Amendment 09 - 09-Tech 18-314 Add01.pdf
PDF 4 MB Posted
- Attached to
- Z2DA--Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19) Federal contract opportunity
- Solicitation number
- 36C25920R0104
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Z
B
DS
E
EP
LS
KS
NA
NM
SS
IC
CATV
CCTV
FO
T
T/D
D
S
IC
UC
S
WAP
#D/#TV
M
S
V
CR
DB
DB
DM
EL
EO
GB
KP
MD
PB
RE
C
BAT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISH FLOOR
BIL BASIC INSULATION LEVEL
BLDG BUILDING
BPIP BOILER PLANT
INSTRUMENTATION PANEL
BRKR BREAKER
BYP BY PASS
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HZ HERTZ
A/C AIR CONDITIONING
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED
CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
ADO AUTOMATIC DOOR OPENER
AF AMPERE FRAME OR AMP FUSE
AFC ABOVE FINISHED COUNTER, AUTOMATIC
FREQUENCY CONTROL, OR
AVAILABLE FAULT CURRENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AH AMPERE HOUR
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMB OR A AMBIENT
AMP AMPERE
ARCH ARCHITECT
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
1P SINGLE POLE
1PH SINGLE-PHASE
3P THREE POLE
3PH THREE-PHASE
3W THREE WIRE
4W FOUR WIRE
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR
PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PCB POLYCHLORINATED BIPHENYL
PEC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
POD POWER OPERATED DAMPER
PT POTENTIAL TRANSFORMER
PTRV POWER TYPE ROOF VENTILATION
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
SCC SHORT CIRCUIT CAPACITY
SES SERVICE ENTRANCE SECTION
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPD SURGE PROTECTIVE DEVICE
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SURF SURFACE
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
G OR GND GROUND OR GENERATOR
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
IESNA ILLUMINATION ENGINEERING SOCIETY
OF NORTH AMERICA
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
W WATT
WH WATER HEATER
WP WEATHERPROOF
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LPS LOW PRESSURE SODIUM
LRA LOCKED ROTOR AMPS
LTCP LOCAL TEMPERATURE CONTROL PANEL
LT LIGHT
LTG LIGHTING
LTG PNL LIGHTING PANEL
LTNG LIGHTNING
LV LOW VOLTAGE
XFER TRANSFER
XFMR TRANSFORMER
XP EXPLOSION PROOF
JB JUNCTION BOX
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT AMPERE
KVAH KILOVOLT AMPERE PER HOUR
KVAR KILOVOLT AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
KWHM KILOWATT HOUR METER
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MG MOTOR GENERATOR
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
N NEUTRAL
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
REC RECESSED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
REQD REQUIRED
TC TIME CLOCK
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
ABBREVIATIONS
A
B
C
C CONDUIT
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER
INSTALLED
CFE CONTRACTOR FURNISHED
EQUIPMENT
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CLF CURRENT LIMITING FUSE
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DCP DIMMER CONTROL PANEL
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DISTR DISTRIBUTION
DISTR PNL DISTRIBUTION PANEL
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DRSW DOOR SWITCH
DS DISCONNECT SWITCH
DWG DRAWING
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMCP EMER. MONITORING CONTROL PANEL
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
ETD EXISTING TO BE DEMOLISHED
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
D
E
F
G
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FABL FIRE ALARM BELL
FABX FIRE ALARM BOX
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FI FILM ILLUMINATOR
FIXT FIXTURE
FLA FULL LOAD AMPS
FLEX FLEXIBLE METALLIC CONDUIT
FLUOR FLUORESCENT
FP FIRE PROTECTION
FT FEET OR FOOT
FVNR FULL VOLTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
H
I
J
K
L
M
N
O
P
STANDARD MOUNTING HEIGHTSANNOTATION
R
S
T
U
V
W
X
CU
M100
M100
MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT
PLUMBING PLAN NOTE CALL OUT
ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT
TECHNOLOGY PLAN NOTE CALL OUT
PLUMBING EQUIPMENT DESIGNATION
EQUIPMENT DESIGNATION TAG
OWNER FURNISHED, CONTRACTOR INSTALLED
EQUIPMENT DESIGNATION
NEW WORK TO EXISTING WORK CONNECTION POINT
DETAIL REFERENCE
SECTION CUT DESIGNATION
ELECTRICAL:
AUDIBLE APPLIANCES (CENTERLINE) 84"
ALARMS 48"
ANNUNCIATOR PANELS 48"
CLOCK OUTLETS (CENTERLINE) 84"
CONTROLS (TOP) 48"
EXIT SIGNS (WALL-MOUNTED, BOTTOM) 80"
FIRE ALARM ANNUNCIATOR PANEL (DISPLAY) 60"
FIRE ALARM BELL (EXTERIOR) 120"
FIRE ALARM CONTROL PANEL/UNIT (DISPLAY) 60"
INTERCOM (AFEA ONLY) 36"
INTERCOMS (TOP) 48"
PANELS & PANELBOARDS (TOP) 72"
PULL STATIONS (HANDLE) 48"
PHOTOCELLS 144"
RECEPTACLES (BOTTOM) 18"
RECEPTACLES (EXTERIOR) 24"
RECEPTACLES (GARAGES) 26"
RECEPTACLES IN EQUIPMENT ROOMS (TOP) 48"
REMOTE INDICATING LIGHT (EQUIPMENT ROOMS) 48"
REMOTE INDICATING LIGHT (FINISHED AREAS) CEILING
SAFETY SWITCHES & STARTERS 48"
SWITCHES (TOP) 48"
TELEPHONE/DATA/TV OUTLETS (BOTTOM) 18"
VISIBLE APPLIANCES (CENTERLINE) 84"
(AFF, AFG UNLESS NOTED OTHERWISE)
COMMUNICATION SYMBOLS
NURSE CALL SYMBOLS
COMMUNICATIONS OUTLET, TYPE AS NOTED
COMMUNICATIONS OUTLET, FLOOR BOX, TYPE AS NOTED
#D = DATA, # = QUANTITY OF CABLES
#E = ELEVATOR, # = QUANTITY OF CABLES
#FMS = FACILITY MONITORING SYSTEM,
# = QUANTITY OF CABLES
#D = DATA, # = QUANTITY OF CABLES
#TV = CABLE TELEVISION, # = QUANTITY OF CABLES
#V = VOICE, # = QUANTITY OF CABLES
WIRELESS ACCESS POINT, CEILING MOUNTED
COMMUNICATIONS OUTLET, CEILING MTD, TYPE AS NOTED
#D = DATA, # = QUANTITY OF CABLES
#TV = CABLE TELEVISION, # - QUANTITY OF CABLES
SPEAKER, WALL MOUNTED
SPEAKER, CEILING MOUNTED
SERVER RACK, TWO-POST, FLOOR MOUNTED
3/4"x4'x8', FIRE-RATED PLYWOOD BACKBOARD
GROUND BAR, TYPE AS NOTED
SERVER RACK, WALL MOUNTED
CABLE TRAY, TYPE AS NOTED
CABLE TELEVISION LINE
CLOSED CIRCUIT TELEVISION LINE, MIN. 1" RACEWAY
FIBEROPTIC LINE
TELEPHONE LINE
TELEPHONE/DATA LINE
DATA LINE
SPEAKER LINE
INTERCOM LINE
INTERCOM, "M" DENOTES MASTER STATION
VOLUME CONTROL, WALL MOUNTED
SECURITY SYMBOLS
CARD READER, PROXIMITY TYPE
DOOR BELL PUSHBUTTON
DOOR BELL PUSHBUTTON
DOOR POSITION MONITOR
ELECTRIFIED LOCKING DEVICE, REQUEST TO EXIT SENSOR,
LATCH BOLT MONITOR, AND DOOR POSITION SWITCH
ELECTRIFIED LOCKING DEVICE
GLASS BREAK DETECTOR
INTRUSION DETECTION KEYPAD
INTRUSION DETECTION MOTION DETECTOR
DURESS PUSHBUTTON
REQUEST TO EXIT BUTTON
SECURITY CAMERA
CODE BLUE PUSHBUTTON STATION
DUTY STATION
STAFF EMERGENCY ASSIST STATION
PATIENT EMERGENCY PULL CORD STATION
STAFF LOCATOR SENSOR
NURSE CALL KEY SWITCH
NURSE CALL VISUAL ANNUNCIATOR PANEL
NURSE CALL MASTER STATION
STAFF STATION (NORMAL)
DOME LIGHT, WALL MOUNTED
DOME LIGHT, CEILING MOUNTED
ZONE DOME LIGHT
MULTI-SERVICE POWER POLE WITH POWER/DATA,
TYPE AS NOTED AND/OR SCHEDULED
UNDERGROUND COMMUNICATIONS LINE,
CABLING TYPE AS NOTED
MULTI-SERVICE FLOOR BOX/POKE-THRU WITH POWER/DATA,
TYPE AS NOTED AND/OR SCHEDULED
SERVER RACK, FOUR-POST, FLOOR MOUNTED
SERVER CABINET, FLOOR MOUNTED
BC BED CONNECTOR
SS STAFF STATION (CODE BLUE)
CB
= CABLE TELEVISION, # = QUANTITY OF CABLES
= VOICE, # = QUANTITY OF CABLES
#TV
#V
WM WINDOW POSITION MONITOR
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:0
A
M
T-001
TECHNOLOGY LEGEND
1 11ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
DIW
A. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE
BEFORE THE START OF WORK.
B. COORDINATE TECHNOLOGY WORK WITH ALL
OTHER TRADES. VERIFY ALL EXISTING
CONDITIONS BEFORE THE START OF WORK.
C. THE DEMOLITION DRAWINGS ARE DEEMED
SCHEMATIC AND BASED OFF OF AVAILABLE
INFORMATION AND MAY NOT REPRESENT ALL
DEVICES/EQUIPMENT REQUIRED FOR
DEMOLITION. FIELD VERIFY ALL EXISTING
DEMOLITION WORK PRIOR TO SUBMISSION OF
PROPOSAL.
D. GRAYED OUT AREAS ARE NOT IN SCOPE OF
WORK.
GENERAL TECHNOLOGY NOTES:
11/04/202011/04/2020NOVEMBER 4, 20202022
S
SOILED LINEN
1C31B
MECH
1C31A
AREA OF DEMOLITION
SOILED LINEN
1C31B
MECH
1C31A
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:2
A
M
1-T-101
BLDG 1 TECHNOLOGY FLOOR PLAN
2 11ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
DIW
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/4" = 1'-0"1
BLDG 1 TECHNOLOGY DEMO PLAN - FIRST FLOOR
1/4" = 1'-0"2
BLDG 1 TECHNOLOGY PLAN - FIRST FLOOR
0 4 8 16
N O R
TH
TRUE
0 4 8 16
N O R
TH
TRUE
1. REMOVE ALL TECHNOLOGY DEVICES AND
ASSOCIATED CATEGORY CABLING BACK TO THE
HEAD END EQUIPMENT/RACK WITHIN THE AREA
OF WORK.
BLDG 1
STAIR
BA01
STAIR
BA03
MECH RM
BA02
EQUIP ROOM
BA05
ELEC
BA04
MAINTENANCE BENCH STOCK
BA06
AREA OF DEMOLITION
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
7-TD100
BLDG 7 TECHNOLOGY DEMOLITION
PLAN - BASMENT
3 11ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
BEN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/8" = 1'-0"1
BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT 0 4 8 16
N O R
TH
TRUE
BLDG 7
EL
RE
CR
EL
RE
CR
EL
RE
CR
AREA OF DEMOLITION
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
7-TD101
BLDG 7 TECHNOLOGY DEMOLITION
PLAN - FIRST FLOOR
4 11ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
BEN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/8" = 1'-0"1
BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR 0 4 8 16
N O R
TH
TRUE
1 REMOVE ALL TECHNOLOGY DEVICES AND
ASSOCIATED CATEGORY CABLING BACK TO THE
HEAD END EQUIPMENT/RACK WITHIN THE AREA
OF WORK.
2 EXISTING HEAD-END TECHNOLOGY AND
SECURITY EQUIPMENT IN ELECTRICAL ROOM TO
BE RELOCATED DURING RENOVATION. REFER
TO SHEET 7-T-101 AND SHEET 7-T-401 FOR
ADDITIONAL INFORMATION.
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
Z
7.4 9.99
MAINTENANCE BENCH STOCK
BA06
EQUIP ROOM
BA05
ELEC
BA04
STAIR
BA01
MECH RM
BA02
STAIR
BA03
2E
2FMS
2FMS
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
7-T-100
BLDG 7 TECHNOLOGY FLOOR PLAN -
BASEMENT
5 11ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
DIW
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/8" = 1'-0"1
BLDG 7 TECHNOLOGY PLAN - BASEMENT 0 4 8 16
N O R
TH
TRUE
EL
RE
CR
EL
RE
CR
EL
RE
CR
EL
CR RE
MD
MD MD MD
DM
DM
DM DM
S S
S S
SS
SS
S
S
S
S
S
S S
S
S
7 8 8.3 9.1 10 11 11.9 12 12.9 13 14
'S
'A
'B
'C
'E
'G
W
X
Y
Z
7.4 9.99
'T
MAINTENANCE BENCH STOCK
1B02
HAC
1B03
TOILET, MEN
1B04
ELEC
1B05
TOILET, WOMEN
1B06
OFFICE, DCSCO
1B07
CORRIDOR
1B00A
STAIR
1BA
SHOWER/LOCKER
1B06A
SHOWER/LOCKER
1B04A
HAC
1B02A
OFFICE
1B02B
WAREHOUSE
1B01
CONFERENCE
1B01A
CORRIDOR
1B01B
ENTRY
1B00
TELE/DATA
1B08
AUX
1B10
CORRIDOR
1C00
RECEIVING/WAREHOUSE
1C01
OFFICE, WILL CALL
1C02
STORAGE (EQUIP)
1C03
OFFICE
1C04
VAULT
1C05
BREAKROOM
1C06
TOILET/SHOWER
1C07
HAC
1C08
TELE/DATA
1C10
ELEC
1C12
MECHANICAL
1C01A
WILL CALL
1C02A
WAREHOUSE
1C09
WAREHOUSE
1C09A
WAREHOUSE
1C09B
LOCKERS
1C09C
WAREHOUSE
1C09D
WAREHOUSE
1C09E
LOGISTICS ADMIN
1B20
CHECK OUT
1B02C
OFFICE, CSCO
1B07A
OFFICE, MGMT ANALYSIS
1B02F
BREAK ROOM
1B01C
2V/2D
2V/2D
2V/2D
2V/2D
2FMS
2V/2D
2V/2D
2V/2D
2V/2D
WAP
WAP
2V/2D
WAPWAP
WAP
WAP
7-T-401
7-T-401
1D/1TV
2V/2D
2V/2D
2V/2D +60" WAP
OIT CLOSET
1B02E
2V/2D
2V/2D 2V/2D
C-04
C-05
C-01
C-03 C-03C-03
4 44
C-03
C-03
2V/2D
C-02
ID-01
ID-01 ID-01 ID-01
55 5
2V/2D
2V/2D
OFFICE, MGMT ANALYSIS
1B02G
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
7-T-101
BLDG 7 TECHNOLOGY FLOOR PLAN -
FIRST FLOOR
6 11ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
DIW
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/8" = 1'-0"1
BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR 0 4 8 16
N O R
TH
TRUE
1 PROVIDE 18-PORT, 12" X 12" X 8" MULTI-USER
TELECOMMUNCATIONS OUTLET ASSEMBLY
(MUTOA).
2 INTERCEPT AND RELOCATE EXISTING
TECHNOLOGY LINES IN ELECTRICAL ROOM 1B05
TO NEW IT ROOM. MATCH EXISTING CONDUIT
AND WIRING AS REQUIRED TO EXTEND
TECHNOLOGY LINES TO NEW LOCATION.
CONTRACTOR TO VERIFY CONDUITS NEEDING
TO BE RELOCATED AND EXACT ROUTING OF
CONDUIT PRIOR TO BEGINNING CONSTRUCTION.
3 REFEED EXISTING ACCESS CONTROL DEVICES
FROM RELOCATED PACS CABINET AS REQUIRED.
4 LOCATE CAMERA IN POSITION TO LOOK DOWN
AISLES. COORDINATE EXACT FURNITURE
LAYOUT WITH COR PRIOR TO INSTALLATION.
5 LOCATE MOTION DETECTOR IN POSITION TO
LOOK DOWN AISLES. COORDINATE EXACT
FURNITURE LAYOUT WITH COR PRIOR TO
INSTALLATION.
8.3
W
7-T-401
OIT CLOSET
1B02E
7N1B5 (NEW)
GROUND BAR
7-T-401
3 3 3
IDS CABINET
(NEW)
PACS
BATTERY
CABINET
(RELOCATED)
PACS
CABINET
(RELOCATED)
110 BLOCK PATCH
PANEL
(RELOCATED)
FIBER OPTIC
TERMINATION
CABINET
(RELOCATED)
8.3
W
18"x1 1/2"
18"x1 1/2" 1 "x
/4
"x
/4
OIT CLOSET
1B02E
IDS CABINET
(NEW)
PACS
BATTERY
CABINET
(RELOCATED)
PACS
CABINET
(RELOCATED)
110 BLOCK PATCH
PANEL
(RELOCATED)
FIBER OPTIC
TERMINATION
CABINET
(RELOCATED)
8.39
48-PORT PP
HCM
HCM
48-PORT PP
48-PORT PP
HCM
PA-MN SYSTEM
RACK-MTD UPS
RACK-MTD UPS
BATTERY
RACK-MTD UPS
RACK-MTD UPS
BATTERY
48-PORT PP
HCM
HCM
48-PORT PP
48-PORT PP
48-PORT PP
48-PORT PP
HCM
HCM
HCM
HCM
48-PORT PPVCM VCM VCM
HCM
FO PP
7N1B5 (NEW)
(TYP.)
5(TYP.)
4(TYP.)
VCM
6 (TYP.)
7(TYP.)
8 (TYP.)
(TYP.)
10(TYP.)
11(TYP.)
8.3 9
FIBER OPTIC
TERMINATION
ENCLOSURE
(RELOCATED)
110 BLOCK
PATCH PANEL
(RELOCATED)
7N1B5 (NEW)
PACS CABINET
(RELOCATED)
PACS BATTERY
CABINET
(RELOCATED)
PACS CABINET
DISCONNECT
(RELOCATED)
IDS CABINET
(NEW)
IDS BATTERY
CABINET (NEW)
12 (TYP.)
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
7-T-401
TECHNOLOGY ENLARGED FLOOR
PLANS AND SECTIONS
7 11ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
BEN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/2" = 1'-0"1
BLDG 7 - IT ROOM 1B02E (DATA RACKS)
PARTIAL FLOOR PLAN 0 4 8 16
N O R
TH
TRUE
1/2" = 1'-0"2
BLDG 7 - IT ROOM 1B02E (LADDER TRAYS)
PARTIAL FLOOR PLAN 0 4 8 16
N O R
TH
TRUE
1/2" = 1'-0"3
BLDG 7 - IT ROOM 1B02E SOUTH SECTION
1. MOUNT GROUND BAR AT 6'-6" AFF. REFER TO
DETAIL 1, SHEET T-501 FOR ADDITIONAL
INFORMATION.
2. PROVIDE (3) 4" E-Z PATH RE-ENTERABLE, FIRE-
RATED SLEEVES, OR APPROVED EQUIVALENT,
FROM ABOVE CORRIDOR CEILING INTO IT ROOM.
3. PROVIDE 19” WIDE, 45RU, HEAVY-DUTY FLOOR-
MOUNTED RACK, BLACK IN COLOR.
4. PROVIDE RACK MOUNTED 48-PORT PATCH
PANELS FOR TERMINATION OF DATA CAT 6A
CABLES. QUANTITY SHOWN IS ESTIMATED,
PROVIDE PATCH PANELS REQUIRED FOR CABLING
PLUS 50% GROWTH.
5. PROVIDE A 2RU HORIZONTAL CABLE MANAGER
(HCM) ABOVE AND BELOW EACH PATCH PANEL.
6. PROVIDE FULL HEIGHT, SINGLE-SIDED VERTICAL
CABLE MANAGER ON EACH SIDE OF EACH RACK.
7. PROVIDE UNINTERRUPTIBLE POWER SUPPLIES
(UPS) PER DIVISION 27 SPECIFICATIONS.
8. RELOCATE EXISTING 24-PORT FIBER ENCLOSURE
WITH FIBER ADAPTERS FOR INCOMING FIBER-
OPTIC CABLING.
9. PROVIDE WALL-MOUNTED, ANGLED SIDE AND END
SUPPORTS AS REQUIRED FOR PROPER SUPPORT
OF LADDER TRAY.
10. PROVIDE 6RU TALL SUPPORT BRACKETS TO
SECURELY CONNECT CABLE TRAY TO TOP OF
RACKS.
11. PROVIDE CABLE RUNWAY RADIUS DROP AS
REQUIRED FOR ROUTING CABLING TO VERTICAL
CABLE MANAGERS AND DATA RACKS.
12. PROVIDE 4’X8’X3/4" FIRE-RATED PLYWOOD ON ALL
WALLS FROM 6” AFF TO 8'-6" AFF.
13. RELOCATE EXISTING PHYSICAL ACCESS CONTROL
CABINET AND ACCESSORIES. REFEED EXISTING
PHYSICAL ACCESS CONTROL DEVICES AS
REQUIRED TO MAINTAIN A FULLY OPERATIONAL
SYSTEM.
14. DEDICATED WALL SPACE FOR INTRUSION
DETECTION SYSTEM AND BATTERY CABINET(S).
PROVIDE CABINET(S) AS REQUIRED FOR A FULLY
OPERATION SYSTEM IN ACCORDANCE WITH THE
SPECIFICATIONS.
15. RELOCATE EXISTING 110 BLOCK TELEPHONE
PATCH PANEL. REFEED EXISTING PHONE LINES
AS REQUIRED.
16. RELOCATE EXISTING FIBER OPTIC TERMINATION
BOX. REFEED RELOCATED FIBER OPTIC ADAPTER.
1/2" = 1'-0"4
BLDG 7 - IT ROOM 1B02E NORTH SECTION
0 4 8 16
N O R
TH
TRUE
0 4 8 16
N O R
TH
TRUE
GENERAL NOTE:
1. ALL HARDWARE SHOWN SHALL BE STAINLESS STEEL.
2. PROVIDE 1 MOUNTING POINT PER 12" OF BAR LENGTH.
3. HOLES MAY BE ADDED IF REQUIRED.
1"
STEEL EXPANSION
ANCHOR
SECTION
1/4" DIA. HOLE
TYP OF (8)
2'-0" MIN
1/4" THICK
CU BUSS
1/2" FENDER WASHERS (EACH SIDE)
1/2" STANDARD WASHER
1/2" LOCK WASHER
1/2" NUT
1/2"DIA. x2"L. BOLT
TYP. OF (2)
3/8" DIA. HOLE
TYP. OF (6)
3" DEEP FIBERGLASS
CHANNEL SAME
LENGTH AS CU BUSS
1/4" DIA.
MOUNTING HOLES
TYP. OF (4)
[51mm]
MIN
2"
[1 m m
/8
1 1/2" TYP
2" 1" 1"
V1 1A
1B
NOTE:
PERMANENTLY LABEL ALL WALL JACKS IN THE FOLLOWING MANNER: BUILDING-FLOOR-JACK NUMBER-ROOM
NUMBER OF CLOSET. EXAMPLE: 1-1-33-148B (BUILDING 1, FLOOR 1, JACK 33, CLOSET ROOM NUMBER 148B). JACK
NUMBER INDICATES THE PUNCH DOWN POSITION OF THE CLOSET CONNECTION. ALL JACKS ON THE SAME PLATE
SHALL HAVE THE SAME NUMBER WHERE POSSIBLE. LABEL ALL JACKS IN ACCORDANCE WITH JCM VAMC IRM-70.
PROVIDE INSULATING
BUSHING ON ALL PATHWAYS
TO COMMUNICATIONS
BACKBOXES.
PROVIDE SINGLE-GANG,
6-PORT FACEPLATE WITH
IDENTIFICATION WINDOWS.
PROVIDE 1-1/4" RACEWAY,
UNLESS NOTED OTHERWISE.
PROVIDE INSULATION
BUSHING AT ENTRANCE TO
BACKBOX.
PROVIDE DOUBLE-GANG
BACKBOX WITH SINGLE-GANG
PLASTER RING.
FILL ALL UNUSED PORTS
WITH BLANK INSERTS. MATCH
COLOR OF FACEPLATE. (TYP.)
PROVIDE HORIZONTAL
CABLING PER SPECIFICATIONS
WITH RJ45 CONNECTOR FOR
DATA CONNECTIONS.
TERMINATE CABLE IN TR AT
RACK-MOUNTED 48-PORT
MODULAR PATCH PANELS.
(TYPICAL)
CAT 5E
NOTE:
COORDINATE EXACT LOCATION OF OUTLET WITH ARCHITECTURAL PLANS. LOCATION OF
OUTLET SHALL NOT CONFLICT WITH MOUNTING BRACKETS OR OTHER TRADES. PERMANENTLY
LABEL ALL WALL JACKS IN THE FOLLOWING MANNER: BUILDING-FLOOR-JACK NUMBER-ROOM
NUMBER OF CLOSET. EXAMPLE: 1-1-33-148B (BUILDING 1, FLOOR 1, JACK 33, CLOSET ROOM
NUMBER 148B). JACK NUMBER INDICATES THE PUNCH DOWN POSITION OF THE CLOSET
CONNECTION. ALL JACKS ON THE SAME PLATE SHALL HAVE THE SAME NUMBER WHERE
POSSIBLE.
PROVIDE INSULATING
BUSHING ON ALL PATHWAYS
TO COMMUNICATIONS
BACKBOXES.
PROVIDE CATEGORY 5E, 8P8C
CONNECTOR FOR DATA
CONNECTION "1B". COLOR OF
CABLE AND CONNECTOR IS BLUE.
TERMINATE DATA CABLE IN TR AT
RACK-MOUNTED 48-PORT
MODULAR PATCH PANELS.
PROVIDE COAX
F-CONNECTOR. MATCH
ADAPTER COLOR TO
FACEPLATE.
PROVIDE SINGLE-GANG,
2-PORT FACEPLATE WITH
IDENTIFICATION WINDOWS.
PROVIDE 1" RACEWAY,
UNLESS NOTED OTHERWISE.
PROVIDE INSULATION
BUSHING AT ENTRANCE TO
BACKBOX.
PROVIDE DOUBLE-GANG
BACKBOX WITH
SINGLE-GANG PLASTER
RING.
LAY-IN CEILING
PROVIDE 4-11/16" X 4-11/16" X
2-1/8" DOUBLE-GANG
BACKBOX WITH
SINGLE-GANG PLASTER
RING.
CEILING TILE ADJUSTABLE
BOX HANGER
ROUTE MINIMUM 1"
RACEWAY AND CABLING
BACK TO SECURITY
SYSTEM HEAD-END
EQUIPMENT IN
COMMUNICATIONS ROOM.
DOOR POSITION
SWITCH
ACCESSIBLE CEILING
PROVIDE DOUBLE-GANG
BACKBOX WITH SINGLE-GANG
PLASTER RING FOR DOOR
MOTION DETECTOR.
LOCATION PER PLANS.
3/4" CONDUIT
(TYPICAL, UNO)
ELECTRIFIED
LOCKSET/STRIKE
DOOR
PROVIDE 6"X6"X4" DEEP
JUNCTION BOX WITH
HINGED COVER.
LOCATE ON SECURE
SIDE OF DOOR.
PROVIDE 1" CONDUIT
BACK TO ACCESS
CONTROL PANEL.
PROVIDE DOUBLE-GANG
BACKBOX WITH
SINGLE-GANG PLASTER
RING FOR CARD READER.
LOCATION PER PLANS.
FLOOR
MAX. 48" AFF
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
7-T-501
TECHNOLOGY DETAILS
8 11ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
BEN
NO SCALE
GROUNDING BAR DETAIL
NO SCALE
6-PORT, 2V/2D TELE-COMMUNICATIONS
OUTLET (TCO) DETAIL
NO SCALE
STANDARD 2-PORT TV MONITOR OUTLET
NO SCALE
LAY-IN CEILING VIDEO SURVEILLANCE
CAMERA INSTALLATION DETAIL
NO SCALE
TYPICAL CARD READER/
ELECTRIFIED LOCKING DEVICE DETAIL
CR
DM
EL
MD
RE
DM
S S S
S S S
1 2
3 4
TELECOM
GROUND BAR TGB
TO ELECTRICAL
MAIN SERVICE
GROUND
WHERE ACCESSIBLE, BOND TGB
TO BUILDING STEEL WITHIN
COMMUNICATIONS ROOM.
PROVIDE SEPARATE, MINIMUM #6 AWG
STRANDED BONDING CONDUCTOR FROM
EACH RACK AND EQUIPMENT ENCLOSURE
TO TGB. (TYPICAL)
PROVIDE MINIMUM #6 AWG STRANDED
BONDING CONDUCTOR FROM CABLE TRAY
TO TGB.
PROVIDE MINIMUM #6 AWG STRANDED
BONDING CONDUCTOR OR BONDING
STRAP
BETWEEN SECTIONS AND JUNCTIONS OF
CABLE TRAYS. (TYPICAL)
PROVIDE BONDING BUSHING AT
CONDUIT END AND MINIMUM #6
AWG
STRANDED BONDING CONDUCTOR
TO CABLE TRAY.
PROVIDE MINIMUM #6 AWG STRANDED
BONDING CONDUCTOR FROM CABLE
TRAY TO FIRE STOP CABLE PENETRATION
ON EACH SIDE OF WALL.
ZONE 2: ADMINISTRATIVE SPACES
SPEAKER WIRING (TYPICAL)
ZONE 3: FIRST
FLOOR OVERALL
ZONE 1: WAREHOUSE/MAINT. BENCH
CATEGORY 6A CABLE
MULTI-CONDUCTOR CABLE
2-STRAND FIBER-OPTIC PATCH CABLE
POWER
PB
LEGEND:
120V
120V
PB
WAREHOUSE FLOOR
INTRUSION DETECTION
SYSTEM. MOTION
DETECTORS, DOOR
MONITORS, AND GLASS
BREAK DETECTORS PER
PLANS. (TYPICAL)
120V
PA-MN
SYSTEM
HEAD-END
EQUIPMENT
120V
COORDINATE CONNECTION
TO VA NETWORK WITH VA
OI&T
PROVIDE UPS PER
SPECIFICATIONS.
PROVIDE UPS
PER
SPECIFICATIONS
RACK-
MOUNTED
UPS
PROPOSED PUBLIC
ADDRESS-MASS
NOTIFICATION
ZONE LAYOUT
VASS SECURITY
CAMERA PATCH
PANEL
VASS POE GB
SWITCH
RACK-MOUNTED
UPS
PACS BATTERY
CABINET(S)
INTRUSION
DETECTION
SYSTEM
CABINET(S)
IDS BATTERY
CABINET(S)
FIRE ALARM
RELAY(S)
COORDINATE
CONNECTION TO VAPD
FIBER ENCLOSURE WITH
VA OI&T
COORDINATE
CONNECTION TO VAPD
FIBER ENCLOSURE WITH
VA OI&T
CARD READERS AND
ASSOCIATED DEVICES PER
PLANS. (TYPICAL)
VASS CAMERAS PER PLANS
(TYPICAL)
FLOORTR - COMMS ROOM CORRIDOR
TR - COMMS ROOM FIRST FLOOR
TR - COMMS ROOM
S S S
SS
S
J J1TV/1D 1TV/1D
TYPICAL MATV
OUTLET
TR - COMMS ROOM
ROUTE TO DATA
PATCH PANEL
(TYPICAL)
MATV BRANCH
CABLE
FLOOR
FUTURE MATV
TRUNK CABLE
MATV SYSTEM
ENCLOSURE WITH
AMPLIFER AND
SPLITTER
CATV CATV CATV CATV
CATV CATV
D D
D
PACS
CABINETS
(RELOCATED)
(RELOCATED)
PUBLIC ADDRESS-MASS NOTIFICATION
SYSTEM (PA-MN) RISER DIAGRAM
NO SCALE
MASTER ANTENNA TELEVISION
SYSTEM (MATV) RISER DIAGRAM
NO SCALE
TECHNOLOGY GROUNDING
AND BONDING RISER DIAGRAM
NO SCALE
SECURITY RISER DIAGRAM
NO SCALE
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
7-T-601
TECHNOLOGY RISER DIAGRAMS
9 11ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
BEN11/04/202011/04/2020NOVEMBER 4, 20202022
CR
MD
PROVIDE ALL ACCESSORIES AS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM COMPATIBLE WITH THE EXISTING CAMPUS PACS SYSTEM. PROVIDE ALL UPGRADES TO THE EXISTING PACS SYSTEM TO INCORPORATE NEW DEVICES.1.
NOTES:
DUAL AUTHENTICATION CARD READER WITH KEYPAD
COMPATIBLE WITH EXISTING NAVAHCS CAMPUS CARD READER
SYSTEM.
BLACK
85mA AVG/
220mA PEAK
AT 12VDC
4" MAXIMUM
MATCH EXISTING
VA CARD READER
SYSTEM
INDOOR/
OUTDOOR,
IP55 RATED
48" TO TOP OF
BOX ABOVE
FINISHED FLOOR
WALL.
RE: DETAIL
2/165-T-502
CARD READERCR-01
NOTESCOMMENTSCOLORPOWERREAD RANGEMODELSLOCATION
MOUNTING
HEIGHT
MOUNTING
TYPE
DESCRIPTIONFORM FACTOR
SYMBOL
TYPE
TYPE
PHYSICAL ACCESS CONTROL SYSTEM (PACS) CARD READER SCHEDULE
COORDINATE LENS(ES) FOCAL LENGTH(S) AND AIMING WITH COR.2.
PROVIDE ALL ACCESSORIES AS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM COMPATIBLE WITH THE EXISTING CAMPUS VASS SYSTEM. PROVIDE ALL UPGRADES TO EXISTING VASS SYSTEM TO INCORPORATE NEW SURVEILLANCE CAMERAS.1.
NOTES:
1, 2
(4) 3-AXIS GIMBAL INDIVIDUAL ADJUSTABLE
CAMERAS WITH SENSORS, DAY/NIGHT, CLEAR
DOME, VANDAL RESISTANT, ETHERNET IP-BASED
DIGITAL CAMERA WITH RJ45 CONNECTION TO
VIDEO SURVEILLANCE SYSTEM.
WHITE
POWER OVER
ETHERNET
REMOTE FOCUS,
VARIFOCAL LENS
4 x 1/3" / 2 MP (MIN)
COMPATIBLE WITH VA
CAMPUS HEAD-END VIDEO
ASSESSMENT AND
SURVEILLANCE SYSTEM
WALL,
8'-6"
ABOVE FINISHED
FIRST FLOOR
LEVEL
WALL BRACKET
MOUNT W/ CORNER
ADAPTER.
270 DEGREE
(4) CUSTOMIZABLE VIEW,
COMPACT DOME
C-05
1, 2
SINGLE 2-AXIS GIMBAL CAMERA WITH MULTIPLE
SENSORS, DAY/NIGHT, CLEAR DOME, VANDAL
RESISTANT, ETHERNET IP-BASED DIGITAL CAMERA
WITH RJ45 CONNECTION TO VIDEO SURVEILLANCE
SYSTEM.
WHITE
POWER OVER
ETHERNET
REMOTE FOCUS,
VARIFOCAL LENS
4 x 1/3" / 2 MP (MIN)
COMPATIBLE WITH VA
CAMPUS HEAD-END VIDEO
ASSESSMENT AND
SURVEILLANCE SYSTEM
INDOOR,
MINIMUM IP65
RATED
FLUSH TO CEILINGCEILING SURFACE
360 DEGREE
PANORAMIC VIEW,
COMPACT DOME
C-04
1, 2
SINGLE 2-AXIS GIMBAL CAMERA WITH MULTIPLE
SENSORS, DAY/NIGHT, CLEAR DOME, VANDAL
RESISTANT, ETHERNET IP-BASED DIGITAL CAMERA
WITH RJ45 CONNECTION TO VIDEO SURVEILLANCE
SYSTEM.
WHITE
POWER OVER
ETHERNET
REMOTE FOCUS,
VARIFOCAL LENS
4 x 1/3" / 2 MP (MIN)
COMPATIBLE WITH VA
CAMPUS HEAD-END VIDEO
ASSESSMENT AND
SURVEILLANCE SYSTEM
INDOOR,
MINIMUM IP65
RATED
14'-0" ABOVE
FINISHED FLOOR
CEILING PENDANT
MOUNT
360 DEGREE
PANORAMIC VIEW,
COMPACT DOME
C-03
1, 2
SINGLE 2-AXIS GIMBAL CAMERA WITH MULTIPLE
LENSES, DAY/NIGHT, CLEAR DOME, VANDAL
RESISTANT, ETHERNET IP-BASED DIGITAL CAMERA
WITH RJ45 CONNECTION TO VIDEO SURVEILLANCE
SYSTEM.
WHITE
POWER OVER
ETHERNET
REMOTE FOCUS,
VARIFOCAL LENS
4 x 1/3" / 2 MP (MIN)
COMPATIBLE WITH VA
CAMPUS HEAD-END VIDEO
ASSESSMENT AND
SURVEILLANCE SYSTEM
INDOOR,
MINIMUM IP65
RATED
WALL, 8'-6"
ABOVE FINISHED
FLOOR
WALL BRACKET
MOUNT
180 DEGREE
PANORAMIC VIEW,
COMPACT DOME
C-02
1, 2
SINGLE 3-AXIS GIMBAL INDIVIDUAL ADJUSTABLE
CAMERA WITH LENS, DAY/NIGHT, CLEAR DOME,
VANDAL RESISTANT, ETHERNET IP-BASED DIGITAL
CAMERA WITH RJ45 CONNECTION TO VIDEO
SURVEILLANCE SYSTEM.
WHITE
POWER OVER
ETHERNET
REMOTE FOCUS,
VARIFOCAL LENS
1 x 1/3" / 2 MP (MIN)
COMPATIBLE WITH VA
CAMPUS HEAD-END VIDEO
ASSESSMENT AND
SURVEILLANCE SYSTEM
INDOOR,
MINIMUM IP65
RATED
FLUSH TO CEILINGCEILING SURFACE
SINGLE VIEW,
COMPACT MINI DOME
C-01
NOTESCOMMENTSCOLORPOWERLENS TYPE
IMAGER/SENSOR
QTY/SIZE,
RESOLUTION
MODELSLOCATION
MOUNTING
HEIGHT
MOUNTING
TYPE
DESCRIPTIONFORM FACTOR
SYMBOL
TYPE
TYPE
VIDEO ASSESSMENT AND SURVEILLANCE SYSTEM (VASS) CAMERA SCHEDULE
PROVIDE ALL ACCESSORIES AS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM COMPATIBLE WITH THE EXISTING CAMPUS PACS SYSTEM. PROVIDE ALL UPGRADES TO THE EXISTING PACS SYSTEM TO INCORPORATE NEW DEVICES.1.
NOTES:
LONG RANGE, MICROWAVE AND PASSIVE INFRA-RED (PIR)
MOTION DETECTOR FOR WIDE AREA COVERAGE.
WHITE
22mA
AT 12VDC
APPROX.
90 DEGREE,
69'-0" LONG X
69'-0" WIDE
COMPATIBLE WITH
VA CAMPUS
HEAD-END
INTRUSION
DETECTION SYSTEM
INDOOR
10'-0" ABOVE
FINISHED FLOOR
WALL
LONG RANGE MOTION
DETECTOR
ID-01
NOTESCOMMENTSCOLORPOWERCOVERAGEMODELSLOCATION
MOUNTING
HEIGHT
MOUNTING
TYPE
DESCRIPTIONFORM FACTOR
SYMBOL
TYPE
TYPE
INTRUSION DETECTION SYSTEM (IDS) MOTION DETECTOR SCHEDULE
INDOOR,
MINIMUM IP65
RATED
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
7-T-602
TECHNOLOGY SCHEDULES
10 11ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
BEN
1 ADD 01 11/04/2022
CLEAN LINEN
BC09
2V/2D
2V/2D
2V/2D
CLEAN LINEN
BC09
AREA OF DEMOLITION
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
14-T-100
BLDG 14 TECHNOLOGY FLOOR PLAN
11 11ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
DIW
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/4" = 1'-0"1
BLDG 14 TECHNOLOGY PLAN - BASEMENT 0 4 8 16
N O R
TH
TRUE
1/4" = 1'-0"2
BLDG 14 TECHNOLOGY DEMO PLAN - BASEMENT 0 4 8 16
N O R
TH
TRUE
1. REMOVE ALL TECHNOLOGY DEVICES AND
ASSOCIATED CATEGORY CABLING BACK TO THE
HEAD END EQUIPMENT/RACK WITHIN THE AREA
OF WORK.
BLDG 14
| 01_T-001 - TECHNOLOGY LEGEND |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 2_1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 03_7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 04_7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 05_7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 06_7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 07_7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 08_7-T-501 - TECHNOLOGY DETAILS |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 09_7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
This is the start of the file's text. The full file is on GovTribe.