2020 Bow Thruster Maintenance Report 1.pdf

PDF 831 KB Posted

Attached to
TRAINING VESSEL FREEDOM STAR(TVFS) FY25 DRY DOCK
Solicitation number
6933A225Q000001
Issued by

About this file

This is a condition report and service documentation for bow thruster maintenance performed on the vessel Freedom Star by BNA Marine Services. The work was conducted from June 16 to July 3, 2020, at the Naval Ship Yard Philadelphia under contract 6933A220P000028.

The maintenance included complete disassembly and inspection of the Omega 400 CP bow thruster, replacement of deteriorated propeller oil seals and gaskets, manufacturing of a new propeller shaft shim, and reassembly with verification of factory specifications. Key findings included deteriorated oil seals and gaskets, which Veerhaa Omega suggested may have been damaged by chemical interactions with the oil used. The final installation included setting gear backlash to .011 inches, installing new blades, adding Shell (100) synthetic oil, and addressing a small leak at the seal box plug. The report includes photographs documenting the condition of various components and measurement verification using precision gauges. The work was performed by BNA Marine Services technicians based in Amelia, LA with approval from MARAD (Maritime Administration).

View the file

Other files

File Type Posted
Crane rope cert.pdf PDF
1547 4411 Rev 5 Machinery Arrgmt.pdf PDF
Tow Winch Pic 2.jpg JPG image
1547L F 54 Rev 4 Barge Towing Arr and Det.pdf PDF
Sullair Compressor Pic.jpg JPG image
1547L P72 Rev 2 Towing winch Power and controls.pdf PDF
AMD 0002 Drydock 2025 Questions and Answers 2.pdf PDF
P00002 6933A225Q000001 .pdf PDF
crane cab rough dimensions.pdf PDF
Tow Winch Pic 1.jpg JPG image
AMD0001 6933A225Q000001 .pdf PDF
Item 225 Photo.jpg JPG image
Item 226 Fassmer FRB.pdf PDF
DB Design PURY P T Y S KMU A BS MEES17K096 201802.pdf PDF
Item 225 SH PLFY P NCMU E OCH410D Parts OCB410D 1.pdf PDF
AMD 00001 TSFS Drydock 2025 Questions and Answers.pdf PDF
Item 226 Global Davit Catalogue 2016.pdf PDF
Item 225 DB PUHY P T Y S KMU A BS U11 E2 3.pdf PDF
FREEDOM STAR ON 629627 Trim and Stability Booklet Rev D.pdf PDF
1547 4411 Rev 5 Machinery Arrgmt.pdf PDF
1547-4701 Rev 3 Rudder Arr 3.pdf PDF
MA-57 Dry dock Report 3.pdf PDF
1547-4420 Rev 3 Bow Thruster Arr 3.pdf PDF
FREEDOM STAR ON 629627 Trim and Stability Booklet Rev D 1.pdf PDF
Stern Thruster Mechanical manual G569W G570W 32HJP 4.pdf PDF
TSFS 2023 Anchor Chain Gauging Report 2.pdf PDF
Shaft Liners 2.pdf PDF
TSFS Wartsila Tailshaft Parts 2024 1.pdf PDF
Stern Thruster 2768WG-D 32HJP SECTIONAL ARRANGEMENET 1.pdf PDF
TSFS 2023 Motor Megger Report 3.pdf PDF
Sherwin Williams Coating Spec 04-12-2024 2.pdf PDF
1316-901 Kings Pointer Docking Plan 3.pdf PDF
FREEDOM STAR MEGGER READINGS blank 1.docx DOCX document
2018 Bow Thruster Maintenance - Final Service Report 1.pdf PDF
1780-4419 Stern Thruster Compt Arrangement1of1 3.pdf PDF
TV KINGS POINTER Docking Calculations 2.pdf PDF
Crane Diesel Manual 1.pdf PDF
TSFS FY25 CSS 6933A225Q000001 FINAL.pdf PDF
1547-1420 Docking Plan 3.pdf PDF
1547-2510 Rev 7 Long l Struct Sections 3.pdf PDF
Sullair ES6 2.pdf PDF
1547-4801 Rev 4 Shafting Arr and Det 2.pdf PDF
ABS Rules Part 7 Chapter 6 4.pdf PDF
TSFS 2023 Anode Locations 2.pdf PDF
TS FREEDOM STAR - Signed CFR 014 Tailshaft Bearing Clearances WI 202 1.pdf PDF
2023 Freedom Star Gauge Calibration List 1.xls XLS spreadsheet
4163B-M20 Bow Thruster Arrangement Omega OCP-400 1.pdf PDF
TSFS Gauge Calibration Final Report 2023 1.pdf PDF
Attmt II TSFS VENDOR PRICE SHEET (SECTION B) .xlsx XLSX spreadsheet
ABS Rules Part 7 Chapter 5 Sections 1 and 2 3.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Condition Report #: 6933A220P000028-CR-048 Request Date:

Contract:

Work Package:

Description of Work Item:

Dwg/Spec:

Category: Category (A) Category (B) X Category (C)

Affects on going work, schedule critical. Immediate action required.

Required for evaluation, not schedule critical. Routine action required.

No action required.

Information Only.

Recommendations/Materials and Man hours Required/Delays and Disruptions:

Submitted By/Title: Date:

Submitted To/Title: Elizabeth Grove / MARAD

Approved Signature*: Date:

*Signature only required for cost estimates

Answered By: Response Date:

Condition Found:

Response:

Rhoads Industries, Inc. is providing the attached bow thruster maintenance report for your reference.

N/A

Nicole Baehr / Project Coordinato 7/16/2020

Condition/RFI Report

7/16/2020

N/A

Item 213 - Bow Thruster Maintenance

Bow Thruster Service Report

6933A220P000028

7-16-2020

CR-048 Item 213 Bow Thruster Maintenance Report
20200715155511659

File details come from the government source that posted it. Updated .