Attachment (Seed Project - SP01 660-18-243 SOW).docx

DOCX document 37 KB Posted

Attached to
Z2DA--Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19) Federal contract opportunity
Solicitation number
36C25920R0104
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19), newest first.
File Type Posted
C01 - Award Notice.docx DOCX document
36C25920R0104 P0015.docx DOCX document
Amendment 0012 - 36C25920R0104.docx DOCX document
Amendment 0011 - 36C25920R0104.docx DOCX document
Amendment 0010 - 36C25920R0104.docx DOCX document
Amendment 09 - Infrastructure Standard for Telecommunications Spaces_with OIT Design Guide Templates_1 Jul 21.pdf PDF
Amendment 09 - 18-314 Specs 20221104.pdf PDF
Amendment 09 - Sub 00004r01 Response.pdf PDF
Amendment 09 - 10-FA 18-314 Add01.pdf PDF
Amendment 09 - 03-Arch 18-314 Add01.pdf PDF
Amendment 09 - 06-Plumb 18-314 Add01.pdf PDF
Amendment 09 - 05-FP 18-314 Add01.pdf PDF
Amendment 09 - 36C25920R0104.docx DOCX document
Amendment 09 - Submittal ID 00011r01 - Div 28 52 31 rev 1 Submittals.pdf PDF
Amendment 09 - 18-314_Addendum-01.pdf PDF
Amendment 09 - 01-Gen 18-314 Add01.pdf PDF
Amendment 09 - 09-Tech 18-314 Add01.pdf PDF
Amendment 09 - 04-IntD 18-314 Add01.pdf PDF
Amendment 09 - RFIs for MATOC Seed Project 36C25920R0104.docx DOCX document
Amendment 09 - 07-Mech 18-314 Add01.pdf PDF
Amendment 09 - 08-Elec 18-314 Add01.pdf PDF
Amendment 09 - SoilBearingInfo-ExistCondDWG_36-02-S1.pdf PDF
Amendment 09 - Interior Design Comments-221026.docx DOCX document
Amendment 09 - 02-Struct 18-314 Add01.pdf PDF
Amendment 0008 - 36C25920R0104.docx DOCX document
Amendment 0007 - 36C25920R0104.docx DOCX document
Amendment 0006 - 36C25920R0104.docx DOCX document
Amendment 0005 - 36C25920R0104.docx DOCX document
Amendment 0004 - 36C25920R0104.docx DOCX document
NEW - Calculation Worksheet for Self-Performed and Subcontracted Work.docx DOCX document
Amendment 0003 - 36C25920R0104.docx DOCX document
S04 - Site Visit Sign-In - 10-11-22.pdf PDF
Amendment 0002 - 36C25920R0104.docx DOCX document
Amendment 0001 - 36C25920R0104.docx DOCX document
Attachment (Seed Project - NESHAP).pdf PDF
Wage Determination UT20210085.pdf PDF
Attachment (Calculation Worksheet for Self-Peformed and Subcontracted Worksheet).docx DOCX document
Attachment (RFP Letter Seed Project - Updated 1-27-22).docx DOCX document
Attachment (Pricing Schedule).docx DOCX document
Attachment (Seed Project - Combined Drawings)_Part1.pdf PDF
Attachment (Seed Project - SLCVA Bldgs 14 1 and 7 Pre-Reno Asb Rpt_signed).pdf PDF
Attachment (Past Performance Questionnaire).docx DOCX document
Attachment (Seed Project - Combined Specs).pdf PDF
36C25920R0104_1 - 9-30-2022.docx DOCX document
Attachment (Seed Project - Combined Drawings)_Part2.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Project Title: Expand Linen Distribution Center Project No.: 660-18-243 Location: Bldgs. 1,7, & 14, Salt Lake City, UT, George E. Wahlen, Depart. of Veteran Affairs Medical Center

I. SCOPE OF WORK:

A. Furnish all necessary services, equipment, labor, materials, supervision, and tools to perform construction services for the NRM Project #660-18-243, entitled “Expand Linen Distribution Center”, located at 500 Foothill Drive, Salt Lake City, UT 84148 on the George E. Wahlen Department of Veterans Affairs Medical Center campus.

The project is a renovation located within building 1 1st floor C zone, building 7 1st floor C zone, and building 14 basement floor C zone. The project area is approximately 500 square feet in building 1, 1200 square feet in building 14, and 16,000 square feet in building 7. The project site is within the main hospital building on campus, which will remain active during construction. As such, thorough attention to keeping a secure site and keeping all items that could pose a self-harm risk or be used to hurt others must be kept in locked construction site always. Infection control requirements shall be adhered to always. A NESHAP survey was conducted and asbestos containing materials were not identified within the area of work for this project.

Contractor shall review all specifications and drawings and shall identify any issues to the contracting officer before solicitation deadline. Contractor shall perform work as specified and shall adhere to standard practices for the industry.

The Prime Contractor shall designate a minimum of one Site Safety and Health Officer (SSHO) to administer the contractor’s safety program and government-accepted Accident Prevention Plan. Each subcontractor shall designate a minimum of one Competent Person (CP) in compliance with 29 CFR 1926.20 (b)(2) that will be identified as a CP to administer their individual safety programs. Also, The SSHO or an equally qualified designated representative/alternative will maintain a presence on the site during construction operations in accordance with FAR Clause 52.236-6: Superintendence by the Contractor. CPs will maintain presence during their construction activities in accordance with above mentioned clause. A listing of the designated SSHO and all known CPs shall be submitted prior to the start of work as part of the APP with the training documentation and/or AHA.

In order to comply with above, please do NOT bid for same SSHO that would or would potentially cover multiple projects on the campus.

B. The scope of work includes, but is not limited to, performing construction including but not limited to architectural, electrical, mechanical, plumbing, site investigation, and testing/special inspection services. NESHAP Asbestos Survey is furnished with the bid documents.

The contractor shall review all drawings, with the assigned VA COR (Contracting Officer’s Representative), to verify the project area/s and what the project entails. The contractor shall be required to lead meetings to discuss progress and problems with the VA staff. The contractor shall be required to take meeting minutes and distribute to the VA for approval and as documentation of what was covered within the meeting.

The contractor shall show a detailed containment plan for infection control and hazmat control. This plan shall be detailed showing locations and what infection and hazmat control requirements are to be used for each area. Safety and infection control requirements shall be enforced for the duration of the project, regardless of any disruptions, to protect patients, visitors, VA staff, and contractors/subcontractors. The contractor shall be responsible for the site during construction and shall ensure all contractor employees and subcontractors adhere to all safety and infection control requirements always.

Total Period of Performance: 240 Days

VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE

VA INFORMATION CUSTODIAL LANGUAGE:

a. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12.

BADGING:

a. All employees of general contractor and subcontractors shall comply with VA security management program and obtain temporary VA badges. This will require fingerprinting and background checks of each individual. The employees of the general contractor will obtain permission of the VA Human Resources, be identified by project and employer, and restricted from unauthorized access.

TRAINING:

a. All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete VA Privacy and Information Security Awareness and Rules of Behavior Training.

***************End of Construction Services SOW****************

File details come from the government source that posted it. Updated .