B09_Amendment_10_GRCA257282_FinalCD_Addendum_08_wSeal_0010.pdf

PDF 18 MB Posted

Attached to
GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation number
140P2026R0101
Issued by

About this file

This document is Addendum 8 to the 100% Complete Construction Documents for the Replace Wastewater Plant South Rim Village project (GRCA-257282), issued by the National Park Service on October 30, 2026, and prepared by Jacobs Government Services Company.

Addendum 8 addresses bidder questions received on October 20, 2026, regarding the June 2025 construction documents and implements minor updates to the contract drawings and specifications through markup format (red for additions, green for deletions, blue for notes). The revised documents include 24 updated drawing sheets covering various systems: power actuated valve schedules (Sheet 42), self-regulated valve schedules with new valve additions (Sheet 43), yard piping plans in Areas 1, 3, and 4 with cleanout relocations (Sheets 102, 104, 105), electrical motor control diagrams with tag number corrections (Sheets 125, 331), instrumentation and control P&IDs with UVI line and drain/vent location revisions (Sheets 159, 169, 170), process tank and building mechanical sections with valve type and equipment tag revisions (Sheets 291, 312, 314–318), digester facility structural plans with W-beam sizing and elevation alignments (Sheets 344, 346, 347), and digester facility mechanical sections with pipe material clarifications and drain/vent locations (Sheets 361, 362). Two specification sections were also updated: Section 10 44 00 (Fire Protection and Safety Equipment) adding clarification that "SEH" abbreviates Safety Eyewear Holder, and Section 40 27 00 (Process Piping) and 40 27 00.01 (Data Sheet) removing the term "proprietary" from thrust restrain and restraint/fitting descriptions to allow broader equipment options. No revisions to standard details were necessary.

View the file

Other files

File Type Posted
B09_Amendment_10_INV_100751_LTF_94239_Grand_Canyon_South_Rim_WWTP_Final_Permit_0010.pdf PDF
B09_Amendment_10_SR_NPDES_AZ0022152_GCSR_Permit_SIGNED_ISSUED_122222_0010.pdf PDF
B09_Amendment_10_SF_30_0010.pdf PDF
Sol_140P2026R0101_Amd_0010.pdf PDF
B09_Amendment_09_SF_30_0009.pdf PDF
B09_Amendment_09_Answers_to_Questions_0009.pdf PDF
Sol_140P2026R0101_Amd_0009.pdf PDF
Sol_140P2026R0101_Amd_0008.pdf PDF
B09_Amendment_07_SF_30_0007.pdf PDF
B09_Amendment_07_GRCA257282_FinalCD_Addendum_07_0007.pdf PDF
Sol_140P2026R0101_Amd_0007.pdf PDF
B09_Amendment_07_Answers_to_Questions_0007.pdf PDF
Sol_140P2026R0101_Amd_0006.pdf PDF
B09_Amendment_06_GRCA257282_FinalCD_Addendum_06_0006.pdf PDF
B09_Amendment_06_SF_30_0006.pdf PDF
B09_Amendment_06_B08_Att_13_Solit_PSP_Vol_II_SubKPlan_0006.docx DOCX document
B09_Amendment_06_GRCA_25782_Site_Visit_Sign_in_Sheet_0006.jpeg JPEG file
B09_Amendment_06_Answers_to_Questions_0006.pdf PDF
B09_Amendment_05_Answers_to_Questions_0005.pdf PDF
Sol_140P2026R0101_Amd_0005.pdf PDF
B09_Amendment_05_GRCA_Final_Individual_Specs_0005.zip ZIP file
B09_Amendment_05_GRCA257282_FinalCD_Addendum_02_SCADA_wSeal_0005.pdf PDF
B09_Amendment_05_GRCA257282_FinalCD_Addendum_04_0005.pdf PDF
B09_Amendment_05_GRCA257282_FinalCD_Addendum_05_0005.pdf PDF
B09_Amendment_05_SF_30_0005.pdf PDF
B09_Amendment_04_SF30_0004.pdf PDF
Sol_140P2026R0101_Amd_0004.pdf PDF
B09_Amendment_03_GRCA257282_FinalCD_Addendum_03_Compiled_wSeal_0003.pdf PDF
Sol_140P2026R0101_Amd_0003.pdf PDF
B09_Amendment_03_Answers_to_Questions_0003.pdf PDF
B09_Amendment_03_SF30_0003.pdf PDF
Sol_140P2026R0101_Amd_0002.pdf PDF
B09_Amendment_02_SF30_0002.pdf PDF
B09_Amendment_02_What_Evaluators_Will_Ask_for_Each_Factor_2_0002.pdf PDF
B09_Amendment_02_GRCA_257282_SR_WWTP_PreBid_Mtg_presentation_(8-11-26)_FINAL_0002.pdf PDF
B09_Amendment_02_GRCA_257282_Precon_SignIn_0002.pdf PDF
Sol_140P2026R0101_Amd_01.pdf PDF
B09_Amendment_01_GRCA257282_Access_Road_100P_Final_CD_DRAWINGS_01.pdf PDF
B09_Amendment_01_SF30_01.pdf PDF
B09_Amendment_01_RCA257282_Access_Road_100P_Final_CD_Specifications_01.pdf PDF
B09_Amendment_01_GRCA257282_CD_Specifications_June2025_01.pdf PDF
Sol_140P2026R0101.pdf PDF
B08_Att_11_Solit_PSP_Vol_II_Equals.pdf PDF
B08_Att_10_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Att_07_GRCA_257282_Price_Schedule.xlsx XLSX spreadsheet
B08_Att_01b_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part2.pdf PDF
B08_Att_03_GRCA257282_100P_FinalCD_Addendum_1.pdf PDF
B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5_1.pdf PDF
B08_Att_12_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Att_08_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .