILES
30 0 30
BASIC DATA:
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
DEPARTMENT OF THE INTERIOR
UNITED STATES
OF
175376
DRAWING NO.
TITLE OF DRAWING
COUNTY
COCONINO
STATE
ARIZONA
REGION
INTERMOUNTAIN
LOCATION WITHIN PARK
NAME OF PARK
GRAND CANYON NATIONAL PARK
QUALITY DESIGN CERTIFICATION
OR
OR
by Design Development (Title I)
Construction Drawing Not Preceded
Approved by Superintendent on
Variance from Design Development (Title I)
Project Manager
Drawing No.
Date
Date
Prepared in Accordance with Design
Development (Title I)
SheetMark REVISION Date Initial
A/E FIRM
REVISED & REDRAWN 2/91. UPDATED 11/98. SGS.
LAND STATUS MAP 113/80,011 7/75; PARK MINI FOLDER 1989;
LEGEND
ARIZONA
NORTHERN
SOUTH RIM VILLAGE
WWTP REPLACEMENT
LOCATION
PROJECT
SCALE OF MILES
VICINITY MAP
0.25 0.25
LOCATION
PROJECT
VILLAGE
CANYON
GRAND
GRCA 257282
HERMIT RD
HUALAPAI RD
CENTER RD
ROWE WELL RD
APACHE W ST
S ENTRANCE RD
VILLAGE LOOP DR
POWER LINE RD
VILLAGE, CO
GREENWOOD
COMPANY
SERVICES
GOVERNMENT
JACOBS
SHEET
257282
PMIS/PKG NO.
P L
O T D
A T
E
P L
O T T
IM
E
\0
\2
:4
:3
A
M S
S /V i
F
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
1A
100% DRAFT CONSTRUCTION DOCUMENTS
ACCESS ROAD IMPROVEMENT
REPLACE WASTEWATER PLANT AT SOUTH RIM VILLAGE
MULT. ADDENDUM NO. 1 6/1/26 KR1
Expires
.A.S.U ,ANOZI
RA
ON
ETACIFITRE
C dengiS et a
D
ROSINSKI
KATARZYNA
77237
)li vi
C( r e en ig nE la noisseforP d er et si g e
R
6- 9-2
Expires 12-31-2028
P L
O T D
A T
E
P L
O T T
IM
E
\0
\2
:4
:0
A
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V i
08/2025
VILLAGE, CO
GREENWOOD
COMPANY
SERVICES
GOVERNMENT
JACOBS
PMIS/PKG NO.
257282
F
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
REVISED BY ADDENDUM NO. 11
R COWAN
K WEBSTER
R COWAN INDEX OF DRAWINGS
GENERAL
01G0002
AERATED COMPOST P&ID09N8701174
PLANT DRAIN PUMP STATION P&ID09N8601173
DRYING BED P&ID09N8501172
DIGESTER UTILITIES P&ID09N8003171
DIGESTER SYSTEM P&ID09N8002170
AEROBIC DIGESTER BLOWERS P&ID09N8001169
PROCESS UTILITIES P&ID09N3213168
RECLAIMED WATER AND NONPOTABLE WATER PUMPS P&ID09N3212167
MEMBRANE AIR COMPRESSOR P&ID09N3211166
AERATION BLOWERS P&ID09N3210165
MAGNESIUM HYDROXIDE PUMPS P&ID09N3209164
SUPPLEMENTAL CARBON PUMPS P&ID09N3208163
MEMBRANE CLEANING CITRIC ACID PUMPS P&ID09N3207162
SODIUM HYPOCHLORITE PUMPS P&ID09N3206161
MEMBRANE CLEANING SODIUM HYPOCHLORITE PUMPS P&ID09N3205160
DISINFECTION AND UV EFFLUENT BOOSTER PUMPS P&ID09N3204159
MEMBRANE AIR SCOUR BLOWERS P&ID09N3203158
MBR PERMEATE PUMPS P&ID09N3202157
MEMBRANE SYSTEM P&ID09N3201156
MIXED LIQUOR SPLITTER WAS PUMPS P&ID09N2503155
BIOREACTORS P&ID09N2502154
EQUALIZATION BASIN AND TANK DRAIN PUMP STATION P&ID09N2501153
ODOR CONTROL P&ID09N2201152
HEADWORKS UTILITIES P&ID09N2005151
FINE SCREENING P&ID09N2004150
GRIT WASHING AND DEWATERING P&ID09N2003149
GRIT BASIN P&ID09N2002148
INFLUENT SCREENING P&ID09N2001147
SEPTAGE RECEIVING P&ID09N1801146
GENERATOR P&ID09N0801145
FACILITY 12 MAINTENANCE BUILDING NIP-1201 NETWORK INTERFACE PANEL09N0104144
FACILITY 80 DIGESTION LCP-8001 CONTROL PANEL LAYOUT09N0103143
FACILITY 20 HEADWORKS LCP-2001 CONTROL PANEL LAYOUT09N0102142
FACILITY 20 HEADWORKS LCP-2001 CONTROL PANEL LAYOUT09N0101141
FACILITY 10 ADMIN BUILDING NETWORK INTERFACE PANELS09N0100140
NETWORK ARCHITECTURE DRAWING09N0040139
COMMUNICATION NETWORK DIAGRAM09N0007138
COMMUNICATION NETWORK DIAGRAM09N0006137
COMMUNICATION NETWORK DIAGRAM09N0005136
COMMUNICATION NETWORK DIAGRAM09N0004135
COMMUNICATION NETWORK DIAGRAM09N0003134
COMMUNICATION NETWORK DIAGRAM09N0002133
COMMUNICATION FIBER BACKBONE09N0001132
09 - INSTRUMENTATION AND CONTROL
EXTERIOR LIGHTING CONTROL DIAGRAM08E7110131
MOTOR CONTROL DIAGRAM08E7106130
MOTOR CONTROL DIAGRAM08E7105129
MOTOR CONTROL DIAGRAMS08E7104128
MOTOR CONTROL DIAGRAM08E7103127
MOTOR CONTROL DIAGRAMS08E7102126
MOTOR CONTROL DIAGRAMS08E7101125
MOTOR CONTROL DIAGRAMS08E7100124
DUCTBANK SCHEDULE08E7004123
DUCTBANK SCHEDULE08E7003122
DUCTBANK SCHEDULE08E7002121
DUCTBANK SCHEDULE08E7001120
LUMINAIRE SCHEDULE08E6002119
LUMINAIRE SCHEDULE08E6001118
PLAN - AREA 408E2004117
PLAN - AREA 308E2003116
PLAN - AREA 208E2002115
PLAN - AREA 108E2001114
PLAN - OVERALL08E2000113
08 - SITE ELECTRICAL
DETAILS07Y5002112
INFLUENT MANHOLE DETAIL07Y5001111
ENLARGED PLAN07Y4001110
SECTIONS07Y3004109
PIPE PROFILE07Y3003108
PIPE PROFILE07Y3002107
PIPE PROFILES07Y3001106
PLAN - AREA 407Y2004105
PLAN - AREA 307Y2003104
PLAN - AREA 207Y2002103
PLAN - AREA 107Y2001102
PLAN - OVERALL07Y2000101
EXISTING UTILITIES PLAN - OVERALL07Y1000100
07 - YARD PIPING
SHEET TITLE/DESCRIPTIONSUB SHEETSHEET
ELECTRICAL PLAN18E1030234
MECHANICAL PLAN, SECTION AND DETAIL18D1030233
STRUCTURAL PLAN AND SECTION18S1030232
18 - RECEIVING STATION
ELECTRICAL PANELBOARD SCHEDULES12E6001231
ELECTRICAL ROOF PLAN12E1040230
ELECTRICAL LIGHTING PLAN12EL1030229
ELECTRICAL POWER PLAN12EP1030228
PLUMBING ISOMETRIC12P9002227
PLUMBING ISOMETRIC12P9001226
PLUMBING ROOF PLAN12P1040225
PLUMBING FLOOR PLAN12P1030224
PLUMBING BELOW GRADE PLAN12P1020223
HVAC SECTION12M3001222
HVAC FLOOR PLAN12M1030221
ARCHITECTURAL SCHEDULES12A6001220A
ARCHITECTURAL INTERIOR ELEVATIONS12A4001219
ARCHITECTURAL SECTIONS12A3001218
ARCHITECTURAL ELEVATIONS12A2002217
ARCHITECTURAL ELEVATIONS12A2001216
ARCHITECTURAL ROOF PLAN12A1040215
ARCHITECTURAL REFLECTED CEILING PLAN12A1039214
ARCHITECTURAL FLOOR PLAN12A1030213
STRUCTURAL SECTIONS12S3003212
STRUCTURAL SECTION12S3002211
STRUCTURAL SECTION12S3001210
STRUCTURAL ROOF PLAN12S1040209
STRUCTURAL FOUNDATION/FLOOR PLAN12S1030208
12 - MAINTENANCE BUILDING
ELECTRICAL PANELBOARD SCHEDULES10E6002207
ELECTRICAL PANELBOARD SCHEDULES10E6001206
ELECTRICAL POWER PLAN - ENLARGED10E4001205
ELECTRICAL ROOF PLAN10E1040204
ELECTRICAL LIGHTING PLAN10EL1030203
ELECTRICAL POWER PLAN10EP1030202
PLUMBING ISOMETRIC10P9004201
PLUMBING ISOMETRIC10P9003200A
PLUMBING ISOMETRIC10P9002199
PLUMBING ISOMETRIC10P9001198
PLUMBING RO WATER SYSTEM DIAGRAM10P6001197
PLUMBING ENLARGED PLANS10P4001196
PLUMBING ROOF PLAN10P1040195
PLUMBING FLOOR PLAN10P1030194
PLUMBING UNDERFLOOR PLAN10P1020193
HVAC FLOOR PLAN10M1030192
ARCHITECTURAL SCHEDULES10A6002191
ARCHITECTURAL SCHEDULES10A6001190A
ARCHITECTURAL INTERIOR ELEVATIONS10A4004189
ARCHITECTURAL ENLARGED PLANS10A4003188
ARCHITECTURAL INTERIOR ELEVATIONS10A4002187
ARCHITECTURAL ENLARGED PLANS10A4001186
ARCHITECTURAL SECTIONS10A3001185
ARCHITECTURAL ELEVATIONS10A2002184
ARCHITECTURAL ELEVATIONS10A2001183
ARCHITECTURAL ROOF PLAN10A1040182
ARCHITECTURAL REFLECTED CEILING PLAN10A1039181
ARCHITECTURAL FLOOR PLAN10A1030180
STRUCTURAL SECTIONS10S3003179
STRUCTURAL SECTIONS10S3002178
STRUCTURAL SECTION10S3001177
STRUCTURAL ROOF PLAN10S1040176
STRUCTURAL FOUNDATION/FLOOR PLAN10S1030175
10 - ADMINISTRATION BUILDING
SHEET TITLE/DESCRIPTIONSUB SHEETSHEET
2A
IRRIGATION DETAILS06I500199
IRRIGATION PLAN - AREA 106I200198
LANDSCAPE SCHEDULE NOTES AND DETAILS06L500197
LANDSCAPE PLAN - AREA 106L200196
LANDSCAPE PLAN - OVERALL06L200095
CROSS SECTIONS06C300294
CROSS SECTIONS06C300193
GRADING PLAN - AREA 406C240492
GRADING PLAN - AREA 306C240391
GRADING PLAN - AREA 206C240290
GRADING PLAN - AREA 106C240189
GRADING PLAN - OVERALL06C240088
TESC PLAN PERMANENT STABILIZATION06C210387
TESC PLAN PHASE 206C210286
TESC PLAN PHASE 106C210185
TESC PLAN PRECONSTRUCTION06C210084
COORDINATE TABLES06C202083
SITE PLAN - AREA 406C200482
SITE PLAN - AREA 306C200381
SITE PLAN - AREA 206C200280
SITE PLAN - AREA 106C200179
SITE PLAN - OVERALL06C200078
EXISTING SITE PLAN06C100077
DEMOLITION 98 - RECLAMATION PLANT SECTION N-S06X112476
DEMOLITION 98 - RECLAMATION PLANT SECTION E-W06X112375
DEMOLITION 98 - RECLAMATION PLANT GALLERY PLAN06X112274
DEMOLITION 98 - RECLAMATION PLANT CLEARWELL PLAN06X112173
DEMOLITION 98/99 - BACKWASH POND PIPING AND GRADING06X112072
DEMOLITION 97 - SLUDGE DRYING BEDS SECTIONS AND DETAILS06X111971
DEMOLITION 97 - SLUDGE DRYING BEDS SITE AND GRADING PLAN06X111870
DEMOLITION 96 - AEROBIC DIG. TANKS SECTIONS AND DETAILS06X111769
DEMOLITION 96 - AEROBIC DIG. TANKS PLAN06X111668
DEMOLITION 94 - SECONDARY CLARIFIER SECTIONS06X111567
DEMOLITION 94 - SECONDARY CLARIFIER PLAN AND DETAILS06X111466
DEMOLITION 93 - FINAL SED. TANK PLAN, SECTIONS & DETAILS06X111365
DEMOLITION 92B - AERATION BASINS SECTIONS E-W06X111264
DEMOLITION 92B - AERATION BASIN PLAN06X111163
DEMOLITION 92A - AERATION TANKS SECTIONS AND DETAILS06X111062
DEMOLITION 92A - AERATION TANKS PLAN AND SECTION06X110961
DEMOLITION 92B - AERATION BASINS SECTIONS N-S06X110860
DEMOLITION 91 - PRETREATMENT BLDG TUNNEL PLANS06X110759
DEMOLITION 91 - PRETREATMENT BLDG SECTION N-S06X110658
DEMOLITION 91 - PRETREATMENT BLDG SECTION E-W06X110557
DEMOLITION 91 - PRETREATMENT BLDG LOWER LEVEL PLAN06X110456
DEMOLITION 90 - CONTROL BUILDING SECTIONS AND DETAILS06X110355
DEMOLITION 90 - CONTROL BUILDING GROUND FLOOR PLAN06X110254
DEMOLITION 90 - CONTROL BUILDING LOWER FLOOR PLAN06X110153
DEMOLITION PLAN - EXISTING UTILITIES06X100352
DEMOLITION PLAN - PHASE 206X100251
DEMOLITION PLAN - PHASE 106X100150
DEMOLITION PLAN - OVERALL06X100049
06 - CIVIL
DESIGN CRITERIA01G040148
DESIGN CRITERIA01G040047
PIPING SCHEDULE01G030246
PIPING SCHEDULE01G030145
PIPING SCHEDULE01G030044
SELF REGULATED VALVE SCHEDULE01G026143
POWER ACTUATED VALVE SCHEDULE01G026042
AREA CLASSIFICATION AND MATERIALS SELECTION TABLE01G025141
AREA CLASSIFICATION AND MATERIALS SELECTION TABLE01G025040
HYDRAULIC PROFILE 01G020139
HYDRAULIC PROFILE 01G020038
RESIDUALS PROCESS FLOW DIAGRAM01G011037
LIQUID PROCESS FLOW DIAGRAM01G010036
ELECTRICAL LEGEND01E000235
ELECTRICAL LEGEND01E000134
PLUMBING CONTROL DIAGRAM01P600233
PLUMBING CONTROL DIAGRAM01P600132
PLUMBING LEGEND01P000131
HVAC CONTROL DIAGRAM01M600830
HVAC CONTROL DIAGRAM01M600729
HVAC CONTROL DIAGRAM01M600628
HVAC CONTROL DIAGRAM01M600527
HVAC CONTROL DIAGRAM01M600426
HVAC CONTROL DIAGRAM01M600325
HVAC CONTROL DIAGRAM01M600224
HVAC CONTROL DIAGRAM01M600123
HVAC LEGEND01M000122
PROCESS LEGEND01D000121
ARCHITECTURAL CODE DATA AND LIFE SAFETY PLANS DIGESTER FACILITY01A008020A
ARCHITECTURAL CODE DATA AND LIFE SAFETY PLANS PROCESS BUILDING01A003219A
ARCHITECTURAL CODE DATA AND LIFE SAFETY PLAN HEADWORKS01A002018A
ARCHITECTURAL CODE DATA AND LIFE SAFETY PLAN MAINTENANCE BUILDING01A001217A
ARCHITECTURAL CODE DATA AND LIFE SAFETY PLAN ADMINISTRATION BUILDING01A001016A
ARCHITECTURAL NOTES, MATERIAL SYMBOLS, AND LEGEND01A000115
STRUCTURAL GENERAL STEEL DETAILS01S500314
STRUCTURAL GENERAL COLUMN REINFORCEMENT01S500213
STRUCTURAL GENERAL BEAM REINFORCEMENT01S500112
STRUCTURAL GENERAL NOTES01S000311
STRUCTURAL GENERAL NOTES01S000210
STRUCTURAL GENERAL NOTES01S00019
INSTRUMENTATION AND CONTROL LEGEND01N00028
INSTRUMENTATION AND CONTROL LEGEND01N00017
CIVIL LEGEND01C00016
LEGEND01G00105
ABBREVIATIONS01G00054
INDEX OF DRAWINGS01G00033A
INDEX OF DRAWINGS01G00022A
COVER SHEET01G00011A
01 - GENERAL
SHEET TITLE/DESCRIPTIONSUB SHEETSHEET
Expires
.A.S.U ,ANOZI
RA
ON
ETACIFITRE
D
ROSINSKI
KATARZYNA
77237
)li vi
C( r e en ig nE la noisseforP d er et si g e
R
6- 9-2
O T D
A T
E
P L
O T T
IM
E
\0
\2
:4
:5
A
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T
R COWAN
K WEBSTER
R COWAN INDEX OF DRAWINGS
GENERAL
01G0003
ELECTRICAL PANELBOARD SCHEDULES32E6002339
ELECTRICAL PANELBOARD SCHEDULES32E6001338
ELECTRICAL ONE-LINE DIAGRAM 32-MCC-0132E5002337
ELECTRICAL ONE-LINE DIAGRAM 32-SWBD-0132E5001336
ELECTRICAL ROOF PLAN32E1040335
ELECTRICAL MAIN LEVEL FACILITY PLAN32EF1030334
ELECTRICAL LOWER LEVEL FACILITY PLAN32EF1020333
ELECTRICAL MAIN LEVEL PROCESS PLAN32EP1030332
ELECTRICAL LOWER LEVEL PROCESS PLAN32EP1020331
FIRE PROTECTION MAIN LEVEL PLAN32FP1030330
FIRE PROTECTION LOWER LEVEL PLAN32FP1020329
PLUMBING ISOMETRIC32P9002328
PLUMBING ISOMETRIC32P9001327
PLUMBING ROOF PLAN32P1040326
PLUMBING MAIN LEVEL PLAN32P1030325
PLUMBING LOWER LEVEL PLAN32P1020324
PLUMBING BELOW SLAB PLAN32P1010323
HVAC SECTION32M3002322
HVAC SECTION32M3001321
HVAC MAIN LEVEL PLAN32M1030320
HVAC LOWER LEVEL PLAN32M1020319
MECHANICAL DETAILS32D5001318
MECHANICAL SECTIONS32D3004317
MECHANICAL SECTIONS32D3003316
MECHANICAL SECTIONS32D3002315
MECHANICAL SECTIONS32D3001314
MECHANICAL UPPER PLAN32D1030313
MECHANICAL LOWER PLAN32D1020312
ARCHITECTURAL SCHEDULES32A6001311A
ARCHITECTURAL SECTION32A3002310
ARCHITECTURAL SECTIONS32A3001309
ARCHITECTURAL ELEVATIONS32A2002308
ARCHITECTURAL ELEVATIONS32A2001307
ARCHITECTURAL ROOF PLAN32A1040306
ARCHITECTURAL MAIN LEVEL PLAN32A1030305
ARCHITECTURAL LOWER LEVEL PLAN32A1020304
STRUCTURAL STEEL DETAILS32S5010303
STRUCTURAL BEAM REINFORCEMENT32S5001302
STRUCTURAL SECTIONS32S3003301
STRUCTURAL SECTION32S3002300
STRUCTURAL SECTION32S3001299
STRUCTURAL ROOF FRAMING PLAN32S1040298
STRUCTURAL MAIN LEVEL PLAN32S1030297
STRUCTURAL LOWER LEVEL PLAN32S1020296
32 - PROCESS BUILDING
ELECTRICAL UPPER FACILITY PLAN25EF1030295
ELECTRICAL UPPER PROCESS PLAN25EP1030294
ELECTRICAL LOWER PROCESS PLAN25EP1020293
PLUMBING UPPER PLAN25P1030292
MECHANICAL SECTIONS25D3004291
MECHANICAL SECTIONS25D3003290
MECHANICAL SECTIONS25D3002289
MECHANICAL SECTION25D3001288
MECHANICAL UPPER PLAN25D1030287
MECHANICAL LOWER PLAN25D1020286
STRUCTURAL DETAILS25S5001285
STRUCTURAL ENLARGED PLANS25S4001284
STRUCTURAL SECTION25S3004283
STRUCTURAL SECTIONS25S3003282
STRUCTURAL SECTIONS25S3002281
STRUCTURAL SECTIONS25S3001280
STRUCTURAL MONORAIL FRAME PLAN25S1040279
STRUCTURAL UPPER LEVEL PLAN25S1030278
STRUCTURAL LOWER LEVEL PLAN25S1020277
25 - PROCESS TANKS
ELECTRICAL PLAN22E1030276
MECHANICAL SECTIONS22D3001275
MECHANICAL PLAN22D1030274
STRUCTURAL PLAN AND SECTION22S1030273
22 - ODOR CONTROL
ELECTRICAL PANELBOARD SCHEDULES20E6001272
ELECTRICAL ONE-LINE DIAGRAM 20-MCC-0120E5001271
ELECTRICAL ROOF PLAN20E1040270
ELECTRICAL FACILITY PLAN20EF1030269
ELECTRICAL PROCESS PLAN20EP1030268
PLUMBING ISOMETRIC20P9001267
PLUMBING PLAN20P1030266
PLUMBING LOWER LEVEL PLAN20P1020265
HVAC SECTIONS20M3001264
HVAC PLAN20M1030263
MECHANICAL ISOMETRIC20D5003262
MECHANICAL ISOMETRIC20D5002261
MECHANICAL ISOMETRIC20D5001260
MECHANICAL ENLARGED PLANS AND SECTIONS20D4002259
MECHANICAL ENLARGED PLAN20D4001258
MECHANICAL SECTION20D3003257
MECHANICAL SECTIONS20D3002256
MECHANICAL SECTION20D3001255
MECHANICAL PLAN20D1030254
ARCHITECTURAL SCHEDULES20A6001253A
ARCHITECTURAL SECTIONS20A3001252
ARCHITECTURAL ELEVATIONS20A2002251
ARCHITECTURAL ELEVATIONS20A2001250
ARCHITECTURAL ROOF PLAN20A1040249
ARCHITECTURAL FLOOR PLAN20A1030248
STRUCTURAL STEEL DETAILS20S5010247
STRUCTURAL DETAILS20S5001246
STRUCTURAL ENLARGED PLANS AND SECTION20S4003245
STRUCTURAL ENLARGED PLANS20S4002244
STRUCTURAL ENLARGED PLAN20S4001243
STRUCTURAL SECTIONS20S3005242
STRUCTURAL SECTIONS20S3004241
STRUCTURAL SECTIONS20S3003240
STRUCTURAL SECTION20S3002239
STRUCTURAL SECTIONS20S3001238
STRUCTURAL ROOF FRAMING PLAN20S1040237
STRUCTURAL FLOOR PLAN20S1030236
STRUCTURAL LOWER LEVEL PLAN20S1020235
20 - HEADWORKS
SHEET TITLE/DESCRIPTIONSUB SHEETSHEET
ARCHITECTURAL ROOF PLAN AND SCHEDULES88A1040401
STRUCTURAL ROOF PLAN88S1040400
STRUCTURAL PLAN AND SECTION88S1030399
88 - COVERED STORAGE
ELECTRICAL POWER PLAN87E1030398
MECHANICAL PLAN, SECTIONS AND DETAIL87D1030397
ARCHITECTURAL ROOF PLAN AND SCHEDULES87A1040396
STRUCTURAL DETAILS87S5001395
STRUCTURAL SECTION87S3002394
STRUCTURAL SECTION87S3001393
STRUCTURAL ROOF PLAN87S1040392
STRUCTURAL FOUNDATION PLAN AND DETAIL87S1030391
87 - COMPOST FACILITY
ELECTRICAL PLAN86E1030390
MECHANICAL PLAN AND SECTION86D1030389
86 - PLANT DRAIN PUMP STATION
MECHANICAL ENLARGED PLAN AND SECTIONS85D4001388
MECHANICAL PLAN - OVERALL85D1030387
STRUCTURAL DETAILS85S5001386
STRUCTURAL ENGLARGED PLAN85S4001385
STRUCTURAL SECTIONS85S3002384
STRUCTURAL OVERALL SECTION85S3001383
STRUCTURAL PLAN - AREA B85S1032382
STRUCTURAL PLAN - AREA A85S1031381
STRUCTURAL PLAN - OVERALL85S1030380
85 - DRYING BEDS
ELECTRICAL PANELBOARD SCHEDULES80E6001379
ELECTRICAL ONE-LINE DIAGRAM 80-MCC-0180E5001378
ELECTRICAL ROOF LEVEL FACILITY PLAN80EF1050377
ELECTRICAL UPPER LEVEL FACILITY PLAN80EF1040376
ELECTRICAL LOWER LEVEL FACILITY PLAN80EF1030375
ELECTRICAL ROOF LEVEL PROCESS PLAN80EP1050374
ELECTRICAL UPPER LEVEL PROCESS PLAN80EP1040373
ELECTRICAL LOWER LEVEL PROCESS PLAN80EP1030372
PLUMBING ISOMETRICS80P9001371
PLUMBING ROOF PLAN80P1050370
PLUMBING UPPER LEVEL PLAN80P1040369
PLUMBING LOWER LEVEL PLAN80P1030368
PLUMBING UNDER FLOOR PLAN80P1020367
HVAC SECTION80M3001366
HVAC ROOF PLAN80M1050365
HVAC UPPER LEVEL PLAN80M1040364
HVAC LOWER LEVEL PLAN80M1030363
MECHANICAL SECTION80D3003362
MECHANICAL SECTIONS80D3002361
MECHANICAL SECTIONS80D3001360
MECHANICAL UPPER LEVEL PLAN80D1040359
MECHANICAL LOWER LEVEL PLAN80D1030358
ARCHITECTURAL SCHEDULES80A6001357A
ARCHITECTURAL SECTIONS80A3001356
ARCHITECTURAL ELEVATIONS80A2002355
ARCHITECTURAL ELEVATIONS80A2001354
ARCHITECTURAL ROOF PLAN80A1050353
ARCHITECTURAL UPPER LEVEL PLAN80A1040352
ARCHITECTURAL LOWER LEVEL PLAN80A1030351
STRUCTURAL BEAM REINFORCEMENT80S5001350
STRUCTURAL ENLARGED PLAN AND SECTIONS80S4001349
STRUCTURAL SECTIONS80S3002348
STRUCTURAL SECTIONS80S3001347
STRUCTURAL UPPER LEVEL PLAN80S1050346
STRUCTURAL INTERMEDIATE LEVEL PLAN80S1040345
STRUCTURAL LOWER LEVEL PLAN80S1030344
80 - DIGESTER FACILITY
ELECTRICAL PROCESS PLAN70EP1030343
MECHANICAL SECTIONS70D3001342A
MECHANICAL PLAN70D1030341
STRUCTURAL PLAN AND SECTION70S1030340
70 - RECLAIMED WATER TANK
SHEET TITLE/DESCRIPTIONSUB SHEETSHEET
3A
Expires
.A.S.U ,ANOZI
RA
ON
ETACIFITRE
D
ROSINSKI
KATARZYNA
77237
)li vi
C( r e en ig nE la noisseforP d er et si g e
R
6- 9-2
M
IN
,T
Y P
P L
O T D
A T
E
P L
O T T
IM
E
\0
\2
:1
:0
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
REVISED BY ADDENDUM NO. 11
1/8"=1'-0"N
GENERAL SHEET NOTES
X:Y
FEET TO Y, EXIT NUMBER)
(X = TOTAL DISTANCE IN
TRAVEL DISTANCE
OCC
SQ FT
OLF OL
OCCUPANT LOAD
OCCUPANT LOAD FACTOR
ROOM SQ FOOTAGE
ROOM NUMBER
ROOM NAME
658 FT
10101
HALL
B
160 FT
10113
300B
291 FT
10111
300B
406 FT
10112
300B
ELECTRICAL ROOM
C:71
A:108
SCADA ROOM
388 FT
10110
I&C SHOP
F-1
190 FT
10108
150B
SUPERVISOR'S OFFICE
C:70
A:58
731 FT
10109
MULTIPURPOSE ROOM
543 FT
10107
150B
PROCESS LAB
84 FT
10105
B
C:75
A:49
RESTROOM
84 FT
10104
B
RESTROOM
161 FT
10102
B 50
LOCKER ROOM
249 FT
10106
150B
ADMINISTRATION BUILDING
LIFE SAFETY PLAN - FACILITY 10
CERTIFIED LAB
24 FT
10103
B
JANITOR CLOSET
PATH OF TRAVEL (CPT)
LONGEST COMMON
B:13
C:59
A:95
C:96
A:44
B
OL
X"
X"
AT EXIT DOOR
OCCUPANT LOAD
WIDTH PER 2024 IBC 1010.1.1)
(32" MINIMUM EGRESS
DOOR WIDTH PROVIDED
IBC 1005.3.2
WIDTH REQUIRED PER 2024
0.2 x OCCUPANT LOAD = DOOR
B
36"
0.2"
C
36"
6.4"
D
34"
0.2"
A
34"
6.6"
P E
R
.3
C:53
A:30
EXIT NUMBER
MECHANICAL ROOM
BUILDING
DRAWING 10A1030.
FOR FIRE EXTINGUISHER LOCATIONS. SEE C.
FOR ABBREVIATIONS, SEE DRAWING 01G0005.B.
DRAWING 01A0001.
SYMBOLS, LEGEND AND ABBREVIATIONS, SEE
FOR GENERAL ARCHITECTURAL NOTES, MATERIAL A.
OCCUPANCY GROUP
E
36"
0.8"
19 FT
10114
B
STORAGE CLOSET
E:30
C:72
A:50
D:16
C:30
A:87
LEGEND
LIFE SAFETY PLAN
ADDITIONAL INFORMATION
DRAWING 10A1030 FOR
ACCESSIBLE SPACES, SEE
M SHOEMAKER
G KIRSTEN
LIFE SAFETY PLAN
ADMINISTRATION BUILDING
M COLLINS CODE DATA AND
ARCHITECTURAL
01A0010
0 8 16 24
1/8"=1'-0"
CPT:49
C:113
A:61
16A
.A.S.U ,ANOZI
RA
ON
ETACIFITRE
C
T
CE
TI
HCRA DERETSI
G E
R
SHOEMAKER
MORGAN
80680
06-30-2027
.... dengiS
D
Expires
6/ 9/
O T D
A T
E
P L
O T T
IM
E
\0
\2
:2
:5
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
REVISED BY ADDENDUM NO. 11
1/8"=1'-0"
GENERAL SHEET NOTES
X:Y
FEET TO Y, EXIT NUMBER)
(X = TOTAL DISTANCE IN
TRAVEL DISTANCE
OCC
SQ FT
OLF OL
OCCUPANT LOAD
OCCUPANT LOAD FACTOR
ROOM SQ FOOTAGE
ROOM NUMBER
ROOM NAME
12101
LIFE SAFETY PLAN - FACILITY 12
1,210 FT
13F-1
MECHANICAL SHOP
12103
300 1S-1
160 FT
12104
300 3S-1
INTERIOR STORAGE
861 FT
STORAGE
COVERED EXTERIOR
E:39
D:35
MAINTENANCE BUILDING
CPT:22
F:22
PATH OF TRAVEL (CPT)
LONGEST COMMON
DRAWING 12A1030.
FOR FIRE EXTINGUISHER LOCATIONS, SEE C.
FOR ABBREVIATIONS, SEE DRAWING 01G0005.B.
TYPES, SEE DRAWING 01A0001.
SYMBOLS, LEGEND, ABBREVIATIONS AND WALL
FOR GENERAL ARCHITECTURAL NOTES, MATERIAL A.
OIL STORAGE
OL
X"
X"
AT EXIT DOOR
OCCUPANT LOAD
WIDTH PER 2024 IBC 1010.1.1)
(32" MINIMUM EGRESS
DOOR WIDTH PROVIDED
IBC 1005.3.2
WIDTH REQUIRED PER 2024
0.2 x OCCUPANT LOAD = DOOR
A
34"
E
34"
D
36"
0.2"0.4"
B
34"
1.2"
C
34"
0.2"
N
EXIT NUMBER
C:34
B:39
OCCUPANCY GROUP
2.6"
LEGEND
LIFE SAFETY PLAN
LIFE SAFETY PLAN
MAINTENANCE BUILDING
M COLLINS CODE DATA AND
01A0012
17A
ON
ETACIFITRE
C
T
CE
TI
HCRA DERETSI
G E
R
SHOEMAKER
MORGAN
80680
06-30-2027
D
Expires
6/ 9/
O T D
A T
E
P L
O T T
IM
E
\0
\2
:1
:5
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
REVISED BY ADDENDUM NO. 11
3/16"=1'-0"N
GENERAL SHEET NOTES
X:Y
FEET TO Y, EXIT NUMBER)
(X = TOTAL DISTANCE IN
TRAVEL DISTANCE
OCC
SQ FT
OLF OL
OCCUPANT LOAD
OCCUPANT LOAD FACTOR
ROOM SQ FOOTAGE
ROOM NUMBER
ROOM NAME
LIFE SAFETY PLAN - FACILITY 20
HEADWORKS
20102
300 1F-1
ELECTRICAL ROOM
297 FT
20101
300 4F-1
1,111 FT
C:13
B:13
PROCESS ROOM
DRAWING 20A1030.
FOR FIRE EXTINGUISHER LOCATIONS, SEE C.
FOR ABBREVIATIONS, SEE DRAWING 01G0005.B.
TYPES, SEE DRAWING 01A0001.
SYMBOLS, LEGEND, ABBREVIATIONS AND WALL
FOR GENERAL ARCHITECTURAL NOTES, MATERIAL A.
OL
X"
X"
AT EXIT DOOR
OCCUPANT LOAD
WIDTH PER 2024 IBC 1010.1.1)
(32" MINIMUM EGRESS
DOOR WIDTH PROVIDED
IBC 1005.3.2
WIDTH REQUIRED PER 2024
0.2 x OCCUPANT LOAD = DOOR
A
34"
0.4"
B
34"
0.2"
C
36"
0.2"
D
34"
0.2"
EXIT NUMBER
OCCUPANCY GROUP
D:27
A:54
LEGEND
LIFE SAFETY PLAN
LIFE SAFETY PLAN
HEADWORKS
M COLLINS CODE DATA AND
ARCHITECTURAL
01A0020
40 8 16
3/16"=1'-0"
18A
ON
ETACIFITRE
C
T
CE
TI
HCRA DERETSI
G E
R
SHOEMAKER
MORGAN
80680
06-30-2027
D
Expires
6/ 9/
O T D
A T
E
P L
O T T
IM
E
\0
\2
:1
:3
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
REVISED BY ADDENDUM NO. 11
1/8"=1'-0"N
GENERAL SHEET NOTES
1 HOUR RATED WALL
X:Y
FEET TO Y, EXIT NUMBER)
(X = TOTAL DISTANCE IN
TRAVEL DISTANCE
OCC
SQ FT
OLF OL
OCCUPANT LOAD
OCCUPANT LOAD FACTOR
OCCUPANCY
ROOM SQ FOOTAGE
ROOM NUMBER
ROOM NAME
FACILITY 32 - PROCESS BUILDING
32103
1,449 FT
15F-1
32102
100 10F-1
32101
300 3F-1
32104
300 2H-4
721 FT
498 FT
PATH OF TRAVEL (CPT)
LONGEST COMMON
2 HOUR RATED WALL
LIFE SAFETY PLAN - MAIN LEVEL
1/8"=1'-0"N
FACILITY 32 - PROCESS BUILDING
LIFE SAFETY PLAN - LOWER LEVEL
32002
1,340 FT
5F-1
PUMP ROOM
UV ROOM
T O E
X
IT
C
F R
O M L
O W
E R L
E V
E L
F
IR
E R
A T
E D E
X
IT
DRAWING 32A1030.
FOR FIRE EXTINGUISHER LOCATIONS, SEE C.
FOR ABBREVIATIONS, SEE DRAWING 01G0005.B.
TYPES, SEE DRAWING 01A0001.
SYMBOLS, LEGEND, ABBREVIATIONS AND WALL
FOR GENERAL ARCHITECTURAL NOTES, MATERIAL A.
OL
X"
X"
AT EXIT DOOR
OCCUPANT LOAD
WIDTH PER 2021 IBC 1010.1.1)
(32" MINIMUM EGRESS
DOOR WIDTH PROVIDED
IBC 1005.3.2
WIDTH REQUIRED PER 2021
0.2 x OCCUPANT LOAD = DOOR
B
34"
2.2"
D
34"
1.4"
E
34"
0.4"
F
72"
0.2"
BLOWER ROOM
MIN 44"
4'-6"
IS 1.2" PER 1005.3.1
STAIR CAPACITY
PER 1011.2, MIN
STAIR WIDTH
EXIT NUMBER
32001
300 4F-1
PUMP ROOM
A
34"
0.4"
F:22
A:22
C
34"
1.8"
E:40
969 FT
CPT:60
C:96
RATED WALL
1 HR
STORAGE ROOM
CHEMICAL
LEGEND
LIFE SAFETY PLAN
STAIR ENCLOSURE
1 HR RATED
995 FT
B:52
D:68
((2) 275 GAL OR (1) 550 GAL)
GLYCERIN CARBON TOTE
((2) 275 GAL OR (1) 550 GAL)
GLYCERIN CARBON TOTE
((2 275 GAL OR (1) 550 GAL)
MAGNESIUM HYDROXIDE TOTE
((2) 275 GAL OR (1) 550 GAL)
SODIUM HYPOCHORITE
((2) 275 GAL OR (1) 550 GAL)
CITRIC ACID TOTE
LIFE SAFETY PLANS
PROCESS BUILDING
M COLLINS CODE DATA AND
01A0032
ELECTRICAL ROOM
RATED WALL
2 HR
19A
C:95
ON
ETACIFITRE
C
T
CE
TI
HCRA DERETSI
G E
R
SHOEMAKER
MORGAN
80680
06-30-2027
D
Expires
6/ 9/
O T D
A T
E
P L
O T T
IM
E
\0
\2
:2
:0
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
REVISED BY ADDENDUM NO. 11
3/32"=1'-0"N
GENERAL SHEET NOTES
X:Y
FEET TO Y, EXIT NUMBER)
(X = TOTAL DISTANCE IN
TRAVEL DISTANCE
OCC
SQ FT
OLF OL
OCCUPANT LOAD
OCCUPANT LOAD FACTOR
ROOM SQ FOOTAGE
ROOM NUMBER
ROOM NAME
LIFE SAFETY PLAN - LOWER LEVEL
FACILITY 80 - DIGESTER FACILITY
3/32"=1'-0"N
LIFE SAFETY PLAN - UPPER LEVEL
FACILITY 80 - DIGESTER FACILITY
80101
300 3F-1
80201
300 5F-1
PATH OF TRAVEL (CPT)
LONGEST COMMON
1023 INTERIOR EXIT STAIRWAY)
1 HOUR RATED WALL (PER IBC
OL
X"
X"
AT EXIT DOOR
OCCUPANT LOAD
WIDTH PER 2024 IBC 1010.1.1)
(32" MINIMUM EGRESS
DOOR WIDTH PROVIDED
IBC 1005.3.2
WIDTH REQUIRED PER 2024
0.2 x OCCUPANT LOAD = DOOR
A
34"
1.8"
EXIT NUMBER
80101
300 2F-1
A:60
ELECTRICAL ROOM DIGESTER FEED ROOM
3/32"=1'-0"N
FACILITY 80 - DIGESTER FACILITY
OCCUPANCY GROUP
80103
DIGESTER 1
0U
80104
DIGESTER 2
0U
B
68"
0.1"
MIN 44"
4'-0"
B:28
A:62
LIFE SAFETY PLAN - ROOF ACCESS LEVEL
BLOWER ROOM
1,296 SQ FT796 SQ FT1,296 SQ FT
1,244 SQ FT
80S01
STAIRWELL
242 SQ FT
F-1
DRAWINGS 80A1030 AND 80A1040.
FOR FIRE EXTINGUISHER LOCATIONS, SEE C.
FOR ABBREVIATIONS, SEE DRAWING 01G0005.B.
TYPES, SEE DRAWING 01A0001.
SYMBOLS, LEGEND, ABBREVIATIONS AND WALL
FOR GENERAL ARCHITECTURAL NOTES, MATERIAL A.
LEGEND
LIFE SAFETY PLAN
403 SQ FT
T O L
O W
E R L
E V
E L
F
IR
E R
A T
E D E
X
IT
CPT:54
A:54
LIFE SAFETY PLANS
DIGESTER FACILITY
M COLLINS CODE DATA AND
ARCHITECTURAL
01A0080
80 16 24
3/32"=1'-0"
1.2" PER 1005.3.1
STAIR CAPACITY IS
PER 1011.2, MIN
STAIR WIDTH
20A
ON
ETACIFITRE
C
T
CE
TI
HCRA DERETSI
G E
R
SHOEMAKER
MORGAN
80680
06-30-2027
D
Expires
6/ 9/
O T D
A T
E
P L
O T T
IM
E
\0
\2
:4
:5
A
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T
NO SCALE
G KIRSTEN
SCHEDULES
M COLLINS ARCHITECTURAL
ADMINISTRATION BUILDING
10A6001
190A
ON
ETACIFITRE
C
T
CE
TI
HCRA DERETSI
G E
R
SHOEMAKER
MORGAN
80680
06-30-2027
D
Expires
6/ 9/
O T D
A T
E
P L
O T T
IM
E
\0
\2
:3
:2
A
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T
NTS
SERVICE WATER
10-WH-1
10-WH-2
1/2" HW
1/2" W1
1/2" HW
1/2" W1
SH-1
SH-1
WHA-A
2" W1
NFWH-1
HB-1
10-TMV-1
SSH-1 NFWH-1
3/4" HWR
S-1
MS-1
1" HW
3/4" HW
3/4" W1
1" W1
1 1/4" TW
1/2" HW
1/2" W1
1/2" W1
1 1/2" W1
2" W1
3/8" W1
DRAINAGE DRYWELL
2214-100
2" RW
1 1/2" RW
1 1/2" W1
3/4" RW
GAUGE, TYP
PRESSURE
10-CP-2
BALL VALVE, TYP
UNION, TYP
DI-ELECTRIC
THERMOMETER, TYP
10-CP-1
3/4" TWR
1 1/4" TW
ICE MAKER
LP-4
LP-4
1/2" W1
3/8" W1
WHA-A
3/8" HW
3/8" W1
3/8" W1
LP-3
4" RW
WHA-A
1 1/2" RW
3/4" RW
WC-1
LAV-1
LAV-1
3/4" HW
2" W1
3/4" W1
3/4" HWR
LP-3
1/2" HW
1/2" W1
EWC-1
1 1/4" RW
WHA-A
LP-4
1 1/2" RW
1 1/4" RW
2" RW
1 1/4" W1
3/8" HW (BEHIND TWR)
SSH-1
1/2" W1
1/2" W1
1" HW
2" RW
DISHWASHER
3/8" HW TO
3/4" HW
3/4" W11" W1
10-RPBP-01
CONNECTION
FLANGED
2 1/2" W1
1 1/4" W1
1 1/4" W1
GENERATOR
RO WATER
CHECK VALVE
3/4" RW
FOR CONTINUATION
REFER TO 10P1020
FOR CONTINUATION
REFER TO 10P1030
FOR CONTINUATION
REFER TO 10P1020
3/41" TWR
3/4" HW
ET-2
VALVE, TYP
CHECK
VALVE, TYP
BALANCE
ET-1
AQUASTAT, TYP
1 1/4" HW
2 1/2" W1
METER
2" WATER
1/2" W1
2" W1
S HINTE
J SACKINGER
ISOMETRIC
S HOSTETLER PLUMBING
ADMINISTRATION BUILDING
10P9003
WC-1
NO SCALE
200A1
2" W1
1" W1
1/2" W1
1/2" W11
1/2" W1
1/2" HW
3/4" RW
.A.S.U ,ANOZI
RA
ON
ETACIFITRE
D
)l a ci n a h c e
M( r ee nig nE lanoissefor d er et si g e
R
HINTE
SCOTT
46267
6- 8-
Expires 06-30-2028
O T D
A T
E
P L
O T T
IM
E
\0
\2
:5
:1
A
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
REVISED BY ADDENDUM NO. 11
WINDOW TYPES
W-1
DOOR TYPES DOOR FRAME TYPES
SDG
2"
D O
O R H
E
IG
H T
2"
OHC
D O
O R H
E
IG
H T
OHCIF
D O
O R H
E
IG
H T
WIDTH
DOOR
DOOR WIDTH
WIDTH
DOOR
D O
O R H
E
IG
H T
DOOR WIDTH
D O
O R H
E
IG
H T
6" 6"
WIDTH
DOOR
WINDOW WIDTH
W
IN
D O
W H
E
IG
H T
T Y
P
NO SCALE
220A
M SHOEMAKER
G KIRSTEN
SCHEDULES
M COLLINS ARCHITECTURAL
MAINTENANCE BUILDING
12A6001
ON
ETACIFITRE
C
T
CE
TI
HCRA DERETSI
G E
R
SHOEMAKER
MORGAN
80680
06-30-2027
D
Expires
6/ 9/
O T D
A T
E
P L
O T T
IM
E
\0
\2
:5
:5
A
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
REVISED BY ADDENDUM NO. 11
DOOR TYPES DOOR FRAME TYPES
SDG / GG
2"
6"6"
D O
O R H
E
IG
H T
D O
O R H
E
IG
H T
D O
O R H
E
IG
H T
WIDTH
DOOR2"
6"
WIDTH
DOOR
WIDTH
DOOR
WIDTH
DOOR
D O
O R H
E
IG
H T
OHCI
DOOR WIDTH
D O
O R H
E
IG
H T
OHC
DOOR WIDTH
DDT
2"2"
D O
O R H
E
IG
H T
WIDTH
DOOR
WIDTH
DOOR
"M
IN6
M
IN6
6"
SCHEDULES
M COLLINS ARCHITECTURAL
HEADWORKS
20A6001
NO SCALE
PANEL
TRANSOM
REMOVABLE
253A
ON
ETACIFITRE
C
T
CE
TI
HCRA DERETSI
G E
R
SHOEMAKER
MORGAN
80680
06-30-2027
D
Expires
6/ 9/
O T D
A T
E
P L
O T T
IM
E
\0
\2
:0
:2
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
REVISED BY ADDENDUM NO. 11
DOOR TYPES DOOR FRAME TYPES
SDF
D O
O R H
E
IG
H T
2"
D O
O R H
E
IG
H T
WIDTH
DOOR2"
WIDTH
DOOR
D O
O R H
E
IG
H T
OHCI
D O
O R H
E
IG
H T
OHC
DOOR WIDTHDOOR WIDTH
G
6"6"
D O
O R H
E
IG
H T
D O
O R H
E
IG
H T
6" 6"
WIDTH
DOOR
WIDTH
DOOR
WIDTH
DOOR
G/GN
D O
O R H
E
IG
H T
WIDTH
DOOR
5" 6"
DDT
2"2"
D O
O R H
E
IG
H T
WIDTH
DOOR
WIDTH
DOOR
PANEL
TRANSOM
REMOVABLE
SCHEDULES
M COLLINS ARCHITECTURAL
PROCESS BUILDING
32A6001
NO SCALE
311A
ON
ETACIFITRE
C
T
CE
TI
HCRA DERETSI
G E
R
SHOEMAKER
MORGAN
80680
06-30-2027
D
Expires
6/ 9/
O T D
A T
E
P L
O T T
IM
E
\0
\2
:2
:0
A
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
REVISED BY ADDENDUM NO. 11
A
SECTION
1/4"=1'-0"
70D1030
B
SECTION
1/4"=1'-0"
70D1030
CL EL 6779.33
CL EL 6805.50
8" UVE (IN) CL EL 6807.50
8" UVE (OUT) CL EL 6779.50
CL EL 6773.00
CL EL 6782.00
8" UVE
24" MANWAY CL EL 6782.00
8" UVE (IN) CL EL 6807.50
24" MANWAY
8" UVE
8" UVE
LEVEL 6781.00
WSE LOW
12" PE/OF
12" PE/OF
M CONLAY
D EDWARDS
SECTIONS
G BROWN MECHANICAL
RECLAIMED WATER TANK
70D3001
0 4 8 12
1/4"=1'-0"
WSE HIGH-HIGH LEVEL @ 8" UVE (IN) INV EL 6807.00WSE HIGH LEVEL 6805.00
LADDER
LADDER
FLANGED PORT
6" DIA BLIND
2642-925
8" V500
8" UVE
4027-6408" V132 , TYP
8" PE/BYP12" PE/OF
TK-7001
STORAGE TANK
RECLAIMED WATER
TK-7001
STORAGE TANK
RECLAIMED WATER
TYP, NOTE 2
INSULATING FLANGE,
2642-925
TYP, NOTE 2
INSULATING FLANGE,
4027-6408" V132 , TYP
@ 8" UVE (OUT) INV EL 6779.00
WSE LOW-LOW LEVEL
4027-640 , TYP 8" PE/BYP
8" PE/D
8" V500
CLIMB DEVICE
SAFETY
CENTER OF TANK
SWING OPEN TOWARD
POST MOUNTED TO
SAFETY GATE HANDRAIL,
HANDRAIL TYP
CENTER OF TANK
SWING OPEN TOWARD
POST MOUNTED TO
SAFETY GATE HANDRAIL,
HANDRAIL TYP
ACCESS HATCH
TO FACILITY 32 PIT-7051A / PI-7051B.
UNIFORM SLOPE AS REQUIRED FOR CONNECTION
START AT MINIMUM COVER AND MAINTAIN 3.
METALS.
GRADE OR FOR ISOLATION BETWEEN DISSIMILAR
INSULATING FLANGE AT FIRST FLANGE ABOVE
ALL BURIED PIPING SHALL BE FITTED WITH 2.
INCLUDING OVERFLOW AND ROOF VENT.
EXPOSED PIPING UP TO THE TANK WALL,
HEAT TRACE AND INSULATE ALL OUTDOOR 1.
SHEET NOTES
COVER VENT OPENING
WELDED TO COMPLETELY
BIRD SCREEN TACK
1/2" MESH HEAVY GAUGE
ROOF VENT HOOD WITH
1" UVE (HDPE)
NOTE 3
1" UVE (HDPE),
1" UVE (SST), NOTE 1
NOTE 2
OR WELD NECK FLANGE,
8"x1" 316 SST BUTT WELD
GENERAL SHEET NOTES
DETAIL 1014-002.
NON-POTABLE WATER - DO NOT DRINK" REFER TO
LABEL STORAGE TANK WATER "CAUTION! A.
342A106-30-2023Expires
.A.S.U ,ANOZI
RA
ON
ETACIFITRE
D
GRIEBEL
KRISTEN
52392
)li vi
C( r e en ig nE la noisseforP d er et si g e
R
O T D
A T
E
P L
O T T
IM
E
\0
\2
:0
:1
P
M
OF
175376
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
G R
C A -2
GRAND CANYON, SOUTH RIM
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH. REVIEW:
CADD:
DATE:
DRAWING NO.A/E FIRM
SHEET
S S /V
COMPANY
SERVICES
GOVERNMENT
JACOBS
IL
E L
C
O M
P L E
T E C
O N
S T
R U
C T
IO
N D
O C
U M
E N
T S
REVISED BY ADDENDUM NO. 11
DOOR TYPES DOOR FRAME TYPES
SDG
2"
6"6"
D O
O R H
E
IG
H T
D O
O R H
E
IG
H T
D O
O R H
E
IG
H T
WIDTH
DOOR2"
6" 6"
WIDTH
DOOR
WIDTH
DOOR
WIDTH
DOOR
D O
O R H
E
IG
H T
OHCI
D O
O R H
E
IG
H T
OHC
DOOR WIDTH
DOOR WIDTH
DDT
2"2"
D O
O R H
E
IG
H T
WIDTH
DOOR
WIDTH
DOOR
G/G
PANEL
TRANSOM
REMOVABLE
N
D O
O R H
E
IG
H T
WIDTH
DOOR
5" 6"
SCHEDULES
M COLLINS ARCHITECTURAL
DIGESTER FACILITY
80A6001
NO SCALE
MULLION
REMOVABLE
357A
ON
ETACIFITRE
C
T
CE
TI
HCRA DERETSI
G E
R
SHOEMAKER
MORGAN
80680
06-30-2027
D
Expires
6/ 9/
© JACOBS
NATIONAL PARK SERVICE
GRAND CANYON NATIONAL PARK
SOUTH RIM
REVISED BY ADDENDUM NO. 11HIGH EAVE1334-102
RAKE1334-101
EAVE1334-100
DRAIN RACK1235-100
LAB CABINET SECTION (ISLAND)1235-052
LAB CABINET SECTION1235-051
DOCK BUMPER1080-003
EXIT WARNING SIGN1014-011
ACCESSIBLE SIGNAGE1014-010
FIRE DOOR SIGN1014-009
HAZARDOUS MATERIAL SIGNAL1014-006
HANDICAPPED PARKING SIGN1014-004
CAUTION SIGN, 2 OF 21014-002
CAUTION SIGN, 1 OF 21014-002
DANGER SIGN1014-001
1000 SERIES
SHOWER STALL0930-004
CEILING TO METAL STUD WALL0929-403
SOFFIT0929-401
WALL AT CEILING0929-201
WALL DETAIL0929-112
WALL DETAIL0929-111
WALL DETAIL0929-110
WALL DETAIL0929-109
PARTITION DETAILS0929-108
WALL DETAIL0929-107
WALL DETAIL0929-106
WALL DETAIL0929-105
WALL DETAIL0929-104
0900 SERIES
LOUVER HEAD AND SILL0890-002
DOOR SILL0871-010
DOOR SILL0871-004
DOOR SILL0871-003
DOOR SILL0871-002
DOOR SILL0871-001
SIDELIGHT JAMB AND SILL0851-005
WINDOW HEAD AND SILL0851-004
WINDOW HEAD AND SILL0851-002
OVERHEAD DOOR JAMB AND SILL (INSULATED)0833-008
OVERHEAD DOOR HEAD (INSULATED)0833-007
OVERHEAD DOOR JAMB AND SILL (INSULATED)0833-004
OVERHEAD DOOR HEAD (INSULATED)0833-003
DOOR HEAD AND JAMB0811-033
DOOR HEAD AND JAMB0811-032
SHEET TITLE/DESCRIPTIONDETAIL
SIZE AS SCHEDULED
IZ
E A
S S
C H
E D
U L E
D
YELLOW
BLACK
1014-002A.dgn 06\05\2026
CAUTION SIGN
1014-002
REVISED BY ADDENDUM NO. 11
DETAIL 1 OF 2
© JACOBS
NATIONAL PARK SERVICE
GRAND CANYON NATIONAL PARK
SOUTH RIM
SIZE AS SCHEDULED
IZ
E A
S S
C H
E D
U L
E
D YELLOW
BLACK
1014-002B.dgn 6/9/2026
CAUTION SIGN
1014-002
FOR [APPLICATION NAME]
NON-POTABLE W ATER IS UTILIZED
CAUTION: NON-POTABLE W ATER
DO NO T DRINK
BLACK
DETAIL 2 OF 2
REVISED BY ADDENDUM NO. 11
TEXT TO BE 1/2" MINIM UM IN HEIGHT.2.
SECTION 10 14 00 SIGNAGE.
USE FOR SIGNS S-8 AND S-9 IN SIGN SCHEDULE OF SPECIFICATION 1.
NOTES:
© JACOBS
NATIONAL PARK SERVICE
2240-100.dgn 06\09\2026
2240-100
HUB DRAIN
2"
FINISHED FLOOR
HUB DRAIN
COUPLING
ON THE DRAWINGS
PIPE SIZE AS SHOWN
FOR 6" TRAP USE 6" x 4" REDUCER
FOR 4" TRAP USE 4" x 6" REDUCER
FOR 3" TRAP USE 3" x 4" REDUCER
FOR 2" TRAP USE 2" x 3" REDUCER
© JACOBS
NATIONAL PARK SERVICE
GRAND CANYON NATIONAL PARK
NATIONAL PARKS SERVICE
GRAND CANYON, ARIZONA
CONTRACT DOCUMENTS
for the construction of the
REPLACE WASTEWATER PLANT SOUTH RIM VILLAGE
GRCA 257282
ADDENDUM NO. 1
JACOBS
Grand Canyon, Arizona
June 10, 2026
© National Parks Service 2026. All rights reserved.
Any reuse, modification, or alteration of this document and the ideas and designs incorporated herein is at the sole risk of the party(ies) reusing, modifying, or altering it. All references to Jacobs and its employees and all professional seals shall be removed prior to any reuse, modification, or alteration of this document.
PW\JA\D3167666\4\42 SEALS PAGE
JUNE 2026 00 01 07 - 1
GRAC 257282 (NO55) ADDENDUM NO. 1
SECTION 00 01 07
SEALS PAGES
FOR
REPLACE WASTEWATER PLANT SOUTH RIM VILLAGE
GRCA 257282
ADDENDUM NO. 1
See Table of Contents for author of each specification section, identified by author’s initials as follows:
AUTHOR’S NAME = INITIALS
SCOTT HINTE = SH CHRISTOPHER KYLE SMITH = CKS
MORGAN SHOEMAKER = MS
SPECIFICATIONS
Digitally Signed
Scott Hinte
SEALS PAGE PW\JA\D3167666\4\42
00 01 07 - 2 JUNE 2026
ADDENDUM NO. 1 GRAC 257282 (NO55)
SPECIFICATIONS
Digitally Signed
Morgan Shoemaker
PW\JA\D3167666\4\42 SEALS PAGE
JUNE 2026 00 01 07 - 3
GRAC 257282 (NO55) ADDENDUM NO. 1
SPECIFICATIONS
Digitally Signed
Christopher Kyle Smith
END OF SECTION
/10
/20
06/30/2028
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 [JUNE 10, 2026] 00 01 10 [REV. 1][ADD1] - 1
GRCA 257282 ADDENDUM NO. 1
TABLE OF CONTENTS
VOLUME 1
Person Section Responsible Title Pages
SPECIFICATIONS
DIVISION 01—GENERAL REQUIREMENTS
01 11 00 KR Summary of Work.................................................................... 1- 14 01 26 01 KR Contract Modification Procedures ........................................... 1- 7 01 27 00 KR Definition of Contract Line Items ............................................ 1- 2 01 31 00 KR Project Management and Coordination ................................... 1- 14 01 32 16 KR Construction Schedule ............................................................. 1- 12 01 32 33 KR Photo Documentation............................................................... 1- 3 01 33 23 KR Submittal Procedures ............................................................... 1- 11
Supplement:
KR Submittal List ........................................................................... 1- 34
01 35 00 KR Environmental Protection and Special Controls ...................... 1- 8 01 35 13.22 KR Archeological Protection ......................................................... 1- 3 01 35 23 KR Safety Requirements ................................................................ 1- 5 01 40 00 KR Quality Requirements .............................................................. 1- 11
Supplements:
KR Statement of Structural Tests and Special Inspections ............ 1- 21 KR Accessibility Inspection Report – Buildings & Facilities ........ 1- 12
01 42 00 KR Reference Standards................................................................. 1- 16 01 43 33 KR Manufacturers’ Field Services ................................................. 1- 4
Supplement:
KR Manufacturer’s Certificate of Proper Installation .................... 1- 1
01 45 33 WWK Special Inspection, Observation, and Testing .......................... 1- 6 Supplements:
WWK Contractor’s Statement of Responsibility ................................ 1- 1 WWK Fabricator’s Certificate of Compliance .................................... 1- 1
01 50 00 KR Temporary Facilities and Controls........................................... 1- 12 01 57 13 KDA Temporary Erosion and Sediment Control .............................. 1- 17 01 57 19.11 KR Indoor Air Quality Management .............................................. 1- 7 01 57 19.12 KR Noise and Acoustics Management ........................................... 1- 3 01 57 23 KR Temporary Storm Water Pollution Prevention ........................ 1- 8 01 57 28 DE Temporary Flow Control ......................................................... 1- 9 01 61 03 DE Equipment – Basic Requirements ............................................ 1- 12
Supplement:
DE Exhibit A, Manufacturer Field Service Report ........................ 1- 5
Person Section Responsible Title Pages
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 [REV. 1][ADD1] - 2 JUNE 2025 [JUNE 10, 2026]
ADDENDUM NO. 1 GRCA 257282
01 67 00 MS Product Requirements .............................................................. 1- 12 Supplement:
MS Affirmative Procurement Reporting Form............................... 1- 2 MS Manufacturer’s Certificate of Proper Installation Form .......... 1- 1 MS Manufacturer’s Certificate of Compliance Form ..................... 1- 1
01 73 20 WWK Openings and Penetrations in Construction ............................. 1- 8 Supplements:
WWK Schedule A – Openings and Penetrations Schedule for New Construction ............................................................ 1- 1
WWK Schedule B – Openings and Penetrations Schedule for Existing Construction ...................................................... 1- 1
01 73 29 MS Cutting and Patching ................................................................ 1- 4 01 73 40 KR Execution ................................................................................. 1- 11 01 74 19 KR Construction Waste Management and Disposal ...................... 1- 9 01 77 00 KR Closeout Procedures................................................................. 1- 6 01 78 23 KR Operation and Maintenance Data............................................. 1- 10
Supplements:
KR Equipment Data Sheet.............................................................. 1- 1 KR Closeout and Operation & Maintenance (O&M)
Requirements Template + Sample ........................................ 1- 8 01 78 25 KR Operations and Maintenance Support Services ....................... 1- 9
Supplements:
KR Minimum Qualifications O&M Supervisor ............................. 1- 2 KR Qualification Schedule for Operation and
Maintenance Services / Positions.......................................... 1- 2 01 79 00 KR Demonstration and Training .................................................... 1- 6 01 81 13 KR Sustainable Design Requirements for Non-LEED™
Projects .................................................................................. 1- 4 01 81 33 AW Cyber Security Requirements .................................................. 1- 6 01 88 15 WWK Anchorage and Bracing............................................................ 1- 7 01 91 14 CL Equipment Testing and Facility Startup .................................. 1- 26
Supplement:
CL Supplement A........................................................................... 1- 13
01 91 15 SH Rev. 1/Total Building Commissioning .................................... 1-13[ADD1]
DIVISION 02—EXISTING CONDITIONS
02 41 00 KR Demolition ............................................................................... 1- 11 Supplement:
KR Hazardous Materials Investigation Report............................... 1-114 02 61 00 KR Removal and Disposal of Contaminated Soil .......................... 1- 8
PW\JA\D3167666\4\42 TABLE OF CONTENTS
JUNE 2025 [JUNE 10, 2026] 00 01 10 [REV. 1][ADD1] - 3
GRCA 257282 ADDENDUM NO. 1
02 81 00 KR Transportation and Disposal of Hazardous Materials .............. 1- 11 Supplement:
KR Attachment A: Sample Offsite Policy Certification Memo ..... 1- 1 02 82 00 KR Asbestos Remediation .............................................................. 1- 32 02 83 00 KR Lead Remediation .................................................................... 1- 18 02 84 16 KR Handling of Lighting Ballasts and Lamps Containing
PCBs and Mercury .............................................................................1- 7 02 84 33 KR Removal and Disposal of Polychlorinated Biphenyls
(PCBs) ................................................................................... 1- 11
DIVISION 03—CONCRETE
03 01 32 WWK Repair of Vertical and Overhead Concrete Surfaces ............... 1- 14 03 01 33 WWK Repair of Horizontal Concrete Surfaces .................................. 1- 13 03 10 00 WWK Concrete Forming and Accessories ......................................... 1- 8 03 15 00 WWK Concrete Joints and Accessories .............................................. 1- 9 03 21 00 WWK Steel Reinforcement ................................................................. 1- 5 03 24 00 WWK Fibrous Reinforcing ................................................................. 1- 3 03 30 00 WWK Cast-in-Place Concrete............................................................. 1- 26
Supplements:
WWK Concrete Mix Design, Class A (5000F3S1P2C2).................... 1- 3 WWK Concrete Mix Design, Class B (4500F2S1P1C1) .................... 1- 2 WWK Concrete Mix Design, Class C (SM00F2S1P2C1) .................. 1- 2 WWK Concrete Mix Design, Class D (4500F1S1P0C1).................... 1- 2 WWK Concrete Mix Design, Class E (CF00F1S1P0C1) ................... 1- 2 WWK Concrete Mix Design, Class F (4500F3S1P1C2) .................... 1- 2
03 39 00 WWK Concrete Curing ....................................................................... 1- 4 03 62 00 WWK Grouting ................................................................................... 1- 11
Supplement:
WWK 24-hour Evaluation of Nonshrink Grout Test Form and Grout Testing Procedures ............................................... 1- 3 03 63 00 WWK Concrete Doweling .................................................................. 1- 5 03 64 23 WWK Epoxy Resin Injection Grouting .............................................. 1- 11 03 64 24 WWK Polyurethane Injection Grouting .............................................. 1- 9
DIVISION 04—MASONRY
04 22 00 WWK Concrete Unit Masonry ............................................................ 1- 16
TABLE OF CONTENTS PW\JA\D3167666\4\42
00 01 10 [REV. 1][ADD1] - 4 JUNE 2025 [JUNE 10, 2026]
ADDENDUM NO. 1 GRCA 257282
DIVISION 05—METALS
05 05 19 WWK Post-Installed Anchors ............................................................. 1- 9 05 05 23 WWK Welding .................................................................................... 1- 6
Supplement:
WWK Welding and Nondestructive Testing Table ............................ 1- 1
05 12 00 WWK Structural Steel Framing .......................................................... 1- 14 05 31 00 WWK Steel Decking ........................................................................... 1- 6 05 50 00 WWK Metal Fabrications ................................................................... 1- 17 05 52 16 WWK Aluminum Railings .................................................................. 1- 9 05 53 00 WWK Metal Gratings ......................................................................... 1- 6
DIVISION 06—WOOD, PLASTICS, AND COMPOSITES
06 10 00 MS Rough Carpentry ...................................................................... 1- 9 06 17 53 WWK Shop-Fabricated Wood Trusses ............................................... 1- 9 06 41 00 MS Architectural Wood Casework ................................................. 1- 8 06 82 00 WWK Glass-Fiber-Reinforced Plastic ................................................ 1- 7
DIVISION 07—THERMAL AND MOISTURE PROTECTION
07 14 00 MS Fluid-Applied Waterproofing .................................................. 1- 5 07 21 00 MS Thermal Insulation ................................................................... 1- 7 07 26 16 MS Belowgrade Vapor Retarders ...................................................