Attmt II TSFS VENDOR PRICE SHEET (SECTION B) .xlsx

XLSX spreadsheet 17 KB Posted

Attached to
TRAINING VESSEL FREEDOM STAR(TVFS) FY25 DRY DOCK
Solicitation number
6933A225Q000001
Issued by

About this file

This is a vendor price sheet template (Attachment II) for drydocking services for the Training Vessel Freedom Star, structured as a detailed line-item pricing schedule. The sheet contains three main sections: General Services Requirements (Series 0100), Drydocking Requirements (Series 0200), and Optional/Unit Priced Items (Series 0300).

The scope includes comprehensive drydocking services with specific line items for security, fire protection, shore power (61,250 kWh), staging, oil boom deployment, and waste management. Major technical requirements include tailshaft examination, rudder inspection, sea valve maintenance, hull blasting/coating, ultrasonic thickness gauging, and various tank inspections. Optional items include wet lay berth ($1,050), supplemental labor (1,500 hours), materials ($60,000), and steel work (estimates for 1,000 lbs flat steel, 1,000 lbs rolled steel, and 100 feet of hull weld seams). The total baseline price shown is $64,250, which includes $3,200 for shore power connection. The work must be performed at a contractor's shipyard located between Philadelphia, PA and Savannah, GA, within 10 miles offshore due to insurance navigation limits.

View the file

Other files

File Type Posted
Crane rope cert.pdf PDF
1547 4411 Rev 5 Machinery Arrgmt.pdf PDF
Tow Winch Pic 2.jpg JPG image
1547L F 54 Rev 4 Barge Towing Arr and Det.pdf PDF
Sullair Compressor Pic.jpg JPG image
1547L P72 Rev 2 Towing winch Power and controls.pdf PDF
AMD 0002 Drydock 2025 Questions and Answers 2.pdf PDF
P00002 6933A225Q000001 .pdf PDF
crane cab rough dimensions.pdf PDF
Tow Winch Pic 1.jpg JPG image
AMD0001 6933A225Q000001 .pdf PDF
Item 225 Photo.jpg JPG image
Item 226 Fassmer FRB.pdf PDF
DB Design PURY P T Y S KMU A BS MEES17K096 201802.pdf PDF
Item 225 SH PLFY P NCMU E OCH410D Parts OCB410D 1.pdf PDF
AMD 00001 TSFS Drydock 2025 Questions and Answers.pdf PDF
Item 226 Global Davit Catalogue 2016.pdf PDF
Item 225 DB PUHY P T Y S KMU A BS U11 E2 3.pdf PDF
FREEDOM STAR ON 629627 Trim and Stability Booklet Rev D.pdf PDF
1547 4411 Rev 5 Machinery Arrgmt.pdf PDF
1547-4701 Rev 3 Rudder Arr 3.pdf PDF
MA-57 Dry dock Report 3.pdf PDF
1547-4420 Rev 3 Bow Thruster Arr 3.pdf PDF
FREEDOM STAR ON 629627 Trim and Stability Booklet Rev D 1.pdf PDF
Stern Thruster Mechanical manual G569W G570W 32HJP 4.pdf PDF
TSFS 2023 Anchor Chain Gauging Report 2.pdf PDF
Shaft Liners 2.pdf PDF
TSFS Wartsila Tailshaft Parts 2024 1.pdf PDF
Stern Thruster 2768WG-D 32HJP SECTIONAL ARRANGEMENET 1.pdf PDF
TSFS 2023 Motor Megger Report 3.pdf PDF
Sherwin Williams Coating Spec 04-12-2024 2.pdf PDF
1316-901 Kings Pointer Docking Plan 3.pdf PDF
FREEDOM STAR MEGGER READINGS blank 1.docx DOCX document
2018 Bow Thruster Maintenance - Final Service Report 1.pdf PDF
1780-4419 Stern Thruster Compt Arrangement1of1 3.pdf PDF
TV KINGS POINTER Docking Calculations 2.pdf PDF
Crane Diesel Manual 1.pdf PDF
TSFS FY25 CSS 6933A225Q000001 FINAL.pdf PDF
1547-1420 Docking Plan 3.pdf PDF
1547-2510 Rev 7 Long l Struct Sections 3.pdf PDF
Sullair ES6 2.pdf PDF
1547-4801 Rev 4 Shafting Arr and Det 2.pdf PDF
2020 Bow Thruster Maintenance Report 1.pdf PDF
ABS Rules Part 7 Chapter 6 4.pdf PDF
TSFS 2023 Anode Locations 2.pdf PDF
TS FREEDOM STAR - Signed CFR 014 Tailshaft Bearing Clearances WI 202 1.pdf PDF
2023 Freedom Star Gauge Calibration List 1.xls XLS spreadsheet
4163B-M20 Bow Thruster Arrangement Omega OCP-400 1.pdf PDF
TSFS Gauge Calibration Final Report 2023 1.pdf PDF
ABS Rules Part 7 Chapter 5 Sections 1 and 2 3.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

INDEPENDENT GOVERNMENT COST ESTIMATE
T.V. KINGS POINTER - ABS SPECIAL PERIODICAL SURVEYS DRYDOCKINGTS FREEDOM STAR ABS PERIODICAL SURVEY DRYDOCKING
ITEMDESCRIPTION OF SERVICESQuanityUnitUnit PriceTotalColumn1
0100SECTION 100: GENERAL SERVICES REQUIREMENTSNSP
0101APPLICABILITY OF RULES AND REGULATIONNSP
0102ACCURACY OF INFORMATIONNSP
0103SECURITY1$- 0
0104FIRE PROTECTION AND SAFETY1$- 0
0105OFFICE AND ADMINISTRATIVE SERVICES1$- 0
0106WHARFAGE1$- 0
0107SURVEYS AND INSPECTIONSNSP
0108ON-SITE CONTRACTOR'S REPRESENTATIVENSP
0109DOCUMENTATION OF OPENINGS, BLANKS AND PLUGS1$- 0
0110ALLOWANCE FOR SCRAP MATERIALNSP
0111MAINTAIN SHIP'S LIGHTING1$- 0
0112HAZARDOUS MATERIALS IDENTIFICATION AND DISPOSAL1- 0- 0
0113USE OF SHIP'S PARTS AND EQUIPMENTNSP
0114PROVIDE SHORE POWER61250kWh- 0Install meter and connect/disconect $3,200
0115DISABLE CO2 AND HALON SYSTEMS.1$- 0
0116MAINTAINING SHIP'S CLEANLINESS1$- 0
0117MAINTAIN CLEAN BILGES AND DRAIN WELLS1$- 0
0118PROTECTIVE FLOOR COVERING1$- 0
0119SURFACE PREPARATION AND PAINTING/COATING GUIDELINENSP
0120SAFE FOR ENTRY AND SAFE FOR HOT WORK CERTIFICATES1$- 0
0121PRODUCTION REPORTING1$- 0
0122CRANE SERVICE50HRS- 0
0123STAGING- 0- 0
0124OIL BOOM1$- 0
0125WELDING / BRAZING PROCEDURESNSP
0126SOUNDINGS1$- 0
0127SANITARY SYSTEM1$- 0
0128WASTE WATER AND OILS1000GAL- 0
0129PORTABLE TOILETS/TEMPORARY FACILITIES1$- 0
0130COMPRESSED AIR1$- 0
0200SECTION 200: DRYDOCKING REQUIREMENTS- 0
0201DRY DOCK SHIP1dock- 0
0202TAILSHAFT EXAMINATION and CPP ASSEMBLIES REMOVAL AND EXAMINATION1exam- 0
0203RUDDER and SKEG INSPECTION and CLEARANCES1Insp- 0
0204SEA CHESTS1$- 0
0205SEA VALVES1$- 0
0206BLASTING & COATING OF HULL1$- 0
0207ULTRASONIC THICKNESS GAUGINGS1$- 0
0208PROPELLER CLEANING, INSPECTION AND COATING1$- 0
0209INTERNAL STRUCTURAL EXAMS AND TESTING OF FUEL TANKS.1$- 0
0210INTERNAL STRUCTURAL EXAMS OF BALLAST, VOIDS, COFFERDAMS, and POTABLE & WASH WATER TANKS.1$- 0
0211ANCHOR CHAINS & LOCKERS1$- 0
0212ZINC ANODES1$- 0
0213Workboat Outboard Engine; Service1$- 0
0214STERN THRUSTER MAINTENANCE1$- 0
0215Closed Circuit TV System; Repair1$- 0
0216Port Shaft Stern Tube Oil Leak; Repair1$- 0
0217CRITICAL GAUGES CALIBRATE1$- 0
0218AIR RECEIVER RELEIEF VALVES; REPLACE1$- 0
0219SULLAIR ES6 AIR COMPRESSORS; REPLACE1$- 0
0220Crane Engine, Winch and Cab; Repair1$- 0
0221ELECTRIC MOTORS; MEGGER1$- 0
0222Port and Stbd #6 Ballast Tanks; Blast and Coat1$- 0
0223Port and Stbd After Peaks; Blast and Coat1$- 0
0224Flying Bridge Spotlights and Controllers; Replace1$- 0
0225Mitsubishi AC System; Maintenance and Repair1$- 0
0226Fast Rescue Boat; Five-Year Overhaul/Service1$- 0
02271$- 0
2281$- 0
- 0
0300SECTION 300: OPTIONAL AND UNIT PRICED ITEMS- 0
0301OPTION - PROVIDE WET LAY BERTH1$1,050.001,050.001,050.00
0302OPTION - SUPPLEMENTAL LABOR1500HRS- 0
0303OPTION - SUPPLEMENTAL MATERIAL60,000.00
0304OPTION - SUPPLEMENTAL STEEL
304aKTR Provide A Quote for Estimated 1,000 lbs of Flat Steel1000LB- 0
304bKTR Provide A Quote for Estimated 1,000 lbs of Rolled Steel1000LB- 0
304cKTR provide a quotation to prep and re-weld external hull weld seams, of an estimated length of 100 feet of weld.100FT- 0
0305OPTION - AUDIO GAUGINGS ADDITIONAL (Est. 1000 Readings)1000EA- 0
Items Below OPTIONAL to be added STAF, NOT included in IGE Total- 0- 0
306TOW WINCH; REMOVE AND INCLINE EXPERIMENT1$- 0
307MSD SYSTEM; REMOVE OLD AND INSTALL NEW1$- 0
308Bow Thruster; Maintenance1$- 0
309- 0
- 0- 0
- 0- 0
SUBTOTAL61,050.00
$3,200.00Price for Work Item 0114

TOTAL 64,250.00

File details come from the government source that posted it. Updated .