B09_Amendment_10_INV_100751_LTF_94239_Grand_Canyon_South_Rim_WWTP_Final_Permit_0010.pdf

PDF 1 MB Posted

Attached to
GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation number
140P2026R0101
Issued by

About this file

This is an Arizona Department of Environmental Quality (ADEQ) Aquifer Protection Permit (APP) for the Grand Canyon National Park South Rim Wastewater Treatment Plant. The permit authorizes the U.S. Department of Interior National Park Service to operate the existing 0.75 million gallons per day (mgd) WWTP and two phased upgrades: Phase I expanding to 0.52 mgd and Phase II to 0.65 mgd. The facility is located in Coconino County, Arizona, over the Coconino Plateau groundwater basin at coordinates Township 31N, Range 02E, Section 26.

The permit establishes comprehensive operational, monitoring, and reporting requirements including discharge limitations for parameters such as fecal coliform, total nitrogen, cyanide, fluoride, metals (antimony through thallium), and volatile/semi-volatile organic compounds. The facility must maintain an operator in direct responsible charge certified for Grade 3 wastewater treatment and ensure daily onsite visits. Key compliance schedule items include submitting Engineer's Certificates of Completion for Phase I (within 90 days of construction) and Phase II equipment upgrades, closing the existing WWTP upon Phase I commencement, and conducting baseline monitoring for new or adjusted AWQS parameters including arsenic, bromate, chlorite, haloacetic acids, microbiological contaminants, total trihalomethanes, and uranium within 90 days of Phase I operation. The permittee must submit quarterly Self-Monitoring Report Forms through the myDEQ portal documenting flow data, discharge monitoring results, reclaimed water quality (Class A for existing; Class A+ for Phase I/II), and facility inspection/operational monitoring. Points of compliance are established at three conceptual locations downgradient of the facility, with groundwater monitoring required only as a contingency action if the director determines cause for concern. The permit became effective April 3, 2026, and remains valid for the facility's operational, closure, and post-closure periods unless suspended or revoked. Financial capability of $16,510,000 for closure has been demonstrated by the permittee.

View the file

Other files

File Type Posted
B09_Amendment_10_GRCA257282_FinalCD_Addendum_08_wSeal_0010.pdf PDF
B09_Amendment_10_SR_NPDES_AZ0022152_GCSR_Permit_SIGNED_ISSUED_122222_0010.pdf PDF
B09_Amendment_10_SF_30_0010.pdf PDF
Sol_140P2026R0101_Amd_0010.pdf PDF
B09_Amendment_09_SF_30_0009.pdf PDF
B09_Amendment_09_Answers_to_Questions_0009.pdf PDF
Sol_140P2026R0101_Amd_0009.pdf PDF
Sol_140P2026R0101_Amd_0008.pdf PDF
B09_Amendment_07_SF_30_0007.pdf PDF
B09_Amendment_07_GRCA257282_FinalCD_Addendum_07_0007.pdf PDF
Sol_140P2026R0101_Amd_0007.pdf PDF
B09_Amendment_07_Answers_to_Questions_0007.pdf PDF
Sol_140P2026R0101_Amd_0006.pdf PDF
B09_Amendment_06_GRCA257282_FinalCD_Addendum_06_0006.pdf PDF
B09_Amendment_06_SF_30_0006.pdf PDF
B09_Amendment_06_B08_Att_13_Solit_PSP_Vol_II_SubKPlan_0006.docx DOCX document
B09_Amendment_06_GRCA_25782_Site_Visit_Sign_in_Sheet_0006.jpeg JPEG file
B09_Amendment_06_Answers_to_Questions_0006.pdf PDF
B09_Amendment_05_Answers_to_Questions_0005.pdf PDF
Sol_140P2026R0101_Amd_0005.pdf PDF
B09_Amendment_05_GRCA_Final_Individual_Specs_0005.zip ZIP file
B09_Amendment_05_GRCA257282_FinalCD_Addendum_02_SCADA_wSeal_0005.pdf PDF
B09_Amendment_05_GRCA257282_FinalCD_Addendum_04_0005.pdf PDF
B09_Amendment_05_GRCA257282_FinalCD_Addendum_05_0005.pdf PDF
B09_Amendment_05_SF_30_0005.pdf PDF
B09_Amendment_04_SF30_0004.pdf PDF
Sol_140P2026R0101_Amd_0004.pdf PDF
B09_Amendment_03_GRCA257282_FinalCD_Addendum_03_Compiled_wSeal_0003.pdf PDF
Sol_140P2026R0101_Amd_0003.pdf PDF
B09_Amendment_03_Answers_to_Questions_0003.pdf PDF
B09_Amendment_03_SF30_0003.pdf PDF
Sol_140P2026R0101_Amd_0002.pdf PDF
B09_Amendment_02_SF30_0002.pdf PDF
B09_Amendment_02_What_Evaluators_Will_Ask_for_Each_Factor_2_0002.pdf PDF
B09_Amendment_02_GRCA_257282_SR_WWTP_PreBid_Mtg_presentation_(8-11-26)_FINAL_0002.pdf PDF
B09_Amendment_02_GRCA_257282_Precon_SignIn_0002.pdf PDF
Sol_140P2026R0101_Amd_01.pdf PDF
B09_Amendment_01_GRCA257282_Access_Road_100P_Final_CD_DRAWINGS_01.pdf PDF
B09_Amendment_01_SF30_01.pdf PDF
B09_Amendment_01_RCA257282_Access_Road_100P_Final_CD_Specifications_01.pdf PDF
B09_Amendment_01_GRCA257282_CD_Specifications_June2025_01.pdf PDF
Sol_140P2026R0101.pdf PDF
B08_Att_11_Solit_PSP_Vol_II_Equals.pdf PDF
B08_Att_10_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Att_07_GRCA_257282_Price_Schedule.xlsx XLSX spreadsheet
B08_Att_01b_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part2.pdf PDF
B08_Att_03_GRCA257282_100P_FinalCD_Addendum_1.pdf PDF
B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5_1.pdf PDF
B08_Att_12_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Att_08_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS AMENDED PERMIT SUPERSEDES ALL PREVIOUS PERMITS

www.azdeq.gov

PERMIT

STATE OF ARIZONA

AQUIFER PROTECTION PERMIT NO. P-100751

PLACE ID 1081, LTF 94239

SIGNIFICANT AMENDMENT

1.0 AUTHORIZATION

In compliance with the provisions of Arizona Revised Statutes (A.R.S.) Title 49, Chapter 2, Articles 1, 2, and 3, Arizona Administrative Code (A.A.C.) Title 18, Chapter 9, Articles 1 and 2, A.A.C. Title 18, Chapter 11, Article 4 and amendments thereto, and the conditions set forth in this permit, the Arizona Department of Environmental Quality (ADEQ) hereby authorizes the United States Department of the Interior (DOI), National Parks Service (NPS) is hereby authorized to operate the Grand Canyon National Park – South Rim Wastewater Treatment Plant (WWTP), located in Grand Canyon, Arizona, in Coconino County, over groundwater of the Coconino Plateau groundwater basin, in Township 31N, Range 02E, Section 26, NW¼, NE¼, NW¼ of the Gila and Salt River Baseline and Meridian.

This permit becomes effective on the date of the Water Quality Division Deputy Director’s signature and shall be valid for the life of the facility (operational, closure, and post-closure periods) unless suspended or revoked pursuant to A.A.C. R18-9-A213. The permittee shall construct, operate and maintain the permitted facilities:

1. Following all the conditions of this permit including the design and operational information documented or referenced below, and

2. Such that Aquifer Water Quality Standards (AWQS) are not violated at the applicable point(s) of compliance (POC) set forth below or if an AWQS for a pollutant has been exceeded in an aquifer at the time of permit issuance, that no additional degradation of the aquifer relative to that pollutant and as determined at the applicable POC occurs as a result of the discharge from the facility.

1.1. PERMITTEE INFORMATION

Facility Name: Grand Canyon National Park – South Rim Wastewater Treatment Plant Facility Address: Approximately ½ mile South of intersection of Row Well Road and West Rim drive Grand Canyon, Arizona County: Coconino

Permitted Flow Rate: 650,000 gallons per day

Permittee: U.S. Department of Interior- National Park Service Permittee Address: PO Box 129 Grand Canyon, Arizona 86023

Facility Contact: J. Treacy Stone Chief of Facility Management and Engineering Emergency Phone No.: (928) 638 – 7730 (landline), (928) 814 – 8666 (cell)

Latitude/Longitude: 36° 02' 59" N / 112° 08' 57" W Legal Description: Township 31N, Range 02W, Section 26, NW¼, NE¼, NW¼ of the Gila and Salt

River Baseline and Meridian

1.2. AUTHORIZING SIGNATURE

Randall Matas, Deputy Director Water Quality Division Arizona Department of Environmental Quality

Signed this _______ day of _________________, 2026

3rd April

PERMIT NO. P-100751

LTF No. 94239 Place ID No. 1081

THIS AMENDED PERMIT SUPERSEDES ALL PREVIOUS PERMITS

TABLE OF CONTENTS

1.0 AUTHORIZATION

1.1. PERMITTEE INFORMATION

1.2. AUTHORIZING SIGNATURE

2.0 SPECIFIC CONDITIONS

2.1. FACILITY / SITE DESCRIPTION

2.1.1. Annual Registration Fee

2.1.2. Financial Capability

2.2. BEST AVAILABLE DEMONSTRATED CONTROL TECHNOLOGY (BADCT)

2.2.1. Engineering Design

2.2.2. Site-Specific Characteristics

2.2.3. Pre-Operational Requirements

2.2.4. Operational Requirements

2.2.5. Reclaimed Water Classification

2.2.6. Certified Areawide Water Quality Management Plan Conformance

2.3. DISCHARGE LIMITATIONS

2.4. POINT OF COMPLIANCE (POC)

2.5. MONITORING REQUIREMENTS

2.5.1. Pre-Operational Monitoring

2.5.2. Routine Discharge Monitoring

2.5.3. Reclaimed Water Monitoring

2.5.4. Facility / Operational Monitoring

2.5.5. Groundwater Monitoring and Sampling Protocols

2.5.6. Surface Water Monitoring and Sampling Protocols

2.5.7. Analytical Methodology

2.5.8. Installation and Maintenance of Monitoring Equipment

2.6. CONTINGENCY PLAN REQUIREMENTS

2.6.1. General Contingency Plan Requirements

2.6.2. Exceeding of Alert Levels and Performance Levels

2.6.2.1. Exceeding of Performance Levels Set for Operational Conditions

2.6.2.2. Exceeding of Alert Levels (ALs) Set for Discharge Monitoring

2.6.2.2.1. Exceeding Permit Flow Limit

2.6.2.3. Exceeding of Alert Levels in Groundwater Monitoring

2.6.2.3.1. Alert Levels for Indicator Parameters

2.6.2.3.2. Alert Levels for Pollutants with Numeric Aquifer Water Quality Standards

2.6.2.3.3. Alert Levels to Protect Downgradient Users from Pollutants without Numeric Aquifer Water Quality

Standards

2.6.2.3.4. Alert Level for Groundwater Level

2.6.3. Discharge Limit Violation

2.6.4. Aquifer Quality Limit Violation

2.6.5. Emergency Response and Contingency Requirements for Unauthorized Discharges

2.6.5.1. Duty to Respond

2.6.5.2. Discharge of Hazardous Substances or Toxic Pollutants

2.6.5.3. Discharge of Non-Hazardous Materials

2.6.5.4. Reporting Requirements

2.6.6. Corrective Actions

2.7. REPORTING AND RECORDKEEPING REQUIREMENTS

2.7.1. Self-Monitoring Report Form

2.7.2. Operation Inspection / Log Book Recordkeeping

2.7.3. Permit Violation and Alert Level Status Reporting

2.7.4. Operational, Other or Miscellaneous Reporting

Grand Canyon National Park – South Rim WWTP Page 3 of 33

2.7.5. Reporting Location

2.7.6. Reporting Deadline

2.7.7. Changes to Facility Information in Section 1.0 and Section 2.0

2.8. TEMPORARY CESSATION

2.9. CLOSURE

2.9.1. Closure Plan

2.9.2. Closure Completion

2.10. POST-CLOSURE

2.10.1. Post-Closure Plan

2.10.2. Post-Closure Completion

3.0 COMPLIANCE SCHEDULE

4.0 TABLES OF MONITORING REQUIREMENTS

4.1. PRE-OPERATIONAL MONITORING (OR CONSTRUCTION REQUIREMENTS)

4.2. COMPLIANCE OR OPERATIONAL MONITORING

5.0 REFERENCES AND PERTINENT INFORMATION

6.0 NOTIFICATION PROVISIONS

6.1. DUTY TO COMPLY

6.2. DUTY TO PROVIDE INFORMATION

6.3. COMPLIANCE WITH AQUIFER WATER QUALITY STANDARDS

6.4. TECHNICAL AND FINANCIAL CAPABILITY

6.5. REPORTING OF BANKRUPTCY OR ENVIRONMENTAL ENFORCEMENT

6.6. INSPECTION AND ENTRY

6.7. DUTY TO MODIFY

6.8. PERMIT ACTION: AMENDMENT, TRANSFER, SUSPENSION, AND REVOCATION

7.0 ADDITIONAL PERMIT CONDITIONS

7.1. OTHER INFORMATION

7.2. SEVERABILITY

7.3. PERMIT TRANSFER

8.0 PROCESS FLOW DIAGRAMS

TABLE OF TABLES

TABLE 1: DISCHARGING FACILITIES

TABLE 2: POINT OF COMPLIANCE

TABLE 3: QUARTERLY REPORTING DEADLINES

TABLE 4: (SEMI-)ANNUAL REPORTING DEADLINES

TABLE 5: COMPLIANCE SCHEDULE ITEMS

TABLE 6: ROUTINE FLOW MONITORING: EXISTING WWTP – 0.75 MGD

TABLE 7: ROUTINE FLOW MONITORING: PHASE I – 0.52 MGD

TABLE 8: ROUTINE FLOW MONITORING: PHASE II - 0.65 MGD

TABLE 9: ROUTINE DISCHARGE MONITORING - EXISTING WWTP

TABLE 10: ROUTINE DISCHARGE MONITORING - PHASE I & II WWTP

TABLE 11: RECLAIMED WATER MONITORING - EXISTING WWTP – CLASS A

TABLE 12: RECLAIMED WATER MONITORING – PHASE I & II WWTP – CLASS A+

TABLE 13: FACILITY INSPECTION AND OPERATIONAL MONITORING – EXISTING WWTP

TABLE 14: FACILITY INSPECTION AND OPERATIONAL MONITORING – PHASE I & II WWTP

Grand Canyon National Park – South Rim WWTP Page 4 of 33

2.0 SPECIFIC CONDITIONS

[A.R.S. §§ 49-203(4), 49-241(A)]

2.1. FACILITY / SITE DESCRIPTION

[A.R.S. § 49-243(K)(8), and A.A.C. R18-5-114]

The permittee is authorized to operate the Grand Canyon National Park- South Rim Wastewater Treatment Plant (WWTP), with average daily maximum monthly (ADMM) flow of 0.52 million gallons per day (mgd) for Phase I and 0.65 mgd for Phase II. ADEQ has graded this facility as a Grade 3 wastewater treatment plant. The facility shall have an operator in direct responsible charge who is certified for the class and grade of the facility and is available to the “onsite operator1” and ensures an onsite operator visits the facility “daily”.

Existing WWTP: The existing WWTP is rated at a capacity of 0.75 mgd. The treatment system consists of headworks with screen and grit chamber, two extended aeration tanks, two clarifiers, secondary equalization effluent, a tertiary filtration system, and chlorination/de-chlorination. The facility has stand-by chemical feed to provide additional effluent clarification if needed. Sludge is treated in an aerobic sludge digester, and then placed in sludge drying beds. Dried sludge is transported to a clay-lined Biosolids Storage Site (formerly known as Sludge Treatment and Disposal Site) located three miles south of the WWTP.

Effluent is discharged into Bright Angel Wash under Arizona Pollutant Discharge Elimination System (AZPDES) Permit No. AZ0022152, or is reused for beneficial purposes under a valid Recycled Water Permit. Effluent may also be discharged to three clay-lined Storage Ponds (formerly known as emergency effluent storage ponds) during emergency plant upsets and for fire suppression. The Storage Ponds are located three miles south of the WWTP and have a total storage capacity of 12 million gallons.

The Existing WWTP will be decommissioned upon commencement of the new Phase I WWTP.

Phase I WWTP– 0.52 mgd:

The new Phase I WWTP treatment train is rated at ADMM flow of 0.52 mgd. Raw sewage enters the WWTP through the influent manhole and passes through headworks with 0.5-inch multi-rake bar screens (capacity 2.0 mgd; 1-duty, 1-standby screen) each equipped with a washer/compactor and then flows through vortex grit removal system (capacity of 2.0 mgd). The grit is further washed prior to discharging to a dumpster along with the debris from the screen. A bypass is provided around the screen for maintenance or failure. Screened and de-gritted influent then flows through 2-mm mechanical fine screens (capacity 2.0 mgd; 1-duty, 1-standby fine screen) and then to bioreactors. The peak flows caused by wet weather infiltration and inflow into collection system can be diverted to a 200,000-gallons influent equalization tank before fine screens. Equalization tank contents are returned to the Headworks upstream of fine screens through the Tank Drain Pump Station after wet weather events for treatment.

Flows from fine screens pass through an influent splitter to three 87,000-gallon bioreactors, each with a 13,000-gallon of anoxic zone, 52,200-gallon aerobic zone and a 21,750-gallon post-anoxic zone. Each anoxic zone and post-anoxic zone are equipped with a mixer and each aerobic zone is equipped with 190 fine bubble diffusers.

Flows from bioreactors flows to the membrane bioreactor system (MBR) consisting of three membrane tanks each with one submerged ultrafiltration membrane cassette consisting of 44 modules. Return Activated Sludge (RAS) pumping pumps back RAS from membrane tanks to the bioreactors. Waste Activated Sludge (WAS) pumping system sends WAS to aerobic digestors. Four 610-standard cubic feet per minute (scfm) positive displacement (PD) blowers (3-duty, and 1-standby) supply air to bioreactors’ aerated zones and three 300-scfm PD blowers (2-duty, and 1-standby) supply scour air for membrane cleaning. Permeate pumping system pumps effluent from the MBR to Ultraviolet (UV) disinfection (capacity of 1.2 mgd; 2 duty 1 standby reactors). Effluent will be disinfected through UV disinfection system consisting of three reactors prior to transferring to 110,000-gallon reclaimed water storage tank.

1Seven days a week. In the absence of the operator in direct responsible charge, the operator in charge of the facility is certified for the applicable class of facility and at a grade no lower than one grade below the grade of the facility.

Grand Canyon National Park – South Rim WWTP Page 5 of 33

Effluent from a new WWTP will be discharged to Bright Angel Wash under a valid AZPDES Permit #AZ0022152 or used as Class A+ reclaimed water for beneficial purpose under a valid Recycled Water Permit. The reclaimed water will be chlorinated prior to discharge through Reclaimed Water Pump Station for beneficial reuse. Effluent may also be discharged to three clay-lined Storage Ponds (formerly known as emergency effluent storage ponds) fire suppression storage. In addition, off-specification water from MBR system or UV disinfection unit, such water can also be diverted to the Storage Ponds. The effluent from the Storage Ponds may be used for fire suppression but shall not be used for any Class A+ beneficial uses. The off-specification water from MBR system or UV disinfection unit can also be diverted to Storage Ponds. These Storage Ponds are located three miles south of the WWTP and have a total storage capacity of 12 million gallons.

WAS is pumped to two, 222-700-gallon aerobic digesters for digestion of sludge. The aerobic digesters can also receive the screened septage from the Septage Receiving Station. Three 600-scfm PD blowers (3-duty, and 1-standby) supply air to aerobic digesters. The supernatant from aerobic digesters is pumped back to headworks through Tank Drain Pump Station. The digested sludge will be dried in new ten concrete sludge drying beds and then Class B biosolids will be hauled off to 4-acres Biosolids Storage Site (previously known as Sludge Treatment and Disposal Site) located three miles south of the WWTP. Biosolids from sludge drying beds will be also used to blend with compost toilet waste at the non-discharging Composting Facility. Biosolids Storage Site receives the biosolids from Grand Canyon North Rim WWTP (Inventory #P-100750) for storage.

Septage Receiving Station: The facility will have a septage receiving station consisting of septage screening and equalization tank to handle septage from dry vault toilets in the South Rim Park. The screenings will be discharged to a roll-off container and septage from the equalization tank will be pumped to the digester or to the headworks of the WWTP.

Phase II - 0.65 mgd WWTP: Under this Phase II, the facility will upgrade the equipment to accommodate the maximum average monthly flow of 0.65 mgd. The treatment components are designed and constructed to accommodate the Phase II hydraulic capacity during Phase I. The four aeration blowers will be replaced with 800 scfm blowers, diffusers will be increased to 300 per bioreactor, and four blowers for aerobic digesters will be replaced with 800-scfm blowers. All other treatment component and disposal methods will remain the same for Phase II.

The facility is provided with standby generators for backup power. The facility will utilize one or multiple propane generators for 600-KW of backup power. The facility has provided the odor control for the headworks facility, the septage receiving station and the composting facility.

The site includes the following permitted discharging facilities:

Table 1: DISCHARGING FACILITIES Facility Latitude (North) Longitude (West)

Existing South Rim WWTP 36° 02' 58.6" 112° 08' 59.4" Existing Sludge Drying Beds 36° 02' 59.6" 112° 09' 02.4" New South Rim WWTP – Phase I & II 36° 02' 57.4" 112° 09' 00.9" Discharge to Bright Angel Wash/ AZPDES Outfall 36° 02' 58.8" 112° 09' 05.0" Storage Pond #1 36° 01' 42.5" 112° 11' 11.7" Storage Pond #2 36° 01' 40.6" 112° 11' 12.9" Storage Pond #3 36° 01' 38.3" 112° 11' 13.4" Biosolids Storage Site 36° 01' 36.7" 112° 11' 05.2" New Sludge Drying Beds 36° 02' 56.6" 112° 09' 01.9"

Grand Canyon National Park – South Rim WWTP Page 6 of 33

2.1.1. Annual Registration Fee

[A.R.S. § 49-242 and A.A.C. R18-14-104]

The annual registration fee for this permit is payable to ADEQ each year. The annual registration fee flow rate is established by the permitted flow rate identified in Section 1.1. If the facility is not constructed or is incapable of discharge, the permittee may be eligible for reduced fees pursuant to Table 2 under A.A.C. R18- 14-104(A). Send all correspondence requesting reduced fees to ADEQ. Please reference the permit number, LTF number, and the reason for requesting reduced fees under this rule.

2.1.2. Financial Capability

[A.R.S. § 49-243(N) and A.A.C. R18-9-A203]

The permittee has demonstrated financial capability under A.R.S. § 49-243(N) and A.A.C. R18-9-A203. The estimated dollar amount for facility closure is $16,510,000. The financial capability was demonstrated through A.A.C. R18-9-A203(B)(1) and (2).

2.2. BEST AVAILABLE DEMONSTRATED CONTROL TECHNOLOGY (BADCT)

[A.R.S. § 49-243(B) and A.A.C. R18-9-A202(A)(5)]

The Existing WWTP is designed to conform with the treatment performance requirements for existing facilities in A.A.C. R18-9-B205.

New Phase I and Phase II WWTP shall be designed, constructed, operated, and maintained to meet the treatment performance criteria for new facilities as specified in A.A.C. R18-9-B204. The facility shall meet the performance requirement for industrial pre-treatment as per A.A.C. R18-9-B204(B)(6)(b).

The treatment facility shall be designed not to exceed a maximum seepage rate of 550 gallons per day per acre for all containment structures within the treatment works.

2.2.1. Engineering Design

New Phase I and Phase II WWTP is designed as per the design report and design plan titled ‘Replace Wastewater Plant South Rim Village GRCA-257282’, signed, dated, and sealed by Katarzyna Rosinski, P.E Civil # 77237 with Jacobs dated October 1, 2024 on seal and subsequent sealed submittals that served as additions to the design report.

The Existing South Rim WWTP was designed, constructed, and located according to plans approved by the Arizona Department of Health Services (ADHS) on 9/18/1986, and by ADEQ on 9/19/2000. The WWTP was originally designed by Kennedy Engineering (Richard Kennedy). The 1986 expansion and improvements were designed by McLaughlin Water Engineering (Ronald McLaughlin), and the 2000 improvements were designed by Richard P. Arber & Associates (Richard Arber). All three engineering firms employ professional engineers registered in the state of Arizona.

2.2.2. Site-Specific Characteristics

Site-specific characteristics were not used to determine BADCT.

2.2.3. Pre-Operational Requirements

Prior to initiating use of the Phase I WWTP and new sludge drying beds, the permittee shall submit a signed, dated, and sealed Engineer’s Certificate of Completion in a format approved by ADEQ per the compliance schedule items #1 and #2 in Section 3.0. The certificate shall be submitted to ADEQ.

Upon upgrading the equipment for Phase II WWTP, the permittee shall submit a signed, dated, and sealed Engineer’s Certificate of Completion in a format approved by ADEQ per the compliance schedule items #11 and #12 in Section 3.0. The certificate shall be submitted to ADEQ.

Grand Canyon National Park – South Rim WWTP Page 7 of 33

2.2.4. Operational Requirements

1. The permittee shall maintain a copy of the up-to-date operations and maintenance manual at the treatment facility site at all times; the manual shall be available upon request during inspections by ADEQ personnel.

2. The pollution control structures shall be inspected for the items listed in Section 4.2, Table 13:

FACILITY INSPECTION AND OPERATIONAL MONITORING.

3. If any damage of the pollution control structures is identified during inspection, proper repair procedures shall be performed. All repair procedures and material(s) used shall be documented in the facility log book as per Section 2.7.2 and reported to ADEQ in the event of a violation or exceedance per Section 2.7.3.

2.2.5. Reclaimed Water Classification

[A.A.C. R18-9-B701(C)(2)(a), A.A.C. R18-11-303 through 307]

The Existing WWTP is rated as producing reclaimed water meeting the Class A Reclaimed Water Quality Standards (A.A.C. R18-11, Article 3) which may be used for any allowable Class A, B, or C use under a valid reclaimed water permit (A.A.C. R18-9, Article 7).

The Phase I and Phase II WWTP is rated as producing reclaimed water meeting the Class A+ Reclaimed Water Quality Standards (A.A.C. R18-11, Article 3) which may be used for any allowable Class A, B, or C use under a valid reclaimed water permit (A.A.C. R18-9, Article 7).

2.2.6. Certified Areawide Water Quality Management Plan Conformance [A.A.C. R18-9-A201(B)(6)(a)]

Facility operations must conform to the approved Certified Areawide Water Quality Management Plan according to the 208-consistency determination in place at the time of permit issuance.

2.3. DISCHARGE LIMITATIONS

[A.R.S. §§ 49-201(14), 49-243 and A.A.C. R18-9-A205(B)]

1. The permittee is authorized to operate:

a. Existing WWTP with an average daily monthly maximum (ADMM) flow of 0.75 million gallons per day (mgd),

b. Phase I WWTP with an ADMM flow of 0.52 mgd, and

c. Phase II WWTP with an ADMM flow of 0.65 mgd.

2. The permittee shall notify all users that the materials authorized to be disposed of through the treatment facility are typical household sewage and pre-treated commercial wastewater and shall not include motor oil, gasoline, paints, varnishes, hazardous wastes, solvents, pesticides, fertilizers or other materials not generally associated with toilet flushing, food preparation, laundry facilities and personal hygiene.

3. The permittee shall operate and maintain all permitted facilities to prevent unauthorized discharges pursuant to A.R.S. § 49-201(12) resulting from failure or bypassing of applicable BADCT.

4. Specific discharge limitations are listed in Section 4.2, Table 9: ROUTINE DISCHARGE MONITORING - Existing WWTP and Table 10: ROUTINE DISCHARGE MONITORING - Phase I &

II WWTP.

Grand Canyon National Park – South Rim WWTP Page 8 of 33

2.4. POINT OF COMPLIANCE (POC)

[A.R.S. § 49-244]

The Points of Compliance (POCs) have been established at the following locations:

Table 2: POINT OF COMPLIANCE

POC # POC Locations (Conceptual) Latitude (North) Longitude (West)

1 Southwest of the WWTP and south of the AZPDES Discharge Point 36° 02’ 11.0” 112° 10’ 00.1”

2 South of the Storage Ponds and Biosolids Storage Site 36° 01’ 35.7” 112° 11’ 11.2”

3 Southwest of the new sludge drying beds 36° 02’ 55.4” 112° 09’ 04.9”

The depth to groundwater is approximately at 2,500 feet below ground surface (bgs) and the groundwater flow direction is to the west-southwest.

POC #1, #2 and #3 are conceptual well locations and groundwater monitoring is not required except as a contingency action. The director may require an amendment of this permit to install a monitoring well if there is cause or concern that groundwater quality may be impacted at the POC. The Director may amend this permit to designate additional points of compliance if information on groundwater gradients or groundwater usage indicates the need.

2.5. MONITORING REQUIREMENTS

[A.R.S. § 49-243(K)(1), A.A.C. R18-9-A206(A)]

Unless otherwise specified in this permit, all monitoring required in this permit shall continue for the duration of the permit, regardless of the status of the facility. Unless otherwise provided, monitoring shall commence the first full monitoring period following permit issuance. All sampling, preservation and holding times shall be in accordance with currently accepted standards of professional practice. Trip blanks, equipment blanks and duplicate samples shall also be obtained, and Chain-of-Custody procedures shall be followed, in accordance with currently accepted standards of professional practice. Copies of laboratory analyses and Chain-of-Custody forms shall be maintained at the permitted facility. Upon request, these documents shall be made readily available for review by ADEQ personnel.

2.5.1. Pre-Operational Monitoring

Not applicable.

2.5.2. Routine Discharge Monitoring

For Existing WWTP, the permittee shall record the effluent per Table 6: ROUTINE FLOW MONITORING:

Existing WWTP – 0.75 mgd. The permittee shall monitor the effluent according to Section 4.2, Table 9:

ROUTINE DISCHARGE MONITORING - Existing WWTP. Representative samples of the effluent shall be collected at the discharge at the chlorine contact channel.

For Phase I and Phase II WWTP, the permittee shall record the effluent per Table 7: ROUTINE FLOW MONITORING: Phase I – 0.52 mgd and Table 8: ROUTINE FLOW MONITORING: Phase II - 0.65 mgd respectively. The permittee shall monitor the effluent according to Section 4.2, Table 10: ROUTINE DISCHARGE MONITORING - Phase I & II WWTP. Representative samples of the effluent shall be collected at a sampling point located downstream of UV disinfection unit.

Grand Canyon National Park – South Rim WWTP Page 9 of 33

2.5.3. Reclaimed Water Monitoring

For Existing WWTP, the permittee shall monitor the reclaimed water according to the Class A Reclaimed Water Monitoring Table in Section 4.2, Table 11: RECLAIMED WATER MONITORING - Existing WWTP

– Class A in addition to the routine discharge monitoring parameters listed in Table 9: ROUTINE DISCHARGE MONITORING - Existing WWTP. Representative samples of the reclaimed water shall be collected at the discharge at the chlorine contact channel.

For Phase I & II WWTP, the permittee shall monitor the reclaimed water according to the Class A+ Reclaimed Water Monitoring Table in Section 4.2, Table 12: RECLAIMED WATER MONITORING – Phase I & II WWTP – Class A+ in addition to the routine discharge monitoring parameters listed in Table 10: ROUTINE DISCHARGE MONITORING - Phase I & II WWTP. Representative samples of the reclaimed water shall be collected at a sampling point located downstream of UV disinfection unit.

2.5.4. Facility / Operational Monitoring

Operational monitoring inspections shall be conducted according to Section 4.2, Table 13: FACILITY INSPECTION AND OPERATIONAL MONITORING – Existing WWTP and Table 14: FACILITY INSPECTION AND OPERATIONAL MONITORING – Phase I & II WWTP.

If any damage of the pollution control structures is identified during inspection, proper repair procedures shall be performed. All repair procedures and materials used shall be documented in the facility log book as per Section 2.7.2 and reported to ADEQ in case of a violation or exceedance as per Section 2.7.3.

2.5.5. Groundwater Monitoring and Sampling Protocols

Routine groundwater monitoring is not required under the terms of this permit.

2.5.6. Surface Water Monitoring and Sampling Protocols

Routine surface water monitoring is not required under the terms of this permit.

2.5.7. Analytical Methodology

All samples collected for compliance monitoring shall be analyzed using Arizona state-approved methods.

If no state-approved method exists, then any appropriate EPA-approved method shall be used. Regardless of the method used, the detection limits must be sufficient to determine compliance with the regulatory limits of the parameters specified in this permit. If all methods have detection limits higher than the applicable limit, the permittee shall follow the applicable contingency requirements of Section 2.6 Contingency Plan Requirements and may propose “other actions” including amending the permit to set higher limits. Analyses shall be performed by a laboratory licensed by the Arizona Department of Health Services, Office of Laboratory Licensure and Certification unless exempted under A.R.S. 36-495.02. For results to be considered valid, all analytical work shall meet quality control standards specified in the approved methods. A list of state-certified laboratories in Arizona can be obtained at the address below:

Arizona Department of Health Services Office of Laboratory Licensure and Certification

250 North 17th Avenue Phoenix, Arizona 85007 Phone: (602) 364-0720

2.5.8. Installation and Maintenance of Monitoring Equipment

Monitoring equipment required by this permit shall be installed and maintained so that representative samples required by the permit can be collected. If new groundwater wells are determined to be necessary, the

Grand Canyon National Park – South Rim WWTP Page 10 of 33 construction details shall be submitted to ADEQ for approval prior to installation and the permit shall be amended to include any new monitoring points.

2.6. CONTINGENCY PLAN REQUIREMENTS

[A.R.S. § 49-243(K)(3), (K)(7) and A.A.C. R18-9-A204, R18-9-A205 and R18-9-C305(A)(1)]

2.6.1. General Contingency Plan Requirements

The permittee shall prepare and implement a contingency plan consistent with the circumstances and actions described in Sections 2.6.2 through 2.6.5 and with A.A.C. R18-9-A204. At least one copy of this permit and the contingency plan referenced in Section 5.0 shall be maintained at the location where day-to-day decisions regarding the operation of the facility are made. The permittee shall revise the contingency plans upon any significant change to the information contained in the plan.

Any AL exceedance, or violation of a DL, or other permit condition shall be reported to ADEQ following the reporting requirements in Section 2.7.3 Permit Violation and Alert Level Status Reporting, unless more specific reporting requirements are set forth in Section 2.6.2 through 2.6.5.

Some contingency actions involve verification sampling. Verification sampling shall consist of the first follow-up sample collected from a location that previously indicated a violation or the exceedance of an AL.

Collection and analysis of the verification sample shall use the same protocols and test methods to analyze for the pollutant or pollutants that exceeded an AL or violated a or DL. Where verification sampling is specified in this permit, it is the option of the permittee to perform such sampling. If verification sampling is not conducted within the timeframe allotted, ADEQ and the permittee shall presume the initial sampling result to be confirmed as if verification sampling had been conducted. The permittee is responsible for compliance with contingency actions relating to the exceedance of an AL or violation of a DL, or any other permit condition. The permittee is subject to enforcement action for the failure to comply with any contingency actions in this permit.

2.6.2. Exceeding of Alert Levels and Performance Levels

2.6.2.1. Exceeding of Performance Levels Set for Operational Conditions

For freeboard performance levels, the permittee shall comply with the requirements as specified in Section 4.2, Table 13: FACILITY INSPECTION AND OPERATIONAL MONITORING – Existing WWTP and Table 14: FACILITY INSPECTION AND OPERATIONAL MONITORING – Phase I & II WWTP to prevent the overtopping of a tank, Storage Ponds, Biosolids Storage Site or sludge drying beds. If a tank, Storage Pond, Biosolids Storage Site or sludge drying bed is overtopped, the permittee shall follow the requirements in Section 2.6.5.3 and the reporting requirements of Section 2.7.3. This includes releases of more than 2,000 gallons of raw influent from the collection system or a treatment process prior to biological treatment that are contained onsite.

If a performance level set in Section 4.2, Table 13 or Table 14 have been exceeded the permittee shall:

1. Notify ADEQ within five (5) days of becoming aware of the exceedance per Section 2.7.5.

2. Submit a written report to ADEQ within thirty (30) days after becoming aware of the exceedance per Section 2.7.5. The report shall document all of the following:

a. A description of the exceedance and the cause of the exceedance;

b. The period of the exceedance, including exact date(s) and time(s), if known, and the anticipated time period during which the exceedance is expected to continue;

c. Any action taken or planned to mitigate the effects of the exceedance or spill, or to eliminate or prevent recurrence of the exceedance or spill;

Grand Canyon National Park – South Rim WWTP Page 11 of 33

d. Any monitoring activity or other information which indicates that any pollutants would be reasonably expected to cause a violation of an AWQS; and

e. Any malfunction or failure of pollution control devices or other equipment or process.

3. The facility is no longer on alert status once the operational indicator no longer indicates that a performance level is being exceeded. The permittee shall, however, complete all tasks necessary to return the facility to its pre-alert operating condition.

2.6.2.2. Exceeding of Alert Levels (ALs) Set for Discharge Monitoring

1. If an AL set in Section 4.2, Table 9: ROUTINE DISCHARGE MONITORING - Existing WWTP or Table 10: ROUTINE DISCHARGE MONITORING - Phase I & II WWTP have been exceeded, the permittee shall investigate to determine the cause of the AL exceedance within 24 hours, or as soon as practicable. The investigation shall include the following:

a. Inspection, testing, and assessment of the current condition of all treatment or pollutant discharge control systems that may have contributed to the exceedance;

b. Review of recent process logs, reports, and other operational control information to identify any unusual occurrences; and

c. If the investigation procedures indicated in (a) and (b) above fail to reveal the cause of the exceedance, the permittee shall sample individual waste streams composing the wastewater for the parameter(s) in question, if necessary to identify the cause of the exceedance.

2. The permittee shall initiate actions identified in the contingency plan referenced in Section 2.6.1 General Contingency Plan Requirements and specific contingency measures identified in Section 2.6 to resolve any problems identified by the investigation which may have led to the AL exceedance. To implement any other corrective action the permittee shall obtain prior approval from ADEQ according to Section 2.6.6 Corrective Actions.

3. Within thirty (30) days of an AL exceedance, the permittee shall submit the laboratory results to ADEQ per Section 2.7.5 along with a summary of the findings of the investigation, the cause of the exceedance, and actions taken to resolve the problem.

4. Upon review of the submitted report, ADEQ may amend the permit to require additional monitoring, increased frequency of monitoring, amendments to permit conditions or other actions.

2.6.2.2.1. Exceeding Permit Flow Limit

1. If the AL for average monthly flow in Section 4.2, Table 7: ROUTINE FLOW MONITORING:

Phase I – 0.52 mgd has been exceeded, the permittee shall begin construction of the next phase, or submit a report to ADEQ detailing the reasons it is not necessary to begin the next phase of construction. Acceptance of the report instead of beginning the next phase of construction requires ADEQ approval.

2. If the AL for average monthly flow in Section 4.2, Table 8: ROUTINE FLOW MONITORING:

Phase II - 0.65 mgd has been exceeded, the permittee shall submit an application to ADEQ for an APP amendment to expand the WWTP, or submit a report detailing the reasons an expansion is not necessary. Acceptance of the report instead of an application for expansion requires ADEQ approval.

Grand Canyon National Park – South Rim WWTP Page 12 of 33

2.6.2.3. Exceeding of Alert Levels in Groundwater Monitoring

2.6.2.3.1. Alert Levels for Indicator Parameters

Not required at time of issuance.

2.6.2.3.2. Alert Levels for Pollutants with Numeric Aquifer Water Quality Standards

Not required at time of issuance.

2.6.2.3.3. Alert Levels to Protect Downgradient Users from Pollutants without Numeric Aquifer Water Quality Standards

Not required at time of issuance.

2.6.2.3.4. Alert Level for Groundwater Level

Not applicable.

2.6.3. Discharge Limit Violation

1. If a DL set in Section 4.2, Table 9, Table 10, Table 11 or Table 12 have been violated, the permittee shall investigate to determine the cause within 24 hours, or as soon as practicable. The investigation shall include the following:

a. Inspection, testing, and assessment of the current condition of all treatment or pollutant discharge control systems that may have contributed to the violation;

b. Review of recent process logs, reports, and other operational control information to identify any unusual occurrences;

c. If the investigation procedures indicated in (a) and (b) above fail to reveal the cause of the violation, the permittee shall sample individual waste streams composing the wastewater for the parameters in violation, as necessary to identify the cause of the violation.

The permittee shall submit a report to ADEQ according to Section 2.7.3, which includes a summary of the findings of the investigation, the cause of the violation, and actions taken to resolve the problem. The permittee shall consider and ADEQ may require corrective action that may include control of the source of discharge, cleanup of affected soil, surface water or groundwater, notification of downstream or downgradient users who may be directly affected by the discharge, and mitigation of the impact of pollutants on existing uses of the aquifer. Corrective actions shall either be specifically identified in this permit, included in an ADEQ-approved contingency plan, or separately approved according to Section 2.6.6.

2. Upon review of the submitted report, ADEQ may amend the permit to require additional monitoring, increased frequency of monitoring, amendments to permit conditions, or other actions.

2.6.4. Aquifer Quality Limit Violation

Not applicable

2.6.5. Emergency Response and Contingency Requirements for Unauthorized Discharges [A.R.S. § 49-201(12) and § 49-241]

2.6.5.1. Duty to Respond

Within 24 hours, or as soon as practicable, the permittee shall act to correct any condition resulting from a discharge pursuant to A.R.S. § 49-201(12) if that condition could pose an imminent and substantial endangerment to public health or the environment.

Grand Canyon National Park – South Rim WWTP Page 13 of 33

2.6.5.2. Discharge of Hazardous Substances or Toxic Pollutants

In the event of any unauthorized discharge pursuant to A.R.S. § 49-201(12) of suspected hazardous substances (A.R.S. § 49-201(19)) or toxic pollutants (A.R.S. § 49-243(I)) on the facility site, the permittee shall promptly isolate the area and attempt to identify the discharged material. The permittee shall record information, including name, nature of exposure and follow-up medical treatment, if necessary, on persons who may have been exposed during the incident. The permittee shall notify ADEQ within 24 hours of discovering the discharge of hazardous material which (a) has the potential to cause an AWQS exceedance, or (b) could pose an endangerment to public health or the environment.

2.6.5.3. Discharge of Non-Hazardous Materials

In the event of any unauthorized discharge pursuant to A.R.S. § 49-201(12) of non-hazardous materials from the facility, the permittee shall promptly attempt to cease the discharge and isolate the discharged material. Discharged material shall be removed and the site cleaned up as soon as possible. The permittee shall notify ADEQ within 24 hours of discovering the discharge of non-hazardous material which has the potential to cause an exceedance, or could pose an endangerment to public health or the environment.

2.6.5.4. Reporting Requirements

The permittee shall submit a written report for any unauthorized discharges reported under Sections

2.6.5.2 and 2.6.5.3 to ADEQ per Section 2.7.5 within thirty (30) days of the discharge or as required by subsequent ADEQ action. The report shall summarize the event, including any human exposure, and facility response activities and include all information specified in Section 2.7.3 Permit Violation and Alert Level Status Reporting. If a notice is issued by ADEQ subsequent to the discharge notification, any additional information requested in the notice shall also be submitted within the time frame specified in the notice. Upon review of the submitted report, ADEQ may require additional monitoring or corrective actions.

2.6.6. Corrective Actions

Specific contingency measures identified in Section 2.6 CONTINGENCY PLAN REQUIREMENTS have already been approved by ADEQ and do not require written approval to implement.

With the exception of emergency response actions taken under Section 2.6.5 Emergency Response and Contingency Requirements for Unauthorized Discharges, the permittee shall obtain written approval from ADEQ prior to implementing a corrective action to accomplish any of the following goals in response to exceedance of an AL, DL, or another permit condition:

1. Control of the source of an unauthorized discharge;

2. Soil cleanup;

3. Cleanup of affected surface waters;

4. Cleanup of affected parts of the aquifer;

5. Mitigation to limit the impact of pollutants on existing uses of the aquifer.

Within thirty (30) days of completion of any corrective action not specified in 2.6.1 through 2.6.5, the operator shall submit to ADEQ per Section 2.7.5, a written report describing the causes, impacts, and actions taken to resolve the problem.

Grand Canyon National Park – South Rim WWTP Page 14 of 33

2.7. REPORTING AND RECORDKEEPING REQUIREMENTS

[A.R.S. § 49-243(K)(2), A.A.C. R18-5-104, R18-9-A206(B), and R18-9-A207]

2.7.1. Self-Monitoring Report Form

1. The permittee shall complete the Self-Monitoring Reporting Forms (SMRFs) provided by ADEQ, and submit the completed report through the myDEQ online reporting system per Section 2.7.5. The permittee shall use the format devised by ADEQ.

2. The permittee shall complete the SMRF to the extent that the information reported may be entered on the form. If no information is required during a reporting period, the permittee shall enter “not required” on the form, include an explanation, and submit the form to ADEQ.

3. The tables contained in Section 4.0 list the monitoring parameters and the frequencies for reporting results on the SMRF:

The following tables are in accordance with the current permitted phases:

a. Table 6: ROUTINE FLOW MONITORING: Existing WWTP – 0.75 mgd

b. Table 7: ROUTINE FLOW MONITORING: Phase I – 0.52 mgd

c. Table 8: ROUTINE FLOW MONITORING: Phase II - 0.65 mgd

The following tables during the Existing WWTP – 0.75 mgd, covered by this permit:

d. Table 9: ROUTINE DISCHARGE MONITORING - Existing WWTP

e. Table 11: RECLAIMED WATER MONITORING - Existing WWTP – Class A

And the following tables during Phase I and Phase II WWTP covered by this permit:

f. Table 10: ROUTINE DISCHARGE MONITORING - Phase I & II WWTP

g. Table 12: RECLAIMED WATER MONITORING – Phase I & II WWTP – Class A+

The parameters listed in the above-identified tables from Section 4.0 are the only parameters for which SMRF reporting is required.

2.7.2. Operation Inspection / Log Book Recordkeeping

A signed copy of this permit shall be maintained at all times at the location where day-to-day decisions regarding the operation of the facility are made. A log book (paper copies, forms, or electronic data) of the inspections and measurements required by this permit shall be maintained at the location where day-to-day decisions are made regarding the operation of the facility. The log book shall be retained for ten years from the date of each inspection, and upon request, the permit and the log book shall be made readily available for review by ADEQ personnel. The information in the log book shall include, but not be limited to, the following information as applicable:

1. Name of inspector;

2. Date and shift inspection was conducted;

3. Condition of applicable facility components;

4. Any damage or malfunction, and the date and time any repairs were performed;

5. Documentation of sampling date and time; and

6. Any other information required by this permit to be entered in the log book.

7. Monitoring records for each measurement shall comply with A.A.C. R18-9-A206(B)(2).

Grand Canyon National Park – South Rim WWTP Page 15 of 33

8. “Daily” for Grade 3 onsite operator site visit sign-in to comply with A.A.C. R18-5-104.

2.7.3. Permit Violation and Alert Level Status Reporting

1. The permittee shall notify ADEQ per Section 2.7.5 within five (5) days (except as provided in Section 2.6.5 Emergency Response and Contingency Requirements for Unauthorized Discharges) of becoming aware of an AL exceedance, or violation of any permit condition, or DL for which notification requirements are not specified in Sections 2.6.2 through 2.6.5.

2. The permittee shall submit a written report to ADEQ per Section 2.7.5 within thirty (30) days of becoming aware of the violation of any permit condition, or DL. The report shall document all of the following:

a. Identification and description of the permit condition for which there has been a violation and a description of the cause;

b. The period of violation including exact date(s) and time(s), if known, and the anticipated time period during which the violation is expected to continue;

c. Any corrective action taken or planned to mitigate the effects of the violation, or to eliminate or prevent a recurrence of the violation;

d. Any monitoring activity or other information which indicates that any pollutants would be reasonably expected to cause a violation of an AWQS;

e. Proposed changes to the monitoring which include changes in constituents or increased frequency of monitoring; and

f. Description of any malfunction or failure of pollution control devices or other equipment or processes.

2.7.4. Operational, Other or Miscellaneous Reporting

The permittee shall record the information as required in Section 4.2, Table 13: FACILITY INSPECTION AND OPERATIONAL MONITORING in the facility log book as per Section 2.7.2 Operation Inspection / Log Book Recordkeeping.

If the treatment facility is classified for reclaimed water under this permit, the permittee shall submit the reclaimed water monitoring results and flow volumes to any of the following in accordance with A.A.C. R18- 9-B701(C)(2)(c):

1. Any reclaimed water agent who has contracted for delivery of reclaimed water from the permittee;

and

2. Any end user who has not waived interest in receiving this information.

2.7.5. Reporting Location

All Self-Monitoring Report Forms (SMRFs) shall be submitted through the myDEQ portal accessible on the ADEQ website at: https://www.azdeq.gov/mydeq. Contact at 602-771-4571 for any inquiry related to the SMRFs.

5-day and 30-day contingency notification and reports, laboratory reports, and verification sampling results;

and the Compliance Schedule Items per Section 3.0 required by this permit should be submitted through the myDEQ portal accessible on the ADEQ website at: https://www.azdeq.gov/mydeq.

If the required reports cannot be submitted, or require further documentation that cannot be submitted on the myDEQ portal, then submit items to APPContingencyreports@azdeq.gov or the address listed below:

https://www.azdeq.gov/mydeq https://www.azdeq.gov/mydeq mailto:APPContingencyreports@azdeq.gov

Grand Canyon National Park – South Rim WWTP Page 16 of 33

The Arizona Department of Environmental Quality Individual Aquifer Protection Program (APP) - Water Reuse & Reclamation Unit

1110 West Washington Street Phoenix, Arizona 85007 Phone (602) 771-4999

2.7.6. Reporting Deadline

The following table lists the quarterly report due dates:

Table 3: QUARTERLY REPORTING DEADLINES Monitoring Conducted During Quarter: Quarterly Report Due By:

January-March April 30 April-June July 30

July-September October 30 October-December January 30

The following table lists the semi-annual and annual report due dates if applicable:

Table 4: (SEMI-)ANNUAL REPORTING DEADLINES Monitoring Conducted: Report Due By:

Semi-annual: January-June July 30 Semi-annual: July-December January 30 Annual: January-December January 30

2.7.7. Changes to Facility Information in Section 1.0 and Section 2.0

ADEQ shall be notified per Section 2.7.5 within ten days of any change of facility information including Facility Name, Permittee Name, Mailing or Street Address, Facility Contact Person, Certified Operator in Direct Responsible Charge or Emergency Telephone Number.

2.8. Temporary Cessation

[A.R.S. § 49-243(K)(8) and A.A.C. R18-9-A209(A)]

The permittee shall give written notice to ADEQ per Section 2.7.5 before ceasing operation of the facility for a period of 60 days or greater. The permittee shall take the following measures upon temporary cessation:

1. If applicable, direct the wastewater flows from the facility to another state-approved wastewater treatment facility;

2. Correct the problem that caused the temporary cessation of the facility; and

3. Notify ADEQ with a monthly facility status report describing the activities conducted on the treatment facility to correct the problem.

4. Submittal of Self-Monitoring Report Forms (SMRFs) is still required; report “temporary cessation” in the comment section.

At the time of notification, the permittee shall submit for ADEQ approval a plan for maintenance of discharge control systems and for monitoring during the period of temporary cessation. Following ADEQ approval, the permittee shall promptly implement the approved plan. If necessary, ADEQ shall amend permit conditions to incorporate conditions to address temporary cessation. During the period of temporary cessation, the permittee shall provide written notice to ADEQ of the operational status of the facility every three years. If the permittee intends to permanently cease operation of any facility, the permittee shall submit closure notification, as set forth in Section 2.9 below.

Grand Canyon National Park – South Rim WWTP Page 17 of 33

2.9. Closure

[A.R.S. §§ 49-243(K)(6), 49-252 and A.A.C. R18-9-A209(B)]

For a facility addressed under this permit, the permittee shall give written notice of closure to ADEQ per Section

2.7.5 of the intent to cease operation without resuming activity for which the facility was designed or operated.

Submittal of SMRFs is still required; report “closure in process” in the comment section.

2.9.1. Closure Plan

Within 90 days following notification of closure, the permittee shall submit for approval to ADEQ per Section 2.7.5, a closure plan which meets the requirements of A.R.S. § 49-252 and A.A.C. R18-9-A209(B)(3).

If results of the implemented closure plan achieve clean-closure, ADEQ will issue a letter of approval to the permittee. If the closure plan contains a schedule for bringing the facility to a clean-closure configuration at a future date, ADEQ may incorporate any part of the schedule as an amendment to this permit.

2.9.2. Closure Completion

Upon completion of closure activities, the permittee shall give written notice to ADEQ per Section 2.7.5 indicating that the approved closure plan has been implemented fully and providing supporting documentation to demonstrate that clean-closure has been achieved (soil sample results, verification sampling results, groundwater data, as applicable). If clean-closure has been achieved, ADEQ shall issue a letter of approval to the permittee at that time. If any of the following conditions apply, the permittee shall follow the terms of post-closure stated in this permit:

1. Clean-closure cannot be achieved at the time of closure notification or within one year thereafter under a diligent schedule of closure actions;

2.…