B09_Amendment_05_GRCA257282_FinalCD_Addendum_05_0005.pdf

PDF 986 KB Posted

Attached to
GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation number
140P2026R0101
Issued by

About this file

This is an addendum to 100% complete construction documents for the National Park Service's Replace Wastewater Plant South Rim Village project (GRCA-257282). The addendum addresses bidder questions received on September 9, 2026, regarding the June 2025 construction documents and documents minor revisions to the design drawings captured in markup format showing additions in red, deletions in green, and notes in blue.

The addendum includes revisions to one drawing: Sheet 232 (Drawing 18S1030), titled "Receiving Station Structural Plan and Section," which contains a revision to the bituminous dampproofing specification reference. No revisions to standard details or specifications are included in this addendum. The revised documents will be incorporated into conformed contract documents following project award. The work is prepared by Jacobs Government Services Company in Greenwood Village, Colorado under Contract No. 140P2023D0006, Task Order No. 140P2023F0235, with a professional engineer certification (Katarzyna Rosinski, License 77237) dated September 16, 2026, and expires December 31, 2028.

View the file

Other files

File Type Posted
Sol_140P2026R0101_Amd_0006.pdf PDF
B09_Amendment_06_B08_Att_13_Solit_PSP_Vol_II_SubKPlan_0006.docx DOCX document
B09_Amendment_06_GRCA257282_FinalCD_Addendum_06_0006.pdf PDF
B09_Amendment_06_SF_30_0006.pdf PDF
B09_Amendment_06_GRCA_25782_Site_Visit_Sign_in_Sheet_0006.jpeg JPEG file
B09_Amendment_06_Answers_to_Questions_0006.pdf PDF
B09_Amendment_05_GRCA257282_FinalCD_Addendum_02_SCADA_wSeal_0005.pdf PDF
B09_Amendment_05_GRCA257282_FinalCD_Addendum_04_0005.pdf PDF
B09_Amendment_05_GRCA_Final_Individual_Specs_0005.zip ZIP file
Sol_140P2026R0101_Amd_0005.pdf PDF
B09_Amendment_05_SF_30_0005.pdf PDF
B09_Amendment_05_Answers_to_Questions_0005.pdf PDF
B09_Amendment_04_SF30_0004.pdf PDF
Sol_140P2026R0101_Amd_0004.pdf PDF
B09_Amendment_03_SF30_0003.pdf PDF
B09_Amendment_03_Answers_to_Questions_0003.pdf PDF
Sol_140P2026R0101_Amd_0003.pdf PDF
B09_Amendment_03_GRCA257282_FinalCD_Addendum_03_Compiled_wSeal_0003.pdf PDF
B09_Amendment_02_GRCA_257282_SR_WWTP_PreBid_Mtg_presentation_(8-11-26)_FINAL_0002.pdf PDF
B09_Amendment_02_GRCA_257282_Precon_SignIn_0002.pdf PDF
Sol_140P2026R0101_Amd_0002.pdf PDF
B09_Amendment_02_What_Evaluators_Will_Ask_for_Each_Factor_2_0002.pdf PDF
B09_Amendment_02_SF30_0002.pdf PDF
Sol_140P2026R0101_Amd_01.pdf PDF
B09_Amendment_01_GRCA257282_Access_Road_100P_Final_CD_DRAWINGS_01.pdf PDF
B09_Amendment_01_SF30_01.pdf PDF
B09_Amendment_01_GRCA257282_CD_Specifications_June2025_01.pdf PDF
B09_Amendment_01_RCA257282_Access_Road_100P_Final_CD_Specifications_01.pdf PDF
Sol_140P2026R0101.pdf PDF
B08_Att_11_Solit_PSP_Vol_II_Equals.pdf PDF
B08_Att_03_GRCA257282_100P_FinalCD_Addendum_1.pdf PDF
B08_Att_04_GRCA257282_Geotechnical_Recommendation_TM_May2025.pdf PDF
B08_Att_10_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Att_01d_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part4.pdf PDF
B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5_1.pdf PDF
B08_Att_12_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Att_01c_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part3.pdf PDF
B08_Att_09_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Att_01b_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part2.pdf PDF
B08_Att_08_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Att_07_GRCA_257282_Price_Schedule.xlsx XLSX spreadsheet
B08_Att_06_Wage_Determination_(1).pdf PDF
B08_Att_01a_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part1.pdf PDF
B08_Att_13_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v2_Mar25.pdf PDF
B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf PDF
B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5.pdf PDF
B08_Att_05_Hazardous_Materials_Investigation_Report_South_Rim_WWTP.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Park Service

Replace Wastewater Plant South Rim Village

GRCA-257282

100% Complete Construction Documents Addendum 5

September 16, 2026

Prepared by:

Jacobs Government Services Company

Greenwood Village, CO

Contract No. 140P2023D0006

Task Order No. 140P2023F0235

Expires

.A.S.U ,ANOZI

RA

ON

ETACIFITRE

C dengiS et a

D

ROSINSKI

KATARZYNA

77237

)li vi

C( r e en ig nE la noisseforP d er et si g e

R

-1

6-

Expires 12-31-2028

GRCA 257282 – 100% Complete CD: Addendum 05

Jacobs Engineering Group Inc. 2

1. Addendum Contents

This addendum addresses questions from bidders on the 100% Final Construction Documents for the

Replace Wastewater Plant South Rim Village project, dated June 2025, that were received by Jacobs on

September 9, 2026. The questions and responses are attached. The questions resulted in minor updates to drawings. Revisions are captured in markup format showing additions in red, deletions in green and notes in blue. Revised documents are listed below and attached. Revised documents will ultimately be incorporated into conformed contract documents after project award.

1.1 Revisions to Drawings

New or

Updated

Sheet No. DWG No. Sheet Name Description

Updated 232 18S1030 Receiving Station Structural

Plan and Section

Revision to bituminous dampproofing specification reference

1.2 Revisions to Standard Details

New of

Updated

Standard

Detail No.

Name Description

None

1.3 Revisions to Specifications

New of

Updated

Specification

No.

Name Description

None

P L

O T D

A T

E

P L

O T T

IM

E

\2

\2

:2

:1

A

M

OF

175376

0" 1"

BAR MEASURES 1" LONG

FULL SIZE DRAWINGS = 22"x34"

G R

C A -2

GRAND CANYON, SOUTH RIM

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH. REVIEW:

CADD:

DATE:

DRAWING NO.A/E FIRM

SHEET

S S /V i

06/2025 401

VILLAGE, CO

GREENWOOD

COMPANY

SERVICES

GOVERNMENT

JACOBS

PMIS/PKG NO.

257282

F

IL

E L

C

O M

P L E

T E C

O N

S T

R U

C T

IO

N D

O C

U M

E N

T S

A

SECTION

3/8"=1'-0"

PLAN

3/8"=1'-0"

N

A

16'-0"

3'-0"

SHEET NOTES

NOTE 1

30'-0"

7'-0"

AT PERIMETER

EL 6790.00 TYP

T.O. CONCRETE

M

IN

3/8"=1'-0"

N

A

3'-0"x3'-0" SUMP

C 3/8"=1'-0"

SLAB SECTION

C

C

2'-4 3/4"5'-4 1/2"

AT TRENCH

EL 6789.86 TYP

T.O. CONCRETE

T Y

P

EL 6790.00

T.O. CONCRETE

1'-0"10'-0"1'-0"

" EL 6779.08

TOC

1'-0" 3'-0" 1'-0"

EL 6781.34

TOC

TOC

SEE PLAN

1'-0" 10'-0" 1'-0"

BASE SLAB

SLOPE TO SUMP

CONCRETE FILL,

FROM TOP SURFACE

#5@12" EW, T&B, 2" CLEAR

NOTE: COATING NOT SHOWN, SEE SECTION A THIS DRAWING.

SLOPE TO SUMP

CONCRETE FILL,

0315-154

4" WATERSTOP

0330-080

3'-0"

0330-080

6"x6" CURB 0330-044

TYPE B

0330-056

0330-043 0330-077, SIM

0330-077 SIM

TOC, SEE PLAN

0330-043 TYPE B

SHEET NOTES

B

SECTION

3/8"=1'-0"

1'-0"3'-0"1'-0"

1.5

1.5

EL 6780.25

TOC

CONCRETE LID

PRECAST

12" CONCRETE WALL

AS PER 07 11 13B

DAMPPROOFING TYP

APPLY BITUMINOUS

B

WALL

CONCRETE

B

PRECAST CONCRETE LID

AS PER 07 11 13B

DAMPPROOFING TYP

APPLY BITUMINOUS

12" CONCRETE WALL

SEE CIVIL

FINISHED GRADE,

SEE CIVIL

FINISHED GRADE,

0330-003

NOTE 4NOTE 4

09 96 35

TYP, AS PER

RESISTANT COATING

WITH A CHEMICAL

COAT CONCRETE

A

SEE

COATING,

3'-0"

"HATCH OPENING

CENTER ON

ALUMINUM GRATING

1'-0" WIDE TRENCH DRAIN W/

VAULT LOWER PLAN

NOTES:

SEE SECTION A THIS SHEET.

FOR INFORMATION NOT SHOWN1.

W KOHLER

A FIRTH

PLAN AND SECTION

B CLEGG STRUCTURAL

RECEIVING STATION

18S1030

NOTE 5

NOTE 3

DRAWINGS 01S0001, 01S0002 AND 01S0003.

FOR GENERAL STRUCTURAL NOTES SEE 1.

MECHANICAL DRAWINGS.

AND PENETRATION DETAILS WITH PROCESS

PIPE PENETRATION, COORDINATE SIZE LOCATION 5.

DRAWING 06C2001.

FACILITY LOCATION CONTROL POINT, SEE CIVIL 4.

FABRICATIONS.

DOOR, SEE SPECIFICATION 05 50 00 METAL

3'-0" x 3'-0" SINGLE LEAF ALUMINUM SIDEWALK 3.

DRAWINGS.

PROCESS EQUIPMENT MFR AND PROCESS

CONCRETE EQUIPMENT PEDESTALS WITH

COORDINATE LOCATION AND HEIGHT OF 2.

FOR ADDITIONAL INFORMATION.

GROUND SURFACE. SEE GEOTECHNICAL REPORT

BEDROCK IS LOCATED NEAR THE EXISTING 1.

BEDROCK

FILL OR UNDISTURBED

COMPACTED GRANULAR

BEDROCK

FILL OR UNDISTURBED

COMPACTED GRANULAR

BEDROCK

OR UNDISTURBED

GRANULAR FILL

COMPACTED

BASE SLAB

CONCRETE

, TYP

TYP

NEOPRENE GASKET,

PLAN

DOOR, SEE

SIDEWALK

EW, T&B

#5@12"

EW, T&B

#5@12"

#5@12"

#5@12" EW, EF, TYP

SUMP, SEE PLAN

T Y

P

TYP

6"

FILL, EL 6788.86

T.O. CONCRETE

2% SLOPE

SLOPE, TYP

NOTE 4

NOTE 4

3/8"=1'-0"

0 4 6

0330-004

ALL AROUND

SEE NOTE 2

TYPE J,

PEDESTAL,

12" SQ EQUIPMENT

ON GRADE

8" THICK (MIN) SLAB

0330-016

TYP

ENCASEMENT

PIPE

D S o u th R im \4 D e li v e ry \4

C

A D D e s ig n \G

R C

A \2

\M ic ro s ta ti o n V i

D ra w in g s \S

T R

U C \1

S

D .d g n

Re g is te re d

Pr ofess iona l Eng i neer (St r uc t ura l)DA

TE

S I GNED _ _ _ _ _ __ _ _ _ _

CE

RT I F ICATE

NO

81476

AR I ZONA U . S . A

WAYNE W. KOHLER

6/

/2

07 14 00

File details come from the government source that posted it. Updated .